ANNEXURE - I

MONTHLY REPORT – EXCUTIVE SUMMARY

Customer Kenna metal Month


8/9 th Mile Tumkur rd,Bangalore -
Unit project ETP Recycle plant.
560073
Production details in m3 ETP Flow Meter Reading Recovery Operating hrs

Total effluent treated RO Feed ETP


Net Output
RO I Permeate RO Permeate RO –I

RO II Permeate RO –II
Initial Reading Recovery %
RO III Permeate RO -III

Total RO Permeate Down Time


Final Reading
Clean
Reject water sent Particular Total Power Mech
ing
  ETP          
 
Sludge produced ( in Kgs ) Recycle Plant        

QUALITY OF ETP & RECYCLE PLANT


Cond Hardness COD
Particulars pH Odour Colour BOD mg/lt
mg/lt mg/lt mg/lt

Final RO Permeate

RO I Permeate Water

RO II Permeate Water

RO III Permeate Water

Raw Effluent

Treated Effluent
MAJOR ACTIVITIES CARRIED OUT – PROCESS
Equipment Activity Support from client

ENVIRONMENT, HEALTH & SAFETY


Remar
Personal protective equipments Incidents / Accidents Remarks
ks
Helmets 1) Non Reportable

Shoes a) First Aid case

Uniforms b) Medical Treatment Case

Goggles c) Near Miss

Tie Rope 2) Reportable case


Note: Accidents Free month - No minor or major accidents have
Gloves
been reported.
ANNEXURE – II

PRODUCTION DETAILS
Reject
  ETP UF RO-I RO-Il RO-Ill Total
water, m3
Total Ru Total Total Ru Total Total Total Total
Run Feed, Perme Recovery Recover Recovery Run Recovery Recovery
Date flow, n feed, Permeate, n feed, Permeate, feed, Permeate, Permeate
hrs m3 ate, m3 % y% % hrs % %
m3 hrs m3 m3 hrs m3 m3 m3 m3
ANNEXURE – III WATER ANALYSIS

Effluent RO1 Permeate


Date
pH cond pH cond
ANNEXURE – IV

CHEMICAL CONSUMPTION DETAILS

S.No Chemical Name Consumed Stock Available Unit

1 Alum Kgs

2 Poly Kgs

3 HCL Kgs

4 SMBS Kgs

5 NaoCl Kgs

6 Anti scalant Kgs

7 Genesol 38 Kgs

8 Genesol 703 Kgs

9 NaoH Kgs

10 Jumbo Filter Nos

11 Slim Filter Nos

Kgs

ANNEXURE – V

ETP FEED REJECT WATER MAKEUP WATER  


Initial Final Total Initial Final Total Initial Final Total Unit
ANNEXURE - VI

DETAIL OF ATTENDANCE

Sl.
Name Designation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
No
1

4
5
Annexure – VIII Maintenance Details

Operational, Electrical & Mechanical Maintainance Report


DATE NAME OF THE UNITS MAINTENANCE ACTIVITY DETAILS