SAP S4 HANA Conversion Overview Technical
SAP S4 HANA Conversion Overview Technical
SAP S4 HANA Conversion Overview Technical
Technical Overview
# Topics
1 Overview
5 Downtime Optimization
6 Important Notes
• Key Focus
• SAP S/4 HANA - Technical Conversion - Preparation, Conversion Process, Post Conversion, Downtime
Optimization
• Target Audience - SAP Basis Consultant, Solution Architect
• Mainstream maintenance support of the existing SAP ECC version will get ended by 2027 and customers should
be prepared to move on with SAP S/4 HANA
• Difference between ECC / SAP S4 - Key differences.. It has New Application / Business Process,Simplified data
model, HANA, Performance rich environment
• Deployment Options
• SAP S/4 HANA Conversion is categorized in to two phases - Prepare and Realize.
• System Conversion
• Upgrade
• Planning
• 3015539 - SAP S/4HANA 2021: Release Information Note (Validate the dependency of OS, Kernel, ECC SPS, Database)
• 3015509 - SAP S/4HANA 2021 Feature Package Stack 00: Additional Release Information
• 3079550 - SAP S/4HANA 2021: Restriction Note
• 3070443 - Database Migration Option (DMO) of SUM 2.0 SP12 (Review the restrictions and dependency of the Source
System)
• Review PAM to understand the supported Operating System and Kernel
• Road Map Viewer - https://go.support.sap.com/roadmapviewer/#/group//roadmapOverviewPage/S4HANATRANSONPRE
• System Requirement
• System Requirement
• Integration dependency with the other SAP Products (SAP Note - 3106645) and SAP Netweaver System in Landscape
• It is recommended to upgrade the SAP Netweaver release 7.40 or lower (ABAP / Java Stack) to latest as the maintenance
support has already expired by end of 2020
• Java Stack is currently supported to specifically to run
• Adobe Document Services
• PI / PO
• EP, ESS / MSS Scenarios
• Plan for Fiori deployment - Embedded / HUB
• Data Archiving - Plan to have data archived which are not required for the Business
• Plan it well ahead of the conversion to get the archival before conversion as a separate Project
• SAP strongly recommends to reduce the data as much as possible, which will help in reducing the system conversion
downtime
• Required to arrive at the Sizing for the target database environment
• Maintenance Planner
• Maintenance Planner
• Maintenance Planner
SAP ECC
SUM will expect archive for third party add-on, connect with third party vendor for archives in advance
Development QA Production
Transport Transport
3 1
1. Execute report - Production Client
SE38:
RC_COLLECT_ANALYSIS_DATA.
2. Download the output analysis file to
local
2
1. Upload the analysis file to SAP
Analysis Ready Readiness check Application
URL:https://rc.cfapps.eu10.hana.ondeman
d.com
2. Download the report
• Readiness check report would provide you the information of Sizing the target infrastructure
• Manual - Report /SDF/HDB_SIZING - 1872170 - ABAP on HANA sizing report (S/4HANA, Suite on HANA...)
• Non-SAP Data Source - Follow Sizing as per SAP Note 1514966. Calculate the data footprint on the source database excluding
the indexes, view and aggregate
• Static Memory: Memory required to store the table data - Source data footprint / 7 *C
• Dynamic Memory: Memory required for computation - Equal to Static Memory
• Total Memory Requirement = Static Memory + Dynamic Memory
• Total Memory Requirement = Source data footprint * 2 / 7 * C (Source Database Compression Factor)
• Simplification item documents the difference in application functionality comparing to the Source Product vs Target
Product
• Adapt the functionality before starting with the conversion
Simplification item which are relevant to the system Lists down Simplification item which are very critical and need to be
which need to be looked and ensure relevant fixes are addressed. This would potentially going to be blocker for the
made available conversion.
