EPC OF FLOWLINE AND PIPELINE FOR HARI FIELD

AND EXISTING FIELD MODIFICATION

01.042-SJB-2020

Foundation Calculation for Gasline Pig Receiver

Document Number :
1100-CV-CAL-005

CONSORTIUM
PT. TRIAGUNG JAYA JINDI SOUTH JAMBI B
PT. FEGAS REKAYASA UTAMA
ABADI – PT. UNISAT Co. Ltd.
Rev. Description NUSANTARA

Pre’d Chk’d Appr’d


Issue Date Approved by Approved by
by by by

Approved For DH
2 20-Jan-2020 AWN OM FA/TAR
Construction
1A Issued for Review 21-Dec-2020 DH AWN OM FA/TAR

STATUS CODE : 1A = Issued for Review, 2 = Approved for Construction / Issued for Information
Foundation Calculation for Gasline Pig Receiver

EPC OF FLOWLINE AND PIPELINE FOR HARI FIELD AND EXISTING FIELD MODIFICATION

REVISION TABLE

REVISION REVISION REVISION


Page Page Attachment
1A 1B 1C 2 3 1A 1B 1C 2 3 1A 1B 1C 2 3

1 X A X X

2 X B X X
3 X C X X
4 X

5 X

6 X
7 X
8 X

9 X
10 X
11 X
12 X
13 X
14 X X
15 X
16 X
17 X
18 X
19
20
21
22
23
24
25
26
27
28

1100-CV-CAL-005 Rev. 2 Page 2 of 18


Foundation Calculation for Gasline Pig Receiver

EPC OF FLOWLINE AND PIPELINE FOR HARI FIELD AND EXISTING FIELD MODIFICATION

REVISION NOTE

Rev. Part Page Comment Implemented Description


No. (Y/N)

1100-CV-CAL-005 Rev. 2 Page 3 of 18


Foundation Calculation for Gasline Pig Receiver

EPC OF FLOWLINE AND PIPELINE FOR HARI FIELD AND EXISTING FIELD MODIFICATION

TABLE OF CONTENTS

1  INTRODUCTION ............................................................................................................................... 6 
1.1  General .............................................................................................................................................. 6 
1.2  Objectives .......................................................................................................................................... 7 
1.3  Terms and Definitions ........................................................................................................................ 7 
1.4  Abbreviations ..................................................................................................................................... 7 
2  REFERENCES .................................................................................................................................. 8 
2.1  Indonesian Regulation ....................................................................................................................... 8 
2.2  International Codes and Standard ..................................................................................................... 8 
2.3  Project Reference Document ............................................................................................................. 8 
3  GENERAL MATERIALS ................................................................................................................... 9 
3.1  Quality of Material .............................................................................................................................. 9 
3.2  Cement .............................................................................................................................................. 9 
3.3  Grouting ............................................................................................................................................. 9 
3.4  Anchor Bolt ........................................................................................................................................ 9 
3.5  Rebar ................................................................................................................................................. 9 
3.6  Structural Steel ................................................................................................................................ 10 
3.7  High Strength Bolt ............................................................................................................................ 10 
3.8  Welding Electrode ............................................................................................................................ 10 
4  DESIGN CRITERIA ......................................................................................................................... 11 
4.1  System of Unit ................................................................................................................................. 11 
4.2  Material Characteristics (Unit Weight) .............................................................................................. 11 
4.3  Wind Data ........................................................................................................................................ 11 
4.4  Geotechnical Data ........................................................................................................................... 11 
5  LOADING DATA ............................................................................................................................. 12 
5.1  Dead Load “D” ................................................................................................................................. 12 
5.2  Live Load “L” .................................................................................................................................... 12 
5.3  Equipment Load “E” ......................................................................................................................... 12 
5.4  Piping Load “P” ................................................................................................................................ 12 
5.5  Wind Load “W” ................................................................................................................................. 12 
5.6  EarthQuake Load “EQ” .................................................................................................................... 12 
5.7  Thermal Force “TF” .......................................................................................................................... 12 
5.8  Soil Pressure “H” ............................................................................................................................. 12 
5.9  Liquid Pressure “LP” ........................................................................................................................ 12 
6  LOAD COMBINATION .................................................................................................................... 13 
6.1  Allowable Stress Design Combination ............................................................................................. 13 
6.2  Ultimate Strength Design Combination ............................................................................................ 13 
7  SUMMARY ...................................................................................................................................... 14 

1100-CV-CAL-005 Rev. 2 Page 4 of 18


Foundation Calculation for Gasline Pig Receiver

EPC OF FLOWLINE AND PIPELINE FOR HARI FIELD AND EXISTING FIELD MODIFICATION

7.1  Foundation Design ........................................................................................................................... 14 


8  ATTACHMENT ................................................................................................................................ 15 
ATTACHMENT A: FOUNDATION CALCULATION........................................................................................ 16 
ATTACHMENT B: FOUNDATION DRAWING ................................................................................................ 17 
ATTACHMENT C: MECHANICAL GA DRAWING ......................................................................................... 18 

1100-CV-CAL-005 Rev. 2 Page 5 of 18


Foundation Calculation for Gasline Pig Receiver

EPC OF FLOWLINE AND PIPELINE FOR HARI FIELD AND EXISTING FIELD MODIFICATION

1 INTRODUCTION
1.1 General
The Hari Field is part of the South Jambi B PSC (Production Sharing Contract), located in South
of Jambi Province. The production field that has been developed are Teluk Rendah Field and
Geger Kalong Field. Production from the wells is delivered to the Teluk Rendah Gas Plant for
gas treatment prior export to Sakernan Gas Station via 10 inch Sales Gas Pipeline. The field
operation has been stopped since 2012.

Jindi South Jambi B Co. Ltd. plans to develop Hari Field with eight (8) new production well and
new Geger Kalong #5 well at Geger Kalong Field. The development plan will be including the re-
activation of Teluk Rendah Gas Plant.
Nevertheless, this project of Scope of Works (SOW) i.e. Engineering, Procurement,
Construction and Installation (EPCI) will be limited for Hari Field development which consists of
Hari-1 wellsite, Hari#2 wellsite and flowlines.

The production wells of Hari field are group into two (2) group; Group 1 are Hari-1, Hari-3, Hari-
6 and Hari-7 well while Group 2 are Hari-2, Hari-4, Hari-5 and Hari-8 well. New 6 inch
underground pipeline approximately 10.4 km will be installed start from Group 1 gathering
manifold at Hari #3 Wellsite area to Teluk Rendah Gas Plant. The pipeline is equipped with pig
launcher/receiver for pipeline cleaning or maintenance purpose.

New 6 inch underground main flowline approximately 12 km will be installed start from Group 1
gathering manifold at Hari #1 Wellsite area to Teluk Rendah Gas Plant. . Group-2 Gathering
Manifold which is located at Hari-2 wellsite area will be commingle with 6 inch main flowline
from Group-1. The main flowline is equipped with pig launcher/receiver for pipeline cleaning or
maintenance purpose.

Additional modification performed to installed interconnection line between Teluk Rendah


incoming line to provide flexibility of Inlet Separator operation.

Figure 1. Hari Flowline & Pipeline

1100-CV-CAL-005 Rev. 2 Page 6 of 18


Foundation Calculation for Gasline Pig Receiver

EPC OF FLOWLINE AND PIPELINE FOR HARI FIELD AND EXISTING FIELD MODIFICATION

1.2 Objectives
This objective of this report is to design the foundation of gasline pig receiver.

1.3 Terms and Definitions


This section relates to the office administration procedures and also outlines the organisational
chart, key personnel and the office facilities.

Company : Jindi South Jambi B Co. Ltd.

Project : EPC OF FLOWLINE AND PIPELINE FOR HARI FIELD AND


EXISTING FIELD MODIFICATION
EPC Contractor : Consortium - PT. Tri Agung Jaya Abadi – PT. UNISAT
Nusantara
Subcon Engineering : PT. Fegas Rekayasa Utama
Company

Vendor : The Party that manufacturers and supplies equipment and


services.

1.4 Abbreviations
AASHTO American Association of State Highway and Transportation Official

ACI American Concrete Institute

AISC American Institute of Steel Construction

API American Petroleum Institute

ASCE American Society of Civil Engineering

ASME American Society of Mechanical Engineers

ASTM American Society of Testing and Machinery

AWS American Welding Society

SNI Standar Nasional Indonesia

1100-CV-CAL-005 Rev. 2 Page 7 of 18


Foundation Calculation for Gasline Pig Receiver

EPC OF FLOWLINE AND PIPELINE FOR HARI FIELD AND EXISTING FIELD MODIFICATION

2 REFERENCES
2.1 Indonesian Regulation

No Document Number Document Title


1 SNI 1727 2013 Beban Minimum untuk Perancangan Bangunan
Gedung dan Struktur Lain

2 SNI 1726 2012 Tata Cara Perencanaan Ketahanan Gempa


untuk Struktur Bangunan Gedung dan Non
Gedung
3 SNI 2847 2013 Persyaratan Beton Struktural untuk Bangunan
Gedung

2.2 International Codes and Standard

No Document Number Document Title


1 ACI 318M-14 Building Code Requirement for Reinforced
Concrete
2 ACI 315 Details and Detailing of Concrete
Reinforcement
3 JIS Japanese Industrial Standard
4 ACI 351 3R-04 Foundations for Dynamic Equipment

2.3 Project Reference Document

No Document Number Document Title


1 1100-CV-SPC-002 Specification for Reinforced Concrete
Foundation, Anchor Bolt & Grouting
2 1100-CV-SPC-003 Specification for Piling Work
3 1115-ME-DWG-001 General Arrangement Drawing Hari Pig
Receiver
4 1100-CV-DBS-001 Civil and Structure Design Criteria

5 01/LG-Rev A-M.BUNGO/JSJ- Laporan geoteknik di Sungai Puar, Mersam


TJA/XII/20 Kabupaten Batanghari, Prov. Jambi.

1100-CV-CAL-005 Rev. 2 Page 8 of 18


Foundation Calculation for Gasline Pig Receiver

EPC OF FLOWLINE AND PIPELINE FOR HARI FIELD AND EXISTING FIELD MODIFICATION

3 GENERAL MATERIALS
The general structural materials to be used for the work shall be in accordance with the following
requirements unless otherwise noted on the drawings.
3.1 Quality of Material
a. Concrete design strength (for structural concrete, f’c) = 28 MPa
b. Concrete design strength (for lean concrete, f’c) = 14 MPa
c. Rebar Steel (SNI or equivalent, f’y) = 390 MPa
d. Steel Structural (JIS or ASTM A 36 or equivalent, f’y) = 235 MPa
3.2 Cement
- ASTM C 150 or equivalent
- Type I cement (general use) shall be used for all above grade and underground concrete
works
3.3 Grouting
- High strength non-shrink, self-levelled, non-staining grout with minimum compressive
strength f’c 52 MPa at 7 days
- The minimum thickness of grout shall be 25 mm.
3.4 Anchor Bolt
- Material for anchor bolts shall have minimum tensile strength of 60 ksi Grade A in
accordance with ASTM A 307. Bolt threads shall be as per ASME B1.1 Class 2A. Nuts shall
be in accordance with ASME B18.2.2 with B1.1 Class 2B thread. Washer shall conform to
ASTM F 436. All anchor bolts, nuts, and washer shall be hot dipped galvanized conform to
ASTM A 153.
3.5 Rebar
- All Materials for rebar for reinforced concrete shall be local (Indonesia) products conform to
SNI 07-2052-2002, ASTM A 82, ASTM A 185, and ASTM A 615. For plain rebar can use
BJTP 24 SNI (fy = 235 MPa) or Grade 40 ASTM (fy = 280 MPa) depends on site and material
readiness and/or engineer’s judgement. Whilst for deformed rebar can use BJTS 40 SNI (fy
= 390 MPa) or Grade 60 ASTM (fy = 420 MPa) depends on site and material readiness
and/or engineer’s judgement.
- The diameter of rebar conform to ASTM A 165 with size 10 mm, 13 mm, 16 mm, 19 mm, 22
mm, 25 mm, 29 mm, 32 mm, 36 mm, 43 mm, and 57 mm. Welded wire fabric shall conform
to ASTM A 185 and shall have a minimum yield stress of 60 ksi and shall be double
annealed. Reinforcing bars, at the time concrete is placed, shall be free from oil or grease,
loose rust or scale, or other coatings that will impair the bond.

1100-CV-CAL-005 Rev. 2 Page 9 of 18


Foundation Calculation for Gasline Pig Receiver

EPC OF FLOWLINE AND PIPELINE FOR HARI FIELD AND EXISTING FIELD MODIFICATION

3.6 Structural Steel


- Structural steel shall conform to ASTM A 36 or SS400 of JIS G 3101 (SS400 of JIS G 3101
is applied in design and actual use with a specified yield strength, fy = 235 MPa). All plates
shall be not less than 6 mm thickness. The minimum thickness for rolled beams and
channels shall mean the flange thickness regardless of the web thickness. The criteria does
not apply to thickness of tube. In design of steel structures, members shall be designed in
accordance with Allowable Stress Design (ASD) method in AISC Specification.
3.7 High Strength Bolt
- Structural Connection bolt for main framing member shall be high strength bolts (htb 8.8)
with a minimum diameter M16 conforming to ASTM A 490 high strength bolt Type-1 (bearing
type with threads included in the shear plan) with hot dip galvanized or approved equal.
Installation of High Strength Bolt materials shall conform to AISC “Specifications for
Structural Joints using ASTM A 490 Bolts”. The threading shall be conform to ASME B1.1
“Unified Inch Screw Threads”.
3.8 Welding Electrode
- All welding electrodes and welding shall conform to AWS D-1.1. The equivalent ASME
designations for covered electrodes and wire may be used. All coated electrodes must be
received by the end user in unbroken containers.

1100-CV-CAL-005 Rev. 2 Page 10 of 18


Foundation Calculation for Gasline Pig Receiver

EPC OF FLOWLINE AND PIPELINE FOR HARI FIELD AND EXISTING FIELD MODIFICATION

4 DESIGN CRITERIA
4.1 System of Unit
- All structural calculations, dimensions, and weights shall be in System International (SI)
units.
4.2 Material Characteristics (Unit Weight)
a. Steel = 78.5 kN/m3
b. Reinforced Concrete = 24.0 kN/m3
c. Plain Concrete = 22.0 kN/m3
d. Soil (KP 09+750) = 15.29 kN/m3
e. Water = 9.81 kN/m3
4.3 Wind Data
- The wind data which will be used is 10 m/s.
4.4 Geotechnical Data
- Based on Doc No. 01/LG-Rev A-M.BUNGO/JSJ-TJA/XII/20, the soil data in which will be used
in this calculation is as follows:

- N-SPT value, N = 31 blows /1 ft


- Qall = 171 kPa
- Cohession, cu = 1.64 ton/m2
- Angle of friction,   = 15.820

1100-CV-CAL-005 Rev. 2 Page 11 of 18


Foundation Calculation for Gasline Pig Receiver

EPC OF FLOWLINE AND PIPELINE FOR HARI FIELD AND EXISTING FIELD MODIFICATION

5 LOADING DATA
5.1 Dead Load “D”
- Dead load is the weight of its own structure member plus another static load.
5.2 Live Load “L”
- Live load is the temporary load applied to the structure. The live load 488 kg/m2 is to be
applied in this calculation.
5.3 Equipment Load “E”
- Equipment load will be as per doc. no. 1115-ME-DWG-001_General Arrangement Drawing
Hari Pig Receiver.
- Empty Load “E(E)” is 549.6 kg
- Operation Load “E(O)” is 597.71 kg
- Testing Load “E(T)” is 706.7 kg
5.4 Piping Load “P”
- Piping load 0 kN is to be applied in this calculation.
5.5 Wind Load “W”
- The wind data which will be used is 10 m/s. The load will be as per ASCE 7-10.
5.6 EarthQuake Load “EQ”
- The earthquake load will be as per SNI 1726:2012.
5.7 Thermal Force “TF”
- Thermal force 0 kN is to be applied in this calculation.
5.8 Soil Pressure “H”
- Soil Pressure is to be applied in this calculation.
5.9 Liquid Pressure “LP”
- Liquid Pressure is to be applied in this calculation.

1100-CV-CAL-005 Rev. 2 Page 12 of 18


Foundation Calculation for Gasline Pig Receiver

EPC OF FLOWLINE AND PIPELINE FOR HARI FIELD AND EXISTING FIELD MODIFICATION

6 LOAD COMBINATION
6.1 Allowable Stress Design Combination
The allowable stress design combination will be used for foundation stability check and steel
structural design check.
The combination for Allowable Stress Design will be as follows (as per SNI 1726 2012):
No. Load Combination Condition
101 D+L+E(E) Empty
102 D+0.75L+E(E)+P(E) Empty
103 D+0.75L+0.45W+E(E)+P(E) Empty + Wind
104 D+0.6W+E(E)+P(E) Empty + Wind
105 (1+0.14SDS)D+0.7EQ+0.21EQ+E(E)+P(E) Empty + Seismic
106 (1+0.105SDS)D+0.75L+0.7EQ+0.21EQ+E(E)+P(E) Empty + Seismic
107 (0.6-0.14SDS)D+0.7EQ+0.21EQ+E(E)+P(E) Empty + Seismic
108 D+L+E(O) Operating
109 D+0.75L+E(O)+P(O)+TF Operating
110 D+0.75L+0.45W+E(O)+P(O)+TF Operating + Wind
111 D+0.6W+E(O)+P(O)+TF Operating + Wind
112 (1+0.14SDS)D+0.7EQ+0.21EQ+E(O)+P(O)+TF Operating + Seismic
113 (1+0.105SDS)D+0.75L+0.7EQ+0.21EQ+E(O)+P(O)+TF Operating + Seismic
114 (0.6-0.14SDS)D+0.7EQ+0.21EQ+E(O)+P(O)+TF Operating + Seismic
115 D+E(O)+P(O)+TF Operating
116 D+L+E(T) Test

6.2 Ultimate Strength Design Combination


The ultimate strength design combination will be used for concrete design.
The combination for Ultimate Strength Design will be as follow (as per SNI 1726 2012).
No. Load Combination Condition
201 1.4D Empty
202 1.2D+1.6L+E(E)+P(E) Empty
203 1.2D+1.6L+0.5W+E(E)+P(E) Empty + Wind
204 1.2D+L+W+E(E)+P(E) Empty + Wind
205 (1.2+0.2SDS)D+EQ+0.3EQ+E(E)+P(E) Empty + Seismic
206 (1+0.15SDS)D+L+EQ+0.3EQ+E(E)+P(E) Empty + Seismic
207 (0.9-0.2SDS)D+EQ+0.3EQ+E(E)+P(E) Empty + Seismic
208 1.2D+1.6L+E(O)+P(O)+TF Operating
209 1.2D+1.6L+0.5W+E(O)+P(O)+TF Operating + Wind
210 1.2D+L+W+E(O)+P(O)+TF Operating + Wind
211 (1.2+0.2SDS)D+EQ+0.3EQ+E(O)+P(O)+TF Operating + Seismic
212 (1+0.15SDS)D+L+EQ+0.3EQ+E(O)+P(O)+TF Operating + Seismic
213 (0.9-0.2SDS)D+EQ+0.3EQ+E(O)+P(O)+TF Operating + Seismic
214 1.2D+1.6L+E(T) Test
215 1.2D+L+E(T)+P(T) Test
216 1.2D+1.6L+0.5W+E(T)+P(T) Test + Wind

1100-CV-CAL-005 Rev. 2 Page 13 of 18


Foundation Calculation for Gasline Pig Receiver

EPC OF FLOWLINE AND PIPELINE FOR HARI FIELD AND EXISTING FIELD MODIFICATION

7 SUMMARY
7.1 Foundation Design
The design will be as follow.
- The foundation (slab)
Length = 3300 mm
Width = 1600 mm
Clear cover = 75 mm
Reinforcement: D16@200 c/c top bottom

- The pedestal
Length = 500 mm
Width = 250 mm
Height = 850 mm
Clear cover = 50 mm
Reinforcement: - Main Bar 12D13
- Stirrup R10-100

- Anchor Bolt
Anchor bolt will use 4 M25 as per Mechanical GA Drawing

1100-CV-CAL-005 Rev. 2 Page 14 of 18


Foundation Calculation for Gasline Pig Receiver

EPC OF FLOWLINE AND PIPELINE FOR HARI FIELD AND EXISTING FIELD MODIFICATION

8 ATTACHMENT
- Attachment A FOUNDATION CALCULATION
- Attachment B FOUNDATION DRAWINGS
- Attachment C MECHANICAL GA

1100-CV-CAL-005 Rev. 2 Page 15 of 18


Foundation Calculation for Gasline Pig Receiver

EPC OF FLOWLINE AND PIPELINE FOR HARI FIELD AND EXISTING FIELD MODIFICATION

ATTACHMENT A: FOUNDATION CALCULATION

1100-CV-CAL-005 Rev. 2 Page 16 of 18


GENERAL DATA PIG LAUNCHER (1194-V-101)

Diameter D = 254 mm
Height H = 685 mm
Length S/F (Seam to Flange) L = 5112 mm
Saddle to Saddle Distance (Center to center) Lpp = 2000 mm
Pedestal Height B = 850 mm
Soil Depth SD = 400 mm

Thickness Foundation Tf = 300 mm


Depth to Water Table Dw = 1 m
Foundation shape Shape = RECTANGULAR
SECTION 1 - LOADING CALCULATION
1.1 Foundation Dimension

AL Lpp
z A A

x
EL ER
AR

B
FOUNDATION PLAN

LF BF

HP LP
HP BP
A HS B
HF y y HF
A B
x z
SECTION AA SECTION BB

Foundation Length LF = 3.50 m EL = ER = 0.63 m


Foundation Width BF = 1.75 m AL = AR = 0.63 m
Foundation Thickness HF = 0.30 m
Pedestal Length LP = 0.50 m
Pedestal Width BP = 0.25 m
Pedestal Height (inc. grot) HP = 0.85 m
Soil Thickness HS = 0.40 m
3
Concrete Unit Weight C = 23.54 kN/m
3
Soil Unit Weight S = 15.29 kN/m
1.2 Dead Load (D)
Dead Load is assumed as foundation selfweight.

