This document provides a daily monitoring report for the wastewater treatment plant (WWTP) 03 at PT Mitrabara Adiperdana Tbk for the period of January 2021. It includes information on influent and effluent water volumes, chemical dosages, total suspended solids (TSS) measurements at multiple points, and frequency of TSS measurements over 30 minutes. The total influent water volume for January 2021 was 322,479.67 cubic meters. Chemical dosages for soil, electrolyte, and polymer were all reported as 0 kilograms. The average TSS measurements for the inlet and outlet of WWTP 03 and after treatment were all within normal ranges. No issues were
This document provides a daily monitoring report for the wastewater treatment plant (WWTP) 03 at PT Mitrabara Adiperdana Tbk for the period of January 2021. It includes information on influent and effluent water volumes, chemical dosages, total suspended solids (TSS) measurements at multiple points, and frequency of TSS measurements over 30 minutes. The total influent water volume for January 2021 was 322,479.67 cubic meters. Chemical dosages for soil, electrolyte, and polymer were all reported as 0 kilograms. The average TSS measurements for the inlet and outlet of WWTP 03 and after treatment were all within normal ranges. No issues were
This document provides a daily monitoring report for the wastewater treatment plant (WWTP) 03 at PT Mitrabara Adiperdana Tbk for the period of January 2021. It includes information on influent and effluent water volumes, chemical dosages, total suspended solids (TSS) measurements at multiple points, and frequency of TSS measurements over 30 minutes. The total influent water volume for January 2021 was 322,479.67 cubic meters. Chemical dosages for soil, electrolyte, and polymer were all reported as 0 kilograms. The average TSS measurements for the inlet and outlet of WWTP 03 and after treatment were all within normal ranges. No issues were
PT MITRABARA ADIPERDANA Tbk. - PERIODE JANUARI 2021 Dosis Bahan Kimia Air Pengotor 5.4.1 Air Pengotor 5.4.2 Air Pengotor 5.4.4 Total Suspended Solid/TSS (ppm) Frekuensi TSS 30 mnt Keterangan Waktu Debit Rata- (ppm) No Hari / Tanggal Volume (m3) Running Rata Tanah Polimer (jam) (m3/jam) Durasi (jam) Volume (m3) Durasi Volume Durasi Inlet WWTP Box Pintu Inlet Rata2 5 Volume (m3) Elektrolit Titik 3 Titik 4 Titik 5 Formula >200 ppm Pengotor (jam) (m3) (jam) 03 Treatment Air WWTP 02 Titik
Bentonite Functionalised with 2-(3-(2-aminoethylthio)propylthio)ethanamine (AEPE) for the Removal of Hg(II) from Wastewaters: Synthesis, Characterisation and Hg(II) Adsorption Properties