Download as pdf or txt
Download as pdf or txt
You are on page 1of 8

-SAMPLE STORYBOARD-

Name: Keisha McKenzie

Topic of Courseware: Construction DeCONSTRUCTION

Storyboard for Courseware

Title of Slide Text On Slide Image on slide Audio on slide Activity on Slide (include
webtool, website, video
etc with links)

Welcome Construction DeConstruction Banner with images of Welcome to this interactive N/A
construction across page Courseware on
Construction
DeConstruction, click the
Prepared by Keisha McKenzie, start button to move to the
ED206 – Semester 2 2019 next slide and learn about
basic construction

About this Courseware This courseware provides an Simple image of a woman Same as text on slide N/A
introduction to the basic types of in construction PPE
personal protective equipment
needed for the industry, hazards that
exist within the industry and the
control measures that should be put
in place to mitigate against such
hazards.

Learners will engage in practical


examples and interactive activities
that will enable them to gain the
necessary knowledge, skills and
attitudes required.

Sample Storyboard v1 – Keisha McKenzie – March 2019


Title of Slide Text On Slide Image on slide Audio on slide Activity on Slide (include
webtool, website, video
etc with links)

The courseware includes videos and


readings that explain each tool,
followed by short videos and activity
worksheets. You will have the
opportunity to ask questions about
the topics covered and finally, you
will be able to participate in a
discussion forum where you can
share what has been learned. I am
certain that you will find the extra
knowledge you gain worthy of the
time you invest to obtain it.

About this courseware The courseware caters to students Man on construction site Same as text on slide N/A
cont’d who are desirous of pursuing a
career in General Construction but
are not acquainted with the basic
knowledge about construction
practices.

The users of this courseware are


expected to be 18 and over and
enrolled in the Level 1 TVET
programme for General Construction.
All students must have basic IT skills
so that they can manipulate the
computer and Internet to complete
the tasks in the courseware.

About this courseware On completion of this courseware, None Same as text on slide N/A
cont’d you will learn how to:
1. Explain the basic concepts

Sample Storyboard v1 – Keisha McKenzie – March 2019


Title of Slide Text On Slide Image on slide Audio on slide Activity on Slide (include
webtool, website, video
etc with links)

and the personal protection


equipment required for the
construction industry
2. Analyse the various kinds of
hazards and risks in the
Construction sector and how
to prevent them

How to use this The courseware has been designed Image of Home, Next, Narration explains what is N/A
courseware for simple use. Back and Quit button with on the slide and what each
explanation beside each buttons /graphic means
At the bottom, you will find the
navigation buttons that are consistent
throughout the courseware and
provides quick and easy access to
the contents of each unit. Click on
each icon below to learn more about
its function.

Subtopic Navigation The main topic buttons are listed to Buttons for two subtopics Repeat what is written on N/A
the right of the screen. and also Extra resources the slide.

Click a topic below to begin reviewing Buttons for HOME, BACK


the related content and QUIT

Subtopic 1- 1st Slide Subtopic 1 Personal Protective HOME, NEXT and QUIT Repeat what is written on N/A
Equipment buttons the slide.

Construction Jobsites can be Topic Buttons to right side


dangerous places to work. There are

Sample Storyboard v1 – Keisha McKenzie – March 2019


Title of Slide Text On Slide Image on slide Audio on slide Activity on Slide (include
webtool, website, video
etc with links)

often many activities occurring at the


same time, with various trades
working side by side. Personal
Protective Equipment are utilised to
protect the worker against health and
safety risks while at work.