Foundation weight W(f) = LF x BF x HF x c


= 43.25 kN
Pedestal weight W(p) = 2 x LP x BP x HP x c
= 5.00 kN
Overburden soil weight W(s) = ((LF x HF) - (2 x LP x HP)) x HS x S
= 35.93 kN
Total Dead Load D = W(f) + W(p) + W(s)
= 84.18 kN

Summary Load
Fx Fz Fy Mx Mz My
Description LC
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Acting on BOF D 84.18 -

Fx Fz Fy Mx Mz My
Description LC
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Acting on TOP D -
1.3 Equipment Load (E)
Equipment Load is weight of pig receiver in empty, operating, and testing condition.

H1

H2
y

x
Empty = 0.590 ton H1 = 789 mm
Operating = 0.638 ton H2 = 900 mm
Testing = 0.794 ton

Summary Load (taken from node 80 & 40 PSA result)


Fx Fz Fy Mx Mz My
Description LC
(kN) (kN) (kN) (kNm) (kNm) (kNm)
E (E) - - 5.79 - - -
Acting on BOF E (O) 36.02 2.21 6.45 3.73 60.841 -
E (T) 0.343 0.05 6.90 0.09 0.579 -
E (E) - - 2.89 - - -
Acting on TOP E (O) 18.01 1.10 3.22 0.87 14.211
E (T) 0.171 0.03 3.45 0.02 0.1351 -
1.4 Live Load (L)
Live Load is applied as 488 kN/m2 as per Civil & Structure Design Criteria.

Live Load
Live Load (Distributed) UDL = 2.9 kN/m2
Area Live Load AL = 2 x LP x BP
= 0.25 m2
Live Load (Point Load) LL = UDL x AL
= 1 kN

Live Load Reaction Support


Reaction at Foundation Rp = 1 kN

Summary Load
Fx Fz Fy Mx Mz My
Description LC
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Acting on BOF L 0.73

Fx Fz Fy Mx Mz My
Description LC
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Acting on TOP L 0.36
1.5 Wind Load (W)
Reference: Wind Load as per ASCE 7-10

Wx Wz

Mz Mx
HC
zBOB
HF
zBOF
z z

x y
X-DIRECTION Z-DIRECTION

Wind Pressure
Exposure coefficient Kz = 0.85 (ASCE 7-10, Table 27.3-1)
Topographic factor Kzt = 1 (ASCE 7-10)
Wind directional factor Kd = 0.85 (ASCE 7-10, Table 26.6-1)
Basic wind speed V = 20 m/s (Civil & Structure Design Criteria)
Wind Pressure qz = 0.613 Kz x Kzt x Kd x V2 (ASCE 7-10)
2
= 177.16 N/m

Wind Force
Gust effect factor G = 0.85 (ASCE 7-10, Section 26.9)
Equipment Length L = 3.96 m (assumed as length of equipment)
Equipment Width B = 0.25 m (assumed as width of equipment)
Height above ground level h = 1.535 m
h/D = 6.04 (to check Cf from ASCE)
Force Coefficient Cf = 1 (ASCE 7-10, Table 29.5-1)
Wind Force Fw = qz G Cf Af (ASCE 7-10)
2
= 150.58 .Af (N/m )

CoG Distance
Height of CoG equipment assumed as half of equipment height
CoG to Base of Baseplate ZBOB = He
= 0.685 m

CoG to Base of Foundation ZBOF = He + Hp + Hf


= 1.835 m
Horizontal Force in X-dir (Fx)
Equipment Projected Area Af = (22/7 x D x L x Hp)
2
= 2.69 m
Wind Load Fx = P x (Af)
= 0.40 kN for TOP

Horizontal Force in Z-dir (Fz)


Equipment Projected Area Af = (1/4 x 22/7 x B2 x Hp)
2
= 0.17 m
Wind Load Fz = P x (Af)
= 0.03 kN for TOP

Moment due to Wind Load in X-dir (Mz)


Momen at TOP Mz = Fx . ZBOB
= 0.28 kN.m for TOP
Momen at BOF Mz = Fx . ZBOF
= 0.74 kN.m for BOF

Moment due to Wind Load in Z-dir (Mx)


Momen at TOP Mx = Fz . ZBOB
= 0.017 kN.m for TOP
Momen at BOF Mx = Fz . ZBOF
= 0.047 kN.m for BOF

Summary Load
Fx Fz Fy Mx Mz My
Primary Load LC
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Wx 0.40 - - - 0.74 -
Acting on BOF
Wz - 0.026 - 0.05 - -
Wx 0.20 - - - 0.14 -
Acting on TOP
Wz - 0.0128 - 0.009 - -
1.6 Earthquake Load (EQ)
Reference: Earthquake as per PUSKIM data and SNI-1726-2012.
Seismic Parameter as per puskim.go.id (Tanah Sedang SD)

Seismic Parameter
PGA Peak Ground Acceleration = 0.175 g puskim.pu.go.id
SS MCE Spectral, Response Acc., at period 0.2s = 0.368 g puskim.pu.go.id
S1 MCE Spectral, Response Acc., at period 1s = 0.232 g puskim.pu.go.id
Fa Site Coefficient, Response Acc., at period 0.2s = 1.505 (unitless) puskim.pu.go.id
Fv Site Coefficient, Response Acc., at period 1s = 1.936 (unitless) puskim.pu.go.id
SMS Prmtr spectral response acc. at periods 0.2s = Fa x Ss = 0.554 g
SM1 Prmrtr spectral response acc. at periods 1s = Fv x S1 = 0.449 g
SDS Prmtr design spectral response acc. at 0.2s = 2/3 x SMS = 0.369 g
SD1 Prmtr design spectral response acc. at 1s = 2/3 x SM1 = 0.299 g

Cs Caclulation
I Importance Factor = 1.00 (Table 2, SNI-1726-2012)
R Faktor Modifikasi Response = 2.00 (Table 21, SNI-1726-2012)
Cs Coefficient Response Seismik = SDS/(R/I) = 0.185 (unitless)
Fundamental Period
hn Height of structure = 1.535 m
Ct Coefficient = 0.0488 (unitless) (Table 15, SNI-1726-2012)
x Coefficient = 0.750 (unitless) (Table 15, SNI-1726-2012)
Ta Approximate Fundamental Period = Ct.hnx = 0.07 s

Cs Boundary
Cs max = SD1/[Ta(R/I)] = 1.72

Condition A: for 0.6(PGA) > S1


Cs min-1 = 0.044SDS x I = 0.02 > Cs min-2
Cs min-2 = 0.01
Condition B: for 0.6(PGA) ≤ S1
Cs min-3 = 0.5S1/(R/I) = 0.06
Condition : Condition B: for 0.6(PGA) ≤ S1
Hence, Cs min = 0.06

Use Coefficient Cs Cs = 0.18

Base Shear TOF (TOP OF FOUNDATION)


Total Dead Weight Empty, Wt = 9.174 ton
Total Dead Weight Operating, Wt = 9.241 ton
Total base sehar design desain base shear:
V = Cs*Wt V = Cs*Wt
= 0,185 x 9,18 = 0,185 x 9,25
= 1.69 ton = 1.71 ton
= 16.61 kN = 16.74 kN

Empty Base Shear Vse = 16.61 kN


Operating Base Shear Vso = 16.74 kN

CoG Distance
Height of CoG equipment assumed as half of equipment height
CoG to Base of Baseplate ZBOB = He
= 0.685 m
CoG to Base of Foundation ZBOF = He + Hp + Hf
= 1.835 m
Horizontal Force in X-dir (Fx)
Empty Condition Fx = 16.61 kN
Operating Condition Fx = 16.74 kN

Horizontal Force in Z-dir (Fz)


Empty Condition Fz = 16.61 kN
Operating Condition Fz = 16.74 kN
Moment due to Earthquake Load in X-dir (Mz)
Empty Condition
Momen at BOF Mz = Vse . ZBOF Moment at TOP
= 30.48 kN.m 11.38 kN.m
Operating Condition
Momen at BOF Mz = Vso . ZBPF Moment at TOP
= 30.71 kN.m 11.46 kN.m

Moment due to Earthquake Load in Z-dir (Mx)


Empty Condition
Momen at BOF Mx = Vse . ZBOF Moment at TOP
= 30.48 kN.m 11.38 kN.m
Operating Condition
Momen at BOF Mx = Vso . ZBOF Moment at TOP
= 30.71 kN.m 11.46 kN.m

Base Shear BOF


Total Dead Weight Empty, Wt = 9.17 ton
Total Dead Weight Operating, Wt = 9.24 ton
Total base sehar design desain base shear:
V = Cs*Wt V = Cs*Wt
= 0,185 x 9,18 = 0,185 x 9,25
= 1.69 ton = 1.71 ton
= 16.61 kN = 16.73 kN

Empty Base Shear Vse = 16.61 kN


Operating Base Shear Vso = 16.73 kN
Height of CoG equipment assumed as half of equipment height
CoG to Base of Baseplate ZBOB = He
= 0.685 m
CoG to Base of Foundation ZBOF = He + Hp + Hf
= 1.835 m

Horizontal Force in X-dir (Fx)


Empty Condition Fx = 16.61 kN
Operating Condition Fx = 16.73 kN

Horizontal Force in Z-dir (Fz)


Empty Condition Fz = 16.61 kN
Operating Condition Fz = 16.73 kN
Moment due to Earthquake Load in X-dir (Mz)
Empty Condition
Momen at BOF Mz = Vse . ZBOF Moment at TOP
= 30.48 kN.m 11.38 kN.m
Operating Condition
Momen at BOF Mz = Vso . ZBPF Moment at TOP
= 30.70 kN.m 11.46 kN.m

Moment due to Earthquake Load in Z-dir (Mx)


Empty Condition
Momen at BOF Mx = Vse . ZBOF Moment at TOP
= 30.48 kN.m 11.38 kN.m
Operating Condition
Momen at BOF Mx = Vso . ZBOF Moment at TOP
= 30.70 kN.m 11.46 kN.m

Summary Load
Fx Fz Fy Mx Mz My
Primary Load LC
(kN) (kN) (kN) (kNm) (kNm) (kNm)
EQx (E) 16.61 30.48
EQz (E) 16.61 30.48
Acting on BOF
EQx (O) 16.73 30.70
EQz (O) 23.66 30.70
EQx (E) 8.30 11.38
EQz (E) 8.30 11.38
Acting on TOP
EQx (O) 8.37 11.46
EQz (O) 11.83 11.46
SECTION 2 - LOADING COMBINATION
2.1 Basic Load (acting at TOP)
Fx Fz Fy Mx Mz My
Primary Load LC
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Dead Load D - - - - - -
Live Load L - - 0.36 - - -
Equipment Empty E(E) - - 2.89 - - -
Equipment Operation E(O) 18.01 1.10 3.22 0.87 14.21 -
Equipment Test E(T) 0.17 0.03 3.45 0.02 0.14 -
Wind Load (x-dir) Wx 0.20 - - - 0.14 -
Wind Load (z-dir) Wz - 0.013 - 0.009 - -
Earthquake (x-dir) EQx (E) 8.30 - - - 11.38 -
Earthquake (z-dir) EQz (E) - 8.30 - 11.38 - -
Earthquake (x-dir) EQx (O) 8.37 - - - 11.46 -
Earthquake (z-dir) EQz (O) - 11.83 - 11.46 - -

2.2 Allowable Stress Design Load Combination for Foundation Stability Design (at TOP)
Fx Fz Fy Mx Mz My
Loading Condition LC Load Combination
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Empty 101 D+L+E(E) 0.00 0.00 3.26 0.00 0.00
Empty 102 D+0.75L+E(E)+P(E) 0.00 0.00 3.17 0.00 0.00
Empty + Wind X 103 D+0.75L+0.45Wx+E(E)+P(E) 0.09 0.00 3.17 0.00 0.06
Empty + Wind Z D+0.75L+0.45Wz+E(E)+P(E) 0.00 0.01 3.17 0.00 0.00
Empty + Wind X 104 D+0.6Wx+E(E)+P(E) 0.12 0.00 2.89 0.00 0.08
Empty + Wind Z D+0.6Wz+E(E)+P(E) 0.00 0.01 2.89 0.005 0.00

Empty + Seismic X 105 (1+0.14SDS)D+0.7EQx+0.21EQz+E(E)+P(E) 5.81 1.74 2.89 2.39 7.96

Empty + Seismic Z (1+0.14SDS)D+0.7EQz+0.21EQx+E(E)+P(E) 1.74 5.81 2.89 7.96 2.39

Empty + Seismic X 106 (1+0.105SDS)D+0.75L+0.7EQx+0.21EQz+E(E)+P(E) 5.81 1.74 4.20 2.39 7.96

Empty + Seismic Z (1+0.105SDS)D+0.75L+0.7EQz+0.21EQx+E(E)+P(E) 1.74 5.81 3.17 7.96 2.39

Empty + Seismic X 107 (0.6-0.14SDS)D+0.7EQx+0.21EQz+E(E)+P(E) 5.81 1.74 3.49 2.99 8.56

Empty + Seismic Z (0.6-0.14SDS)D+0.7EQz+0.21EQx+E(E)+P(E) 2.34 6.41 3.49 8.56 2.99

Operating 108 D+L+E(O) 18.01 1.10 3.59 0.87 14.21


Operating 109 D+0.75L+E(O)+P(O)+TF 18.01 1.10 3.49 0.87 14.21
Operating + Wind X 110 D+0.75L+0.45Wx+E(O)+P(O)+TF 18.10 1.10 3.49 0.87 14.27
Operating + Wind Z D+0.75L+0.45Wz+E(O)+P(O)+TF 18.01 1.11 3.49 0.874 14.21
Operating + Wind X 111 D+0.6Wx+E(O)+P(O)+TF 18.13 1.10 3.22 0.87 14.29
Operating + Wind Z D+0.6Wz+E(O)+P(O)+TF 18.01 1.11 3.22 0.876 14.21

Operating + Seismic X 112 (1+0.14SDS)D+0.7EQx+0.21EQz+E(O)+P(O)+TF 23.82 2.85 3.22 3.26 22.17

Operating + Seismic Z (1+0.14SDS)D+0.7EQz+0.21EQz+E(O)+P(O)+TF 19.75 6.92 3.22 8.83 16.60

(1+0.105SDS)D+0.75L+0.7EQx+0.21EQz+E(O)+P(O)+T
Operating + Seismic X 113 24.87 4.59 4.49 4.28 23.23
F
(1+0.105SDS)D+0.75L+0.7EQz+0.21EQx+E(O)+P(O)+T
Operating + Seismic Z 20.77 10.39 4.49 9.89 17.62
F

Operating + Seismic X 114 (0.6-0.14SDS)D+0.7EQx+0.21EQz+E(O)+P(O)+TF 24.47 4.19 3.82 3.88 22.83

Operating + Seismic Z (0.6-0.14SDS)D+0.7EQz+0.21EQx+E(O)+P(O)+TF 20.37 9.99 3.82 9.49 17.22


Fx Fz Fy Mx Mz My
Loading Condition LC Load Combination
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Operating 115 D+E(O)+P(O)+TF 18.01 1.10 3.22 0.87 14.21
Test 116 D+L+E(T) 0.17 0.03 3.81 0.02 0.14
Test + Wind X 117 D+0.75L+0.45Wx+E(T)+P(T) 0.26 0.03 3.72 0.02 0.20
Test + Wind Z D+0.75L+0.45Wz+E(T)+P(T) 0.17 0.03 3.72 0.025 0.14

2.3 Ultimate Strength Design Load Combination for Reinforced Concrete Design (at TOP)
Fx Fz Fy Mx Mz My
Loading Condition LC Load Combination
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Empty 201 1.4D 0.00 0.00 0.00 0.00 0.00
Empty 202 1.2D+1.6L+E(E)+P(E) 0.00 0.00 3.47 0.00 0.00
Empty + Wind X 203 1.2D+1.6L+0.5Wx+E(E)+P(E) 0.10 0.00 3.47 0.00 0.07
Empty + Wind Z 1.2D+1.6L+0.5Wz+E(E)+P(E) 0.00 0.01 3.47 0.004 0.00
Empty + Wind X 204 1.2D+L+Wx+E(E)+P(E) 0.20 0.00 3.26 0.00 0.14
Empty + Wind Z 1.2D+L+Wz+E(E)+P(E) 0.00 0.01 3.26 0.01 0.00

Empty + Seismic X 205 (1.2+0.2SDS)D+EQx+0.3EQz+E(E)+P(E) 9.50 3.69 4.09 4.61 12.58

Empty + Seismic Z (1.2+0.2SDS)D+0.3EQx+EQz+E(E)+P(E) 3.69 9.50 4.09 12.58 4.61

Empty + Seismic X 206 (1+0.15SDS)D+L+EQx+0.3EQz+E(E)+P(E) 8.30 2.49 2.89 3.41 11.38

Empty + Seismic Z (1+0.15SDS)D+L+EQz+0.3EQx+E(E)+P(E) 2.49 8.30 8.30 8.30 8.30

Empty + Seismic X 207 (0.9-0.2SDS)D+EQx+0.3EQz+E(E)+P(E) 9.30 2.49 2.89 3.41 11.38

Empty + Seismic Z (0.9-0.2SDS)D+EQz+0.3EQx+E(E)+P(E) 3.49 9.30 3.89 12.38 4.41

Operating 208 1.2D+1.6L+E(O)+P(O)+TF 18.01 1.10 3.80 0.87 14.21


Operating + Wind X 209 1.2D+1.6L+0.5Wx+E(O)+P(O)+TF 18.11 1.10 3.80 0.87 14.28
Operating + Wind Z 1.2D+1.6L+0.5Wz+E(O)+P(O)+TF 18.01 1.11 3.80 0.875 14.28
Operating + Wind X 210 1.2D+L+Wx+E(O)+P(O)+TF 18.21 1.10 3.59 0.87 14.35
Operating + Wind Z 1.2D+L+Wz+E(O)+P(O)+TF 18.01 1.12 3.59 0.88 14.21

Operating + Seismic X 211 (1.2+0.2SDS)D+EQx+0.3EQz+E(O)+P(O)+TF 27.52 4.79 4.42 5.48 26.79

Operating + Seismic Z (1.2+0.2SDS)D+EQz+0.3EQx+E(O)+P(O)+TF 21.70 10.61 4.42 13.45 18.82

Operating + Seismic X 212 (1+0.15SDS)D+L+EQx+0.3EQz+E(O)+P(O)+TF 34.68 3.59 3.22 4.28 37.05

Operating + Seismic Z (1+0.15SDS)D+L+EQz+0.3EQx+E(O)+P(O)+TF 28.87 9.41 3.22 12.25 29.09

Operating + Seismic X 213 (0.9-0.2SDS)D+EQx+0.3EQz+E(O)+P(O)+TF 26.38 4.65 3.22 4.31 25.67

Operating + Seismic Z (0.9-0.2SDS)D+EQz+0.3EQx+E(O)+P(O)+TF 20.52 12.94 12.94 12.94 17.65

