LOTUS CONSTRUCTION MANAGEMENT CONSULTANTS (PVT) LTD
PROJECT:
CHECKLIST FOR SUB GRADE CONSTRUCTION
Date : IR/WIR No : Descipline :Structural Sheet : 1 of 1
No. DESCRIPTION OK / NOT REMARKS
1 STUDY ON CURRENT LAND CONDITIONS & STATUS
1.1 Any Soil Investigation conducted? Reports Available? 1.2 Work permit or relevant authority approval granted? 2 PREPARATION TO START WORK/ TEMPORARY WORK 2.1 Survey works was done as per construction drawing? 2.2 Any traffic diversion required? If applicable 2.3 Dust control system implemented? If applicable 2.4 Proper temporary/ permenent drain system provided? 2.5 Any protection required for private property?If applicable 2.6 Any services relocation/protection required? If applicable 2.7 Shoring or underpinning required? If applicable 3 CUTTING, BACKFILLING & COMPACTION 3.1 Removal of suface vegetation & top soil done? 3.2 Excavation depth as per specified/ instructed? 3.3 Backfilling material source tested and approved? 3.4 Backfilling shall done layer by layer? Max thk:………... 3.5 Backfilling shall follow specification and drawing? 3.6 Compaction shall follow specification and drawing? 4 TESTING REQUIREMENTS 4.1 Any compaction test carried out? No. of Test:……….. 4.2 Test results within tolerance and specification? Remarks