MAURITIUS METRO EXPRESS PROJECT

ENGINEERING, PROCUREMENT AND CONSTRUCTION WORKS

Inspection Request List Report

Inspection Period: 01-Aug-2021 - 3 IR No: Location: Discipline: All IR Status: All

IR No IR Date Inspection Date Inspection Type Location Descipline Element/Strcture Activity Reference Details Drawing No Method Statement Remarks Status
MLRT/LNT/CH/08266 31-Aug-2021 01-Sep-2021 16:00 Witness (Proposed Road) / D rai nage Gs G S T OP L AYER 85185 WMS-CH-016 Rejected
MLRT/LNT/CS/08174 31-Aug-2021 01-Sep-2021 16:00 Witness Ch3+130 to 3+150RHS Cul verts / Ramps ) Pcc/Retaining wall PCC TM DWG /81562 MLRTLNTWMSCS/045 Ranjan Paul 58637462 Approved
MLRT/LNT/CH/08263 31-Aug-2021 01-Sep-2021 15:30 Witness 4.290 to 4.310 bhs / D rai nage Track 1 & 2 top layer - D WG/85222 MLRT/LNT/WMS/CC/007 R Mathan / 58637422 Rejected
MLRT/LNT/CH/08264 31-Aug-2021 01-Sep-2021 15:30 Witness 3.650 to 3.760 lhs / D rai nage Access road of GSB top l ayer - & P/99247 MLRT/LNT/MWS/CH/16 R Mathan / 58737422 Rejected
MLRT/LNT/CE/00257 31-Aug-2021 01-Sep-2021 13:00 Review 08/03 (A2), 08/04 (A7) OHE OHL Foundation and conc reting 28525/28526 MLRT-LNT-WMS-CE-042 Approved
MLRT/LNT/CH/08270 31-Aug-2021 01-Sep-2021 11:45 Review CH-2+069 / D rai nage SECANT-PILE-P22 BORING & CONCRETE - 0002-REV -1 R EV-1 Anjani Kumar Approved
MLRT/LNT/CH/08267 31-Aug-2021 01-Sep-2021 11:30 Witness CH-1760 TO 1780 / D rai nage T WALL RETAINER IN SPECTION - D WG-25131-REV -A R EV-3 Anjani Kumar Rejected
MLRT/LNT/CH/08268 31-Aug-2021 01-Sep-2021 11:30 Review 1760 to 1780 / D rai nage T Wall Retainer CON CRET E - D WG-25131-REV -A R EV-1 ANJANI KUMAR Rejected
MLRT/LNT/CH/08269 31-Aug-2021 01-Sep-2021 11:30 Witness CH-2069 / D rai nage Secant -Pile-P22 Ins pec tion - 002-REV -B R EV-1 ANJANI Approved
MLRT/LNT/CH/08265 31-Aug-2021 01-Sep-2021 11:00 Witness road / D rai nage Access road G rafe top lay er P& P -99286 P& P -99286 MLRT-LNT-WMS-CH-012 Gopisetti Ramoji Rao Approved
MLRT/LNT/CS/08177 31-Aug-2021 01-Sep-2021 11:00 Review R HS Cul verts / Ramps ) Retaining wall Raft c oncrete c heck ing Retaining wall Raft D WG/81580 Senthil Kumar R Approved
MLRT/LNT/CB/02224 31-Aug-2021 01-Sep-2021 10:00 Witness St jean station Stations St jean station LHS PCC mass fill D WG-38200, R ev -A Sourav Kumar Saha Approved
MLRT/LNT/CS/08179 31-Aug-2021 01-Sep-2021 10:00 Witness R HS Cul verts / Ramps ) Retaining wall c heck ing Retaining wall D WG/81580 Senthil Kumar R Approved
MLRT/LNT/CS/08175 31-Aug-2021 01-Sep-2021 09:00 Review Ch3+070 to 3+090RHS Cul verts / Ramps ) Raft/Retaining wall c oncreting of raft G /81562 MLRTLNTWMSCS/045 Ranjan Paul 58637462 Approved
MLRT/LNT/CS/08176 31-Aug-2021 01-Sep-2021 09:00 Witness R HS Cul verts / Ramps ) Retaining wall Raft c heck ing Retaining wall Raft D WG/81580 Senthil Kumar R Approved
MLRT/LNT/CS/08178 31-Aug-2021 01-Sep-2021 09:00 Review R HS Cul verts / Ramps ) Retaining wall c oncrete c heck ing Retaining wall D WG/81580 Senthil Kumar R Approved
MLRT/LNT/CS/08168 30-Aug-2021 31-Aug-2021 16:15 Witness Curepipe FO Cul verts / Ramps ) both side wall at P04-05 Curepipe FO DWG- WMS-CC Sohail A. Approved
MLRT/LNT/CS/08165 30-Aug-2021 31-Aug-2021 16:00 Witness FOB- Foot over bridge Cul verts / Ramps ) Retaining wall 1st lift Conc reti ng D WG 22926 B MLRT LNT WMS CC 013 Mr.Kanchivanam Approved
MLRT/LNT/CS/08167 30-Aug-2021 31-Aug-2021 16:00 Review Station Cul verts / Ramps ) A-B dec k sl ab Station DWG- WMS-CC Sohail A. Approved
MLRT/LNT/CS/08171 30-Aug-2021 31-Aug-2021 16:00 Review Ch3+050 to 3+070RHS Cul verts / Ramps ) wall li ft G /81561 MLRTLNTWMSCS/045 Ranjan Paul 58637462 Approved
MLRT/LNT/CS/08172 30-Aug-2021 31-Aug-2021 16:00 Witness R HS Cul verts / Ramps ) Raft/Retaining wall Reinforcement of raft G /81561 MLRTLNTWMSCS/045 Ranjan Paul 58637462 Approved
MLRT/LNT/CS/08173 30-Aug-2021 31-Aug-2021 16:00 Review Ch3+050 to 3+070RHS Cul verts / Ramps ) Raft/Retaining wall c oncreting of raft G /81562 MLRTLNTWMSCS/045 Ranjan Paul 58637462 Rejected
MLRT/LNT/CS/08166 30-Aug-2021 31-Aug-2021 15:45 Witness Station Cul verts / Ramps ) A-B s lab Station DWG- WMS-CC Sohail A. Approved
MLRT/LNT/SH/00354 30-Aug-2021 31-Aug-2021 14:15 Witness Depot Rolling Stock Tool Pins - - - Submitted to RITES
MLRT/LNT/CS/08169 30-Aug-2021 31-Aug-2021 14:00 Witness Ch3+100 to 3+15RHS Cul verts / Ramps ) Sbc/Retaining wall s oil G /81562 MLRTLNTWMSCS/045 Ranjan Paul 58637462 Approved
MLRT/LNT/CS/08170 30-Aug-2021 31-Aug-2021 14:00 Witness Ch3+050 to 3+070RHS Cul verts / Ramps ) Wall final lift final lift G /81561 MLRTLNTWMSCS/045 Ranjan Paul 58637462 Approved
MLRT/LNT/CH/08259 30-Aug-2021 31-Aug-2021 14:00 Witness (Trac k portion) / D rai nage Subgrade top layer WMS-CC-007 Rejected
MLRT/LNT/CH/08254 30-Aug-2021 31-Aug-2021 11:15 Review 1810 to 1980 / D rai nage WAL L CON CRET E - D WG-25131-REV -A MLRT-LNT-WMS-CS-029 Anjani Kumar Com ments
MLRT/LNT/CH/08258 30-Aug-2021 31-Aug-2021 11:00 Witness (Trac k portion) / D rai nage Subballast top layer 85057 WMS-CC-014 Approved
MLRT/LNT/CH/08253 30-Aug-2021 31-Aug-2021 10:15 Witness CH-1810 TO 1980 / D rai nage R HS WAL L ins pection - D WG-25131-REV -A 029-REV -1 Anjani Kumar Com ments
MLRT/LNT/CH/08255 30-Aug-2021 31-Aug-2021 10:15 Review CH-0269 / D rai nage Secant Pile-S-23 Pile Boring & Concrete - 0002-REV -B R EV-1 AnjaniKumar Approved
MLRT/LNT/CB/02223 30-Aug-2021 31-Aug-2021 10:00 Witness St jean station LHS Stations LHS station wall 1st lift s huttering & c oncrete D WG-38200, R ev -A Sourav Kumar Saha Com ments
MLRT/LNT/CH/08262 30-Aug-2021 31-Aug-2021 09:30 Witness road / D rai nage Access road G rade top l ayer P& P -99288 to 99299 P& P -99288 to 99299 MLRT-LNT-WMS-CH-012 Gopisetti Ramoji Rao Approved
MLRT/LNT/CH/08261 30-Aug-2021 31-Aug-2021 09:15 Witness road / D rai nage Access road lay er P& P -99288 to 99289 P& P -99288 to 99289 MLRT-LNT-WMS-CH-014 Gopisetti Ramoji Rao Approved
MLRT/LNT/CH/08257 30-Aug-2021 31-Aug-2021 09:00 Review portion) / D rai nage BC1 lay ing 85062 WMS-CH-047 Approved
MLRT/LNT/CH/08260 30-Aug-2021 31-Aug-2021 09:00 Witness road / D rai nage Access road G rade top l ayer P& P-99288 P& P-99288 MLRT-LNT-WMS-CH-012 Goposetti Ramoji Rao Approved
