PROJECT TIME SHEET

DAILY ACTIVITY REPORT


COMPANY PT MOTT MACDONALD INDONESIA
PROJECT TITLE Palembang City Sewerage Project CMC
EXPERT NAME AFIF RIYANDA PUTRA
MONTH Dec-21

DATE WORK ACTIVITY DAY REMARK

Wed, 1 Dec
Thu, 2 Dec
Fri, 3 Dec
Sat, 4 Dec
Sun, 5 Dec
Mon, 6 Dec
Tue, 7 Dec
Wed, 8 Dec Training 1
Thu, 9 Dec Training 1
Fri, 10 Dec Training, Induction 1
Sat, 11 Dec
Sun, 12 Dec
Mon, 13 Dec Site Inspection, Training 1
Tue, 14 Dec Site Inspection, B2A 1
Wed, 15 Dec Site Inspection B2A 1
Thu, 16 Dec Site Inspection B2B 1
Fri, 17 Dec Meeting cmc with waskita at direksi keet B2B 1
Sat, 18 Dec
Sun, 19 Dec
Mon, 20 Dec Reviewing the project contract, shop drawing, and technical specification 1
Tue, 21 Dec Reviewing the project contract, shop drawing, and technical specification 1
Wed, 22 Dec Reviewing the project contract, shop drawing, and technical specification 1
Thu, 23 Dec Site Inspection, Measure and value the work done on site 1
Fri, 24 Dec Measure and value the work done on site 1
Sat, 25 Dec National Holiday
Sun, 26 Dec
Mon, 27 Dec Measure and value the work done on site 1
Tue, 28 Dec Write Actual Progress,Daily Report , Site Inspection 1
Wed, 29 Dec Write Actual Progress,Daily Report , Site Inspection 1
Thu, 30 Dec Write Daily report, Meeting with waskita at direksi keet B2B 1
Fri, 31 Dec Write Actual Progress,Daily Report , Site Inspection 1

Total 18

PREPARED BY AFIF RIYANDA PUTRA APPROVED BY Ronald van de Kuilen

SIGNATURE SIGNATURE

DATE 31-Dec-21 DATE