Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 5

Construction of Check Dams

Check Dams

Dry Massonary

Production,Hauling Loading Unloading and Placing

[0sXs5]KM

Cement Mortared Massonary Class "C"

SUMMURY OF 4400

Stone Pitchining Method 1:-Dry Stone

Pitching Production,Hauling,Loading, Unloading

and Placing:

[0sXs5]KM [5<X≤10]KM

[10<Xs15]KM

[15<Xs20]KM
[20<Xs25]KM

[25<Xs35]KM

Method 2:-Grouted (With Mortar) Stone

Pitching, Production, Hlauling,Loading.Unloading

and Placing: [0sXs5]KM

Method 3:-Wired and Grouted (With Mortar)

Stone Pitching, Production, Hauling Loading.Unloading and Placing:

[0sXs5]KM

[5<Xs10]KM

[10<Xs15]KM

[15<Xs20] KM

[20<Xs25] KM
125<X≤35]KM

SUMMURY OF 4500j

Gablons Gabions

For Gully Using Check Dams (Dry Stone Massonary]

SUMMURY OF 4600 Drift and Vented Causeways

Ford Drift [Renforced Concrete]

Concrete C-20

Reinforcement Bar

Ford Drift [Stone Pitching]

[0sXs5]KM

Ford Drift [Cement Mortared Massonary]

[0sXs5]KM

Caseway Ford
Causeway Ford [Renforced concrete (C-25)

including Pipe laying/class B bedding Nominal Diameter 750mm.

Nominal Diameter 910mm

Nominal Diameter1060mm

Nominal Diameter

1220mm SUMMURY OF 4700

TOTAL SUMMARY 4000

CONSTRUCTION OF EMBANKMENT, GRAVELLING

AND STABILAZATION

Placing Gravel Material

Gravel Material

Production, Loading, Unloading Spreading and

Compaction:-Using Dump Truck,Loader,Tractor,Animal Cart,Labour etc;


[0.4 X<=5]KN [5<x<10]KM

[10<X≤15 5]KM

[ 15<X<=20 rfloor KM

[20 < X <= 25] * K * M

25<X<=35]KM

[35 <X<=45]KM [ 45<X<=55]KM

[ 55<X<=65]KM

[65<X≤75]KM

SUMMURY

You might also like