MLRT/LNT/CH/08256 30-Aug-2021 31-Aug-2021 08:00 Review portion) / D rai nage Tack coat ov er G B1A surface 85062 WMS-CH-047 Approved
MLRT/LNT/CR/01672 30-Aug-2021 30-Aug-2021 21:00 Witness 1 & Trac k 2 Track Works Ballasted Track Ball asted Trac k Section New NA 001 Rev -01 IR 1670 Com ments
MLRT/LNT/CH/08244 28-Aug-2021 30-Aug-2021 17:30 Witness 3.650 to 3.760 LHS / D rai nage Access Road of subgrade top layer - & P/99247-99248 MLRT/LNT/WMS/CH/16 R Mathan / 58637422 Rejected
MLRT/LNT/CH/08248 28-Aug-2021 30-Aug-2021 17:00 Review R HS / D rai nage Retaining wall c heck ing Retaining wall D WG/81580 Senthil Kumar R Rejected
MLRT/LNT/CS/08161 28-Aug-2021 30-Aug-2021 16:00 Review Ch3+050 to 3+070RHS Cul verts / Ramps ) wall li ft G /81562 MLRTLNTWMSCS/045 Ranjan Paul 58637462 Approved
MLRT/LNT/CS/08162 28-Aug-2021 30-Aug-2021 16:00 Review Ch3+020 to 3+040RHS Cul verts / Ramps ) c um retai ning wal l li ft G /81579 MLRTLNTWMSCS/045 Ranjan Paul 58637462 Approved
MLRT/LNT/CS/08164 28-Aug-2021 30-Aug-2021 16:00 Review 3+000RH S Cul verts / Ramps ) c um Retaining wall li ft G /81579 MLRTLNTWMSCS/045 Ranjan Paul 58637462 Rejected
MLRT/LNT/CS/08160 28-Aug-2021 30-Aug-2021 15:00 Witness Ch3+050 to 3+070RHS Cul verts / Ramps ) wall 2nd lift G /81562 MLRTLNTWMSCS/045 Ranjan Paul 58637462 Approved
MLRT/LNT/CS/08163 28-Aug-2021 30-Aug-2021 15:00 Witness 3+000RH S Cul verts / Ramps ) c um retai ning wal l final lift G /81579 MLRTLNTWMSCS/045 Ranjan Paul 58637462 Approved
MLRT/LNT/CH/08252 29-Aug-2021 30-Aug-2021 15:00 Witness road / D rai nage Access road G rade top l ayer P& P-99288 P& P-99288 MLRT-LNT-WMS-CH-012 Gopisetti Ramoji Rao Submitted to RITES
MLRT/LNT/CB/02222 27-Aug-2021 30-Aug-2021 14:30 Review Serv ice Buil ding Stations Serv ice Buil ding R icheli eu D epot . Mr. Ravi kumar Shukla Com ments
MLRT/LNT/CH/08251 29-Aug-2021 30-Aug-2021 14:00 Witness Jean road / D rai nage Access road top layer P& P-99288 P& P-99288 MLFT-LNT-WMS-CH-014 Gopisetti Ramoji Rao Submitted to RITES
MLRT/LNT/CH/08243 28-Aug-2021 30-Aug-2021 12:15 Review 3.760 to 3.980 LHS / D rai nage Access Road Laying of WC1 - & P/99247-99248 MLRT/LNT/WMS/CH/19 R Mathan / 58637422 Com ments
MLRT/LNT/CH/08242 28-Aug-2021 30-Aug-2021 12:00 Review 3.760 to 3.980 LHS / D rai nage Access Road c oat - & P/99247-99248 MLRT/LNT/WMS/CH/19 R Mathan / 58637422 Approved
MLRT/LNT/CH/08246 28-Aug-2021 30-Aug-2021 12:00 Review R HS / D rai nage Retaining wall Raft c heck ing Retaining wall Raft D WG/81580 Senthil Kumar R Approved
MLRT/LNT/CH/08249 28-Aug-2021 30-Aug-2021 11:30 Witness CH-2070 / D rai nage Secant Pile-P22 Ins pec tion - 002-REV -B R EV-1 Anjani Kumar Rejected
MLRT/LNT/CH/08250 28-Aug-2021 30-Aug-2021 11:30 Review CH-2+069 / D rai nage Secant -Pile-p22 Pile-Boring & concrete - 0002-REV -B R EV-1 Anjani Kumar Rejected
MLRT/LNT/CH/08245 28-Aug-2021 30-Aug-2021 09:00 Witness R HS / D rai nage Retaining wall Raft Reinforcement checking Retaining wall Raft D WG/81580 Senthil Kumar R Approved
MLRT/LNT/CH/08247 28-Aug-2021 30-Aug-2021 09:00 Witness R HS / D rai nage Retaining wall Reinforcement checking Retaining wall D WG/81580 Senthil Kumar R Approved
MLRT/LNT/CH/08241 28-Aug-2021 30-Aug-2021 08:30 Review 3.760 to 3.980 LHS / D rai nage Acces Road Laying of BC1 - & P/99247-99248 MLRT/LNT/MWS/CH/47 R Mathan / 58637422 Approved
MLRT/LNT/CH/08238 27-Aug-2021 28-Aug-2021 17:00 Review Ch-5+990 to ch-6+080 / D rai nage RHS drain BHS wall and conc reting - D WG-25608 MLRT-LNT-WMS-CC-029 Arijit Malik-58637434 Rejected
MLRT/LNT/CH/08237 27-Aug-2021 28-Aug-2021 16:00 Witness Ch-5+990 to ch-6+080 / D rai nage RHS drain BHS wall reinforcem ent - D WG-25608 MLRT-LNT-WMS-CC-029 Arijit Malik Rejected
MLRT/LNT/CS/08159 27-Aug-2021 28-Aug-2021 16:00 Review Ch3+050 to 3+070RHS Cul verts / Ramps ) wall li ft G /81562 MLRTLNTWMSCS/045 Ranjan Paul 58637462 Approved
MLRT/LNT/CR/01671 27-Aug-2021 28-Aug-2021 16:00 Witness 4+591.577 track 1 Track Works Embedded track s urfac e c oncrete D WG-21371 REV 01 R EV 01 Ganesha velan.P Com ments
MLRT/LNT/CS/08158 27-Aug-2021 28-Aug-2021 14:00 Witness Ch3+050 to 3+070RHS Cul verts / Ramps ) wall 1s t li ft G /81562 MLRTLNTWMSCS/045 Ranjan Paul 58637462 Approved
MLRT/LNT/CH/08240 27-Aug-2021 28-Aug-2021 13:30 Review CH-2+069 / D rai nage Secant Pile-S -23 Boring & concrete - 0002-REV -B R EV-1 Anjani Kumar Rejected
MLRT/LNT/CB/02221 26-Aug-2021 28-Aug-2021 13:00 Witness St jean station LHS Stations LHS station footing Conc reti ng D WG-38200, R -A Sourav Kumar Saha Approved
MLRT/LNT/CH/08239 27-Aug-2021 28-Aug-2021 11:15 Witness CH-2+069 / D rai nage Secant Pile-S23 c oncrete - 0002-REV -B 087-REV -1 Anjani Kumar Approved
MLRT/LNT/CH/08236 27-Aug-2021 28-Aug-2021 10:00 Review Ch-6+030 to ch-6+080 / D rai nage RHS drain stitching and conc reting - D WG-25608 MLRT-LNT-WMS-CC-029 Arijit Malik-58637434 Com ments
MLRT/LNT/CH/08235 27-Aug-2021 28-Aug-2021 09:00 Witness Ch-6+030 to ch-6+080 / D rai nage RHS drain stitching reinforcem ent - D WG-25608 MLRT-LNT-WMS-CC-029 Arijit Malik-58637434 Com ments
MLRT/LNT/CR/01670 26-Aug-2021 27-Aug-2021 21:00 Witness 1 & Trac k 2 Track Works Ballasted Track Ball asted Trac k Section New NA R ev -01 N ew Submitted to RITES
MLRT/LNT/CH/08228 26-Aug-2021 27-Aug-2021 18:30 Review R HS / D rai nage Retaining wall c heck ing Retaining wall D WG/81580 Senthil Kumar R Rejected
MLRT/LNT/CH/08230 26-Aug-2021 27-Aug-2021 18:00 Review R HS / D rai nage Retaining wall Raft c heck ing Retaining wall Raft D WG/81580 Senthil Kumar R Rejected
MLRT/LNT/CH/08232 26-Aug-2021 27-Aug-2021 18:00 Review (Ch. 4+610) / D rai nage Approach slab c heck ing Approach slab Senthil Kumar R Approved
MLRT/LNT/CB/02220 26-Aug-2021 27-Aug-2021 17:00 Witness St jean station LHS Stations LHS Footing R ei nforc ement D WG-38200, R EV-A Sourav Kumar Saha Approved
MLRT/LNT/CS/08157 26-Aug-2021 27-Aug-2021 17:00 Review Ch3+050 to 3+070RHS Cul verts / Ramps ) Raft/Retaining wall c oncreting of raft G /81562 MLRTLNTWMSCS/045 Ranjan Paul 58637462 Approved
MLRT/LNT/CS/08154 26-Aug-2021 27-Aug-2021 16:00 Review Ch3+020 to 3+040RHS Cul verts / Ramps ) c um retai ning wal l li ft G /81579 MLRTKNTWMSCS/45 Ranjan Paul 58637462 Rejected
MLRT/LNT/CR/01669 26-Aug-2021 27-Aug-2021 16:00 Witness 4+591.577 T1 Track Works Embedded track s urfac e c oncrete D WG-21371 REV A R EV 01 Ganesha velan.P Submitted to RITES
