LARSEN & TOUBRO LIMITED

CONSTRUCTION OF FOUR LANE BRIDGE FROM DHUBRI TO PHULBARI OVER


BRAHMAPUTRA RIVER
Format No.: L&T/DPBP/QF 06 Rev 1, Rev Date: 30.07.2021
Client : National Highways & Infrastructure Development Corporation Limited (NHIDCL)
Authority Engineer : AECOM Asia Company Limited In Association with PADECO Co.Ltd
EPC Contractor : Larsen & Toubro Ltd.
SIEVE ANALYSIS OF COARSE AGGREGATE FOR CONCRETE
[As Per IS : 2386 (Part 1) - 1963]
Laboratory job no. Date of sampling
Type of material Sampled by
Source of aggregate Date of testing
Location Tested by
Proposed use

INDIVIDUAL GRADATION of 20 mm Aggregate


Wt. of sample taken W (gm) =
Retained % of Passing Specification limits as per Table-7 of
Sieve size
Wt (gm) % (col.2/W) Cumulative % (100-col.4) IS 383 : 2016
1 2 3 4 5 20 mm
40 mm 100
20 mm 85-100
10 mm 0 - 20
4.75 mm 0-5

Remarks:

INDIVIDUAL GRADATION of 10 mm Aggregate


Wt. of sample taken W (gm) =
Retained % of Passing Specification limits as per Table-7 of
Sieve size
Wt (gm) % (col.2/W) Cumulative % (100-col.4) IS 383 : 2016
1 2 3 4 5 10 mm
12.5 mm 100
10 mm 85-100
4.75 mm 0 - 20
2.36 mm 0-5

Remarks:

COMBINED GRADATION of 20 mm & 10 mm Aggregate


Blending Percentage : 20 mm = 10 mm =
Wt. of sample taken W (gm) =
Retained % of Passing Specification limits as per Table-7 of
Sieve size
Wt (gm) % (col.2/W) Cumulative % (100-col.4) IS 383 : 2016
1 2 3 4 5 For Graded Agg. of 20 mm Nominal Size
40 mm 100
20 mm 90 - 100
10 mm 25 - 55
4.75 mm 0 - 10
Remarks:

For L&T Construction Representative For Authority Engineer Representative For Client Representative
Name: Name: Name:

Signature: Signature: Signature:

Date: Date: Date:

You might also like