Test 214 1.2D+1.6L+E(T) 0.17 0.03 4.03 0.02 0.14


Test 215 1.2D+L+E(T)+P(T) 0.17 0.03 3.81 0.02 0.14
Test + Wind X 216 1.2D+1.6L+0.5Wx+E(T)+P(T) 0.27 0.03 4.03 0.02 0.20
Test + Wind Z 1.2D+1.6L+0.5Wz+E(T)+P(T) 0.17 0.03 4.03 0.025 0.14
SECTION 2 - LOADING COMBINATION
2.1 Basic Load (acting at BOF)
Fx Fz Fy Mx Mz My
Primary Load LC
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Dead Load D - - 84.18 - - -
Live Load L - - 0.73 - - -
Equipment Empty E(E) - - 5.79 - - -
Equipment Operation E(O) 36.02 2.21 6.45 3.73 60.84 -
Equipment Test E(T) 0.34 0.05 6.90 0.09 0.58 -
Wind Load (x-dir) Wx 0.40 - - - 0.74 -
Wind Load (z-dir) Wz - 0.03 - 0.05 - -
Earthquake (x-dir) EQx (E) 16.61 - - - 30.48 -
Earthquake (z-dir) EQz (E) - 16.61 - 30.48 - -
Earthquake (x-dir) EQx (O) 16.73 - - - 30.70 -
Earthquake (z-dir) EQz (O) - 23.66 - 30.70 - -

2.2 Allowable Stress Design Load Combination for Foundation Stability Design (at BOF)
Fx Fz Fy Mx Mz My
Loading Condition LC Load Combination
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Empty 101 D+L+E(E) - - 90.692 - -
Empty 102 D+0.75L+E(E)+P(E) - - 90.511 - -
Empty + Wind X 103 D+0.75L+0.45Wx+E(E)+P(E) 0.1821 - 90.511 - 0.3341
Empty + Wind Z D+0.75L+0.45Wz+E(E)+P(E) - 0.01149 90.511 0.0211 -
Empty + Wind X 104 D+0.6Wx+E(E)+P(E) 0.2428 - 89.967 - 0.4455
Empty + Wind Z D+0.6Wz+E(E)+P(E) - 0.01533 89.967 0.0281 -

Empty + Seismic X 105 (1+0.14SDS)D+0.7EQx+0.21EQz+E(E)+P(E) 11.626 3.48791 94.319 6.4003 21.334

Empty + Seismic Z (1+0.14SDS)D+0.7EQz+0.21EQx+E(E)+P(E) 3.4879 11.6264 94.319 21.334 6.4003

Empty + Seismic X 106 (1+0.105SDS)D+0.75L+0.7EQx+0.21EQz+E(E)+P(E) 11.626 3.48791 95.173 6.4003 21.334

Empty + Seismic Z (1+0.105SDS)D+0.75L+0.7EQz+0.21EQx+E(E)+P(E) 3.4879 11.6264 95.173 21.334 6.4003

Empty + Seismic X 107 (0.6-0.14SDS)D+0.7EQx+0.21EQz+E(E)+P(E) 11.626 3.48791 51.944 6.4003 21.334

Empty + Seismic Z (0.6-0.14SDS)D+0.7EQz+0.21EQx+E(E)+P(E) 3.4879 11.6264 51.944 21.334 6.4003

Operating 108 D+L+E(O) 36.02 2.21 91.351 3.73 60.84


Operating 109 D+0.75L+E(O)+P(O)+TF 36.02 2.21 91.169 3.73 60.84
Operating + Wind X 110 D+0.75L+0.45Wx+E(O)+P(O)+TF 36.204 2.21 91.169 3.73 61.175
Operating + Wind Z D+0.75L+0.45Wz+E(O)+P(O)+TF 36.02 2.21781 91.169 3.7476 60.84
Operating + Wind X 111 D+0.6Wx+E(O)+P(O)+TF 36.264 2.21 90.626 3.73 61.286
Operating + Wind Z D+0.6Wz+E(O)+P(O)+TF 36.02 2.22164 90.626 3.7546 60.84

Operating + Seismic X 112 (1+0.14SDS)D+0.7EQx+0.21EQz+E(O)+P(O)+TF 47.648 5.694 94.974 10.127 82.175

Operating + Seismic Z (1+0.14SDS)D+0.7EQz+0.21EQz+E(O)+P(O)+TF 39.510 13.833 94.974 25.061 67.241

(1+0.105SDS)D+0.75L+0.7EQx+0.21EQz+E(O)+P(O)+T
Operating + Seismic X 113 39.535 18.7717 94.431 25.217 67.288
F
(1+0.105SDS)D+0.75L+0.7EQz+0.21EQx+E(O)+P(O)+T
Operating + Seismic Z 47.733 7.17593 94.433 10.174 82.331
F

Operating + Seismic X 114 (0.6-0.14SDS)D+0.7EQx+0.21EQz+E(O)+P(O)+TF 47.733 7.17593 52.602 10.174 82.331

Operating + Seismic Z (0.6-0.14SDS)D+0.7EQz+0.21EQx+E(O)+P(O)+TF 39.535 18.8 52.602 25.217 67.288


Fx Fz Fy Mx Mz My
Loading Condition LC Load Combination
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Operating 115 D+E(O)+P(O)+TF 36.02 2.21 90.626 3.73 60.84
Test 116 D+L+E(T) 0.34 0.05 91.81 0.09 0.58
Test + Wind X 117 D+0.75L+0.45Wx+E(T)+P(T) 0.5246 0.05 91.63 0.09 0.9126
Test + Wind Z D+0.75L+0.45Wz+E(T)+P(T) 0.34 0.06 91.63 0.1112 0.58

2.3 Ultimate Strength Design Load Combination for Reinforced Concrete Design (at BOF)
Fx Fz Fy Mx Mz My
Loading Condition LC Load Combination
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Empty 201 1.4D 0 0 117.85 0 0
Empty 202 1.2D+1.6L+E(E)+P(E) - - 107.96 - -
Empty + Wind X 203 1.2D+1.6L+0.5Wx+E(E)+P(E) 0.2023 - 107.96 - 0.3712
Empty + Wind Z 1.2D+1.6L+0.5Wz+E(E)+P(E) - 0.01277 107.96 0.0234 -
Empty + Wind X 204 1.2D+L+Wx+E(E)+P(E) 0.40 - 107.53 - 0.74
Empty + Wind Z 1.2D+L+Wz+E(E)+P(E) - 0.02554 107.53 0.05 -

Empty + Seismic X 205 (1.2+0.2SDS)D+EQx+0.3EQz+E(E)+P(E) 16.61 4.98273 113.02 9.1433 30.5

Empty + Seismic Z (1.2+0.2SDS)D+EQz+0.3EQx+E(E)+P(E) 4.9827 16.6 113.02 30.5 9.1433

Empty + Seismic X 206 (1+0.15SDS)D+L+EQx+0.3EQz+E(E)+P(E) 16.6 4.98273 95.354 9.1433 30.5

Empty + Seismic Z (1+0.15SDS)D+L+EQz+0.3EQx+E(E)+P(E) 4.9827 16.6 95.354 30.5 9.1433

Empty + Seismic X 207 (0.9-0.2SDS)D+EQx+0.3EQz+E(E)+P(E) 16.6 4.98273 75.333 9.1433 30.5

Empty + Seismic Z (0.9-0.2SDS)D+EQz+0.3EQx+E(E)+P(E) 5.0192 16.6 75.333 30.5 9.1433

Operating 208 1.2D+1.6L+E(O)+P(O)+TF 36.02 2.21 108.62 3.73 60.84


Operating + Wind X 209 1.2D+1.6L+0.5Wx+E(O)+P(O)+TF 36.224 2.21 108.62 3.73 61.212
Operating + Wind Z 1.2D+1.6L+0.5Wz+E(O)+P(O)+TF 36.02 2.21909 108.62 3.7499 60.84
Operating + Wind X 210 1.2D+L+Wx+E(O)+P(O)+TF 36.4 2.21 108.19 3.73 61.6
Operating + Wind Z 1.2D+L+Wz+E(O)+P(O)+TF 36.02 2.23 2.2319 2.23 2.23

Operating + Seismic X 211 (1.2+0.2SDS)D+EQx+0.3EQz+E(O)+P(O)+TF 52.8 9.30576 96.842 12.937 91.5

Operating + Seismic Z (1.2+0.2SDS)D+EQz+0.3EQx+E(O)+P(O)+TF 41.041 25.9 96.842 34.4 70.051

Operating + Seismic X 212 (1+0.15SDS)D+L+EQx+0.3EQz+E(O)+P(O)+TF 52.8 7.09945 96.013 9.2102 30.701

Operating + Seismic Z (1+0.15SDS)D+L+EQz+0.3EQx+E(O)+P(O)+TF 41.041 25.9 96.013 34.4 70.051

Operating + Seismic X 213 (0.9-0.2SDS)D+EQx+0.3EQz+E(O)+P(O)+TF 52.75 9.30576 75.991 12.937 91.5

Operating + Seismic Z (0.9-0.2SDS)D+EQz+0.3EQx+E(O)+P(O)+TF 41.041 25.9 75.991 34.4 70.051

Test 214 1.2D+1.6L+E(T) 0.34 0.05 109.08 0.09 0.58


Test 215 1.2D+L+E(T)+P(T) 0.34 0.05 108.64 0.09 0.58
Test + Wind X 216 1.2D+1.6L+0.5Wx+E(T)+P(T) 0.5448 0.05 109.08 0.09 0.9497
Test + Wind Z 1.2D+1.6L+0.5Wz+E(T)+P(T) 0.34 0.07 109.08 0.1136 0.58
SECTION 3 - FOUNDATION CHECK & REINFORCEMENT

The stability will be calculated manually and reinforcement of foundation and pedestall will be calculated using SAPv2000 Program.

The parameters are described below:


1. Pedestal Dimension
Pedestal Length = 0.5 m
Pedestal Width = 0.25 m
Pedestal Height (inc. grot) = 0.85 m
2. Load Combination
Allowable Stress Design Load Combination for Foundation Stability Design
101 D+L+E(E) Empty
102 D+0.75L+E(E)+P(E) Empty
103 D+0.75L+0.45Wx+E(E)+P(E) Empty + Wind X
D+0.75L+0.45Wz+E(E)+P(E) Empty + Wind Z
104 D+0.6Wx+E(E)+P(E) Empty + Wind X
D+0.6Wz+E(E)+P(E) Empty + Wind Z
105 (1+0.14SDS)D+0.7EQx+0.21EQz+E(E)+P(E) Empty + Seismic X
(1+0.14SDS)D+0.7EQz+0.21EQx+E(E)+P(E) Empty + Seismic Z
106 (1+0.105SDS)D+0.75L+0.7EQx+0.21EQz+E(E)+P(E) Empty + Seismic X
(1+0.105SDS)D+0.75L+0.7EQz+0.21EQx+E(E)+P(E) Empty + Seismic Z
107 (0.6-0.14SDS)D+0.7EQx+0.21EQz+E(E)+P(E) Empty + Seismic X
(0.6-0.14SDS)D+0.7EQz+0.21EQx+E(E)+P(E) Empty + Seismic Z
108 D+L+E(O) Operating
109 D+0.75L+E(O)+P(O)+TF Operating
110 D+0.75L+0.45Wx+E(O)+P(O)+TF Operating + Wind X
D+0.75L+0.45Wz+E(O)+P(O)+TF Operating + Wind Z
111 D+0.6Wx+E(O)+P(O)+TF Operating + Wind X
D+0.6Wz+E(O)+P(O)+TF Operating + Wind Z
112 (1+0.14SDS)D+0.7EQx+0.21EQz+E(O)+P(O)+TF Operating + Seismic X
(1+0.14SDS)D+0.7EQz+0.21EQz+E(O)+P(O)+TF Operating + Seismic Z
113 (1+0.105SDS)D+0.75L+0.7EQx+0.21EQz+E(O)+P(O)+TF Operating + Seismic X
(1+0.105SDS)D+0.75L+0.7EQz+0.21EQx+E(O)+P(O)+TF Operating + Seismic Z
114 (0.6-0.14SDS)D+0.7EQx+0.21EQz+E(O)+P(O)+TF Operating + Seismic X
(0.6-0.14SDS)D+0.7EQz+0.21EQx+E(O)+P(O)+TF Operating + Seismic Z
115 D+E(O)+P(O)+TF Operating
116 D+L+E(T) Test
117 D+0.75L+0.45Wx+E(T)+P(T) Test + Wind X
D+0.75L+0.45Wz+E(T)+P(T) Test + Wind Z
Ultimate Strength Design Load Combination for Reinforced Concrete Design
201 1.4D Empty
202 1.2D+1.6L+E(E)+P(E) Empty
203 1.2D+1.6L+0.5Wx+E(E)+P(E) Empty + Wind X
1.2D+1.6L+0.5Wz+E(E)+P(E) Empty + Wind Z
204 1.2D+L+Wx+E(E)+P(E) Empty + Wind X
1.2D+L+Wz+E(E)+P(E) Empty + Wind Z
205 (1.2+0.2SDS)D+EQx+0.3EQz+E(E)+P(E) Empty + Seismic X
(1.2+0.2SDS)D+0.3EQx+EQz+E(E)+P(E) Empty + Seismic Z
206 (1+0.15SDS)D+L+EQx+0.3EQz+E(E)+P(E) Empty + Seismic X
(1+0.15SDS)D+L+EQz+0.3EQx+E(E)+P(E) Empty + Seismic Z
207 (0.9-0.2SDS)D+EQx+0.3EQz+E(E)+P(E) Empty + Seismic X
(0.9-0.2SDS)D+EQz+0.3EQx+E(E)+P(E) Empty + Seismic Z
208 1.2D+1.6L+E(O)+P(O)+TF Operating
209 1.2D+1.6L+0.5Wx+E(O)+P(O)+TF Operating + Wind X
1.2D+1.6L+0.5Wz+E(O)+P(O)+TF Operating + Wind Z
210 1.2D+L+Wx+E(O)+P(O)+TF Operating + Wind X
1.2D+L+Wz+E(O)+P(O)+TF Operating + Wind Z
211 (1.2+0.2SDS)D+EQx+0.3EQz+E(O)+P(O)+TF Operating + Seismic X
(1.2+0.2SDS)D+EQz+0.3EQx+E(O)+P(O)+TF Operating + Seismic Z
212 (1+0.15SDS)D+L+EQx+0.3EQz+E(O)+P(O)+TF Operating + Seismic X
(1+0.15SDS)D+L+EQz+0.3EQx+E(O)+P(O)+TF Operating + Seismic Z
213 (0.9-0.2SDS)D+EQx+0.3EQz+E(O)+P(O)+TF Operating + Seismic X
(0.9-0.2SDS)D+EQz+0.3EQx+E(O)+P(O)+TF Operating + Seismic Z
214 1.2D+1.6L+E(T) Test
215 1.2D+L+E(T)+P(T) Test
216 1.2D+1.6L+0.5Wx+E(T)+P(T) Test + Wind X
1.2D+1.6L+0.5Wz+E(T)+P(T) Test + Wind Z

3. Soil Data
The soil data will use as per below (Based on soil report)
a. Cohession, c 16.4 ton/m2
b. Angle of friction,  15.8 degree
below 1 meter depth
c. N-SPT, depth 1 m below surface
N-SPT 31 /304,8mm
- Stability of Foundation

AL Lpp
z A A

x
EL ER
AR

FOUNDATION PLAN

LF BF
G.L. HP HP LP
BP Fz W4
A B
D
HF y Fy y HF
Fy
A B
O W1 W2 O
Fz Fx
Mx W5 Mz
W3
x z

SECTION A-A SECTION B-B

Foundation Length LF = 3.50 m EL = ER = 0.63 m


Foundation Width BF = 1.75 m AL = AR = 0.63 m
Foundation Thickness HF = 0.30 m D = 0.40 m
Pedestal Length LP = 0.50 m Lpp = 2.00 m
Pedestal Width BP = 0.25 m
Pedestal Height (inc. grot) HP = 0.85 m
Soil Thickness HS = 0.40 m
3
Concrete Unit Weight C = 23.54 kN/m
3
Soil Unit Weight S = 15.29 kN/m

Fz = 18.77 kN (LC 112)


Mx = 25.217 kNm (LC 112)
Fx = 47.7332 kN (LC 112) taken from load comb. 112 for stability at BOF
Mz = 82.3312 kNm (LC 112)
Fy = 95.1731 kN (LC 112)
SOIL DATA

- (Data of soil at depth 1 m)


2
c = 160.88 kN/m
0
 = 15.82
3
water = 9.81 kN/m
3
soil = 15.29 kN/m
3
soil eff. = 5.48 kN/m

Due to symmectrical between passive and active side, the soil active pressure and passive pressure are negligible.

- Concrete Data
3
concrete = 23.54 kN/m
W1 = 2.50 kN (pedestal weight)
W2 = 2.50 kN (pedestal weight)
W3 = 43.25 kN (slab weight)
W4 = 2.50 kN (pedestal weight)
W5 = 43.25 kN (slab weight)

- Table Moment (X dir.)


Force Distance to O. Moment
Area Vert. Hor. Vert. Hor. Mactive Mpassive
kN kN m m kNm kNm
W1 2.50 0.75 1.88
W2 2.50 0.75 1.88
W3 43.25 1.75 75.68
Fz 18.77
Mx 25.22
Fy 95.17 1.75 75.68

Summary:
Ma = 25.22 kNm (active moment to O, LC 112)
Mp = 155.12 kNm (resistance pasive moment to O, LC 112)
Ha = 18.77 kN (active sliding force to O, LC 112)
Hp = - kN (resistance passive sliding force to O, LC 112)
V = 143.42 kN (vertical load, LC 112)

- Table Moment (Z dir.)


Force Distance to O. Moment
Area Vert. Hor. Vert. Hor. Mactive Mpassive
kN kN m m kNm kNm
W4 2.50 0.88 2.19
W5 43.25 0.88 37.84
Fx 47.73
Mz 82.33
Fy 95.17 0.88 83.28
Summary:
Ma = 82.33 kNm (active moment to O, LC 112)
Mp = 123.31 kNm (resistance pasive moment to O, LC 112)
Ha = 47.73 kN (active sliding force to O, LC 112)
Hp = - kN (resistance passive sliding force to O, LC 112)
V = 140.92 kN (vertical load, LC 112)

- Check Stability

for X Dir.

- Overturning
ƩMp/ƩMa > SF
6.151 > 1.5 OK!

- Sliding
ƩHp/ƩHa > SF
ƩHp = c*B + f*ƩV
f = 0.5 (shear coefficient between concrete and soil)
ƩHp = 634.80 kN (per 1 m' length)
ƩHp/ƩHa > SF
33.8 > 1.5 OK!

- Soil Stability Lf 


e1 = B/2 - (ƩMp/ƩMa)/ƩV
= 1.707 m
e2 = B/6
= 0.583 m Condition 2!
max min
Condition 2:
max = 2*ƩV/(B*L)
2
= 46.8 kN/m
2
min = 0 kN/m

- Calculating Foundation Allowable Capacity

2
qall = 171 kN/m (Based on soil report)
2
max = 46.8 kN/m
qall/max > SF
3.651 > 1.5 OK!

for Z Dir.

- Overturning
ƩMp/ƩMa < SF
1.50 < 1.5 OK!
- Sliding
ƩHp/ƩHa > SF
ƩHp = c*B + f*ƩV
f = 0.6 (shear coefficient between concrete and soil)
ƩHp = 366.10 kN (per 1 m' length)
ƩHp/ƩHa > SF
7.7 > 1.5 OK!

- Soil Stability Bf 


e1 = B/2 - (ƩMp/ƩMa)/ƩV
= 0.864 m
e2 = B/6
= 0.292 m Condition 2!
max min
Condition 2:
max = 2*ƩV/(B*L)
2
= 46.0151 kN/m
2
min = 0 kN/m

- Calculating Foundation Allowable Capacity

2
qall = 171 kN/m (Based on soil report)
2
max = 46.02 kN/m
qall/max > SF
3.716 > 1.5 OK!