MLRT/LNT/CH/08231 26-Aug-2021 27-Aug-2021 16:00 Witness (Ch. 4+610) / D rai nage Approach slab Reinforcement checking Approach slab Aminuddin Approved
MLRT/LNT/CS/08156 26-Aug-2021 27-Aug-2021 16:00 Witness R HS Cul verts / Ramps ) Raft/Retaining wall Reinforcement of raft G /81562 MLRTLNTWMSCS/045 Ranjan Paul 58637462 Approved
MLRT/LNT/CH/08229 26-Aug-2021 27-Aug-2021 14:00 Witness R HS / D rai nage Retaining wall Raft Reinforcement checking Retaining wall Raft D WG/81580 Senthil Kumar R Rejected
MLRT/LNT/CS/08153 26-Aug-2021 27-Aug-2021 13:00 Witness Ch3+020 to 3+040RHS Cul verts / Ramps ) c um retai ning wal l final lift G /81579 MLRTLNTWMSCS/045 Ranjan Paul 58637462 Approved
MLRT/LNT/CH/08223 26-Aug-2021 27-Aug-2021 12:15 Review 3.760 to 3.980 LHS / D rai nage Acces Road Laying Of WC1 - & P/99247-99248 MLRT/LNT/WMS/CH/19 R Mathan / 58637422 Rejected
MLRT/LNT/CH/08222 26-Aug-2021 27-Aug-2021 12:00 Review 3.760 to 3.980 LHS / D rai nage Acces Road c oat. - & P/99247-99248 MLRT/LNT/WMS/CH/47 R Mathan / 58637422 Rejected
MLRT/LNT/CH/08224 26-Aug-2021 27-Aug-2021 12:00 Witness (Trac k portion) / D rai nage Subballast top layer 85057 WMS-CC-014 Rejected
MLRT/LNT/CH/08234 26-Aug-2021 27-Aug-2021 11:35 Witness road / D rai nage Access road lay er P& P-99288. - 99289 P& P-99288. - 99289 MLRT-LNT-WMS-CH-014 Goposetti Ramoji Rao Rejected
MLRT/LNT/CH/08225 26-Aug-2021 27-Aug-2021 11:00 Witness (Trac k portion) / D rai nage Embankment top Em bankm ent top layer 85146 WMS-CC-007 Rejected
MLRT/LNT/CH/08226 26-Aug-2021 27-Aug-2021 11:00 Witness (Trac k portion) / D rai nage Subgrade top top layer 85132 WMS-CC-007 Rejected
MLRT/LNT/CH/08218 26-Aug-2021 27-Aug-2021 10:00 Witness 9+930 to 10+040 / D rai nage LHS drain Excavation & pcc D WG-25130, R EV-B Sourav Kumar Saha Com ments
MLRT/LNT/CH/08219 26-Aug-2021 27-Aug-2021 10:00 Witness 9+930 to 10+040 / D rai nage LHS drain s huttering & c oncreting D WG-25130, R EV-B Sourav Kumar Saha Com ments
MLRT/LNT/CH/08220 26-Aug-2021 27-Aug-2021 10:00 Witness 9+930 to 10+040 / D rai nage LHS drain s huttering & c oncreting D WG-25130, R EV-B Sourav Kumar Saha Com ments
MLRT/LNT/CH/08227 26-Aug-2021 27-Aug-2021 10:00 Witness R HS / D rai nage Retaining wall Reinforcement checking Retaining wall D WG/81580 Senthil Kumar R Rejected
MLRT/LNT/CH/08233 26-Aug-2021 27-Aug-2021 10:00 Witness road / D rai nage Access road G rade top l ayer P& P-99288. - 99289 P& P-99288. - 99289 MLRT-LNT-WMS-CH-012 Gopisetti Ramoji Rao Rejected
MLRT/LNT/CS/08155 26-Aug-2021 27-Aug-2021 09:00 Witness FOB-Foot over bridge Cul verts / Ramps ) C-16 Column 1st lift work s D WG 22927 MLRT LNT WMS CC 021 Mr.kanchivanam Approved
MLRT/LNT/CH/08221 26-Aug-2021 27-Aug-2021 09:00 Review 3.760 to 3.980 LHS / D rai nage Access Road Laying of BC1 - & P/99247-99248 MLRT/LNT/WMS/CH/47 R Mathan / 58637422 Rejected
MLRT/LNT/CG/00071 26-Aug-2021 27-Aug-2021 09:00 Review L ocation Seis mology L OCATION S Bri dge) - - CIV IL-001 Rev -02 B Anil Kumar Sahu Com ments
MLRT/LNT/CH/08209 25-Aug-2021 26-Aug-2021 18:00 Review 1380 to 1400 lhs / D rai nage s truc ture Retainer wall top lift s truc ture 81999 rev D 045 rev 02 Shamik Saraswati Approved
MLRT/LNT/CH/08212 25-Aug-2021 26-Aug-2021 18:00 Review 1440 to 1460 lhs / D rai nage D rain retainer structure and conc reting D rain retainer structure 81999 rev D 045 rev 02 Shamik Saraswati Com ments
MLRT/LNT/CH/08207 25-Aug-2021 26-Aug-2021 16:00 Review Floreal station / D rai nage Back filling at Fl oreal station WP-CS-003 Rejected
MLRT/LNT/CR/01668 25-Aug-2021 26-Aug-2021 16:00 Witness 4+591.577 T1 Track Works Embedded track c oncreting D WG-21371 REV A R EV 00 Ganesha velan.P Com ments
MLRT/LNT/CH/08204 25-Aug-2021 26-Aug-2021 15:00 Witness Ch3+020 to 3+040RHS / D rai nage c um retai ning wal l c oncreting of drain wall G /81579 MLRTLNTWMSCS/45 Ranjan Paul 58637462 Approved
MLRT/LNT/CS/08152 25-Aug-2021 26-Aug-2021 15:00 Witness Ch2+970 to 2+990RHS Cul verts / Ramps ) c um retai ning wal l li ft G /81579 MLRTLNTWMSCS/045 Ranjan Paul 58637462 Approved
MLRT/LNT/CH/08211 25-Aug-2021 26-Aug-2021 15:00 Witness 1440 to 1460 lhs / D rai nage D rain retainer structure reinforcem ent c hec k ing D rain retainer structure 81999 rev D 045 rev 02 Shamik Saraswati Com ments
MLRT/LNT/CH/08217 25-Aug-2021 26-Aug-2021 15:00 Witness LHS / D rai nage Cover slab/Drain c over slab G /25807 MLRTLNTWMSCC/29 Ranjan Paul 58637462 Com ments
MLRT/LNT/CE/00256 26-Aug-2021 26-Aug-2021 15:00 Review (A2), OHE OHL Foundation and conc reting 28525/28526 MLRT-LNT-WMS-CE-042 Approved
MLRT/LNT/CH/08215 25-Aug-2021 26-Aug-2021 14:30 Witness CH-2+069 / D rai nage Secant -Pile-S-23 ins pection - 0002-REV -B R EV-1 Anjani Kumar Rejected
MLRT/LNT/CH/08216 25-Aug-2021 26-Aug-2021 11:45 Review CH-2+069 / D rai nage Secant -Pile-S-23 Pile-Boring - 0001-REV -B R EV-01 Anjani Kumar Rejected
MLRT/LNT/CH/08210 25-Aug-2021 26-Aug-2021 11:00 Witness 2210 to 2230 rhs / D rai nage s truc ture Sbc test Retaining wall structure 81999 rev A 045 rev 02 Shamik Saraswati Approved
MLRT/LNT/CH/08205 25-Aug-2021 26-Aug-2021 09:00 Review portion) / D rai nage Primecoat s urfac e 85060 WMS-CH-042 Approved
MLRT/LNT/CH/08206 25-Aug-2021 26-Aug-2021 09:00 Review (Trac k portion) / D rai nage Geotextile track porti on 85057 WMS-CC-042 Approved
MLRT/LNT/CH/08208 25-Aug-2021 26-Aug-2021 09:00 Witness 1380 to 1400 lhs / D rai nage s truc ture reinforcem ent c hec k ing s truc ture 81999 rev D 045 rev 02 Shamik Saraswati Approved
MLRT/LNT/CH/08213 25-Aug-2021 26-Aug-2021 07:45 Witness CH-1780 TO 1810 / D rai nage Center drain Raft Ins pec tion - A MLRT-LNT-WMS-CS-029 Anjani Kumar Com ments
MLRT/LNT/CH/08214 25-Aug-2021 26-Aug-2021 07:45 Review CH-1780 TO 1810 / D rai nage CENTER DRAIN RAFT CON CRET E - D WG-25131-REV -A 029-REV -3 Anjani Kumar
MLRT/LNT/CH/08203 24-Aug-2021 25-Aug-2021 18:00 Review 1380 to 1400 lhs Retainer wall top lift Drain retainer structure 81999 rev D 045 rev 02 Shamik Saraswati Rejected
MLRT/LNT/CH/08194 24-Aug-2021 25-Aug-2021 17:00 Review Retaining wall Raft Retaining wall Raft Senthil Kumar R Approved
MLRT/LNT/CH/08196 24-Aug-2021 25-Aug-2021 16:30 Witness Access road MLRT-LNT-WMS-CH-012 Gopisetti Ramoji Rao Approved
