Final Inspection Report Buritica 金矿项目最终验收报告: Of Buritica Gold Project

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 5

Final Inspection Report Of Buritica Gold Project

Buritica 金矿项目最终验收报告

XCF/KYF-50 Flotation Cell

XCF/KYF-50 浮选机

Equipment No. :X50-1,X50-2,X50-3,K50-4

X50-5,K50-6,K50-7,K50-8,X50-9,K50-10

X50-11,K50-12,X50-13,K50-14,X50-15,K50-16

X50-17

设备编号:X50-1,X50-2,X50-3,K50-4

X50-5,K50-6,K50-7,K50-8,X50-9,K50-10

X50-11,K50-12,X50-13,K50-14,X50-15,K50-16
X50-17
序 检验要求 检验仪器 检验结果 备注
号 检验项目 检验员

N Inspection Inspection Inspectio Remark


Item Inspector
O Requirement Equipment n Result s

槽体、横梁 目测
1
Tank,beam Visual

目测
2 主轴部件 Agitator 如有破损,必须
油漆 Visual
修复
Painting 目测
3 电机装置 Motor Assembly Any damage
s
must be repaired Visual

给中尾矿箱
目测
4 Feed / Connection/Tailing
Visual
Box

目测
5 槽体 Tank
Visual
如有破损,必须
衬胶 给中尾矿箱
修复 目测
6 Rubber Feed / Connection/Tailing
lining Any damage Visual
Box
must be repaired
叶轮定子衬胶 目测
7
Impeller / Stator lining Visual

满足说明书要求 扭矩扳手(抽
连接螺栓扭矩 查)
8 Meet the
Connecting bolt torque specification Torque wrench
requirements (spot check)

大小皮带轮的水平度
水平仪
9 The levelness of the driver and driven <2mm
gradienter
pulleys
叶轮定子径向间隙

The radial clearance of the impeller and 钢板尺


10 stator. 10mm
Steel rulers
(最大值-最小值) the max gap-the
Minimum gap

手盘试运转 灵活 目测
11
Test Run by Hands Rotate Smoothly Visual

电机转向测试 顺时针 目测
12
Motor steering test Clockwise Visual

槽体连接密封性 无漏水 水
13
The leakproofness of tank No liquid leak Water

4 小时或轴承温
度不再升高
试运转时间 表
14 4 h or Bearing
Test Operation Watch
tempreture begin
to fall

是否有异响 无异响 耳听
15
Abnormal Noise Abnormal Noise Ears

主轴上轴承温升 测温仪
16 Upper Bearing Tempreture Arise of ≤ 50℃
Agitator Thermodetector

主轴下轴承温升 测温仪
17 Lower Bearing Tempreture Arise of ≤ 50℃
Agitator Thermodetector

电机上轴承温升 测温仪
18 ≤ 50℃
Upper Bearing Tempreture Arise of Motor Thermodetector
电机下轴承温升 测温仪
19 Lower Bearing Tempreture Arise of ≤ 50℃
Motor Thermodetector

叶轮径向跳动 Impeller Tip Radial 百分表


20 ≤10mm
Runout Percentile scale

空转噪音 声级计
21 ≤85dBa
No Load Noise Soud level meter

After joint inspection of this XCF/KYF-50 flotation cell by LXML and BGRIMM-MAT, testing results
certify that this flotation cell complies with the technical specification and design requirements.

We here by confirm that this flotation cell is acceptable.

经大陆黄金有限公司哥伦比亚分公司和北矿机电科技有限责任公司对 XCF/KYF-50 浮选机的联合检


验,确认该浮选机符合技术规范并达到设计要求。

我们在此确认该浮选机验收合格。

For and on behalf of For and on behalf of

CONTINENTAL GOLD INC. BGRIMM-MAT

大陆黄金有限公司哥伦比亚分公司 北矿机电科技有限责任公司

Date / 日期: Date / 日期:

You might also like