REINFORCEMENT DESIGN

- Calculating Ultimate Moment of Foundation B

AL Lpp
z A A

x
EL ER
AR

FOUNDATION PLAN
Mx Mx Mz
Fy Fy Fy
LF Fz BF Fx
G.L. HP Fz HP LP
BP W4 D
A B
HF y y HF
Fy
A B
W1 O W2 O

W3 W5
x z

SECTION A-A SECTION B-B

Foundation Length LF = 3.50 m EL = ER = 0.63 m


Foundation Width BF = 1.75 m AL = AR = 0.63 m
Foundation Thickness HF = 0.30 m D = 0.40 m
Pedestal Length LP = 0.50 m Lpp = 2.00 m
Pedestal Width BP = 0.25 m
Pedestal Height (inc. grot) HP = 0.85 m
Soil Thickness HS = 0.40 m
Concrete Unit Weight C = 23.54 kN/m3
Soil Unit Weight S = 15.29 kN/m3

Fz = 25.87 kN (LC 212)


Mx = 34.43 kNm (LC 212)
Fx = 52.75 kN (LC 212) taken from load comb. 209 & 212 for reinforced concrete at BOF
Mz = 91.54 kNm (LC 212)
Fy = 117.9 kN (LC 209)

- Table Moment (X dir.)


Force Distance to O. Moment
Area Vert. Hor. Vert. Hor. Mactive Mpassive
kN kN m m kNm kNm
W1 2.50 1.00 2.50
W2 2.50 1.00 2.50
W3 43.25 0.00 0.00
Fz 25.87 1.15 29.75
Fz 25.87 1.15 29.75
Mx 34.43
Mx 34.43
Fy 117.85 1.00 117.85
Fy 117.85 1.00 117.85
Summary:
Mult = 59.50 kNm (active moment to O, LC 212)

- Table Moment (Z dir.)


Force Distance to O. Moment
Area Vert. Hor. Vert. Hor. Mactive Mpassive
kN kN m m kNm kNm
W4 2.50 0.00 0.00
W5 43.25 0.00 0.00
Fx 52.75 1.15 60.67
Mz 91.54
Fy 117.85 0.00 0.00

Summary:
Mult = 60.67 kNm (active moment to O, LC 212)

- Reinforcement of Slab of X dir.


Based on  min

As need = min*b*d
min = 0.20%
min = 1.4/f'y
= 0.36%
min = 0.36%
b = 1000 mm
clear cover = 75 mm
Dia. Bar = 16 mm
d = 201 mm
2
As need = 721.5 mm per 1 m' length

Propose use D16-200 (Top Bottom)


2
A bar = 201.1 mm
s bar = 200 mm
n bar = 5 ea per 1 m' length
As use = A bar x n bar
2
= 1006 mm per 1 m' length > As need OK!
Based on Moment Ultimate

As need = Mult./(0.9*fy*d)
Mult. = 59.50 kNm
f'c = 28 MPa
fy main = 390 MPa
b = 1000 mm
clear cover = 75 mm
Dia. Bar = 16 mm
d = 201 mm
2
As need = 843 mm per 1 m' length

Propose use D16-200 (Top Bottom)


2
A bar = 201.1 mm
s bar = 200 mm
n bar = 5 ea per 1 m' length
As use = A bar x n bar
2
= 1006 mm per 1 m' length
a = As*fy/(0,85*fc*b)
= 16.48 mm
Mn = 0,9*As*fy*(d - a/2)
= 68.05 kNm > Mult OK!

Use D16-200 reinf. for X dir.

- Reinforcement of Slab of Z dir.


Based on  min

As need = min*b*d
min = 0.20%
min = 1.4/f'y
= 0.36%
b = 1000 mm
clear cover = 75 mm
Dia. Bar = 16 mm
d = 201 mm
2
As need = 402 mm per 1 m' length

Propose use D16-200 (Top Bottom)


2
A bar = 201.1 mm
s bar = 200 mm
n bar = 5 ea per 1 m' length
As use = A bar x n bar
2
= 1006 mm per 1 m' length > As need OK!

Based on Moment Ultimate

As need = Mult./(0.9*fy*d)
Mult. = 60.67 kNm
f'c = 28 MPa
fy main = 390 MPa
b = 1000 mm
clear cover = 75 mm
Dia. Bar = 16 mm
d = 201 mm

2
As need = 860 mm per 1 m' length
Propose use D16-200 (Top Bottom)
2
A bar = 201.1 mm
s bar = 200 mm
n bar = 5 ea per 1 m' length
As use = A bar x n bar
2
= 1006 mm per 1 m' length
a = As*fy/(0,85*fc*b)
= 16.48 mm
Mn = 0,9*As*fy*(d - a/2)
= 68.05 kNm > Mult OK!

Use D16-200 reinf. for X dir.

Checking Punching Shear of Slab

d = 0.201 m
X

Bp = 0.25 m BP+d
Z
Lp = 0.5 m
Bp + d = 0.451 m
Lp + d = 0.7 m
LP+d
bo = 2*((Bp+d)+(Lp+d))
= 2.3 m
β = Lp/Bp
= 2
αs = 20 for corner, 30 for edge, 40 for interior column
= 30
 = 0.75 (reduction factor)

According to ACI 318M-14 Table 22.6.5.2, v c shall be the least of the following criterias.
with λ = 1 (normal concrete)

Vc1 = 0.33*λ*√f'c
= 1.764 kN
Vc2 = 0.17*λ*√f'c * (1+2/β)
= 1.799 kN
Vc3 = 0.083*λ*√f'c * (2+αs*d/bo)
= 2.028 kN
Vc min = min (Vc1, Vc2, Vc3)
= 1.764 kN
Vc = Vc min*bo*d
= 816.8 kN
Vult. = Weight of one pedestal + Fy max.
= 120.4 kN

Checking Shear Reinforcement of Slab

Vult. = 120.4 kN
*Vc = 408.4 kN --> Vu < Vc OK!
0,5**Vc = 306.3 kN --> Vu < 0,5Vc OK!

Check shear reinf. --> No shear reinforcement needed

Use D16-200 Reinforcement (Top & Bottom) for Slab reinforcement.


ΦMn
- Reinforcement of Pedestal

min = 1.00% Ag
2
= 1250 mm
max = 6.00% Ag ΦPn
2
7500 mm
Hp = 850 mm
Lp = 500 mm
Bp = 250 mm
clear cover = 50 mm
Dia. Bar = 13 mm Lp c
Dia. Stirrup = 10 mm
f'c = 28 MPa
fy main = 390 MPa x
fy sec. = 390 MPa
Bp
Propose n = 12 ea
E steel = 200000 MPa
1 = 0.85
ds
2
As tot. = 1593 mm d1
ds = (Clear cover + Dia. Stirrup + Dia Main/2)
d2
= 66.5 mm
d3
n bar at LP = 5 ea
d4
n bar at BP = 3 ea d5

Check n bar --> 12 ea OK!

space between rebar at LP


xLp = 91.75 mm
clean space between rebar at LP
xnLp = 88.5 mm > 30 mm OK!
space between rebar at BP
xnBp = 58.5 mm
clean space between rebar at BP
xnBp = 52 mm > 30 mm OK!

Reduction factor:

= 0.65 If Pn > 0.1*f'c*Bp*Lp

= 0.8 If Pn = 0

= 0.65+0.15*(Pn 0 - Pn)/Pn0 If 0 < Pn < 0.1*f'c*Bp*Lp

Pn0 = Nominal Pn at axial sentris


= 0.80*[(0.85*f'c*Bp*Lp + As total*(fy-0.85*f'c)]
= 3442 kN

0.1*f'c*Bp*Lp = 350 kN

Balance Condition:
c = cb = 600/(600 + fy)*d1
cb = 262.7 mm
Rebar Diagram Table

Area of Rebar (mm2) Distance to Conc. (mm)


No
As1=n/n total*Astotal, dst.. d1=(n-n1+1)*x+ds, dst…
1 = (n)/(n-tot)*Astot 663.928571 = (n - 1)*x+ds 433.5
2 = (2)/(n-tot)*Astot 265.571429 = (n - 2)*x+ds 341.75
3 = (2)/(n-tot)*Astot 265.571429 = (n - 3)*x+ds 250
4 = (2)/(n-tot)*Astot 265.571429 = (n - 4)*x+ds 158.25
5 = (n)/(n-tot)*Astot 132.785714 = (n - 5)*x+ds 66.5

2
As tot. = 1593 mm OK! p min < p < p max

Strain for each bars:


si = 0.003*(c - di)/c

Stress for each bars:


Untuk |si|< fy/Efsi = si*Es
Untuk |si|> fy/Efsi = fy

DESCRIPTION FORMULA UNIT


Each Rebar's Internal Force Fsi = Asi*fsi*10^-3 kN
Resultant of Each Rebar's Internal Force Cs = ΣFsi kN
Moment due to Each Rebar's Internal Force Msi = Fsi*(h/2 - di) kNmm
Total Moment due to Each Rebar's Internal Force Ms = ΣMsi kNmm
Height of Concrete Block Compressive Stress a = b1*c mm
Internal Force at Compressive Concrete Block Cc = 0.85*f'c*b*a*10^-3 kN
Moment due to Internal Force at Compressive Mc = Cc*(h-a)/2 kNmm
Concrete Block
Nominal Axial Force Pn = Cs + Cc kN
Nominal Moment Mn = (Mc + Ms)*10^-3 kNm
Design Ultimate Axial Force Pu = *Pn kN
Design Umtimate Moment Mu = *Mn kNm

Moment Interaction Diagram

2500
Pedestal Balance Condition Pult, Mult

2000
Compression
Failure Zone
1500

1000 Tension
Φ*Pn (kN)

Failure Zone

500

Pult, Mult
0
0 50 100 150 200 250 300

‐500

‐1000
Φ*Mn (kN‐m)
Data (For Concrete Foundation Design)
Pult 0 117.9 kN
taken from load comb. 213 for reinforced concrete at TOP
Mult 0 34.43 kNm

Balance Condition:
Absis: 0 280 kNm
Ordinate: 1616.12 1616 kN

Tension Failure:
Absis: 0 280 kNm
Ordinate: 0 1616 kN

Compression Failure:
Absis: 0 126.3 kNm
Ordinate: 0 2237 kN

From moment diagram above, the designed pedestal can withstand Pult and Mult.

- Shear Reinforcement of Pedestal

Vc (concrete strength)
Vc = (1+((Nu/14*Ag))*(f'c^0,5/6)*(b*d)
Nu = 117.9 kN
2
14*Ag = 1.75 m
f'c = 28 MPa
b = 0.25 m
d = 0.184 m
Vc = 2724607.1 Newton
= 2724.61 kN

Dimension requirement
Vu<0.5 ØVc No reinforcement required
0,5 ØVc<Vu<ØVc use minimum reinforcement
(Vu - ØVc )< 0.67bwd√fc' pedestal dimension ok, if not, dimension need to be made larger

Capacity reduction factor for shear


Øs = 0.75

Vult. = 52.75 kN
*Vc = 2043 kN
0,5**Vc = 1022 kN
0.67bwd√fc' = 162.6 kN

Thus,
Vu<0.5 ØVc No reinforcement required
if Vult. < 0.34*B*L*√fc', maximum spacing is minimum value of:
0.34*B*L*f'c^0.5 = 224.89 kN
- d/2 = 92 mm
- 24" = 600 mm
- 16 x longitudinal bars = 208 mm
- 48 x tie bar = 480 mm

if Vult. > 0.34*B*L*√fc', maximum spacing is minimum value of:


- d/4 = 46 mm
- 12" = 300 mm

Thus,
Vult. < 0.34*B*L*√fc' s = 92 mm

Use D10-100 mm as stirrup.


SETTLEMENT CALCULATION
Immediate
Df : Depth of Foundation = 0.85 m
L : Length of footing = 3.50 m
B : Width of footing = 1.75 m
hf : Thickness of footing = 0.30 m

Table is taken from Foundation analysis and Design Book fifth Edition, by J Bowles

The following borelog BH-1 is considered to calculate settlement with soil profile as follow:

El + 0
Footing 3.25 m
Soft Clay
(Layer 1) 2.40 m
El - 3.25
Medium Stiff Clay 6.75 m
(Layer 2)

El - 10
Dense Sandy Clay

Immediate Settlement
The immediate settlement of a rectangular base on the surface of an elastic half-space can be computed from an equation from the
Theory of Elasticitiy [Timoshenko and Goodier (1951)] as follow:
1 𝜇 1 2𝜇
∆H 𝑞 𝐵 𝐼 𝐼 𝐼
𝐸 1 𝜇
qmax Permanent maximum soil bearing pressure = 46.83 kN/m2
qo base contact pressure = qmax = 46.83 kPa
μ poisson's ratio = for most clay soil = 0.45
cu cohession = = 0.167 kg/cm2
Es Strain-stress modulus = 30 Mpa = 29430 kN/m2
B' = B/2 = 0.88 m
H = H = 3.25 m
N = H/B' = 3.71
M = L/B = 2.00

Based on Table 5-2 on Foundation Analysis and Design by Joseph E. Bowles, I1 and I2 for N and M above:
I1 = 0.479
I2 = 0.068
D Depth of foundation = 0.85 m
D/B = 0.49
Based on Figure 5-7 on Foundation Analysis and Design by Joseph E. Bowles, IF for D/B and m above:
IF = 0.620

m Number of contributing corner = 4


DH Immediate settlement
= 46.83*0.875*(1-0.45^2)/29430*(0.479+(1-2*0.45)/(1-0.45)*0.068)*0.62*4 m
= 0.0014 m
= 1.3531 mm
Consolidation Settlement
Depth of footing z1 = 0.850 m
Depth of footing to bottom of soft clay z2 = 2.400 m
Contact pressure qo = qmax
= 46.8 kN/m2
No. Elevation, D D/B Dq/qo* Dq
(m)
1 0.48 0.274 0.65 30.44
2 0.96 0.549 0.3 14.05
3 1.44 0.823 0.22 10.30
4 1.92 1.097 0.14 6.56
5 2.40 1.371 0.05 2.34
*obtained from figure 5-4 Boussinesq pressure bulb on Foundation Analysis and Design by Joseph E. Bowles

A = Dq x H = 0.48*((30.44+2.34)/2+14.05+10.3+6.56) = 22.70
with
H = 2.400 m; Dp = 22.7/2.4 = 9.46 kN/m2
gs1 = 1.371 gr/cm3 (See attachment C)
= 13.45 kN/m3
po' = H1/2 x gs1
= 3.25/2*13kN/m2
= 21.86 kN/m2
pc' = 0.625 kg/cm2
= 61.3 kN/m2
OCR = pc'/po'
= 2.8054
po' + Dp = 21.86+9.46
= 31.32 kN/m2
Cc = 0.311
Cr = 1/10 Cc (Ref. 18 Table 2.5)
= 0.0311
Conditon:
Sc = (Cc Hc )/(1+e0) log (po' +Dp)/po' clay normally consolidated
Sc = (Cr Hc )/(1+e0) log (po' +Dp)/po' clay over consolidated with po' + Dp < pc
Sc = (Cr Hc )/(1+e0) log (pc /po') + (Cc Hc/1+e0) log (po' +Dp)/pc clay over consolidated with po' < pc < po' + Dp

eo = 1.043
DH = Cr . H /(1 + eo) log((po' + Dp)/po')
= 0.0311*2.4/(1+1.043)*log(31.32/21.86)
= 0.0057 m
= 5.71 mm

Total settlement : dt = 1.35+5.71 = 7.1 mm < Allowable Settlement


< 25.00 mm …OK
Foundation Calculation for Gasline Pig Receiver

EPC OF FLOWLINE AND PIPELINE FOR HARI FIELD AND EXISTING FIELD MODIFICATION

ATTACHMENT B: FOUNDATION DRAWING

1100-CV-CAL-005 Rev. 2 Page 17 of 18


Foundation Calculation for Gasline Pig Receiver

EPC OF FLOWLINE AND PIPELINE FOR HARI FIELD AND EXISTING FIELD MODIFICATION

ATTACHMENT C: MECHANICAL GA DRAWING

1100-CV-CAL-005 Rev. 2 Page 18 of 18


3
CAESAR II 2014 Ver.7.00.00.2800, (Build 140416) Date: JAN 19, 2021 Time: 15:0
Job:: PSA FOR TRGP TRAIL1BTRY
Licensed To:: SPLM: PT. Tiga Inti Pilar @ 2014 –ID#00719782

RESTRAINT SUMMARY REPORT: Loads On Restraints


Various Load Cases

LOAD CASE DEFINITION KEY

CASE 1 (HYD) WW+HP


CASE 2 (OPE) W+T1+P1
CASE 3 (OPE) W+T1+P2
CASE 4 (OPE) W+T2+P2
CASE 8 (SUS) W+P1
CASE 14 (OCC) L14=L11+L12+L13

Node Load Case FX lb. FY lb. FZ lb. MX ft.lb. MY ft.lb. MZ ft.lb.


Rigid +Y;
45
Rigid Z
1(HYD) -310 -1083 2 0.0 0.0 0.0
2(OPE) 1210 -4035 231 0.0 0.0 0.0
3(OPE) 1210 -4035 231 0.0 0.0 0.0
4(OPE) 729 -2429 91 0.0 0.0 0.0
8(SUS) -276 -920 2 0.0 0.0 0.0
14(OCC) 29 98 165 0.0 0.0 0.0
MAX 1210/L2 -4035/L2 231/L2

Rigid Y;
85 Rigid GUI;
Rigid GUI
1(HYD) 387 -469 -14 0.0 0.0 0.0
2(OPE) 6888 2586 -727 0.0 0.0 0.0
3(OPE) 6888 2586 -727 0.0 0.0 0.0
4(OPE) 4662 440 -287 0.0 0.0 0.0
8(SUS) 352 -330 -13 0.0 0.0 0.0
14(OCC) 353 60 28 0.0 0.0 0.0
MAX 6888/L2 2586/L2 -727/L2

140 Rigid +Y
1(HYD) 3 -1762 -53 0.0 0.0 0.0
2(OPE) 0 0 0 0.0 0.0 0.0
3(OPE) 0 0 0 0.0 0.0 0.0
4(OPE) 0 0 0 0.0 0.0 0.0
8(SUS) -15 -1651 -50 0.0 0.0 0.0
14(OCC) 0 0 0 0.0 0.0 0.0
MAX -15/L8 -1762/L1 -53/L1

Rigid +Y;
250
Rigid GUI
1(HYD) -5 -1194 13 0.0 0.0 0.0
2(OPE) 5113 0 0 0.0 0.0 0.0
3(OPE) 5113 0 0 0.0 0.0 0.0
4(OPE) 1009 0 0 0.0 0.0 0.0
8(SUS) -6 -1131 13 0.0 0.0 0.0
14(OCC) 385 0 0 0.0 0.0 0.0
MAX 5113/L2 -1194/L1 13/L1

290 Rigid +Y
1(HYD) -0 -356 11 0.0 0.0 0.0
2(OPE) 0 0 0 0.0 0.0 0.0
3(OPE) 0 0 0 0.0 0.0 0.0
 

(UP) 

(WEST)  (SOUTH) 
 
EPC OF FLOWLINE AND PIPELINE FOR HARI FIELD
AND EXISTING FIELD MODIFICATION

01.042-SJB-2020

DATASHEET FOR HARI PIG RECEIVER

1115-V-105

Document Number :
1100-ME-DST-002

CONSORTIUM
PT. TRIAGUNG
JINDI SOUTH JAMBI B Co.
PT. FEGAS REKAYASA UTAMA JAYA ABADI –
Ltd.
PT. UNISAT
Rev. Description NUSANTARA

Prepared Check Appr’d


Issue Date Approved by Approved
by by by

Approved for
2 5-Jan-2021 DN DW OM
Construction
1A Issued for Review 14-Dec-2020 DN DW OM

STATUS CODE : 1A = Issued for Review, 2 = Approved for Construction / Issued for Information
Datasheet for Hari Pig Receiver (1115-V-105)
EPC OF FLOWLINE AND PIPELINE FOR HARI FIELD AND EXISTING FIELD MODIFICATION

REVISION TABLE

REVISION REVISION REVISION


Page Page Attachment
A B C 0 1 A B C 0 1 A B C 0 1

1 X
2 X
3 X

4 X X

5 X
6 X X
7
8
9
10
11
12
13
14
15
16
17

18
19
20

21
22
23
24
25
26
27
28

1100-ME-DST-002 Rev 2 Page 2 of 6


Datasheet for Hari Pig Receiver (1115-V-105)
EPC OF FLOWLINE AND PIPELINE FOR HARI FIELD AND EXISTING FIELD MODIFICATION

REVISION NOTE

Rev. Implemented
Part Page Comment Description
No. (Y/N)
Add Reference Document of
2 4
Specification

2 6 Update Sketch

1100-ME-DST-002 Rev 2 Page 3 of 6


CLIENT

DATA SHEET DOC. NO.