MLRT/LNT/CS/08151 24-Aug-2021 25-Aug-2021 16:00 Witness Pcc/Retaining wall MLRTLNTWMSCS/045 Ranjan Paul 58637462 Approved
MLRT/LNT/CH/08200 24-Aug-2021 25-Aug-2021 15:00 Witness 3.650 to 3.760 LHS Access road - MLRT/LNT/WMS/CH/11 R Mathan / 58637422 Approved
MLRT/LNT/CS/08149 24-Aug-2021 25-Aug-2021 15:00 Review Ch2+925 to 2+940RHS MLRTLNTWMDCS/45 Ranjan Paul 58637462 Approved
MLRT/LNT/CE/00255 24-Aug-2021 25-Aug-2021 15:00 Review OHE OHL Foundation MLRT-LNT-WMS-CE-042 Approved
MLRT/LNT/CB/02218 24-Aug-2021 25-Aug-2021 14:00 Witness St jean station LHS Sourav Kumar Saha Approved
MLRT/LNT/CB/02219 24-Aug-2021 25-Aug-2021 14:00 Witness St jean station St jean station footing Check for SBC Sourav Kumar Saha Approved
MLRT/LNT/CR/01667 24-Aug-2021 25-Aug-2021 14:00 Review Track Works Embedded track Ganesha velan.P Approved
MLRT/LNT/CH/08193 24-Aug-2021 25-Aug-2021 14:00 Witness Retaining wall Raft Reinforcement checking Retaining wall Raft Senthil Kumar R Approved
MLRT/LNT/CH/08201 24-Aug-2021 25-Aug-2021 14:00 Witness Ch3+445 to 3+463LHS Raft&wall/Drain MLRTLNTWMSCC/29 Ranjan Paul 58637462
MLRT/LNT/CH/08198 24-Aug-2021 25-Aug-2021 12:15 Review CH-2+069 SECANT-PILE-P23 - Anjani Kumar Approved
MLRT/LNT/CH/08191 24-Aug-2021 25-Aug-2021 12:00 Witness GB1A 85049 WMS-CH-016 Approved
MLRT/LNT/CH/08192 24-Aug-2021 25-Aug-2021 12:00 Review Retaining wall Excavation & PCC laying Retaining wall Senthil Kumar R Approved
MLRT/LNT/CH/08197 24-Aug-2021 25-Aug-2021 11:15 Witness CH-2+069 SECANT -PILE-P23 - Anjani kumar Approved
MLRT/LNT/CH/08190 24-Aug-2021 25-Aug-2021 11:00 Review Kerb fixing 84452 WMS-CH-086
MLRT/LNT/CH/08195 24-Aug-2021 25-Aug-2021 11:00 Witness Access road MLRT-LNT-WMS-CH-014 Gopisetti Ramoji Rao Approved
MLRT/LNT/CS/08148 24-Aug-2021 25-Aug-2021 11:00 Witness MLRTLNTWMSCS/45 Ranjan Paul 58637462 Approved
MLRT/LNT/CH/08199 24-Aug-2021 25-Aug-2021 10:30 Review 3.760 to 3.980 LHS Access road Inspection for priming - MLRT/LNT/WMS/CH/47 R Mathan / 58637422 Approved
MLRT/LNT/CS/08150 24-Aug-2021 25-Aug-2021 10:00 Witness Ch3+000 to 3+020RHS MLRTLNTWMSCS/45 Ranjan Paul 58637462 Approved
MLRT/LNT/CH/08202 24-Aug-2021 25-Aug-2021 10:00 Witness Ch 1380 to 1400 lhs Drain retainer structure 81999 rev D 045 rev 02 Shamik Saraswati Rejected
MLRT/LNT/CR/01666 24-Aug-2021 25-Aug-2021 09:00 Review Track Works Embedded track Ganesha velan.P
MLRT/LNT/CR/01665 23-Aug-2021 24-Aug-2021 21:00 Witness Track Works Ballasted Track New NA Approved
MLRT/LNT/CH/08188 23-Aug-2021 24-Aug-2021 17:00 Review Retaining wall Raft Retaining wall Raft Senthil Kumar R Approved
MLRT/LNT/CS/08147 23-Aug-2021 24-Aug-2021 16:30 Review Curepipe FO Deck Slab P04-05 Curepipe FO DWG- 22484 B WMS-CC- Sohail A. Approved
MLRT/LNT/CS/08146 23-Aug-2021 24-Aug-2021 16:15 Witness Curepipe FO Deck Slab P04-05 Curepipe FO DWG- 22481-84 B WMS- CC- Sohail A. Approved
MLRT/LNT/CB/02217 23-Aug-2021 24-Aug-2021 15:15 Witness Curepipe Central Curepipe Central DWG- 30292 B WMS-CC Sohail A. Cancelled
MLRT/LNT/CR/01664 23-Aug-2021 24-Aug-2021 14:00 Review Track Works Embedded track Ganesha velan.P Submitted to RITES
MLRT/LNT/CH/08186 23-Aug-2021 24-Aug-2021 14:00 Witness Pcc/Drain Laying of bottom PCC MLRTLNTWMSCC/29 Ranjan Paul 58637462 Approved
MLRT/LNT/CH/08187 23-Aug-2021 24-Aug-2021 12:00 Witness Retaining wall Raft Reinforcement checking Retaining wall raft Senthil Kumar R Approved
MLRT/LNT/CH/08189 23-Aug-2021 24-Aug-2021 12:00 Review St. Stevenson Junction Laying of PCC PCC Senthil Kumar R Approved
MLRT/LNT/CH/08184 23-Aug-2021 24-Aug-2021 11:00 Review 2+069 Secant Pile-P-24 Pile Concrete - Anjani Kumar Approved
MLRT/LNT/CS/08145 23-Aug-2021 24-Aug-2021 11:00 Review Ch3+020 to 3+050RHS MLRTLNTWMSCS/045 Ranjan Paul 58637462 Approved
MLRT/LNT/CH/08185 23-Aug-2021 24-Aug-2021 10:15 Witness 4.590 to 4.605 BHS Track 1 & 2 - MLRT/LNT/WMS/CC/007 R Mathan / 58637422 Approved
MLRT/LNT/CS/08144 23-Aug-2021 24-Aug-2021 10:00 Witness Ch3+020 to 3+040RHS MLRTLNTWMSCS/045 Ranjan Paul 58637462 Approved
MLRT/LNT/CB/02216 23-Aug-2021 24-Aug-2021 09:00 Review Trianon station Platform ramp slabs K.N.Aravinth Approved
MLRT/LNT/CR/01663 23-Aug-2021 24-Aug-2021 09:00 Review Track Works Embedded track Rail cladding Ganesha velan.P
MLRT/LNT/CB/02215 23-Aug-2021 24-Aug-2021 08:00 Witness Trianon station Platform ramp slabs K.N.Aravinth Approved
MLRT/LNT/CS/08143 23-Aug-2021 24-Aug-2021 00:00 Witness FOB-Foot over bridge C-16 Column 1st lift Mr.Kanchivanam Rejected
MLRT/LNT/CH/08172 20-Aug-2021 23-Aug-2021 17:00 Review 1360 to 1380 lhs 81999 rev D 045 rev 02 Shamik Saraswati Approved
MLRT/LNT/CH/08181 22-Aug-2021 23-Aug-2021 16:30 Witness 3.760 to 3.980 LHS Access road - MLRT/LNT/WMS/CH/16 R Mathan / 58637422 Approved
MLRT/LNT/CH/08173 21-Aug-2021 23-Aug-2021 16:00 Witness Subgrade (OGL) 85185 WMS-CH-011 Approved
MLRT/LNT/CH/08175 21-Aug-2021 23-Aug-2021 16:00 Witness Subgrade 85049 WMS-CC-007 Approved
MLRT/LNT/CS/08142 21-Aug-2021 23-Aug-2021 16:00 Review MLRTLNTWMSCS/045 Ranjan Paul 58637462 Approved
MLRT/LNT/CH/08183 23-Aug-2021 23-Aug-2021 16:00 Review St. Stevenson junction Laying of PCC Aminuddin Rejected
MLRT/LNT/CH/08178 21-Aug-2021 23-Aug-2021 14:45 Review CH-2+069 Secant Pile-P22 Pile Boring - Anjani Kumar Rejected
MLRT/LNT/CH/08174 21-Aug-2021 23-Aug-2021 14:00 Review Retaining wall Excavation & PCC laying retaining wall Senthil Kumar R Approved
MLRT/LNT/CS/08140 21-Aug-2021 23-Aug-2021 14:00 Witness Sbc/Retaining wall Sbc testing of soil MLRTLNTWMSCS/045 Ranjan Paul 58637462 Approved
MLRT/LNT/CH/08171 20-Aug-2021 23-Aug-2021 13:00 Witness 1360 to 1380 lhs 81999 rev D 045 rev 02 Shamik Saraswati Approved
MLRT/LNT/CH/08180 22-Aug-2021 23-Aug-2021 11:30 Witness 4.590 to 4.605 BHS Track 1 & 2 - MLRT/LNT/WMS/CC/007 R Mathan/58637422 Rejected
MLRT/LNT/CH/08176 21-Aug-2021 23-Aug-2021 11:00 Witness 2190 to 2120 rhs Retaining wall Sbc test Retaining wall 81999 rev A 045 rev 02 Shamik Saraswati Approved
MLRT/LNT/CH/08182 22-Aug-2021 23-Aug-2021 11:00 Witness Access road MLRT-LNT-WMS-CH-014 Gopisetti Ramoji Rao Rejected
MLRT/LNT/CB/02214 21-Aug-2021 23-Aug-2021 10:00 Witness Phoenix station Platform LHS AND RHS Screed concrete works MLRT LNT WMS CB 028 Mr Kanchivanam Approved