Upon completion of this subtopic, you


should be able to:
1. Document the Construction
industry standards and the
related PPE after reviewing
content of the
ConstructionDeconstruction
Courseware with 100%
accuracy
2. Differentiate between different
types of personal protective
equipment used by
Construction workers based
on industry standards with
100% accuracy
3. Simulate the use of at least
four types of PPE during a
video role-play scenario
based on established
Constructional Industry
standards
4. Provide justification for
wearing PPR while on
construction sites with 100%
compliance

Sample Storyboard v1 – Keisha McKenzie – March 2019


Title of Slide Text On Slide Image on slide Audio on slide Activity on Slide (include
webtool, website, video
etc with links)

Subtopic 1- Middle Personal protective equipment Images of Boots, Gloves, Repeat what is on slide N/A
are…… Goggles, Construction Hat

Subtopic 1- Middle ---

Subtopic 1- Middle Personal Protective Equipment Video on Personal Repeat what is on slide  Watch video on
video Activity Protective Equipment Personal Protective
video – Video link Equipment
Now that you have been introduced  Complete worksheet
to the Personal Protective Button links to:  Upload to dropbox link
Equipment, watch this video and 1. Worksheet here: XXXXXXX
complete the attached worksheet, 2. Dropbox link
and upload to drop box link

Subtopic 1- Middle ---

Subtopic 1- Middle ---

Subtopic 1- Middle Using Personal Protective Equipment Gloves and Goggles Repeat what is on slide Quick Question: Using
Trigger
Now that you have reviewed some
additional content on Personal Of the two items below,
Protective Equipment, answer this which is the better
quick Question SUITED Personal
Protective Equipment for
Of the two items below, which is the Mixing Cement?
better SUITED Personal Protective
Equipment for Mixing Cement? Goggle or Gloves

Goggle or Gloves You are correct, gloves


are useful for protecting
the hands against cement

Sample Storyboard v1 – Keisha McKenzie – March 2019


Title of Slide Text On Slide Image on slide Audio on slide Activity on Slide (include
webtool, website, video
etc with links)

material

You are incorrect. Please


review slides on this topic
again.

Subtopic 1- Middle ---

Subtopic 1- Middle ---

Subtopic 1- Middle ---

Subtopic 1- Middle ---

Subtopic 1- Middle ---

Subtopic 1- Middle ---

Subtopic 1- Middle Personal Protective Equipment Man dressed in PPE to Please watch the video on Simulation Game via Brain
right Personal Protective Pop.com
Click the video to outlining Personal Equipment then click the
Protective Equipment to the left of button to the left to BUTTON linking to follow-
screen, then complete the game by Video on screen complete the Brain pop up Simulation Game via
clicking the button to the right. simulation game Brain Pop.com on
Construction which is
BUTTON linking to follow- based on video
up Simulation Game via
Brain Pop.com

Subtopic 1 - Last slide Concluding Personal Protective Image of man with Repeat of what is written Excel Summative Quiz
Equipment Personal Protective on slide with 5 questions
Equipment beside him,
In conclusion, Personal Protective with Question.. ARE YOU

Sample Storyboard v1 – Keisha McKenzie – March 2019


Title of Slide Text On Slide Image on slide Audio on slide Activity on Slide (include
webtool, website, video
etc with links)

Equipment are required on all PROTECTED?


construction sites and must be worn
at all times. At a minimum, each Button that links to Quiz
employee is required to wear a hard
hat, safety glasses and it is useful to
wear steel toed construction boots,

We are now at the end of this


subtopic on Personal Protective
Equipment in the Construction
Industry,

Please complete the quiz and click


the next button to move to the
second subtopic on OSHA Standards

Subtopic 2- 1st Slide Continue same as Topic 1

Subtopic 2 - Middle

Subtopic 2 - Middle

Subtopic 2 - Middle

Subtopic 2 - Middle

Subtopic 2 - Middle

Subtopic 2 - Middle

Subtopic 2 - Middle

Sample Storyboard v1 – Keisha McKenzie – March 2019


Title of Slide Text On Slide Image on slide Audio on slide Activity on Slide (include
webtool, website, video
etc with links)

Subtopic 2 - Middle

Subtopic 2 - Middle

Subtopic 2 - Middle

Subtopic 2 - Middle

Subtopic 2 - Middle

Subtopic 2 - Middle

Subtopic 2 - last Slide

Extra Resources

Are you sure you want


to quit?

Thanks for viewing


slide

Sample Storyboard v1 – Keisha McKenzie – March 2019

You might also like