HARI PIG RECEIVER 1100-ME-DST-002
1115-V-105
CONTRACTOR Sheet 4 of 6
DESCRIPTION REV DATE PREP CHECK'D APPV'D
ISSUED FOR REVIEW 1A 14/12/2020 DN DW OM
APPROVED FOR CONSTRUCTION 2 05/01/2021 DN DW OM

EPC OF FLOWLINE AND PIPELINE FOR HARI FIELD


PROJECT TITLE : MANUFACTURER : TBA
AND EXISTING FIELD MODIFICATION
EQUIPMENT NAME : Hari Pig Receiver ORIENTATION : HORIZONTAL
ITEM NO. : 115-V-105 NO. OF UNIT : 1 (ONE)
1 ORIENTATION HORIZONTAL FLUID TWO PHASE GAS
2 CODE FOR VESSEL ASME B 31.8 OPERATING PRESSURE psig 295
3 CODE FOR CLOSURE ASME Sect. VIII Div. 1 o 95
OPERATING TEMPERATURE F
4 CODE STAMP ASME "U Stamp" (For Closure) DENSITY OF CONTENT lb/ft3 1.73
5 SPECIFICATION - LETHAL SERVICE NO
6 DESIGN PRESSURE (INTERNAL) psig 1300
7 DESIGN PRESSURE (EXTERNAL) psig ATM PIPELINE DATA
8 DESIGN TEMPERATURE o 200 ASME B31.8
F CONNECTION PIPELINE DESIGN CODE
9 INTENDED NO. OF OPERATING CYCLES - PIPELINE OD. inch (mm) 6.625 (168)
10 DESIGN LIFE Years 20 MATERIAL OF CONNECTION PIPELINE/PIPING:
11 CORROSION ALLOWANCE mm 3 PIPELINE API 5L X-52
12 WELD JOINT EFFICIENCIES: Maximum Pig Length Acceptable in Barrel, mm. 3200
13 SHELL 1
14 CLOSURE 1 MATERIAL
15 DESIGN FACTOR 0.6 BARREL API 5L X-52
16 FIRE PROOFING NOT REQUIRED REDUCER A 860 WHPY52
17 INSULATION (HOT/COLD) THICKNESS NOT REQUIRED SADDLE / PAD SADDLE A 285 Gr C / A 36
18 PASSIVE FIRE PROTECTION NOT REQUIRED STUD BOLTS / NUTS A 193 Gr B7 / A 194 Gr 2H
19 CLIPS FOR LADDERS & PLATFORM NOT REQUIRED FLANGE / WELDOLET A 694-F52, ASME B16.5 / -
20 CLIPS FOR PIPE SUPPORT NOT REQUIRED PIPE NOZZLE API 5L X-52
21 LIFTING LUGS YES QOC SEALS Note 7
22 EARTHING LUGS YES EARTHING LUGS A 240 Gr 316
23 QUICK OPENING CLOSURE YES (Note 4) INTERNAL ATTACHMENT N/A
24 SUPPORT TYPE SADDLES EXTERNAL ATTACHMENT A 36
25 MAJOR / MINOR BARREL OD. inch (mm) 10.75 (273) / 6.625 (168) SUPPORT (SADDLE / DOUBLER PLATE) A3 6
26 LENGTH MAJOR BARREL mm (Note 9) ACCESSORIES
27 REDUCER mm (Note 9) NAMEPLATE A 240 Gr 316
28 MINOR BARREL mm (Note 9)
29 THICKNESS QOC- SHELL RING mm *
30 MAJOR BARREL mm 9.27 *
31 REDUCER mm *
32 MINOR BARREL mm 7.11 *
33 QUICK OPENING CLOSURE DWG. NO. PROVIDED BY VENDOR
34

35 FABRICATION & INSPECTION PROTECTIVE PAINTING / COATING


36 INSPECTION AUTHORITY MIGAS EXTERNAL PAINTING / COATING AS PER SPECIFICATION
37 POST WELD HEAT TREATMENT AS PER CODE SPEC. INTERNAL PAINTING / COATING N/A
38 SPECIAL HEAT TREATMENT NO
39 MATERIAL IMPACT TEST NO WEIGHT
40 MATERIAL NDT NO EMPTY (APPOXIMATE) kg 549.71 (*)
41 MATERIAL CUT EDGES NDT NO OPERATING (FULL UNIT) kg 597.71 (*) (Note 6)
42 RADIOGRAPHY 100% X-RAY HYDROTEST (APPROXIMATE) kg 693.32 (*)
43 OTHER NDT (UT/MPI/DPI) 100% QUICK OPENING CLOSURE (EMPTY) kg *
44 HYDROSTATIC TEST PRESSURE AS PER CODE & SPEC.
45 FUCTION TEST NO
46 NOTES
47 1. Vendor to verify data at locations marked with *
48 2. Vendor to confirm that fabrication, inspection and testing shall follow the referenced Codes, Standards and Project Specifications.
49 3. Vendor to advise
50 4. Using blind flange 10" #600 complete with davit/hinge, gasket & bolt/nut as temporary. This blind will be change into Quick Opening Closure by connecting flange to flange.
51 Vendor shall supply QOC designed with flange 10" for connecting to barrel. Also supply completed with gasket and bolt/nut as loose item.
52 The Quick Opening Closure shall be equipped with a mechanical interlock to prevent the door from being opened while barrel is pressurized.
53 5. Vendor to provide all required data for MIGAS certification.
54 6. Operating weight is empty weight + weight of pig tool ± 48 kg. Weight of pig tools will be detailed by selected vendor.
55 7. The Closure shall be provided with seal, typically an "O" ring type with Viton anti exposive decompression (AED), Seal materials for end closure shall be suitable for long-term
56 exposure to the transported service fluid at the design pressure and temperature conditions. Seal materials shall resist explosive and compatible with fluid service.
57 8. Vendor to supply spare parts for Start Up & Commissioning
58 9. For detail, refer to general sketch drawing
59 10. Applicable Specification: 1100-ME-SPC-001 Specification for Pig Launcher and Receiver, 1100-ME-SPC-003 Specification for Surface Preparation and Painting.
60
CLIENT

DATA SHEET DOC. NO.


HARI PIG RECEIVER 1100-ME-DST-002
1115-V-105
CONTRACTOR Sheet 5 of 6
DESCRIPTION REV DATE PREP CHECK'D APPV'D
ISSUED FOR REVIEW 1A 14/12/2020 DN DW OM
APPROVED FOR CONSTRUCTION 2 05/01/2021 DN DW OM

EPC OF FLOWLINE AND PIPELINE FOR HARI FIELD


PROJECT TITLE : MANUFACTURER : TBA
AND EXISTING FIELD MODIFICATION
EQUIPMENT NAME : Hari Pig Receiver ORIENTATION : HORIZONTAL
ITEM NO. : 115-V-105 NO. OF UNIT : 1 (ONE)
1 TECHNICAL DATA SHEET QUICK OPENING CLOSURE
2 ITEM INFORMATION CERTIFICATION
3 PRODUCT NUMBER * MATERIAL CERTIFICATION AS PER CODE
4 LINE ITEM NUMBER 1 (ONE) NON-DESTRUCTIVE TESTING
5 QUANTITY 1 (ONE) M.P.I. ON WELD END PREPARATION *
6 EQUIPMENT TAG NUMBER 115-V-105 DYE PENETRANT ON WELD END PREPARATION *
7 DESIGN CONDITIONS ULTRASONIC EXAMINATION - HUB *
8 CLOSURE NOMINAL DIAMETER 10" - 600# ULTRASONIC EXAMINATION - DOOR *
9 CLOSURE DESIGN CODE ASME VIII Div.1 OTHER REQUIREMENTS
10 VESSEL DESIGN CODE ASME B 31.8 INSPECTION REQUIREMENTS YES
11 CLOSURE DESIGN PRESSURE psig 1300 CE MARKING *
12 CLOSURE DESIGN TEMPERATURE °F 200 CLOSURE FINISH *
13 CORROSION ALLOWANCE mm 3 WELD OVERLAY MATERIAL -
14 PIPELINE PRODUCT RAW GAS WELD OVERLAY THICKNESS -
15 VESSEL WALL THICKNESS(MAJOR/MINOR) mm 9.27 / 7.11 * CLOSURE KEY INTERLOCK/SWITCH -
16 CLOSURE ORIENTATION HORIZONTAL
17 HINGE HANDLING (WHEN FACING CLOSURE) RIGHT HAND
18 PRINCIPAL MATERIALS OF CONSTRUCTION ( NOTE  1,  3,  4 ) 
19 HUB MATERIAL *
20 DOOR MATERIAL *
21 DOOR SEAL *
22 LOCKING BAND *
23 HINGE/DAVIT MOUNTING PLATE *
24 PRESSURE WARNING SCREW *
25
26

27 NOZZLE SIZE
28 Mark Required No. Size Sch Rating Face Type Service Remark
29 N1 1 10 Inch 40 600# RF WN Quick Opening Closure Note 4 & 7
30 N2 1 6 Inch 40 600# RF WN Outlet
31 N3 1 2 Inch XS 600# RF WN Kicker & Equalizing Line
32 N4 1 2 Inch XS 600# RF WN Drain
33 N5 1 2 Inch XS 600# RF WN Drain
34 N6 1 2 Inch XS 600# RF WN Equalizing Line
35 N7 1 2 Inch XS 600# RF WN Vent to Flare Header
36 N8 1 2 Inch XS 600# RF WN Spare for Purging & Vent Connection W/ Blind, Gasket & Bolt/Nut
37 N9 1 2 Inch XS 600# RF WN Pig Passage Indicator
38 N10 1 2 Inch XS 600# RF WN Pressure Indicator
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
CLIENT
DATA SHEET DOC. NO.
HARI PIG RECEIVER 1100-ME-DST-002
1115-V-105
CONTRACTOR Sheet 6 of 6
DESCRIPTION REV DATE PREP CHECK'D APPV'D
ISSUED FOR REVIEW 1A 14/12/2020 DN DW OM
APPROVED FOR CONSTRUCTION 2 05/01/2021 DN DW OM

EPC OF FLOWLINE AND PIPELINE FOR HARI FIELD


PROJECT TITLE : MANUFACTURER : TBA
AND EXISTING FIELD MODIFICATION
EQUIPMENT NAME : Hari Pig Receiver ORIENTATION : HORIZONTAL
ITEM NO. : 115-V-105 NO. OF UNIT : 1 (ONE)
1 SKETCH
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59 - VENDOR shall verify and finalize General Arrangement and Detail Design.
60
Foundation Calculation for Gasline Pig Receiver

EPC OF FLOWLINE AND PIPELINE FOR HARI FIELD AND EXISTING FIELD MODIFICATION

ATTACHMENT A: FOUNDATION CALCULATION

1100-CV-CAL-005 Rev. 2 Page 16 of 18


GENERAL DATA PIG LAUNCHER (1194-V-101)

Diameter D = 254 mm
Height H = 685 mm
Length S/F (Seam to Flange) L = 5112 mm
Saddle to Saddle Distance (Center to center) Lpp = 2000 mm
Pedestal Height B = 850 mm
Soil Depth SD = 400 mm

Thickness Foundation Tf = 300 mm


Depth to Water Table Dw = 1 m
Foundation shape Shape = RECTANGULAR
SECTION 1 - LOADING CALCULATION
1.1 Foundation Dimension

AL Lpp
z A A

x
EL ER
AR

B
FOUNDATION PLAN

LF BF

HP LP
HP BP
A HS B
HF y y HF
A B
x z
SECTION AA SECTION BB

Foundation Length LF = 3.50 m EL = ER = 0.63 m


Foundation Width BF = 1.75 m AL = AR = 0.63 m
Foundation Thickness HF = 0.30 m
Pedestal Length LP = 0.50 m
Pedestal Width BP = 0.25 m
Pedestal Height (inc. grot) HP = 0.85 m
Soil Thickness HS = 0.40 m
3
Concrete Unit Weight C = 23.54 kN/m
3
Soil Unit Weight S = 15.29 kN/m
1.2 Dead Load (D)
Dead Load is assumed as foundation selfweight.

Foundation weight W(f) = LF x BF x HF x c


= 43.25 kN
Pedestal weight W(p) = 2 x LP x BP x HP x c
= 5.00 kN
Overburden soil weight W(s) = ((LF x HF) - (2 x LP x HP)) x HS x S
= 35.93 kN
Total Dead Load D = W(f) + W(p) + W(s)
= 84.18 kN

Summary Load
Fx Fz Fy Mx Mz My
Description LC
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Acting on BOF D 84.18 -

Fx Fz Fy Mx Mz My
Description LC
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Acting on TOP D -
1.3 Equipment Load (E)
Equipment Load is weight of pig receiver in empty, operating, and testing condition.

H1

H2
y

x
Empty = 0.590 ton H1 = 789 mm
Operating = 0.638 ton H2 = 900 mm
Testing = 0.794 ton

Summary Load (taken from node 80 & 40 PSA result)


Fx Fz Fy Mx Mz My
Description LC
(kN) (kN) (kN) (kNm) (kNm) (kNm)
E (E) - - 5.79 - - -
Acting on BOF E (O) 36.02 2.21 6.45 3.73 60.841 -
E (T) 0.343 0.05 6.90 0.09 0.579 -
E (E) - - 2.89 - - -
Acting on TOP E (O) 18.01 1.10 3.22 0.87 14.211
E (T) 0.171 0.03 3.45 0.02 0.1351 -
1.4 Live Load (L)
Live Load is applied as 488 kN/m2 as per Civil & Structure Design Criteria.

Live Load
Live Load (Distributed) UDL = 2.9 kN/m2
Area Live Load AL = 2 x LP x BP
= 0.25 m2
Live Load (Point Load) LL = UDL x AL
= 1 kN

Live Load Reaction Support


Reaction at Foundation Rp = 1 kN

Summary Load
Fx Fz Fy Mx Mz My
Description LC
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Acting on BOF L 0.73

Fx Fz Fy Mx Mz My
Description LC
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Acting on TOP L 0.36
1.5 Wind Load (W)
Reference: Wind Load as per ASCE 7-10

Wx Wz

Mz Mx
HC
zBOB
HF
zBOF
z z

x y
X-DIRECTION Z-DIRECTION

Wind Pressure
Exposure coefficient Kz = 0.85 (ASCE 7-10, Table 27.3-1)
Topographic factor Kzt = 1 (ASCE 7-10)
Wind directional factor Kd = 0.85 (ASCE 7-10, Table 26.6-1)
Basic wind speed V = 20 m/s (Civil & Structure Design Criteria)
Wind Pressure qz = 0.613 Kz x Kzt x Kd x V2 (ASCE 7-10)
2
= 177.16 N/m

Wind Force
Gust effect factor G = 0.85 (ASCE 7-10, Section 26.9)
Equipment Length L = 3.96 m (assumed as length of equipment)
Equipment Width B = 0.25 m (assumed as width of equipment)
Height above ground level h = 1.535 m
h/D = 6.04 (to check Cf from ASCE)
Force Coefficient Cf = 1 (ASCE 7-10, Table 29.5-1)
Wind Force Fw = qz G Cf Af (ASCE 7-10)
2
= 150.58 .Af (N/m )

CoG Distance
Height of CoG equipment assumed as half of equipment height
CoG to Base of Baseplate ZBOB = He
= 0.685 m

CoG to Base of Foundation ZBOF = He + Hp + Hf


= 1.835 m
Horizontal Force in X-dir (Fx)
Equipment Projected Area Af = (22/7 x D x L x Hp)
2
= 2.69 m
Wind Load Fx = P x (Af)
= 0.40 kN for TOP

Horizontal Force in Z-dir (Fz)


Equipment Projected Area Af = (1/4 x 22/7 x B2 x Hp)
2
= 0.17 m
Wind Load Fz = P x (Af)
= 0.03 kN for TOP

Moment due to Wind Load in X-dir (Mz)


Momen at TOP Mz = Fx . ZBOB
= 0.28 kN.m for TOP
Momen at BOF Mz = Fx . ZBOF
= 0.74 kN.m for BOF

Moment due to Wind Load in Z-dir (Mx)


Momen at TOP Mx = Fz . ZBOB
= 0.017 kN.m for TOP
Momen at BOF Mx = Fz . ZBOF
= 0.047 kN.m for BOF

Summary Load
Fx Fz Fy Mx Mz My
Primary Load LC
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Wx 0.40 - - - 0.74 -
Acting on BOF
Wz - 0.026 - 0.05 - -
Wx 0.20 - - - 0.14 -
Acting on TOP
Wz - 0.0128 - 0.009 - -
1.6 Earthquake Load (EQ)
Reference: Earthquake as per PUSKIM data and SNI-1726-2012.
Seismic Parameter as per puskim.go.id (Tanah Sedang SD)

Seismic Parameter
PGA Peak Ground Acceleration = 0.175 g puskim.pu.go.id
SS MCE Spectral, Response Acc., at period 0.2s = 0.368 g puskim.pu.go.id
S1 MCE Spectral, Response Acc., at period 1s = 0.232 g puskim.pu.go.id
Fa Site Coefficient, Response Acc., at period 0.2s = 1.505 (unitless) puskim.pu.go.id
Fv Site Coefficient, Response Acc., at period 1s = 1.936 (unitless) puskim.pu.go.id
SMS Prmtr spectral response acc. at periods 0.2s = Fa x Ss = 0.554 g
SM1 Prmrtr spectral response acc. at periods 1s = Fv x S1 = 0.449 g
SDS Prmtr design spectral response acc. at 0.2s = 2/3 x SMS = 0.369 g
SD1 Prmtr design spectral response acc. at 1s = 2/3 x SM1 = 0.299 g

Cs Caclulation
I Importance Factor = 1.00 (Table 2, SNI-1726-2012)
R Faktor Modifikasi Response = 2.00 (Table 21, SNI-1726-2012)
Cs Coefficient Response Seismik = SDS/(R/I) = 0.185 (unitless)
Fundamental Period
hn Height of structure = 1.535 m
Ct Coefficient = 0.0488 (unitless) (Table 15, SNI-1726-2012)
x Coefficient = 0.750 (unitless) (Table 15, SNI-1726-2012)
Ta Approximate Fundamental Period = Ct.hnx = 0.07 s

Cs Boundary
Cs max = SD1/[Ta(R/I)] = 1.72

Condition A: for 0.6(PGA) > S1


Cs min-1 = 0.044SDS x I = 0.02 > Cs min-2
Cs min-2 = 0.01
Condition B: for 0.6(PGA) ≤ S1
Cs min-3 = 0.5S1/(R/I) = 0.06
Condition : Condition B: for 0.6(PGA) ≤ S1
Hence, Cs min = 0.06

Use Coefficient Cs Cs = 0.18

Base Shear TOF (TOP OF FOUNDATION)


Total Dead Weight Empty, Wt = 9.174 ton
Total Dead Weight Operating, Wt = 9.241 ton
Total base sehar design desain base shear:
V = Cs*Wt V = Cs*Wt
= 0,185 x 9,18 = 0,185 x 9,25
= 1.69 ton = 1.71 ton
= 16.61 kN = 16.74 kN

Empty Base Shear Vse = 16.61 kN


Operating Base Shear Vso = 16.74 kN

CoG Distance
Height of CoG equipment assumed as half of equipment height
CoG to Base of Baseplate ZBOB = He
= 0.685 m
CoG to Base of Foundation ZBOF = He + Hp + Hf
= 1.835 m
Horizontal Force in X-dir (Fx)
Empty Condition Fx = 16.61 kN
Operating Condition Fx = 16.74 kN

Horizontal Force in Z-dir (Fz)


Empty Condition Fz = 16.61 kN
Operating Condition Fz = 16.74 kN
Moment due to Earthquake Load in X-dir (Mz)
Empty Condition
Momen at BOF Mz = Vse . ZBOF Moment at TOP
= 30.48 kN.m 11.38 kN.m
Operating Condition
Momen at BOF Mz = Vso . ZBPF Moment at TOP
= 30.71 kN.m 11.46 kN.m

Moment due to Earthquake Load in Z-dir (Mx)


Empty Condition
Momen at BOF Mx = Vse . ZBOF Moment at TOP
= 30.48 kN.m 11.38 kN.m
Operating Condition
Momen at BOF Mx = Vso . ZBOF Moment at TOP
= 30.71 kN.m 11.46 kN.m

Base Shear BOF


Total Dead Weight Empty, Wt = 9.17 ton
Total Dead Weight Operating, Wt = 9.24 ton
Total base sehar design desain base shear:
V = Cs*Wt V = Cs*Wt
= 0,185 x 9,18 = 0,185 x 9,25
= 1.69 ton = 1.71 ton
= 16.61 kN = 16.73 kN