MLRT/LNT/CH/08177 21-Aug-2021 23-Aug-2021 09:45 Review 2+069.600 Secant pile- P-24 Pile-Boring - Anjani kumar Rejected
MLRT/LNT/CH/08179 21-Aug-2021 23-Aug-2021 09:45 Witness 2+069 - Anjani Kumar Approved
MLRT/LNT/CS/08141 21-Aug-2021 22-Aug-2021 14:00 Witness Ch3+000 to 3+020RHS MLRTLNTWMSCS/045 Ranjan Paul 58637462 Approved
MLRT/LNT/CS/08138 20-Aug-2021 21-Aug-2021 16:00 Review Ch2+940 to 2+960RHS MLRTLNTWMSCS/045 Ranjan Paul 58637462 Approved
MLRT/LNT/CS/08136 20-Aug-2021 21-Aug-2021 14:00 Witness Ch2+360 Approach slab(Stage 1) Ranjan Paul 58637462 Approved
MLRT/LNT/CH/08167 20-Aug-2021 21-Aug-2021 14:00 Review Embankment 85139 WMS-CC-007 Approved
MLRT/LNT/CS/08139 20-Aug-2021 21-Aug-2021 14:00 Review Floreal station Back filling 85049 WP-CS-003 Approved
MLRT/LNT/CH/08169 20-Aug-2021 21-Aug-2021 13:00 Review Access road Laying of BC MLRT-LNT-WMS-CH-019 Gopisetti Ramoji Rao
MLRT/LNT/CH/08170 20-Aug-2021 21-Aug-2021 13:00 Review Access road Laying of BC MLRT-LNT-WMS-CH-019 Gopisetti Ramoji Rao
MLRT/LNT/GQ/00140 20-Aug-2021 21-Aug-2021 11:00 Witness Quality Soil Sampling - - Approved
MLRT/LNT/CH/08168 20-Aug-2021 21-Aug-2021 11:00 Review Excavation WMS-CC-010 Approved
MLRT/LNT/CH/08166 20-Aug-2021 21-Aug-2021 10:00 Review Access road Laying of BC MLRT-LNT-WMS-CH-019 Gopisetti Ramoji Rao
MLRT/LNT/CS/08137 20-Aug-2021 21-Aug-2021 10:00 Witness MLRTLNTWMSCS/045 Ranjan Paul 58637462 Approved
MLRT/LNT/CH/08154 18-Aug-2021 20-Aug-2021 19:00 Review 1400 to 1420 lhs 81999 rev D 045 rev 2 Shamik Saraswati
MLRT/LNT/CH/08153 18-Aug-2021 20-Aug-2021 17:00 Witness 1400 to 1420 lhs 81999 rev D 045 rev 02 Shamik Saraswati
MLRT/LNT/CB/02213 19-Aug-2021 20-Aug-2021 17:00 Review Curepipe Central PD Roof Slab Part -01 Curepipe Central DWG-20388 WMS-CC Sohail A. Approved
MLRT/LNT/CH/08158 19-Aug-2021 20-Aug-2021 16:00 Review LHS FOOTPATH footpath Senthil Kumar R Approved
MLRT/LNT/CS/08135 19-Aug-2021 20-Aug-2021 16:00 Review MLRTLNTWMSCS/045 Ranjan Paul 58637462 Approved
MLRT/LNT/CB/02212 19-Aug-2021 20-Aug-2021 16:00 Witness Curepipe Central PD Roof Slab Part -01 Curepipe Central DWG- 20393-96 B WMS-CC- Sohail A. Approved
MLRT/LNT/CH/08164 19-Aug-2021 20-Aug-2021 15:30 Witness Access road MLRT-LNT-WMS-CH-012 Gopisetti Ramoji Rao Approved
MLRT/LNT/CS/08133 19-Aug-2021 20-Aug-2021 15:00 Witness Ch2+360 Ranjan Paul 58637462 Approved
MLRT/LNT/CH/08155 19-Aug-2021 20-Aug-2021 14:00 Review Embankment 85146 WMS-CC-007 Approved
MLRT/LNT/CH/08156 19-Aug-2021 20-Aug-2021 14:00 Review Retaining wall Excavation & PCC laying Retaining wall Senthil Kumar R Approved
MLRT/LNT/CS/08132 19-Aug-2021 20-Aug-2021 14:00 Review MLRTLNTWMSCS/045 Ranjan Paul 58637462 Approved
MLRT/LNT/CS/08134 19-Aug-2021 20-Aug-2021 14:00 Witness Reinforcement of raft MLRTLNTWMSCS/045 Ranjan Paul 58637462 Approved
MLRT/LNT/CB/02211 19-Aug-2021 20-Aug-2021 13:00 Review Trianon station Platform ramp Check for PCC laying K.N.Aravinth Approved
MLRT/LNT/CH/08157 19-Aug-2021 20-Aug-2021 12:00 Witness LHS FOOTPATH Reinforcement checking footpath Senthil Kumar R
MLRT/LNT/CS/08131 19-Aug-2021 20-Aug-2021 11:00 Witness Reinforcement of raft MLRTLNTWMSCS/045 Ranjan Paul 58637462 Approved
MLRT/LNT/CH/08165 19-Aug-2021 20-Aug-2021 11:00 Witness CH-2+069 SECANT PILE-P-24 PILE BORING - Anjani Kumar Rejected
MLRT/LNT/CH/08161 19-Aug-2021 20-Aug-2021 10:00 Review Access road Laying of prime coat MLRT-LNT-WMS-CH-019 Goposetti Ramoji Rao
MLRT/LNT/CH/08162 19-Aug-2021 20-Aug-2021 10:00 Review Access road Laying of prime coat MLRT-LNT-WMS-CH-019 Goposetti Ramoji Rao
MLRT/LNT/CH/08163 19-Aug-2021 20-Aug-2021 10:00 Review Access road Laying of prime coat MLRT-LNT-WMS-CH-019 Gopisetti Ramoji Rao
MLRT/LNT/CH/08159 19-Aug-2021 20-Aug-2021 09:00 Witness Access road MLRT-LNT-WMS-CH-014 Gopisetti Ramoji Rao
MLRT/LNT/CH/08160 19-Aug-2021 20-Aug-2021 09:00 Witness Access road MLRT-LNT-WMS-CH-014 Gopisetti Ramoji Rao
MLRT/LNT/CU/00029 18-Aug-2021 19-Aug-2021 19:15 Review Rosehill Surveying & Mapping Condition Survey Condition survey - - - B Anil kumar sahu
MLRT/LNT/CS/08128 18-Aug-2021 19-Aug-2021 16:00 Review Ch3+000 to 3+020RHS ok MLRTLNTWMSCS/045 Ranjan Paul 58637462 Approved
MLRT/LNT/CS/08130 18-Aug-2021 19-Aug-2021 16:00 Review Ch2+940 to 2+960RHS MLRTLNTWMSCS/045 Ranjan Paul 58637462 Approved
MLRT/LNT/CE/00254 19-Aug-2021 19-Aug-2021 16:00 Review 04/22 (C2)- Pedestal OHE OHL Foundation MLRT-LNT-WMS-CE-042 Approved
MLRT/LNT/CH/08150 18-Aug-2021 19-Aug-2021 15:00 Witness Access road MLRT-LNT-WMS-CH-014 Gopisetti Ramoji Rao
MLRT/LNT/CH/08152 18-Aug-2021 19-Aug-2021 15:00 Review 1270 to 1290 lhs 25807 rev b 029 rev 03 Shamik Saraswati
MLRT/LNT/CH/08149 18-Aug-2021 19-Aug-2021 14:00 Review MLRTLNTWMSCC/29 Ranjan Paul 58637462 Approved
MLRT/LNT/CS/08129 18-Aug-2021 19-Aug-2021 14:00 Witness Ch2+940 to 2+960RHS Reinforcement of raft MLRTLNTWMSCS/045 Ranjan Paul 58637462 Approved
MLRT/LNT/GQ/00139 18-Aug-2021 19-Aug-2021 11:30 Witness Quality Soil Sampling - - Approved
MLRT/LNT/CV/00053 18-Aug-2021 19-Aug-2021 11:00 Information Environmental - Approved
MLRT/LNT/CH/08151 18-Aug-2021 19-Aug-2021 11:00 Witness 1270 to 1290 lhs 25807 rev b 029 rev 03 Shamik Saraswati
MLRT/LNT/CV/00052 18-Aug-2021 19-Aug-2021 10:30 Information River Seche Environmental Surface Water Quality -
MLRT/LNT/CS/08126 18-Aug-2021 19-Aug-2021 10:00 Review Floreal station Back filling ok 85132 WP-CS-003 Approved
MLRT/LNT/CH/08148 18-Aug-2021 19-Aug-2021 10:00 Witness MLRTLNTWMSCC/029 Ranjan Paul 58637462 Approved
MLRT/LNT/CS/08127 18-Aug-2021 19-Aug-2021 10:00 Witness MLRTLNTWMSCS/045 Ranjan Paul 58637462 Approved
MLRT/LNT/CH/08146 17-Aug-2021 18-Aug-2021 17:00 Review Retaining wall 1st lift retaining wall Senthil Kumar R Rejected
MLRT/LNT/CE/00253 18-Aug-2021 18-Aug-2021 17:00 Review 09/29 (A2), 09/30 (A2) OHE OHL Foundation MLRT-LBT-WMS-CE-042 Approved
MLRT/LNT/CE/00252 18-Aug-2021 18-Aug-2021 16:00 Review 04/22 (C2) - Raft OHE OHL Foundation MLRT-LBT-WMS-CE-042 Approved
MLRT/LNT/CB/02210 18-Aug-2021 18-Aug-2021 16:00 Review Curepipe Central Curepipe Central DWG-30289 B WMS- Sohail A. Approved
MLRT/LNT/CS/08125 17-Aug-2021 18-Aug-2021 15:00 Witness Drain 8+040 to 8+060 MLRT LNT WMS CC 025 Mr.Kanchivanam
MLRT/LNT/CH/08145 17-Aug-2021 18-Aug-2021 14:00 Witness Access road MLRT-LNT-WMS-CH-014 Gopisetti Ramoji Rao