SUM tool will execute the Simplification item check during the
conversion and it will stop the conversion procedure if there is any
Copyright © 2021 Tech Mahindra. All rights reserved.
mandatory Simplification which requires to be fixed
SAP S/4 HANA Conversion - Preparation
• Code compatibility to run in target product version need to be validated and plan to adapt the custom code
• Configure central ATC environment to perform the custom code check and Fiori App is also available
• Conversion to new data model, requires the adjustment of the Objects (Pre / Post Conversion)
• FAQ - https://blogs.sap.com/2019/06/25/custom-code-adaptation-for-sap-s4hana-faq/#_Toc470164409
SUM
DMO
SUM DMO - PAS
Source - Any DB Target - HANA DB Move & DB Source & Target - HANA DB
Source & Target - Any DB
Migration
Example 2 :
1. SAP ECC on Any DB
2. No Change – Primary Application Server Host. Example 3:
New kernel will be updated and PAS will be 1. SAP ECC on Any DB
connect to new HANA database 2. Change – Primary Application Server &
Copyright © Change
3. in Database
2021 Tech Mahindra. System Host
All rights reserved. Database System Host to new Host
SAP S/4 HANA Conversion - Realize
Downtime Calculator:
• Readiness Check Report - New Planned Downtime Calculator in SAP Readiness Check Is Now Live | SAP Blogs
• Based on Non-Production executions
• Downtime Optimization - Technical Downtime Optimization App – Allows to upload the non-production UPGANA.xml and
would provide recommendation on how to optimize the subsequent executions
nZDM: Import of new tables structure and clones the impacted structures and transfer the data changes to
the tables (Record & Replay)
Downtime Optimized DMO: Approach help is in migrating the selected large tables to target in uptime and
transfer data changes (Record & Replay)
Downtime Optimized Conversion: Part of the tables migration, conversion and FI data conversion to target in
uptime
nZDT: SAP Service offering, technology allows to perform conversion with very minimal Business downtime
Copyright © 2021 Tech Mahindra. All rights reserved.
SAP S/4 HANA Conversion - Realize
• Software update manager - Downtime Optimization Options: Downtime Optimized DMO & Downtime-
Optimized Conversion
SAP Service offering, technology allows to perform conversion with very minimal Business downtime, support
the below scenarios
• Update and upgrade of the ABAP System
• System conversion from SAP ECC to SAP S/4 HANA
• Production environment will be available for the users to work while conversion happens in Clone
Approach:
1. Clone of Production
2. Activate change-recording in
Production
3. Perform SAP S/4 HANA
Conversion on Clone
4. Synchronize the changes from
Production and to target clone
5. Final synchronization
6. Post Activities and Target Clone
becomes Production
Copyright © 2021 Tech Mahindra. All rights reserved.
SAP S/4 HANA Conversion - Realize
Add-On Dependency:
2214409 - SAP S/4HANA: Compatible Add-ons
2011192 - Uninstallation of ABAP add-ons
Copyright © 2021 Tech Mahindra. All rights reserved.
Important SAP Notes
CVI Preparation:
2713963 – FAQ: CVI – Customer Vendor Integration for system conversion to SAP S/4HANA
https://blogs.sap.com/2018/07/31/bp-and-cvi-in-sap-s4hana-system-conversion/
Client Preparation:
DMO Specific SAP Note: (Always refer the latest release and SP level related note)
SUM Notes:
TDO App:
3036423 - Frequently Asked Questions about Technical Downtime Optimization App
Integration:
2251604 - Version Interoperability between SAP S/4HANA On Premise Edition and SAP NetWeaver Systems
2324473 - Integration of SAP CRM with SAP S/4HANA: resolved restrictions
2231667 - Restrictions for integration of SAP S/4HANA, on-premise edition with SAP CRM
2816584 - SAP S/4HANA 1909: Process Integration with SAP on-premise Solutions
2229853 - GRC and S/4HANA oP: compatibility information
2226408 - Global Trade Services and S/4HANA oP: compatibility information
2402120 - Integration between SAP Master Data Governance and SAP S/4 HANA on-premise
2348379 - SAP MII integration compatibility with SAP S/4 HANA
2289330 - Integration between "SAP Portfolio and Project Management" and "SAP S/4HANA, on-premise
edition"
2244695 - Restrictions for Integration of SAP TM with S/4HANA on premise edition
2238445 - Integration of Supply Chain Management Applications to SAP S/4HANA
2668150 - SAP S/4HANA 1809: Release information and restrictions for EWM in SAP S/4HANA
2231667 - Restrictions for integration of SAP S/4HANA, on-premise edition with SAP CRM
2324473 - Integration of SAP CRM with SAP S/4HANA: resolved restrictions