Empty Base Shear Vse = 16.61 kN


Operating Base Shear Vso = 16.73 kN
Height of CoG equipment assumed as half of equipment height
CoG to Base of Baseplate ZBOB = He
= 0.685 m
CoG to Base of Foundation ZBOF = He + Hp + Hf
= 1.835 m

Horizontal Force in X-dir (Fx)


Empty Condition Fx = 16.61 kN
Operating Condition Fx = 16.73 kN

Horizontal Force in Z-dir (Fz)


Empty Condition Fz = 16.61 kN
Operating Condition Fz = 16.73 kN
Moment due to Earthquake Load in X-dir (Mz)
Empty Condition
Momen at BOF Mz = Vse . ZBOF Moment at TOP
= 30.48 kN.m 11.38 kN.m
Operating Condition
Momen at BOF Mz = Vso . ZBPF Moment at TOP
= 30.70 kN.m 11.46 kN.m

Moment due to Earthquake Load in Z-dir (Mx)


Empty Condition
Momen at BOF Mx = Vse . ZBOF Moment at TOP
= 30.48 kN.m 11.38 kN.m
Operating Condition
Momen at BOF Mx = Vso . ZBOF Moment at TOP
= 30.70 kN.m 11.46 kN.m

Summary Load
Fx Fz Fy Mx Mz My
Primary Load LC
(kN) (kN) (kN) (kNm) (kNm) (kNm)
EQx (E) 16.61 30.48
EQz (E) 16.61 30.48
Acting on BOF
EQx (O) 16.73 30.70
EQz (O) 23.66 30.70
EQx (E) 8.30 11.38
EQz (E) 8.30 11.38
Acting on TOP
EQx (O) 8.37 11.46
EQz (O) 11.83 11.46
SECTION 2 - LOADING COMBINATION
2.1 Basic Load (acting at TOP)
Fx Fz Fy Mx Mz My
Primary Load LC
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Dead Load D - - - - - -
Live Load L - - 0.36 - - -
Equipment Empty E(E) - - 2.89 - - -
Equipment Operation E(O) 18.01 1.10 3.22 0.87 14.21 -
Equipment Test E(T) 0.17 0.03 3.45 0.02 0.14 -
Wind Load (x-dir) Wx 0.20 - - - 0.14 -
Wind Load (z-dir) Wz - 0.013 - 0.009 - -
Earthquake (x-dir) EQx (E) 8.30 - - - 11.38 -
Earthquake (z-dir) EQz (E) - 8.30 - 11.38 - -
Earthquake (x-dir) EQx (O) 8.37 - - - 11.46 -
Earthquake (z-dir) EQz (O) - 11.83 - 11.46 - -

2.2 Allowable Stress Design Load Combination for Foundation Stability Design (at TOP)
Fx Fz Fy Mx Mz My
Loading Condition LC Load Combination
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Empty 101 D+L+E(E) 0.00 0.00 3.26 0.00 0.00
Empty 102 D+0.75L+E(E)+P(E) 0.00 0.00 3.17 0.00 0.00
Empty + Wind X 103 D+0.75L+0.45Wx+E(E)+P(E) 0.09 0.00 3.17 0.00 0.06
Empty + Wind Z D+0.75L+0.45Wz+E(E)+P(E) 0.00 0.01 3.17 0.00 0.00
Empty + Wind X 104 D+0.6Wx+E(E)+P(E) 0.12 0.00 2.89 0.00 0.08
Empty + Wind Z D+0.6Wz+E(E)+P(E) 0.00 0.01 2.89 0.005 0.00

Empty + Seismic X 105 (1+0.14SDS)D+0.7EQx+0.21EQz+E(E)+P(E) 5.81 1.74 2.89 2.39 7.96

Empty + Seismic Z (1+0.14SDS)D+0.7EQz+0.21EQx+E(E)+P(E) 1.74 5.81 2.89 7.96 2.39

Empty + Seismic X 106 (1+0.105SDS)D+0.75L+0.7EQx+0.21EQz+E(E)+P(E) 5.81 1.74 4.20 2.39 7.96

Empty + Seismic Z (1+0.105SDS)D+0.75L+0.7EQz+0.21EQx+E(E)+P(E) 1.74 5.81 3.17 7.96 2.39

Empty + Seismic X 107 (0.6-0.14SDS)D+0.7EQx+0.21EQz+E(E)+P(E) 5.81 1.74 3.49 2.99 8.56

Empty + Seismic Z (0.6-0.14SDS)D+0.7EQz+0.21EQx+E(E)+P(E) 2.34 6.41 3.49 8.56 2.99

Operating 108 D+L+E(O) 18.01 1.10 3.59 0.87 14.21


Operating 109 D+0.75L+E(O)+P(O)+TF 18.01 1.10 3.49 0.87 14.21
Operating + Wind X 110 D+0.75L+0.45Wx+E(O)+P(O)+TF 18.10 1.10 3.49 0.87 14.27
Operating + Wind Z D+0.75L+0.45Wz+E(O)+P(O)+TF 18.01 1.11 3.49 0.874 14.21
Operating + Wind X 111 D+0.6Wx+E(O)+P(O)+TF 18.13 1.10 3.22 0.87 14.29
Operating + Wind Z D+0.6Wz+E(O)+P(O)+TF 18.01 1.11 3.22 0.876 14.21

Operating + Seismic X 112 (1+0.14SDS)D+0.7EQx+0.21EQz+E(O)+P(O)+TF 23.82 2.85 3.22 3.26 22.17

Operating + Seismic Z (1+0.14SDS)D+0.7EQz+0.21EQz+E(O)+P(O)+TF 19.75 6.92 3.22 8.83 16.60

(1+0.105SDS)D+0.75L+0.7EQx+0.21EQz+E(O)+P(O)+T
Operating + Seismic X 113 24.87 4.59 4.49 4.28 23.23
F
(1+0.105SDS)D+0.75L+0.7EQz+0.21EQx+E(O)+P(O)+T
Operating + Seismic Z 20.77 10.39 4.49 9.89 17.62
F

Operating + Seismic X 114 (0.6-0.14SDS)D+0.7EQx+0.21EQz+E(O)+P(O)+TF 24.47 4.19 3.82 3.88 22.83

Operating + Seismic Z (0.6-0.14SDS)D+0.7EQz+0.21EQx+E(O)+P(O)+TF 20.37 9.99 3.82 9.49 17.22


Fx Fz Fy Mx Mz My
Loading Condition LC Load Combination
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Operating 115 D+E(O)+P(O)+TF 18.01 1.10 3.22 0.87 14.21
Test 116 D+L+E(T) 0.17 0.03 3.81 0.02 0.14
Test + Wind X 117 D+0.75L+0.45Wx+E(T)+P(T) 0.26 0.03 3.72 0.02 0.20
Test + Wind Z D+0.75L+0.45Wz+E(T)+P(T) 0.17 0.03 3.72 0.025 0.14

2.3 Ultimate Strength Design Load Combination for Reinforced Concrete Design (at TOP)
Fx Fz Fy Mx Mz My
Loading Condition LC Load Combination
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Empty 201 1.4D 0.00 0.00 0.00 0.00 0.00
Empty 202 1.2D+1.6L+E(E)+P(E) 0.00 0.00 3.47 0.00 0.00
Empty + Wind X 203 1.2D+1.6L+0.5Wx+E(E)+P(E) 0.10 0.00 3.47 0.00 0.07
Empty + Wind Z 1.2D+1.6L+0.5Wz+E(E)+P(E) 0.00 0.01 3.47 0.004 0.00
Empty + Wind X 204 1.2D+L+Wx+E(E)+P(E) 0.20 0.00 3.26 0.00 0.14
Empty + Wind Z 1.2D+L+Wz+E(E)+P(E) 0.00 0.01 3.26 0.01 0.00

Empty + Seismic X 205 (1.2+0.2SDS)D+EQx+0.3EQz+E(E)+P(E) 9.50 3.69 4.09 4.61 12.58

Empty + Seismic Z (1.2+0.2SDS)D+0.3EQx+EQz+E(E)+P(E) 3.69 9.50 4.09 12.58 4.61

Empty + Seismic X 206 (1+0.15SDS)D+L+EQx+0.3EQz+E(E)+P(E) 8.30 2.49 2.89 3.41 11.38

Empty + Seismic Z (1+0.15SDS)D+L+EQz+0.3EQx+E(E)+P(E) 2.49 8.30 8.30 8.30 8.30

Empty + Seismic X 207 (0.9-0.2SDS)D+EQx+0.3EQz+E(E)+P(E) 9.30 2.49 2.89 3.41 11.38

Empty + Seismic Z (0.9-0.2SDS)D+EQz+0.3EQx+E(E)+P(E) 3.49 9.30 3.89 12.38 4.41

Operating 208 1.2D+1.6L+E(O)+P(O)+TF 18.01 1.10 3.80 0.87 14.21


Operating + Wind X 209 1.2D+1.6L+0.5Wx+E(O)+P(O)+TF 18.11 1.10 3.80 0.87 14.28
Operating + Wind Z 1.2D+1.6L+0.5Wz+E(O)+P(O)+TF 18.01 1.11 3.80 0.875 14.28
Operating + Wind X 210 1.2D+L+Wx+E(O)+P(O)+TF 18.21 1.10 3.59 0.87 14.35
Operating + Wind Z 1.2D+L+Wz+E(O)+P(O)+TF 18.01 1.12 3.59 0.88 14.21

Operating + Seismic X 211 (1.2+0.2SDS)D+EQx+0.3EQz+E(O)+P(O)+TF 27.52 4.79 4.42 5.48 26.79

Operating + Seismic Z (1.2+0.2SDS)D+EQz+0.3EQx+E(O)+P(O)+TF 21.70 10.61 4.42 13.45 18.82

Operating + Seismic X 212 (1+0.15SDS)D+L+EQx+0.3EQz+E(O)+P(O)+TF 34.68 3.59 3.22 4.28 37.05

Operating + Seismic Z (1+0.15SDS)D+L+EQz+0.3EQx+E(O)+P(O)+TF 28.87 9.41 3.22 12.25 29.09

Operating + Seismic X 213 (0.9-0.2SDS)D+EQx+0.3EQz+E(O)+P(O)+TF 26.38 4.65 3.22 4.31 25.67

Operating + Seismic Z (0.9-0.2SDS)D+EQz+0.3EQx+E(O)+P(O)+TF 20.52 12.94 12.94 12.94 17.65

Test 214 1.2D+1.6L+E(T) 0.17 0.03 4.03 0.02 0.14


Test 215 1.2D+L+E(T)+P(T) 0.17 0.03 3.81 0.02 0.14
Test + Wind X 216 1.2D+1.6L+0.5Wx+E(T)+P(T) 0.27 0.03 4.03 0.02 0.20
Test + Wind Z 1.2D+1.6L+0.5Wz+E(T)+P(T) 0.17 0.03 4.03 0.025 0.14
SECTION 2 - LOADING COMBINATION
2.1 Basic Load (acting at BOF)
Fx Fz Fy Mx Mz My
Primary Load LC
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Dead Load D - - 84.18 - - -
Live Load L - - 0.73 - - -
Equipment Empty E(E) - - 5.79 - - -
Equipment Operation E(O) 36.02 2.21 6.45 3.73 60.84 -
Equipment Test E(T) 0.34 0.05 6.90 0.09 0.58 -
Wind Load (x-dir) Wx 0.40 - - - 0.74 -
Wind Load (z-dir) Wz - 0.03 - 0.05 - -
Earthquake (x-dir) EQx (E) 16.61 - - - 30.48 -
Earthquake (z-dir) EQz (E) - 16.61 - 30.48 - -
Earthquake (x-dir) EQx (O) 16.73 - - - 30.70 -
Earthquake (z-dir) EQz (O) - 23.66 - 30.70 - -

2.2 Allowable Stress Design Load Combination for Foundation Stability Design (at BOF)
Fx Fz Fy Mx Mz My
Loading Condition LC Load Combination
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Empty 101 D+L+E(E) - - 90.692 - -
Empty 102 D+0.75L+E(E)+P(E) - - 90.511 - -
Empty + Wind X 103 D+0.75L+0.45Wx+E(E)+P(E) 0.1821 - 90.511 - 0.3341
Empty + Wind Z D+0.75L+0.45Wz+E(E)+P(E) - 0.01149 90.511 0.0211 -
Empty + Wind X 104 D+0.6Wx+E(E)+P(E) 0.2428 - 89.967 - 0.4455
Empty + Wind Z D+0.6Wz+E(E)+P(E) - 0.01533 89.967 0.0281 -

Empty + Seismic X 105 (1+0.14SDS)D+0.7EQx+0.21EQz+E(E)+P(E) 11.626 3.48791 94.319 6.4003 21.334

Empty + Seismic Z (1+0.14SDS)D+0.7EQz+0.21EQx+E(E)+P(E) 3.4879 11.6264 94.319 21.334 6.4003

Empty + Seismic X 106 (1+0.105SDS)D+0.75L+0.7EQx+0.21EQz+E(E)+P(E) 11.626 3.48791 95.173 6.4003 21.334

Empty + Seismic Z (1+0.105SDS)D+0.75L+0.7EQz+0.21EQx+E(E)+P(E) 3.4879 11.6264 95.173 21.334 6.4003

Empty + Seismic X 107 (0.6-0.14SDS)D+0.7EQx+0.21EQz+E(E)+P(E) 11.626 3.48791 51.944 6.4003 21.334

Empty + Seismic Z (0.6-0.14SDS)D+0.7EQz+0.21EQx+E(E)+P(E) 3.4879 11.6264 51.944 21.334 6.4003

Operating 108 D+L+E(O) 36.02 2.21 91.351 3.73 60.84


Operating 109 D+0.75L+E(O)+P(O)+TF 36.02 2.21 91.169 3.73 60.84
Operating + Wind X 110 D+0.75L+0.45Wx+E(O)+P(O)+TF 36.204 2.21 91.169 3.73 61.175
Operating + Wind Z D+0.75L+0.45Wz+E(O)+P(O)+TF 36.02 2.21781 91.169 3.7476 60.84
Operating + Wind X 111 D+0.6Wx+E(O)+P(O)+TF 36.264 2.21 90.626 3.73 61.286
Operating + Wind Z D+0.6Wz+E(O)+P(O)+TF 36.02 2.22164 90.626 3.7546 60.84

Operating + Seismic X 112 (1+0.14SDS)D+0.7EQx+0.21EQz+E(O)+P(O)+TF 47.648 5.694 94.974 10.127 82.175

Operating + Seismic Z (1+0.14SDS)D+0.7EQz+0.21EQz+E(O)+P(O)+TF 39.510 13.833 94.974 25.061 67.241

(1+0.105SDS)D+0.75L+0.7EQx+0.21EQz+E(O)+P(O)+T
Operating + Seismic X 113 39.535 18.7717 94.431 25.217 67.288
F
(1+0.105SDS)D+0.75L+0.7EQz+0.21EQx+E(O)+P(O)+T
Operating + Seismic Z 47.733 7.17593 94.433 10.174 82.331
F

Operating + Seismic X 114 (0.6-0.14SDS)D+0.7EQx+0.21EQz+E(O)+P(O)+TF 47.733 7.17593 52.602 10.174 82.331

Operating + Seismic Z (0.6-0.14SDS)D+0.7EQz+0.21EQx+E(O)+P(O)+TF 39.535 18.8 52.602 25.217 67.288


Fx Fz Fy Mx Mz My
Loading Condition LC Load Combination
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Operating 115 D+E(O)+P(O)+TF 36.02 2.21 90.626 3.73 60.84
Test 116 D+L+E(T) 0.34 0.05 91.81 0.09 0.58
Test + Wind X 117 D+0.75L+0.45Wx+E(T)+P(T) 0.5246 0.05 91.63 0.09 0.9126
Test + Wind Z D+0.75L+0.45Wz+E(T)+P(T) 0.34 0.06 91.63 0.1112 0.58

2.3 Ultimate Strength Design Load Combination for Reinforced Concrete Design (at BOF)
Fx Fz Fy Mx Mz My
Loading Condition LC Load Combination
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Empty 201 1.4D 0 0 117.85 0 0
Empty 202 1.2D+1.6L+E(E)+P(E) - - 107.96 - -
Empty + Wind X 203 1.2D+1.6L+0.5Wx+E(E)+P(E) 0.2023 - 107.96 - 0.3712
Empty + Wind Z 1.2D+1.6L+0.5Wz+E(E)+P(E) - 0.01277 107.96 0.0234 -
Empty + Wind X 204 1.2D+L+Wx+E(E)+P(E) 0.40 - 107.53 - 0.74
Empty + Wind Z 1.2D+L+Wz+E(E)+P(E) - 0.02554 107.53 0.05 -

Empty + Seismic X 205 (1.2+0.2SDS)D+EQx+0.3EQz+E(E)+P(E) 16.61 4.98273 113.02 9.1433 30.5

Empty + Seismic Z (1.2+0.2SDS)D+EQz+0.3EQx+E(E)+P(E) 4.9827 16.6 113.02 30.5 9.1433

Empty + Seismic X 206 (1+0.15SDS)D+L+EQx+0.3EQz+E(E)+P(E) 16.6 4.98273 95.354 9.1433 30.5

Empty + Seismic Z (1+0.15SDS)D+L+EQz+0.3EQx+E(E)+P(E) 4.9827 16.6 95.354 30.5 9.1433

Empty + Seismic X 207 (0.9-0.2SDS)D+EQx+0.3EQz+E(E)+P(E) 16.6 4.98273 75.333 9.1433 30.5

Empty + Seismic Z (0.9-0.2SDS)D+EQz+0.3EQx+E(E)+P(E) 5.0192 16.6 75.333 30.5 9.1433

Operating 208 1.2D+1.6L+E(O)+P(O)+TF 36.02 2.21 108.62 3.73 60.84


Operating + Wind X 209 1.2D+1.6L+0.5Wx+E(O)+P(O)+TF 36.224 2.21 108.62 3.73 61.212
Operating + Wind Z 1.2D+1.6L+0.5Wz+E(O)+P(O)+TF 36.02 2.21909 108.62 3.7499 60.84
Operating + Wind X 210 1.2D+L+Wx+E(O)+P(O)+TF 36.4 2.21 108.19 3.73 61.6
Operating + Wind Z 1.2D+L+Wz+E(O)+P(O)+TF 36.02 2.23 2.2319 2.23 2.23

Operating + Seismic X 211 (1.2+0.2SDS)D+EQx+0.3EQz+E(O)+P(O)+TF 52.8 9.30576 96.842 12.937 91.5

Operating + Seismic Z (1.2+0.2SDS)D+EQz+0.3EQx+E(O)+P(O)+TF 41.041 25.9 96.842 34.4 70.051

Operating + Seismic X 212 (1+0.15SDS)D+L+EQx+0.3EQz+E(O)+P(O)+TF 52.8 7.09945 96.013 9.2102 30.701

Operating + Seismic Z (1+0.15SDS)D+L+EQz+0.3EQx+E(O)+P(O)+TF 41.041 25.9 96.013 34.4 70.051

Operating + Seismic X 213 (0.9-0.2SDS)D+EQx+0.3EQz+E(O)+P(O)+TF 52.75 9.30576 75.991 12.937 91.5

Operating + Seismic Z (0.9-0.2SDS)D+EQz+0.3EQx+E(O)+P(O)+TF 41.041 25.9 75.991 34.4 70.051

Test 214 1.2D+1.6L+E(T) 0.34 0.05 109.08 0.09 0.58


Test 215 1.2D+L+E(T)+P(T) 0.34 0.05 108.64 0.09 0.58
Test + Wind X 216 1.2D+1.6L+0.5Wx+E(T)+P(T) 0.5448 0.05 109.08 0.09 0.9497
Test + Wind Z 1.2D+1.6L+0.5Wz+E(T)+P(T) 0.34 0.07 109.08 0.1136 0.58
SECTION 3 - FOUNDATION CHECK & REINFORCEMENT

The stability will be calculated manually and reinforcement of foundation and pedestall will be calculated using SAPv2000 Program.

