Notification For Pouring (NFP) : Project: Sport Facilities (20A, 20B & 20C)
Notification For Pouring (NFP) : Project: Sport Facilities (20A, 20B & 20C)
Rev: 0
Rec'd : / / / /
Structure: RCC - Drop Beams & Stairs Grade of Concrete : 30Mpa Placing: Pump
Engr. Mohammed Younus Engr. Jijo Joseph Engr.Shahid Ali Engr. Alsayed Asherif
QA/QC. Engineer QA/QC Electrical Engineer QA[QC Mechanical Engineer Area Technical Manager
Inspection's Results
Sub Activity Check List Action Code Remarks/ Inspection Date
Action Code :
A Poured
B Not Poured
C Not Completed
Inspected Date : / / Inspected Time : : am / pm
Remarks:
Signature : Signature :
Date :
Any approval relative to this inspection do not relieve the Contractor from compliance with the requirements of the Contract Documents and standards of good construction practice.
This inspection is only for review of general performance with the design concept of the project and general compliance with the information given in the Contract documents.
The Contractor is responsible for confirming and correlating all quantities and dimensions, selecting fabrication processes and techniques of construction,
coordinating his work with that of other trades, and performing his work in a safe, timely, and satisfactory manner.