MLRT/LNT/CB/02209 18-Aug-2021 18-Aug-2021 14:00 Witness Curepipe Central Curepipe Central DWG- 30292 B WMS- Sohail A. Approved
MLRT/LNT/CR/01661 18-Aug-2021 18-Aug-2021 12:30 Witness Ch-24857 T2 Track Works Plinth Track Ganesha velan.P
MLRT/LNT/CR/01662 18-Aug-2021 18-Aug-2021 12:30 Witness Ch-24857 to 24812 T2 Track Works Plinth Track Ganesha velan.P Submitted to RITES
MLRT/LNT/CH/08147 17-Aug-2021 18-Aug-2021 12:00 Witness Retaining wall SBC check for Soil retaining wall Senthil Kumar R Approved
MLRT/LNT/CR/01659 18-Aug-2021 18-Aug-2021 11:30 Review Track Works FBW & AT Welding New NA Approved
MLRT/LNT/CR/01660 18-Aug-2021 18-Aug-2021 11:30 Witness Track Works FBW & AT Welding New NA
MLRT/LNT/CH/08143 17-Aug-2021 18-Aug-2021 11:00 Review RIVER SECHE-A1 PILECAP-A1 - ANJANI KUMAR Rejected
MLRT/LNT/CR/01658 17-Aug-2021 18-Aug-2021 10:30 Witness Track Works Plinth Track Inspection of SAT Ganesha velan.P Submitted to RITES
MLRT/LNT/CH/08144 17-Aug-2021 18-Aug-2021 10:00 Witness Retaining wall 1st lift Reinforcement checking retaining wall Senthil Kumar R Rejected
MLRT/LNT/CH/08142 17-Aug-2021 18-Aug-2021 09:00 Witness River sche-A1 PILE CAP-A1 - ANJANI KUMAR Rejected
MLRT/LNT/CH/08141 16-Aug-2021 17-Aug-2021 17:00 Witness Subballast Mlrt-lnt-Wms-CH-014 Karan Singh Approved
MLRT/LNT/CR/01656 16-Aug-2021 17-Aug-2021 16:00 Witness Track Works Embedded track Ganesha velan.P Submitted to RITES
MLRT/LNT/CH/08137 16-Aug-2021 17-Aug-2021 16:00 Review 31200 Rev - B WMS-wp-Cs-003 Rejected
MLRT/LNT/CH/08140 16-Aug-2021 17-Aug-2021 16:00 Witness Access road MLRT-LNT-WMS-CH-014 Gopisetti Ramoji Rao
MLRT/LNT/CU/00028 16-Aug-2021 17-Aug-2021 15:00 Review Surveying & Mapping - - - -
MLRT/LNT/CH/08136 16-Aug-2021 17-Aug-2021 15:00 Witness Access road MLRT-LNT-WMS-CH-014 Gopisetti Ramoji Rao
MLRT/LNT/CH/08139 16-Aug-2021 17-Aug-2021 15:00 Review 1380 to 1400 lhs 81999 rev D 045 rev 02 Shamik Saraswati
MLRT/LNT/CS/08124 16-Aug-2021 17-Aug-2021 14:00 Review MLRTLNTWMSCS/045 Ranjan Paul 58637462 Approved
MLRT/LNT/CR/01657 17-Aug-2021 17-Aug-2021 14:00 Witness Track Works Plinth Track . Ganesha velan.P Approved
MLRT/LNT/CH/08135 16-Aug-2021 17-Aug-2021 11:30 Witness Access road MLRT-LNT-WMS-CH-014 Gopisetti Ramoji Rao Rejected
MLRT/LNT/CS/08123 16-Aug-2021 17-Aug-2021 11:00 Witness FOB-Ramp foundation Ramp foundation MLRT LNT WMS CC 013 Mr.Kanchivanam Approved
MLRT/LNT/CE/00251 16-Aug-2021 17-Aug-2021 11:00 Review OHE OHL Foundation MLRT/LNT/WMS/CE/042 Approved
MLRT/LNT/CH/08138 16-Aug-2021 17-Aug-2021 10:00 Witness 1380 to 1400 lhs 81999 rev D 045 rev 02 Shamik Saraswati
MLRT/LNT/CR/01655 15-Aug-2021 16-Aug-2021 18:00 Witness Track Works Plinth Track Ganesha velan.P
MLRT/LNT/CH/08131 14-Aug-2021 16-Aug-2021 17:00 Review 1280 to 1300 lhs 25807 029 rev 03 Shamik Saraswati
MLRT/LNT/CR/01653 15-Aug-2021 16-Aug-2021 17:00 Witness Track Works Embedded track Ganesha velan.P Submitted to RITES
MLRT/LNT/CS/08122 14-Aug-2021 16-Aug-2021 16:00 Review ok MLRTLNTWMSCS/045 Ranjan Paul 58637462 Approved
MLRT/LNT/CH/08133 15-Aug-2021 16-Aug-2021 16:00 Witness Access road MLRT-LNT-WMS-CH-012 Gopisetti Ramoji Rao Approved
MLRT/LNT/CS/08121 14-Aug-2021 16-Aug-2021 15:00 Witness Ch3+000 to 3+020RHS Reinforcement of raft MLRTLNTWMSCS/045 Ranjan Paul 58637462 Approved
MLRT/LNT/CH/08129 14-Aug-2021 16-Aug-2021 15:00 Review Subgrade 85049 WMS-CC-007 Approved
MLRT/LNT/CH/08132 15-Aug-2021 16-Aug-2021 15:00 Witness Access road MLRT-LNT-WMS-CH-012 Gopisetti Ramoji Rao Approved
MLRT/LNT/CB/02208 14-Aug-2021 16-Aug-2021 14:30 Review Curepipe Central Curepipe Central DWG- 30289 B WMS- Sohail A. Approved
MLRT/LNT/CR/01654 15-Aug-2021 16-Aug-2021 14:30 Witness Track Works Plinth Track Ganesha velan.P Approved
MLRT/LNT/CH/08134 15-Aug-2021 16-Aug-2021 14:00 Witness 2140 to 2290 rhs Retaining wall Sbc test Retaining wall 81999 rev A 045 rev 02 Shamik Saraswati Rejected
MLRT/LNT/CH/08130 14-Aug-2021 16-Aug-2021 13:00 Witness 1280 to 1300 lhs 25807 029 rev 03 Shamik Saraswati
MLRT/LNT/CS/08120 14-Aug-2021 16-Aug-2021 11:00 Witness FOB-Ramp foundation MLRT LNT WMS CC 013 Mr.Kanchivanam Approved
MLRT/LNT/CH/08128 14-Aug-2021 16-Aug-2021 11:00 Review Trackside wall /Drain MLRTLNTWMSCS/045 Ranjan Paul 58637462
MLRT/LNT/CE/00250 15-Aug-2021 16-Aug-2021 11:00 Review OHE OHL Foundation MLRT-LNT-WMS-CE-042 Approved
MLRT/LNT/CB/02207 14-Aug-2021 16-Aug-2021 10:00 Witness Curepipe Central Curepipe Central DWG-30292 B WMS- Sohail A. Approved
MLRT/LNT/CH/08127 14-Aug-2021 16-Aug-2021 09:00 Witness Trackside wall /Drain Reinforcement of wall MLRTLNTWMSCS/045 Ranjan Paul 58637462
MLRT/LNT/CH/08126 14-Aug-2021 14-Aug-2021 19:00 Review Retaining wall Raft retaining wall Senthil Kumar R Rejected
MLRT/LNT/CH/08119 13-Aug-2021 14-Aug-2021 18:00 Review 1360 to 1380 lhs 81999 rev D 045 rev 02 Shamik Saraswati Approved
MLRT/LNT/CH/08121 13-Aug-2021 14-Aug-2021 18:00 Review 1280 to 1300 lhs 25807 029 rev 03 Shamik Saraswati
MLRT/LNT/CH/08124 13-Aug-2021 14-Aug-2021 16:30 Witness Access road MLRT-LNT-WMS-CH-012 Gopisetti Ramoji Rao
MLRT/LNT/CR/01651 13-Aug-2021 14-Aug-2021 16:00 Witness Track Works Embedded track Ganesha velan.P Submitted to RITES
MLRT/LNT/CH/08120 13-Aug-2021 14-Aug-2021 16:00 Witness 1280 to 1300 lhs 25807 029 rev 03 Shamik Saraswati
MLRT/LNT/CS/08119 13-Aug-2021 14-Aug-2021 16:00 Review MLRTLNTWMSCS/045 Ranjan Paul 58637462 Approved
MLRT/LNT/CH/08125 14-Aug-2021 14-Aug-2021 16:00 Witness Retaining wall Raft Reinforcement checking retaining wall Senthil Kumar R Rejected
MLRT/LNT/CS/08117 13-Aug-2021 14-Aug-2021 14:00 Witness RIVER SECHE A1 ABUTMENT PILECAP - 22935-A CC-012-REV-2 SARATH Rejected
MLRT/LNT/CH/08122 13-Aug-2021 14-Aug-2021 14:00 Witness Access road MLRT-LNT-WMS-CH-014 Gopisetti Ramoji Rao Approved
MLRT/LNT/CS/08118 13-Aug-2021 14-Aug-2021 14:00 Witness MLRTLNTWMSCS/045 Ranjan Paul 58637462 Approved
MLRT/LNT/CB/02204 13-Aug-2021 14-Aug-2021 13:00 Review St.Jean station K.N.Aravinth
MLRT/LNT/CB/02206 13-Aug-2021 14-Aug-2021 13:00 Review Trianon station K.N.Aravinth Approved
MLRT/LNT/CE/00249 13-Aug-2021 14-Aug-2021 11:00 Review OHE OHL Foundation MLRT-LNT-WMS-CE-042 Approved
MLRT/LNT/CR/01652 13-Aug-2021 14-Aug-2021 10:30 Review 24350-24410 T2 Track Works Plinth track