The parameters are described below:


1. Pedestal Dimension
Pedestal Length = 0.5 m
Pedestal Width = 0.25 m
Pedestal Height (inc. grot) = 0.85 m
2. Load Combination
Allowable Stress Design Load Combination for Foundation Stability Design
101 D+L+E(E) Empty
102 D+0.75L+E(E)+P(E) Empty
103 D+0.75L+0.45Wx+E(E)+P(E) Empty + Wind X
D+0.75L+0.45Wz+E(E)+P(E) Empty + Wind Z
104 D+0.6Wx+E(E)+P(E) Empty + Wind X
D+0.6Wz+E(E)+P(E) Empty + Wind Z
105 (1+0.14SDS)D+0.7EQx+0.21EQz+E(E)+P(E) Empty + Seismic X
(1+0.14SDS)D+0.7EQz+0.21EQx+E(E)+P(E) Empty + Seismic Z
106 (1+0.105SDS)D+0.75L+0.7EQx+0.21EQz+E(E)+P(E) Empty + Seismic X
(1+0.105SDS)D+0.75L+0.7EQz+0.21EQx+E(E)+P(E) Empty + Seismic Z
107 (0.6-0.14SDS)D+0.7EQx+0.21EQz+E(E)+P(E) Empty + Seismic X
(0.6-0.14SDS)D+0.7EQz+0.21EQx+E(E)+P(E) Empty + Seismic Z
108 D+L+E(O) Operating
109 D+0.75L+E(O)+P(O)+TF Operating
110 D+0.75L+0.45Wx+E(O)+P(O)+TF Operating + Wind X
D+0.75L+0.45Wz+E(O)+P(O)+TF Operating + Wind Z
111 D+0.6Wx+E(O)+P(O)+TF Operating + Wind X
D+0.6Wz+E(O)+P(O)+TF Operating + Wind Z
112 (1+0.14SDS)D+0.7EQx+0.21EQz+E(O)+P(O)+TF Operating + Seismic X
(1+0.14SDS)D+0.7EQz+0.21EQz+E(O)+P(O)+TF Operating + Seismic Z
113 (1+0.105SDS)D+0.75L+0.7EQx+0.21EQz+E(O)+P(O)+TF Operating + Seismic X
(1+0.105SDS)D+0.75L+0.7EQz+0.21EQx+E(O)+P(O)+TF Operating + Seismic Z
114 (0.6-0.14SDS)D+0.7EQx+0.21EQz+E(O)+P(O)+TF Operating + Seismic X
(0.6-0.14SDS)D+0.7EQz+0.21EQx+E(O)+P(O)+TF Operating + Seismic Z
115 D+E(O)+P(O)+TF Operating
116 D+L+E(T) Test
117 D+0.75L+0.45Wx+E(T)+P(T) Test + Wind X
D+0.75L+0.45Wz+E(T)+P(T) Test + Wind Z
Ultimate Strength Design Load Combination for Reinforced Concrete Design
201 1.4D Empty
202 1.2D+1.6L+E(E)+P(E) Empty
203 1.2D+1.6L+0.5Wx+E(E)+P(E) Empty + Wind X
1.2D+1.6L+0.5Wz+E(E)+P(E) Empty + Wind Z
204 1.2D+L+Wx+E(E)+P(E) Empty + Wind X
1.2D+L+Wz+E(E)+P(E) Empty + Wind Z
205 (1.2+0.2SDS)D+EQx+0.3EQz+E(E)+P(E) Empty + Seismic X
(1.2+0.2SDS)D+0.3EQx+EQz+E(E)+P(E) Empty + Seismic Z
206 (1+0.15SDS)D+L+EQx+0.3EQz+E(E)+P(E) Empty + Seismic X
(1+0.15SDS)D+L+EQz+0.3EQx+E(E)+P(E) Empty + Seismic Z
207 (0.9-0.2SDS)D+EQx+0.3EQz+E(E)+P(E) Empty + Seismic X
(0.9-0.2SDS)D+EQz+0.3EQx+E(E)+P(E) Empty + Seismic Z
208 1.2D+1.6L+E(O)+P(O)+TF Operating
209 1.2D+1.6L+0.5Wx+E(O)+P(O)+TF Operating + Wind X
1.2D+1.6L+0.5Wz+E(O)+P(O)+TF Operating + Wind Z
210 1.2D+L+Wx+E(O)+P(O)+TF Operating + Wind X
1.2D+L+Wz+E(O)+P(O)+TF Operating + Wind Z
211 (1.2+0.2SDS)D+EQx+0.3EQz+E(O)+P(O)+TF Operating + Seismic X
(1.2+0.2SDS)D+EQz+0.3EQx+E(O)+P(O)+TF Operating + Seismic Z
212 (1+0.15SDS)D+L+EQx+0.3EQz+E(O)+P(O)+TF Operating + Seismic X
(1+0.15SDS)D+L+EQz+0.3EQx+E(O)+P(O)+TF Operating + Seismic Z
213 (0.9-0.2SDS)D+EQx+0.3EQz+E(O)+P(O)+TF Operating + Seismic X
(0.9-0.2SDS)D+EQz+0.3EQx+E(O)+P(O)+TF Operating + Seismic Z
214 1.2D+1.6L+E(T) Test
215 1.2D+L+E(T)+P(T) Test
216 1.2D+1.6L+0.5Wx+E(T)+P(T) Test + Wind X
1.2D+1.6L+0.5Wz+E(T)+P(T) Test + Wind Z

3. Soil Data
The soil data will use as per below (Based on soil report)
a. Cohession, c 16.4 ton/m2
b. Angle of friction,  15.8 degree
below 1 meter depth
c. N-SPT, depth 1 m below surface
N-SPT 31 /304,8mm
- Stability of Foundation

AL Lpp
z A A

x
EL ER
AR

FOUNDATION PLAN

LF BF
G.L. HP HP LP
BP Fz W4
A B
D
HF y Fy y HF
Fy
A B
O W1 W2 O
Fz Fx
Mx W5 Mz
W3
x z

SECTION A-A SECTION B-B

Foundation Length LF = 3.50 m EL = ER = 0.63 m


Foundation Width BF = 1.75 m AL = AR = 0.63 m
Foundation Thickness HF = 0.30 m D = 0.40 m
Pedestal Length LP = 0.50 m Lpp = 2.00 m
Pedestal Width BP = 0.25 m
Pedestal Height (inc. grot) HP = 0.85 m
Soil Thickness HS = 0.40 m
3
Concrete Unit Weight C = 23.54 kN/m
3
Soil Unit Weight S = 15.29 kN/m

Fz = 18.77 kN (LC 112)


Mx = 25.217 kNm (LC 112)
Fx = 47.7332 kN (LC 112) taken from load comb. 112 for stability at BOF
Mz = 82.3312 kNm (LC 112)
Fy = 95.1731 kN (LC 112)
SOIL DATA

- (Data of soil at depth 1 m)


2
c = 160.88 kN/m
0
 = 15.82
3
water = 9.81 kN/m
3
soil = 15.29 kN/m
3
soil eff. = 5.48 kN/m

Due to symmectrical between passive and active side, the soil active pressure and passive pressure are negligible.

- Concrete Data
3
concrete = 23.54 kN/m
W1 = 2.50 kN (pedestal weight)
W2 = 2.50 kN (pedestal weight)
W3 = 43.25 kN (slab weight)
W4 = 2.50 kN (pedestal weight)
W5 = 43.25 kN (slab weight)

- Table Moment (X dir.)


Force Distance to O. Moment
Area Vert. Hor. Vert. Hor. Mactive Mpassive
kN kN m m kNm kNm
W1 2.50 0.75 1.88
W2 2.50 0.75 1.88
W3 43.25 1.75 75.68
Fz 18.77
Mx 25.22
Fy 95.17 1.75 75.68

Summary:
Ma = 25.22 kNm (active moment to O, LC 112)
Mp = 155.12 kNm (resistance pasive moment to O, LC 112)
Ha = 18.77 kN (active sliding force to O, LC 112)
Hp = - kN (resistance passive sliding force to O, LC 112)
V = 143.42 kN (vertical load, LC 112)

- Table Moment (Z dir.)


Force Distance to O. Moment
Area Vert. Hor. Vert. Hor. Mactive Mpassive
kN kN m m kNm kNm
W4 2.50 0.88 2.19
W5 43.25 0.88 37.84
Fx 47.73
Mz 82.33
Fy 95.17 0.88 83.28
Summary:
Ma = 82.33 kNm (active moment to O, LC 112)
Mp = 123.31 kNm (resistance pasive moment to O, LC 112)
Ha = 47.73 kN (active sliding force to O, LC 112)
Hp = - kN (resistance passive sliding force to O, LC 112)
V = 140.92 kN (vertical load, LC 112)

- Check Stability

for X Dir.

- Overturning
ƩMp/ƩMa > SF
6.151 > 1.5 OK!

- Sliding
ƩHp/ƩHa > SF
ƩHp = c*B + f*ƩV
f = 0.5 (shear coefficient between concrete and soil)
ƩHp = 634.80 kN (per 1 m' length)
ƩHp/ƩHa > SF
33.8 > 1.5 OK!

- Soil Stability Lf 


e1 = B/2 - (ƩMp/ƩMa)/ƩV
= 1.707 m
e2 = B/6
= 0.583 m Condition 2!
max min
Condition 2:
max = 2*ƩV/(B*L)
2
= 46.8 kN/m
2
min = 0 kN/m

- Calculating Foundation Allowable Capacity

2
qall = 171 kN/m (Based on soil report)
2
max = 46.8 kN/m
qall/max > SF
3.651 > 1.5 OK!

for Z Dir.

- Overturning
ƩMp/ƩMa < SF
1.50 < 1.5 OK!
- Sliding
ƩHp/ƩHa > SF
ƩHp = c*B + f*ƩV
f = 0.6 (shear coefficient between concrete and soil)
ƩHp = 366.10 kN (per 1 m' length)
ƩHp/ƩHa > SF
7.7 > 1.5 OK!

- Soil Stability Bf 


e1 = B/2 - (ƩMp/ƩMa)/ƩV
= 0.864 m
e2 = B/6
= 0.292 m Condition 2!
max min
Condition 2:
max = 2*ƩV/(B*L)
2
= 46.0151 kN/m
2
min = 0 kN/m

- Calculating Foundation Allowable Capacity

2
qall = 171 kN/m (Based on soil report)
2
max = 46.02 kN/m
qall/max > SF
3.716 > 1.5 OK!

REINFORCEMENT DESIGN

- Calculating Ultimate Moment of Foundation B

AL Lpp
z A A

x
EL ER
AR

FOUNDATION PLAN
Mx Mx Mz
Fy Fy Fy
LF Fz BF Fx
G.L. HP Fz HP LP
BP W4 D
A B
HF y y HF
Fy
A B
W1 O W2 O

W3 W5
x z

SECTION A-A SECTION B-B

Foundation Length LF = 3.50 m EL = ER = 0.63 m


Foundation Width BF = 1.75 m AL = AR = 0.63 m
Foundation Thickness HF = 0.30 m D = 0.40 m
Pedestal Length LP = 0.50 m Lpp = 2.00 m
Pedestal Width BP = 0.25 m
Pedestal Height (inc. grot) HP = 0.85 m
Soil Thickness HS = 0.40 m
Concrete Unit Weight C = 23.54 kN/m3
Soil Unit Weight S = 15.29 kN/m3

Fz = 25.87 kN (LC 212)


Mx = 34.43 kNm (LC 212)
Fx = 52.75 kN (LC 212) taken from load comb. 209 & 212 for reinforced concrete at BOF
Mz = 91.54 kNm (LC 212)
Fy = 117.9 kN (LC 209)

- Table Moment (X dir.)


Force Distance to O. Moment
Area Vert. Hor. Vert. Hor. Mactive Mpassive
kN kN m m kNm kNm
W1 2.50 1.00 2.50
W2 2.50 1.00 2.50
W3 43.25 0.00 0.00
Fz 25.87 1.15 29.75
Fz 25.87 1.15 29.75
Mx 34.43
Mx 34.43
Fy 117.85 1.00 117.85
Fy 117.85 1.00 117.85
Summary:
Mult = 59.50 kNm (active moment to O, LC 212)

- Table Moment (Z dir.)


Force Distance to O. Moment
Area Vert. Hor. Vert. Hor. Mactive Mpassive
kN kN m m kNm kNm
W4 2.50 0.00 0.00
W5 43.25 0.00 0.00
Fx 52.75 1.15 60.67
Mz 91.54
Fy 117.85 0.00 0.00

Summary:
Mult = 60.67 kNm (active moment to O, LC 212)

- Reinforcement of Slab of X dir.


Based on  min

As need = min*b*d
min = 0.20%
min = 1.4/f'y
= 0.36%
min = 0.36%
b = 1000 mm
clear cover = 75 mm
Dia. Bar = 16 mm
d = 201 mm
2
As need = 721.5 mm per 1 m' length

Propose use D16-200 (Top Bottom)


2
A bar = 201.1 mm
s bar = 200 mm
n bar = 5 ea per 1 m' length
As use = A bar x n bar
2
= 1006 mm per 1 m' length > As need OK!
Based on Moment Ultimate

As need = Mult./(0.9*fy*d)
Mult. = 59.50 kNm
f'c = 28 MPa
fy main = 390 MPa
b = 1000 mm
clear cover = 75 mm
Dia. Bar = 16 mm
d = 201 mm
2
As need = 843 mm per 1 m' length

Propose use D16-200 (Top Bottom)


2
A bar = 201.1 mm
s bar = 200 mm
n bar = 5 ea per 1 m' length
As use = A bar x n bar
2
= 1006 mm per 1 m' length
a = As*fy/(0,85*fc*b)
= 16.48 mm
Mn = 0,9*As*fy*(d - a/2)
= 68.05 kNm > Mult OK!

Use D16-200 reinf. for X dir.

- Reinforcement of Slab of Z dir.


Based on  min

As need = min*b*d
min = 0.20%
min = 1.4/f'y
= 0.36%
b = 1000 mm
clear cover = 75 mm
Dia. Bar = 16 mm
d = 201 mm
2
As need = 402 mm per 1 m' length

Propose use D16-200 (Top Bottom)


2
A bar = 201.1 mm
s bar = 200 mm
n bar = 5 ea per 1 m' length
As use = A bar x n bar
2
= 1006 mm per 1 m' length > As need OK!

Based on Moment Ultimate

As need = Mult./(0.9*fy*d)
Mult. = 60.67 kNm
f'c = 28 MPa
fy main = 390 MPa
b = 1000 mm
clear cover = 75 mm
Dia. Bar = 16 mm
d = 201 mm

2
As need = 860 mm per 1 m' length
Propose use D16-200 (Top Bottom)
2
A bar = 201.1 mm
s bar = 200 mm
n bar = 5 ea per 1 m' length
As use = A bar x n bar
2
= 1006 mm per 1 m' length
a = As*fy/(0,85*fc*b)
= 16.48 mm
Mn = 0,9*As*fy*(d - a/2)
= 68.05 kNm > Mult OK!

Use D16-200 reinf. for X dir.

Checking Punching Shear of Slab

d = 0.201 m
X

Bp = 0.25 m BP+d
Z
Lp = 0.5 m
Bp + d = 0.451 m
Lp + d = 0.7 m
LP+d
bo = 2*((Bp+d)+(Lp+d))
= 2.3 m
β = Lp/Bp
= 2
αs = 20 for corner, 30 for edge, 40 for interior column
= 30
 = 0.75 (reduction factor)

According to ACI 318M-14 Table 22.6.5.2, v c shall be the least of the following criterias.
with λ = 1 (normal concrete)

Vc1 = 0.33*λ*√f'c
= 1.764 kN
Vc2 = 0.17*λ*√f'c * (1+2/β)
= 1.799 kN
Vc3 = 0.083*λ*√f'c * (2+αs*d/bo)
= 2.028 kN
Vc min = min (Vc1, Vc2, Vc3)
= 1.764 kN
Vc = Vc min*bo*d
= 816.8 kN
Vult. = Weight of one pedestal + Fy max.
= 120.4 kN

Checking Shear Reinforcement of Slab

Vult. = 120.4 kN
*Vc = 408.4 kN --> Vu < Vc OK!
0,5**Vc = 306.3 kN --> Vu < 0,5Vc OK!

Check shear reinf. --> No shear reinforcement needed

Use D16-200 Reinforcement (Top & Bottom) for Slab reinforcement.


ΦMn
- Reinforcement of Pedestal

min = 1.00% Ag
2
= 1250 mm
max = 6.00% Ag ΦPn
2
7500 mm
Hp = 850 mm
Lp = 500 mm
Bp = 250 mm
clear cover = 50 mm
Dia. Bar = 13 mm Lp c
Dia. Stirrup = 10 mm
f'c = 28 MPa
fy main = 390 MPa x
fy sec. = 390 MPa
Bp
Propose n = 12 ea
E steel = 200000 MPa
1 = 0.85
ds
2
As tot. = 1593 mm d1
ds = (Clear cover + Dia. Stirrup + Dia Main/2)
d2
= 66.5 mm
d3
n bar at LP = 5 ea
d4
n bar at BP = 3 ea d5

Check n bar --> 12 ea OK!

space between rebar at LP


xLp = 91.75 mm
clean space between rebar at LP
xnLp = 88.5 mm > 30 mm OK!
space between rebar at BP
xnBp = 58.5 mm
clean space between rebar at BP
xnBp = 52 mm > 30 mm OK!

Reduction factor:

= 0.65 If Pn > 0.1*f'c*Bp*Lp

= 0.8 If Pn = 0

= 0.65+0.15*(Pn 0 - Pn)/Pn0 If 0 < Pn < 0.1*f'c*Bp*Lp

Pn0 = Nominal Pn at axial sentris


= 0.80*[(0.85*f'c*Bp*Lp + As total*(fy-0.85*f'c)]
= 3442 kN

0.1*f'c*Bp*Lp = 350 kN

Balance Condition:
c = cb = 600/(600 + fy)*d1
cb = 262.7 mm
Rebar Diagram Table

Area of Rebar (mm2) Distance to Conc. (mm)


No
As1=n/n total*Astotal, dst.. d1=(n-n1+1)*x+ds, dst…
1 = (n)/(n-tot)*Astot 663.928571 = (n - 1)*x+ds 433.5
2 = (2)/(n-tot)*Astot 265.571429 = (n - 2)*x+ds 341.75
3 = (2)/(n-tot)*Astot 265.571429 = (n - 3)*x+ds 250
4 = (2)/(n-tot)*Astot 265.571429 = (n - 4)*x+ds 158.25
5 = (n)/(n-tot)*Astot 132.785714 = (n - 5)*x+ds 66.5

2
As tot. = 1593 mm OK! p min < p < p max

Strain for each bars:


si = 0.003*(c - di)/c

Stress for each bars:


Untuk |si|< fy/Efsi = si*Es
Untuk |si|> fy/Efsi = fy

DESCRIPTION FORMULA UNIT


Each Rebar's Internal Force Fsi = Asi*fsi*10^-3 kN
Resultant of Each Rebar's Internal Force Cs = ΣFsi kN
Moment due to Each Rebar's Internal Force Msi = Fsi*(h/2 - di) kNmm
Total Moment due to Each Rebar's Internal Force Ms = ΣMsi kNmm
Height of Concrete Block Compressive Stress a = b1*c mm
Internal Force at Compressive Concrete Block Cc = 0.85*f'c*b*a*10^-3 kN
Moment due to Internal Force at Compressive Mc = Cc*(h-a)/2 kNmm
Concrete Block
Nominal Axial Force Pn = Cs + Cc kN
Nominal Moment Mn = (Mc + Ms)*10^-3 kNm
Design Ultimate Axial Force Pu = *Pn kN
Design Umtimate Moment Mu = *Mn kNm

Moment Interaction Diagram

2500
Pedestal Balance Condition Pult, Mult

2000
Compression
Failure Zone
1500

1000 Tension
Φ*Pn (kN)

Failure Zone

500

Pult, Mult
0
0 50 100 150 200 250 300

‐500

‐1000
Φ*Mn (kN‐m)
Data (For Concrete Foundation Design)
Pult 0 117.9 kN
taken from load comb. 213 for reinforced concrete at TOP
Mult 0 34.43 kNm

Balance Condition:
Absis: 0 280 kNm
Ordinate: 1616.12 1616 kN

Tension Failure:
Absis: 0 280 kNm
Ordinate: 0 1616 kN

Compression Failure:
Absis: 0 126.3 kNm
Ordinate: 0 2237 kN

From moment diagram above, the designed pedestal can withstand Pult and Mult.

