SAUDI ARAMCO ID/PID - REV 1 - 5/18/05 (Standards Cutoff - August 2004)

SATIP No. APPROVED DATE DISCIPLINE:


SAUDI ARAMCO TYPICAL INSPECTION PLAN
FORCED DRAFT FAN INSTALLATION SATIP-F-001-02 25-May-05 MECHANICAL
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & Activity Code PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

1.0 DOCUMENT REVIEW

1.1 Safety Instruction Sheet RH1 RH1 For review and approval by SAPMT & CSD.

2.0 MATERIAL RECEIVING


Equipment Verification & Visual
2.1 SAIC-F-2010 SAIC-F-2010 W1 W1
inspection of Fan, Driver & Ducting
2.2 Storage and preservation SAIC-F-2011 SAIC-F-2011 W1 S

Refer to the respective SATIPs for Electrical


Material Verification, Visual Inspection
and Instruments(SATIP# P-113-01, P-515-
2.3 and Storage/Preservation of Electrical
01, J-100-01, J-200-01, J-300-01, J-902-
and Instrumentation components
03)

3.0 INSTALLATION

3.1 Pre-Installation Inspection SAIC-M-2006 SAIC-M-2006 H1 W1


SAIC-M-2007
3.2 Equipment Erection-Fan & Driver SAIC-M-2007 W1 W1
SATR-M-2002
3.3 Duct work installation SAIC-F-2012 SAIC-F-2012 W1 S

3.4 Grouting Refer to SATIP-Q-010-01

3.5 Installation of Structural components Refer to SATIP-M-001-01

3.6 Auxiliary Piping Installation SAIC-F-2013 SAIC-F-2013 W1 S

3.7 Control and instrumentation inspection Refer to SATIP-J-003-01, J-902-03

3.8 Electrical inspection Refer to SATIP-P-113-01, P-515-01

3.9 Painting Refer to SATIP-H-002-03

3.10 Insulation (when applicable) Refer to SATIP-N-001-02

Page 1 of 2
SAUDI ARAMCO ID/PID - REV 1 - 5/18/05 (Standards Cutoff - August 2004)
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
FORCED DRAFT FAN INSTALLATION SATIP-F-001-02 25-May-05 MECHANICAL
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & Activity Code PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

4.0 PRE-COMMISSIONING

4.1 Final shaft alignment SAIC-G-2006 SAIC-G-2006 H1 W1

SAIC-F-2014
4.1 Re-Instatement / Final Inspection SAIC-F-2014
SATR-A-2011
H1 S
SA-6133
4.2 Punch Listing/ Final Inspection for MCC
(FEIL)
H1

GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may
1 adjust the levels of Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization.
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC
3 organization representative is not present.
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in
4 attendance.
5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.

LEGEND
W1 100% Witness Inspection/Test H2 Sample Hold Point for QC Inspection or Test RH1 100% Review and Approval of Documents
W2 Sample Witness Inspection/Test R1 100% Review of Documents RH2 Sample Review and Approval of Documents
H1 100% Hold Point for QC Inspection or Test R2 sample Review of Documents S Surveillance

Page 2 of 2