MLRT/LNT/CB/02203 13-Aug-2021 14-Aug-2021 09:00 Witness St Jean station K.N.Aravinth
MLRT/LNT/CB/02205 13-Aug-2021 14-Aug-2021 09:00 Witness Trianon station K.N.Aravinth Approved
MLRT/LNT/CH/08118 13-Aug-2021 14-Aug-2021 09:00 Witness 1360 to 1380 lhs 81999 rev D 045 rev 02 Shamik Saraswati Approved
MLRT/LNT/CR/01650 13-Aug-2021 14-Aug-2021 09:00 Review Track Works Embedded track Ganesha velan.P Submitted to RITES
MLRT/LNT/CH/08123 13-Aug-2021 14-Aug-2021 08:30 Review 3.760 to 3.980 LHS Acces Road - MLRT/LNT/WMS/CH/83 R Mathan / 58637422 Approved
MLRT/LNT/CH/08117 13-Aug-2021 13-Aug-2021 15:00 Witness Acvess road MLRT-LNT-WMS-CH-012 Gopisetti Ramoji Rao Approved
MLRT/LNT/CR/01648 12-Aug-2021 13-Aug-2021 11:00 Review Track Works Embedded track Ganesha velan.P Submitted to RITES
MLRT/LNT/CR/01649 12-Aug-2021 13-Aug-2021 10:00 Witness Ch-24333 to 24400 T2 Track Works Plinth Track . Ganesha velan.P
MLRT/LNT/CS/08116 11-Aug-2021 12-Aug-2021 16:00 Review MLRTLNTWMSCS/045 Ranjan Paul 58637462 Approved
MLRT/LNT/CH/08116 11-Aug-2021 12-Aug-2021 16:00 Review 1280 to 1300 lhs Drain lhs Pcc 25807 029 rev 03 Shamik Saraswati Approved
MLRT/LNT/CU/00027 11-Aug-2021 12-Aug-2021 15:00 Review Surveying & Mapping Condition Survey Condition Survey - - - B Anil Kumar Sahu
MLRT/LNT/CS/08114 11-Aug-2021 12-Aug-2021 14:00 Review Ch2+970 to 2+990RHS MLRTLNTWMSCS/45 Ranjan Paul 58637462 Approved
MLRT/LNT/CS/08115 11-Aug-2021 12-Aug-2021 14:00 Witness Reinforcement of raft MLRTLNTWMSCS/045 Ranjan Paul 58637462 Approved
MLRT/LNT/CS/08113 11-Aug-2021 12-Aug-2021 13:00 Witness MLRTLNTWMSCS/045 Ranjan Paul 58637462 Approved
MLRT/LNT/CR/01642 09-Aug-2021 12-Aug-2021 11:30 Review Track Works New NA
MLRT/LNT/CR/01647 11-Aug-2021 12-Aug-2021 10:00 Review Track Works Embedded track Ganesha velan.P Submitted to RITES
MLRT/LNT/CH/08115 11-Aug-2021 12-Aug-2021 08:00 Review 8+040 to 8+060 Drain R.Kanchivanam Approved
MLRT/LNT/CS/08112 10-Aug-2021 11-Aug-2021 17:00 Review MLRTLNTWMSCS/045 Ranjan Paul 58637462 Approved
MLRT/LNT/CH/08113 10-Aug-2021 11-Aug-2021 17:00 Witness Subballast Karan Singh Rejected
MLRT/LNT/CS/08111 10-Aug-2021 11-Aug-2021 16:00 Witness Reinforcement of raft MLRTLNTWMSCS/045 Ranjan Paul 58637462 Approved
MLRT/LNT/CB/02202 10-Aug-2021 11-Aug-2021 16:00 Review Vacoas Central Station pole Aminuddin Approved
MLRT/LNT/CB/02198 10-Aug-2021 11-Aug-2021 14:30 Review Curepipe Central Curepipe Central DWG-30289 B WMS-CC- Sohail A. Approved
MLRT/LNT/CB/02197 10-Aug-2021 11-Aug-2021 14:00 Witness Curepipe Central Curepipe Central DWG-CC-30292 B WMS-CC- Sohail A. Approved
MLRT/LNT/CH/08114 10-Aug-2021 11-Aug-2021 14:00 Witness Access road MLRT-LNT-MWS-CH-012 Gopisetti Ramoji Rao Rejected
MLRT/LNT/CR/01646 11-Aug-2021 11-Aug-2021 14:00 Review Track Works Embedded track Ganesha velan.P Submitted to RITES
MLRT/LNT/CB/02196 10-Aug-2021 11-Aug-2021 13:00 Review Trianon station K.N.Aravinth Approved
MLRT/LNT/CE/00248 10-Aug-2021 11-Aug-2021 13:00 Review 06/26 (A2), 06/27 (A7) OHE OHL Foundation MLRT-LNT-WMS-CE-042 Approved
MLRT/LNT/CB/02201 10-Aug-2021 11-Aug-2021 12:00 Witness Vacoas Central Station Reinforcement checking pole Aminuddin Approved
MLRT/LNT/CR/01641 09-Aug-2021 11-Aug-2021 11:30 Review Track Works New NA
MLRT/LNT/CH/08111 10-Aug-2021 11-Aug-2021 11:00 Review RHS drain stitching - MLRT-LNT-WMS-CC-29 Arijit Malik-58637434 Rejected
MLRT/LNT/CH/08109 09-Aug-2021 11-Aug-2021 10:00 Review 0+500 to 2+200 0+500 to 2+200 Tree cutting - - - Prabu 58637514 Submitted to RITES
MLRT/LNT/CH/08110 10-Aug-2021 11-Aug-2021 10:00 Witness Ch-5+990 to ch-6+030 RHS drain stitching - MLRT-LNT-WMS-CC-029 Arijit Malik-58637434 Rejected
MLRT/LNT/CH/08112 10-Aug-2021 11-Aug-2021 10:00 Review Subgrade ab 85049 WMS-CC-007 Approved
MLRT/LNT/GQ/00138 10-Aug-2021 11-Aug-2021 10:00 Witness Quality Concrete Trial Mix Concrete Mix Design - - Rejected
MLRT/LNT/CB/02200 10-Aug-2021 11-Aug-2021 09:00 Review Vacoas Central Station Excavation & PCC laying electrical pole Aminuddin Approved
MLRT/LNT/CB/02195 10-Aug-2021 11-Aug-2021 08:00 Witness Trianon station K.N.Aravinth Approved
MLRT/LNT/CB/02199 10-Aug-2021 11-Aug-2021 08:00 Review Trianon station Platform ramp K.N.Aravinth Approved
MLRT/LNT/CR/01643 09-Aug-2021 10-Aug-2021 17:00 Witness Track Works Plinth Track Ganesha velan.P Submitted to RITES
MLRT/LNT/CE/00247 09-Aug-2021 10-Aug-2021 15:00 Review OHE OHL Foundation MLRT/LNT/WMS/CE/042 Approved
MLRT/LNT/CU/00026 09-Aug-2021 10-Aug-2021 14:45 Review Surveying & Mapping Condition Survey Condition Survey - - - B Anil Kumar Sahu
MLRT/LNT/CH/08105 09-Aug-2021 10-Aug-2021 14:00 Review Stevenson Junction Approach slab slab Senthil Kumar R Approved
MLRT/LNT/CH/08108 09-Aug-2021 10-Aug-2021 13:00 Review drain Senthil Kumar R
MLRT/LNT/CS/08109 09-Aug-2021 10-Aug-2021 12:30 Witness River cascade bridge Test pile Rebar cage inspection - Prabu 58637514 Submitted to RITES
MLRT/LNT/CS/08110 09-Aug-2021 10-Aug-2021 12:30 Review River cascade bridge Test pile Boring and concreting - Prabu 58637514 Submitted to RITES
MLRT/LNT/CH/08104 09-Aug-2021 10-Aug-2021 12:00 Witness Stevenson Junction Approach slab Reinforcement checking slab Senthil Kumar R Approved
MLRT/LNT/CR/01640 09-Aug-2021 10-Aug-2021 11:30 Review Track Works New NA
MLRT/LNT/CR/01644 10-Aug-2021 10-Aug-2021 11:30 Witness Caudan A1 Ramp Track Works Plinth track . Approved
MLRT/LNT/CR/01645 10-Aug-2021 10-Aug-2021 11:00 Review Track Works Embedded track Ganesha velan.P Submitted to RITES
MLRT/LNT/CS/08107 09-Aug-2021 10-Aug-2021 10:00 Witness 1760 to 1810 - 25131-A CC-029-Rev-2 Sarath
MLRT/LNT/CS/08108 09-Aug-2021 10-Aug-2021 10:00 Review 1760 to 1810 - 25131-A cc-029-rev-2 Sarath
MLRT/LNT/CE/00246 09-Aug-2021 10-Aug-2021 10:00 Review 06/24 (A2), 06/25 (A2) OHE OHL Foundation MLRT-LNT-WMS-CE-042 Approved
MLRT/LNT/CH/08107 09-Aug-2021 10-Aug-2021 10:00 Witness Reinforcement checking drain Senthil Kumar R
MLRT/LNT/CH/08103 09-Aug-2021 10-Aug-2021 09:00 Review Stevenson Junction Approach slab Excavation & PCC laying slab Senthil Kumar R Approved
MLRT/LNT/CH/08106 09-Aug-2021 10-Aug-2021 09:00 Witness Retaining wall SBC check for soil sbc Senthil Kumar R Approved
MLRT/LNT/CU/00025 07-Aug-2021 09-Aug-2021 22:00 Review 14500 - 15140 Surveying & Mapping GPR Survey GPR Scanning . Charan - 58637477 Submitted to RITES