- Shear Reinforcement of Pedestal

Vc (concrete strength)
Vc = (1+((Nu/14*Ag))*(f'c^0,5/6)*(b*d)
Nu = 117.9 kN
2
14*Ag = 1.75 m
f'c = 28 MPa
b = 0.25 m
d = 0.184 m
Vc = 2724607.1 Newton
= 2724.61 kN

Dimension requirement
Vu<0.5 ØVc No reinforcement required
0,5 ØVc<Vu<ØVc use minimum reinforcement
(Vu - ØVc )< 0.67bwd√fc' pedestal dimension ok, if not, dimension need to be made larger

Capacity reduction factor for shear


Øs = 0.75

Vult. = 52.75 kN
*Vc = 2043 kN
0,5**Vc = 1022 kN
0.67bwd√fc' = 162.6 kN

Thus,
Vu<0.5 ØVc No reinforcement required
if Vult. < 0.34*B*L*√fc', maximum spacing is minimum value of:
0.34*B*L*f'c^0.5 = 224.89 kN
- d/2 = 92 mm
- 24" = 600 mm
- 16 x longitudinal bars = 208 mm
- 48 x tie bar = 480 mm

if Vult. > 0.34*B*L*√fc', maximum spacing is minimum value of:


- d/4 = 46 mm
- 12" = 300 mm

Thus,
Vult. < 0.34*B*L*√fc' s = 92 mm

Use D10-100 mm as stirrup.


SETTLEMENT CALCULATION
Immediate
Df : Depth of Foundation = 0.85 m
L : Length of footing = 3.50 m
B : Width of footing = 1.75 m
hf : Thickness of footing = 0.30 m

Table is taken from Foundation analysis and Design Book fifth Edition, by J Bowles

The following borelog BH-1 is considered to calculate settlement with soil profile as follow:

El + 0
Footing 3.25 m
Soft Clay
(Layer 1) 2.40 m
El - 3.25
Medium Stiff Clay 6.75 m
(Layer 2)

El - 10
Dense Sandy Clay

Immediate Settlement
The immediate settlement of a rectangular base on the surface of an elastic half-space can be computed from an equation from the
Theory of Elasticitiy [Timoshenko and Goodier (1951)] as follow:
1 𝜇 1 2𝜇
∆H 𝑞 𝐵 𝐼 𝐼 𝐼
𝐸 1 𝜇
qmax Permanent maximum soil bearing pressure = 46.83 kN/m2
qo base contact pressure = qmax = 46.83 kPa
μ poisson's ratio = for most clay soil = 0.45
cu cohession = = 0.167 kg/cm2
Es Strain-stress modulus = 30 Mpa = 29430 kN/m2
B' = B/2 = 0.88 m
H = H = 3.25 m
N = H/B' = 3.71
M = L/B = 2.00

Based on Table 5-2 on Foundation Analysis and Design by Joseph E. Bowles, I1 and I2 for N and M above:
I1 = 0.479
I2 = 0.068
D Depth of foundation = 0.85 m
D/B = 0.49
Based on Figure 5-7 on Foundation Analysis and Design by Joseph E. Bowles, IF for D/B and m above:
IF = 0.620

m Number of contributing corner = 4


DH Immediate settlement
= 46.83*0.875*(1-0.45^2)/29430*(0.479+(1-2*0.45)/(1-0.45)*0.068)*0.62*4 m
= 0.0014 m
= 1.3531 mm
Consolidation Settlement
Depth of footing z1 = 0.850 m
Depth of footing to bottom of soft clay z2 = 2.400 m
Contact pressure qo = qmax
= 46.8 kN/m2
No. Elevation, D D/B Dq/qo* Dq
(m)
1 0.48 0.274 0.65 30.44
2 0.96 0.549 0.3 14.05
3 1.44 0.823 0.22 10.30
4 1.92 1.097 0.14 6.56
5 2.40 1.371 0.05 2.34
*obtained from figure 5-4 Boussinesq pressure bulb on Foundation Analysis and Design by Joseph E. Bowles

A = Dq x H = 0.48*((30.44+2.34)/2+14.05+10.3+6.56) = 22.70
with
H = 2.400 m; Dp = 22.7/2.4 = 9.46 kN/m2
gs1 = 1.371 gr/cm3 (See attachment C)
= 13.45 kN/m3
po' = H1/2 x gs1
= 3.25/2*13kN/m2
= 21.86 kN/m2
pc' = 0.625 kg/cm2
= 61.3 kN/m2
OCR = pc'/po'
= 2.8054
po' + Dp = 21.86+9.46
= 31.32 kN/m2
Cc = 0.311
Cr = 1/10 Cc (Ref. 18 Table 2.5)
= 0.0311
Conditon:
Sc = (Cc Hc )/(1+e0) log (po' +Dp)/po' clay normally consolidated
Sc = (Cr Hc )/(1+e0) log (po' +Dp)/po' clay over consolidated with po' + Dp < pc
Sc = (Cr Hc )/(1+e0) log (pc /po') + (Cc Hc/1+e0) log (po' +Dp)/pc clay over consolidated with po' < pc < po' + Dp

eo = 1.043
DH = Cr . H /(1 + eo) log((po' + Dp)/po')
= 0.0311*2.4/(1+1.043)*log(31.32/21.86)
= 0.0057 m
= 5.71 mm

Total settlement : dt = 1.35+5.71 = 7.1 mm < Allowable Settlement


< 25.00 mm …OK
Foundation Calculation for Gasline Pig Receiver

EPC OF FLOWLINE AND PIPELINE FOR HARI FIELD AND EXISTING FIELD MODIFICATION

ATTACHMENT B: FOUNDATION DRAWING

1100-CV-CAL-005 Rev. 2 Page 17 of 18


Foundation Calculation for Gasline Pig Receiver

EPC OF FLOWLINE AND PIPELINE FOR HARI FIELD AND EXISTING FIELD MODIFICATION

ATTACHMENT C: MECHANICAL GA DRAWING

1100-CV-CAL-005 Rev. 2 Page 18 of 18


3
CAESAR II 2014 Ver.7.00.00.2800, (Build 140416) Date: JAN 19, 2021 Time: 15:0
Job:: PSA FOR TRGP TRAIL1BTRY
Licensed To:: SPLM: PT. Tiga Inti Pilar @ 2014 –ID#00719782

RESTRAINT SUMMARY REPORT: Loads On Restraints


Various Load Cases

LOAD CASE DEFINITION KEY

CASE 1 (HYD) WW+HP


CASE 2 (OPE) W+T1+P1
CASE 3 (OPE) W+T1+P2
CASE 4 (OPE) W+T2+P2
CASE 8 (SUS) W+P1
CASE 14 (OCC) L14=L11+L12+L13

Node Load Case FX lb. FY lb. FZ lb. MX ft.lb. MY ft.lb. MZ ft.lb.


Rigid +Y;
45
Rigid Z
1(HYD) -310 -1083 2 0.0 0.0 0.0
2(OPE) 1210 -4035 231 0.0 0.0 0.0
3(OPE) 1210 -4035 231 0.0 0.0 0.0
4(OPE) 729 -2429 91 0.0 0.0 0.0
8(SUS) -276 -920 2 0.0 0.0 0.0
14(OCC) 29 98 165 0.0 0.0 0.0
MAX 1210/L2 -4035/L2 231/L2

Rigid Y;
85 Rigid GUI;
Rigid GUI
1(HYD) 387 -469 -14 0.0 0.0 0.0
2(OPE) 6888 2586 -727 0.0 0.0 0.0
3(OPE) 6888 2586 -727 0.0 0.0 0.0
4(OPE) 4662 440 -287 0.0 0.0 0.0
8(SUS) 352 -330 -13 0.0 0.0 0.0
14(OCC) 353 60 28 0.0 0.0 0.0
MAX 6888/L2 2586/L2 -727/L2

140 Rigid +Y
1(HYD) 3 -1762 -53 0.0 0.0 0.0
2(OPE) 0 0 0 0.0 0.0 0.0
3(OPE) 0 0 0 0.0 0.0 0.0
4(OPE) 0 0 0 0.0 0.0 0.0
8(SUS) -15 -1651 -50 0.0 0.0 0.0
14(OCC) 0 0 0 0.0 0.0 0.0
MAX -15/L8 -1762/L1 -53/L1

Rigid +Y;
250
Rigid GUI
1(HYD) -5 -1194 13 0.0 0.0 0.0
2(OPE) 5113 0 0 0.0 0.0 0.0
3(OPE) 5113 0 0 0.0 0.0 0.0
4(OPE) 1009 0 0 0.0 0.0 0.0
8(SUS) -6 -1131 13 0.0 0.0 0.0
14(OCC) 385 0 0 0.0 0.0 0.0
MAX 5113/L2 -1194/L1 13/L1

290 Rigid +Y
1(HYD) -0 -356 11 0.0 0.0 0.0
2(OPE) 0 0 0 0.0 0.0 0.0
3(OPE) 0 0 0 0.0 0.0 0.0
 

(UP) 

(WEST)  (SOUTH) 
 
EPC OF FLOWLINE AND PIPELINE FOR HARI FIELD
AND EXISTING FIELD MODIFICATION

01.042-SJB-2020

DATASHEET FOR HARI PIG RECEIVER

1115-V-105

Document Number :
1100-ME-DST-002

CONSORTIUM
PT. TRIAGUNG
JINDI SOUTH JAMBI B Co.
PT. FEGAS REKAYASA UTAMA JAYA ABADI –
Ltd.
PT. UNISAT
Rev. Description NUSANTARA

Prepared Check Appr’d


Issue Date Approved by Approved
by by by

Approved for
2 5-Jan-2021 DN DW OM
Construction
1A Issued for Review 14-Dec-2020 DN DW OM

STATUS CODE : 1A = Issued for Review, 2 = Approved for Construction / Issued for Information
Datasheet for Hari Pig Receiver (1115-V-105)
EPC OF FLOWLINE AND PIPELINE FOR HARI FIELD AND EXISTING FIELD MODIFICATION

REVISION TABLE

REVISION REVISION REVISION


Page Page Attachment
A B C 0 1 A B C 0 1 A B C 0 1

1 X
2 X
3 X

4 X X

5 X
6 X X
7
8
9
10
11
12
13
14
15
16
17

18
19
20

21
22
23
24
25
26
27
28

1100-ME-DST-002 Rev 2 Page 2 of 6


Datasheet for Hari Pig Receiver (1115-V-105)
EPC OF FLOWLINE AND PIPELINE FOR HARI FIELD AND EXISTING FIELD MODIFICATION

REVISION NOTE

Rev. Implemented
Part Page Comment Description
No. (Y/N)
Add Reference Document of
2 4
Specification

2 6 Update Sketch

1100-ME-DST-002 Rev 2 Page 3 of 6


CLIENT

DATA SHEET DOC. NO.


HARI PIG RECEIVER 1100-ME-DST-002
1115-V-105
CONTRACTOR Sheet 4 of 6
DESCRIPTION REV DATE PREP CHECK'D APPV'D
ISSUED FOR REVIEW 1A 14/12/2020 DN DW OM
APPROVED FOR CONSTRUCTION 2 05/01/2021 DN DW OM

EPC OF FLOWLINE AND PIPELINE FOR HARI FIELD


PROJECT TITLE : MANUFACTURER : TBA
AND EXISTING FIELD MODIFICATION
EQUIPMENT NAME : Hari Pig Receiver ORIENTATION : HORIZONTAL
ITEM NO. : 115-V-105 NO. OF UNIT : 1 (ONE)
1 ORIENTATION HORIZONTAL FLUID TWO PHASE GAS
2 CODE FOR VESSEL ASME B 31.8 OPERATING PRESSURE psig 295
3 CODE FOR CLOSURE ASME Sect. VIII Div. 1 o 95
OPERATING TEMPERATURE F
4 CODE STAMP ASME "U Stamp" (For Closure) DENSITY OF CONTENT lb/ft3 1.73
5 SPECIFICATION - LETHAL SERVICE NO
6 DESIGN PRESSURE (INTERNAL) psig 1300
7 DESIGN PRESSURE (EXTERNAL) psig ATM PIPELINE DATA
8 DESIGN TEMPERATURE o 200 ASME B31.8
F CONNECTION PIPELINE DESIGN CODE
9 INTENDED NO. OF OPERATING CYCLES - PIPELINE OD. inch (mm) 6.625 (168)
10 DESIGN LIFE Years 20 MATERIAL OF CONNECTION PIPELINE/PIPING:
11 CORROSION ALLOWANCE mm 3 PIPELINE API 5L X-52
12 WELD JOINT EFFICIENCIES: Maximum Pig Length Acceptable in Barrel, mm. 3200
13 SHELL 1
14 CLOSURE 1 MATERIAL
15 DESIGN FACTOR 0.6 BARREL API 5L X-52
16 FIRE PROOFING NOT REQUIRED REDUCER A 860 WHPY52
17 INSULATION (HOT/COLD) THICKNESS NOT REQUIRED SADDLE / PAD SADDLE A 285 Gr C / A 36
18 PASSIVE FIRE PROTECTION NOT REQUIRED STUD BOLTS / NUTS A 193 Gr B7 / A 194 Gr 2H
19 CLIPS FOR LADDERS & PLATFORM NOT REQUIRED FLANGE / WELDOLET A 694-F52, ASME B16.5 / -
20 CLIPS FOR PIPE SUPPORT NOT REQUIRED PIPE NOZZLE API 5L X-52
21 LIFTING LUGS YES QOC SEALS Note 7
22 EARTHING LUGS YES EARTHING LUGS A 240 Gr 316
23 QUICK OPENING CLOSURE YES (Note 4) INTERNAL ATTACHMENT N/A
24 SUPPORT TYPE SADDLES EXTERNAL ATTACHMENT A 36
25 MAJOR / MINOR BARREL OD. inch (mm) 10.75 (273) / 6.625 (168) SUPPORT (SADDLE / DOUBLER PLATE) A3 6
26 LENGTH MAJOR BARREL mm (Note 9) ACCESSORIES
27 REDUCER mm (Note 9) NAMEPLATE A 240 Gr 316
28 MINOR BARREL mm (Note 9)
29 THICKNESS QOC- SHELL RING mm *
30 MAJOR BARREL mm 9.27 *
31 REDUCER mm *
32 MINOR BARREL mm 7.11 *
33 QUICK OPENING CLOSURE DWG. NO. PROVIDED BY VENDOR
34

35 FABRICATION & INSPECTION PROTECTIVE PAINTING / COATING


36 INSPECTION AUTHORITY MIGAS EXTERNAL PAINTING / COATING AS PER SPECIFICATION
37 POST WELD HEAT TREATMENT AS PER CODE SPEC. INTERNAL PAINTING / COATING N/A
38 SPECIAL HEAT TREATMENT NO
39 MATERIAL IMPACT TEST NO WEIGHT
40 MATERIAL NDT NO EMPTY (APPOXIMATE) kg 549.71 (*)
41 MATERIAL CUT EDGES NDT NO OPERATING (FULL UNIT) kg 597.71 (*) (Note 6)
42 RADIOGRAPHY 100% X-RAY HYDROTEST (APPROXIMATE) kg 693.32 (*)
43 OTHER NDT (UT/MPI/DPI) 100% QUICK OPENING CLOSURE (EMPTY) kg *
44 HYDROSTATIC TEST PRESSURE AS PER CODE & SPEC.
45 FUCTION TEST NO
46 NOTES
47 1. Vendor to verify data at locations marked with *
48 2. Vendor to confirm that fabrication, inspection and testing shall follow the referenced Codes, Standards and Project Specifications.
49 3. Vendor to advise
50 4. Using blind flange 10" #600 complete with davit/hinge, gasket & bolt/nut as temporary. This blind will be change into Quick Opening Closure by connecting flange to flange.
51 Vendor shall supply QOC designed with flange 10" for connecting to barrel. Also supply completed with gasket and bolt/nut as loose item.
52 The Quick Opening Closure shall be equipped with a mechanical interlock to prevent the door from being opened while barrel is pressurized.
53 5. Vendor to provide all required data for MIGAS certification.
54 6. Operating weight is empty weight + weight of pig tool ± 48 kg. Weight of pig tools will be detailed by selected vendor.
55 7. The Closure shall be provided with seal, typically an "O" ring type with Viton anti exposive decompression (AED), Seal materials for end closure shall be suitable for long-term
56 exposure to the transported service fluid at the design pressure and temperature conditions. Seal materials shall resist explosive and compatible with fluid service.
57 8. Vendor to supply spare parts for Start Up & Commissioning
58 9. For detail, refer to general sketch drawing
59 10. Applicable Specification: 1100-ME-SPC-001 Specification for Pig Launcher and Receiver, 1100-ME-SPC-003 Specification for Surface Preparation and Painting.
60
CLIENT

DATA SHEET DOC. NO.


HARI PIG RECEIVER 1100-ME-DST-002
1115-V-105
CONTRACTOR Sheet 5 of 6
DESCRIPTION REV DATE PREP CHECK'D APPV'D
ISSUED FOR REVIEW 1A 14/12/2020 DN DW OM
APPROVED FOR CONSTRUCTION 2 05/01/2021 DN DW OM

EPC OF FLOWLINE AND PIPELINE FOR HARI FIELD


PROJECT TITLE : MANUFACTURER : TBA
AND EXISTING FIELD MODIFICATION
EQUIPMENT NAME : Hari Pig Receiver ORIENTATION : HORIZONTAL
ITEM NO. : 115-V-105 NO. OF UNIT : 1 (ONE)
1 TECHNICAL DATA SHEET QUICK OPENING CLOSURE
2 ITEM INFORMATION CERTIFICATION
3 PRODUCT NUMBER * MATERIAL CERTIFICATION AS PER CODE
4 LINE ITEM NUMBER 1 (ONE) NON-DESTRUCTIVE TESTING
5 QUANTITY 1 (ONE) M.P.I. ON WELD END PREPARATION *
6 EQUIPMENT TAG NUMBER 115-V-105 DYE PENETRANT ON WELD END PREPARATION *
7 DESIGN CONDITIONS ULTRASONIC EXAMINATION - HUB *
8 CLOSURE NOMINAL DIAMETER 10" - 600# ULTRASONIC EXAMINATION - DOOR *
9 CLOSURE DESIGN CODE ASME VIII Div.1 OTHER REQUIREMENTS
10 VESSEL DESIGN CODE ASME B 31.8 INSPECTION REQUIREMENTS YES
11 CLOSURE DESIGN PRESSURE psig 1300 CE MARKING *
12 CLOSURE DESIGN TEMPERATURE °F 200 CLOSURE FINISH *
13 CORROSION ALLOWANCE mm 3 WELD OVERLAY MATERIAL -
14 PIPELINE PRODUCT RAW GAS WELD OVERLAY THICKNESS -
15 VESSEL WALL THICKNESS(MAJOR/MINOR) mm 9.27 / 7.11 * CLOSURE KEY INTERLOCK/SWITCH -
16 CLOSURE ORIENTATION HORIZONTAL
17 HINGE HANDLING (WHEN FACING CLOSURE) RIGHT HAND
18 PRINCIPAL MATERIALS OF CONSTRUCTION ( NOTE  1,  3,  4 ) 
19 HUB MATERIAL *
20 DOOR MATERIAL *
21 DOOR SEAL *
22 LOCKING BAND *
23 HINGE/DAVIT MOUNTING PLATE *
24 PRESSURE WARNING SCREW *
25
26

27 NOZZLE SIZE
28 Mark Required No. Size Sch Rating Face Type Service Remark
29 N1 1 10 Inch 40 600# RF WN Quick Opening Closure Note 4 & 7
30 N2 1 6 Inch 40 600# RF WN Outlet
31 N3 1 2 Inch XS 600# RF WN Kicker & Equalizing Line
32 N4 1 2 Inch XS 600# RF WN Drain
33 N5 1 2 Inch XS 600# RF WN Drain
34 N6 1 2 Inch XS 600# RF WN Equalizing Line
35 N7 1 2 Inch XS 600# RF WN Vent to Flare Header
36 N8 1 2 Inch XS 600# RF WN Spare for Purging & Vent Connection W/ Blind, Gasket & Bolt/Nut
37 N9 1 2 Inch XS 600# RF WN Pig Passage Indicator
38 N10 1 2 Inch XS 600# RF WN Pressure Indicator
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
CLIENT
DATA SHEET DOC. NO.
HARI PIG RECEIVER 1100-ME-DST-002
1115-V-105
CONTRACTOR Sheet 6 of 6
DESCRIPTION REV DATE PREP CHECK'D APPV'D
ISSUED FOR REVIEW 1A 14/12/2020 DN DW OM
APPROVED FOR CONSTRUCTION 2 05/01/2021 DN DW OM

EPC OF FLOWLINE AND PIPELINE FOR HARI FIELD


PROJECT TITLE : MANUFACTURER : TBA
AND EXISTING FIELD MODIFICATION
EQUIPMENT NAME : Hari Pig Receiver ORIENTATION : HORIZONTAL
ITEM NO. : 115-V-105 NO. OF UNIT : 1 (ONE)
1 SKETCH
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59 - VENDOR shall verify and finalize General Arrangement and Detail Design.