SAUDI ARAMCO ID/PID - REV 1 - 5/18/05 (Standards Cutoff - August 2004)

SATIP No. APPROVED DATE DISCIPLINE:


SAUDI ARAMCO TYPICAL INSPECTION PLAN
PRESSURE VESSEL INSTALLATION SATIP-D-001-01 25-May-05 MECHANICAL
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE & QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. Activity Code PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

1.0 DOCUMENT REVIEW

1.1 Review of Safety Instruction Sheet (S.I.S) SAIC-D-2001 RH1 RH1

2.0 MATERIAL RECEIVING

Verification of NMRs for Vessels and


2.1 SAIC-D-2022
Trays

Visual Inspection
SAIC-D-2002 SAIC-D-2002
2.2 a) External Inspection H1 H1
SAIC-D-2003 SAIC-D-2003
b) Internal Inspection

Ladders, platforms, and other structural


2.3 SAIC-D-2004 SAIC-D-2004 W1 S
steel attachments

2.4 Storage, Handling and Preservation SAIC-D-2005 SAIC-D-2005 H1 W1

Refer to the respective SATIPs for Electrical &


Verification and visual inspection of
Instrumentation: ( SATIP-P-113-01, P-121-01 or P-104-
2.5 Vendor Supplied electrical and
02, P-515-01, J-100-01, J-200-01, J-300-01, J-400-01, P-
instrumentation materials
104-09, J-902-03)

3.0 INSTALLATION

3.1 Concrete placement Refer to SATIP-Q-001-02

3.2 Pre-Installation inspection SAIC-D-2006 SAIC-D-2006 H1 W1

Equipment Installation - Alignment & SAIC-D-2007


3.3 Elevation Survey (Vertical Vessel & SAIC-D-2007 SATR-D-2001 H1 W1
Horizontal Vessel) SATR-D-2002

3.4 Grouting Inspection Refer to SATIP-Q-010-01

Inspection of Ladder, platform and other


3.5 Refer to SATIP-M-001-01
structural attachment installations.

Page 1 of 3
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
PRESSURE VESSEL INSTALLATION SATIP-D-001-01 25-May-05 MECHANICAL
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE & QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. Activity Code PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

3.6 Inspection of Vessel Trim Installation SAIC-D-2008 SAIC-D-2008 W1 S

3.7 Tray Installation SAIC-D-2009 SAIC-D-2009 H1 W1

3.8 Tray Testing SATR-D-2004 SATR-D-2004 H1 H1

Flange Joint- Gasket Verification & Bolt SAIC-L-2014 See Note 1 of the General Notes , at least 10% minimum
3.9 SAIC-L-2014 H1 W2
tightening SATR-L-2001 thereafter.

3.10 Piping inspection Refer to SATIP-L-350-01

3.11 Steam Tracing Refer to SATIP-L-350-06

Internal CP (galvanic) for internally coated


3.12 Refer to SATIP-X-500-01
vessels

3.13 Lighting Installation Refer to SATIP-P-123-02

3.14 Relief Valve Installation Refer to SATIP-J-600-01

3.15 Grounding Installation Refer to SATIP-P-111-01

Refer to the respective SATIPs for Electrical &


Instrumentation: ( SATIP-P-113-01, P-121-01 or P-121-
3.16 Electrical & Instrumentation installation
02, P-515-01, J-100-01, J-200-01, J-300-01, J-400-01, P-
104-09, J-902-03)

Painting, Vessel Identification & color


3.17 Refer to SATIP-H-100-01
Coding

3.18 Insulation Refer to SATIP-N-001-01 or SATIP-N-001-02

Page 2 of 3
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
PRESSURE VESSEL INSTALLATION SATIP-D-001-01 25-May-05 MECHANICAL
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE & QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. Activity Code PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

3.19 Fireproofing Refer to SATIP-B-006-01 or SATIP-B-006-02

4.0 PRE-COMMISSIONING

4.1 Vessel Closure Inspection SATR-D-2003 SATR-D-2003 H1 H1

Instrumentation and Electrical pre- Refer to the respective SATIPs for Electrical &
4.2
commissioning Instrumentation

4.3 Tightness Test Refer to SATIP-A-004-05

Final Inspection/Punch listing for Re- SAIC-D-2012


4.4 SAIC-D-2012 H1 S
Instatement (by Contractor) SATR-A-2011

Mechanical Completion Punch listing


4.5 FEIL SA-6133 H1
(Final MCC or Partial MCC)

GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the
1 levels of Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization.
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization
3 representative is not present.

4 Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in attendance.

5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.

LEGEND
W1 100% Witness Inspection/Test H2 Sample Hold Point for QC Inspection or Test RH1 100% Review and Approval of Documents
W2 Sample Witness Inspection/Test R1 100% Review of Documents RH2 Sample Review and Approval of Documents
H1 100% Hold Point for QC Inspection or Test R2 Sample Review of Documents S Surveillance

Page 3 of 3