MLRT/LNT/CR/01639 08-Aug-2021 09-Aug-2021 17:00 Witness Ch-4+619 to 4+611 Track Works Ganesha velan.P Submitted to RITES
MLRT/LNT/CH/08096 07-Aug-2021 09-Aug-2021 16:00 Review RCC T TYPE RETAINER retainer Senthil Kumar R Rejected
MLRT/LNT/CH/08098 07-Aug-2021 09-Aug-2021 16:00 Review LHS DRAIN COVER SLAB drain Senthil Kumar R Approved
MLRT/LNT/CR/01638 08-Aug-2021 09-Aug-2021 16:00 Witness Caudan A1 Ramp Track Works Plinth Track . Rejected
MLRT/LNT/CH/08102 09-Aug-2021 09-Aug-2021 16:00 Review RCC T TYPE RETAINER retainer Senthil Kumar R Approved
MLRT/LNT/CS/08105 07-Aug-2021 09-Aug-2021 15:15 Review River cascade Bridge Test Pile Boring and concreting - Prabu 58637514 Submitted to RITES
MLRT/LNT/CS/08104 07-Aug-2021 09-Aug-2021 15:00 Witness River Cascade Bridge TEST PILE Rebar inspection - Prabu 58637514 Submitted to RITES
MLRT/LNT/CH/08094 07-Aug-2021 09-Aug-2021 15:00 Review Retaining wall Excavation & PCC laying retaining wall Senthil Kumar R Rejected
MLRT/LNT/CS/08106 07-Aug-2021 09-Aug-2021 14:00 Witness MLRTLNTWMSCS/045 Ranjan Paul 58637462 Approved
MLRT/LNT/CH/08093 07-Aug-2021 09-Aug-2021 13:00 Review Ch-6+020 to ch-6+120 RHS drain - MLRT-LNT-WMS-CC-029 Arijit Malik-58637434 Approved
MLRT/LNT/CB/02194 07-Aug-2021 09-Aug-2021 13:00 Review Trianon station Platform grade slab K.N.Aravinth Rejected
MLRT/LNT/CH/08095 07-Aug-2021 09-Aug-2021 12:00 Witness RCC T TYPE RETAINER Reinforcement checking retainer Senthil Kumar R Rejected
MLRT/LNT/CH/08097 07-Aug-2021 09-Aug-2021 12:00 Witness LHS DRAIN COVER SLAB Reinforcement checking drain Senthil Kumar R Approved
MLRT/LNT/CH/08101 09-Aug-2021 09-Aug-2021 12:00 Witness RCC T TYPE RETAINER Reinforcement checking retainer Senthil Kumar R Approved
MLRT/LNT/CH/08100 08-Aug-2021 09-Aug-2021 11:00 Witness Subgrade MLRT-LNT-WMS-CC-07 Karan Singh Approved
MLRT/LNT/CB/02192 07-Aug-2021 09-Aug-2021 08:00 Review Trianon station Embedded track PCC Check for laying of PCC K.N.Aravinth Approved
MLRT/LNT/CB/02193 07-Aug-2021 09-Aug-2021 08:00 Witness Trianon station Platform Grade slab K.N.Aravinth Rejected
MLRT/LNT/CR/01637 07-Aug-2021 08-Aug-2021 15:00 Witness Track Works Embedded track Ganesha velan.P Submitted to RITES
MLRT/LNT/CH/08099 07-Aug-2021 08-Aug-2021 10:00 Witness Subgrade MLRT-LNT-WMS-CC-07 Karan Singh Rejected
MLRT/LNT/CR/01636 07-Aug-2021 07-Aug-2021 23:45 Witness Track Works New NA Submitted to RITES
MLRT/LNT/CS/08102 06-Aug-2021 07-Aug-2021 16:00 Witness Ramp foundation Excavation and PCC MLRT LNT WMS CC 042 Mr.Kanchivanam Approved
MLRT/LNT/CH/08090 06-Aug-2021 07-Aug-2021 16:00 Review drain Senthil Kumar R Rejected
MLRT/LNT/CH/08092 06-Aug-2021 07-Aug-2021 16:00 Witness SUBGRADE MLRT-LNT-WMS-CC-07 Karan Singh Rejected
MLRT/LNT/CH/08088 06-Aug-2021 07-Aug-2021 15:00 Review 3+700 to 3+720 LHS RCC T TYPE RETAINER retainer Senthil Kumar R Rejected
MLRT/LNT/CS/08103 06-Aug-2021 07-Aug-2021 15:00 Review Embankment WMS-CC-007 Rejected
MLRT/LNT/CB/02190 06-Aug-2021 07-Aug-2021 14:30 Review Curepipe Central Curepipe Central DWG- WMS-CC Sohail A. Approved
MLRT/LNT/CS/08100 06-Aug-2021 07-Aug-2021 14:00 Witness FOB-Ramp foundation Ramp foundation SBC TEST MLRT LNT WMS CC 042 Mr.Kanchivanam
MLRT/LNT/CS/08101 06-Aug-2021 07-Aug-2021 14:00 Witness FOB-Ramp foundation Ramp foundation SBC TEST MLRT LNT WMS CC 042 Mr.Kanchivanam Rejected
MLRT/LNT/CR/01634 06-Aug-2021 07-Aug-2021 14:00 Witness La Vigie - RBG Store Track Works Flash Butt Welding New NA Approved
MLRT/LNT/CB/02191 06-Aug-2021 07-Aug-2021 14:00 Witness Phoenix station . Arup Laha (58637448) Rejected
MLRT/LNT/CE/00245 06-Aug-2021 07-Aug-2021 14:00 Review OHE OHL Foundation MLRT/LNT/WMS/CE/042 Approved
MLRT/LNT/CS/08099 06-Aug-2021 07-Aug-2021 13:00 Witness Ramp foundation MLRT LNT WMS CC 042 Mr Kanchivanam Approved
MLRT/LNT/CB/02188 06-Aug-2021 07-Aug-2021 13:00 Review Trianon station K.N.Aravinth Rejected
MLRT/LNT/CH/08087 06-Aug-2021 07-Aug-2021 12:00 Witness RCC T TYPE RETAINER Reinforcement checking retainer Senthil Kumar R Rejected
MLRT/LNT/CH/08089 06-Aug-2021 07-Aug-2021 12:00 Witness Reinforcement checking Drain Senthil Kumar R Rejected
MLRT/LNT/CH/08091 06-Aug-2021 07-Aug-2021 11:15 Witness 3.760 to 3.980 lhs Access road - MLRT/LNT/WMS/CH/16 R Mathan / 58637422 Approved
MLRT/LNT/CB/02187 06-Aug-2021 07-Aug-2021 11:00 Witness Trianon station K.N.Aravinth Rejected
MLRT/LNT/CR/01635 07-Aug-2021 07-Aug-2021 11:00 Witness Caudan A1 Ramp Track Works Plinth track Rejected
MLRT/LNT/CH/08084 06-Aug-2021 07-Aug-2021 10:00 Witness Footpath Sourav Saha
MLRT/LNT/CH/08085 06-Aug-2021 07-Aug-2021 10:00 Review 4.130 to 4.280 LHS Access road - MLRT/LNT/WMS/CH/83 R Mathan / 58637422 Approved
MLRT/LNT/CH/08086 06-Aug-2021 07-Aug-2021 10:00 Witness Retaining wall SBC Check for soil retaining wall Senthil Kumar R Rejected
MLRT/LNT/CB/02189 06-Aug-2021 07-Aug-2021 10:00 Witness Curepipe Central Curepipe Central DWG- WMS-CC- Sohail A. Approved
MLRT/LNT/CH/08080 05-Aug-2021 06-Aug-2021 17:00 Witness Access road MLRT-LNT-WMS-CH-014 Gopisetti Ramoji Rao Approved
MLRT/LNT/CR/01632 06-Aug-2021 06-Aug-2021 17:00 Witness Track Works Embedded track Ganesha velan.P Submitted to RITES
MLRT/LNT/CH/08079 05-Aug-2021 06-Aug-2021 15:00 Witness 3.760 to 3.980 LHS Access road - MLRT/LNT/WMS/CH/16 R Mathan / 58637422 Rejected
MLRT/LNT/CH/08081 05-Aug-2021 06-Aug-2021 15:00 Witness 6820 to 6840 RHS Drain raft and wall . Arup Laha (58637448)
MLRT/LNT/CR/01630 05-Aug-2021 06-Aug-2021 15:00 Witness T2 ch 24+357 Track Works Plinth Track AT welding Submitted to RITES
MLRT/LNT/CR/01633 06-Aug-2021 06-Aug-2021 15:00 Witness Caudan A1 Ramp Track Works Plinth track Sample Toe load test Submitted to RITES
MLRT/LNT/CH/08078 05-Aug-2021 06-Aug-2021 14:00 Review Retaining wall Excavation & PCC laying retaining wall Senthil Kumar R Rejected
MLRT/LNT/CH/08083 05-Aug-2021 06-Aug-2021 14:00 Witness 8+695 To 8+725 Subgrade MLRT-LNT-WMS-CC-007 Karan Singh Rejected
MLRT/LNT/CH/08077 05-Aug-2021 06-Aug-2021 12:00 Witness RCC T TYPE RETAINER Excavation & PCC laying retainer Senthil Kumar R Approved
MLRT/LNT/CE/00244 05-Aug-2021 06-Aug-2021 11:30 Review OHE OHL Foundation MLRT/LNT/WMS/CE/042 Approved
MLRT/LNT/CR/01631 05-Aug-2021 06-Aug-2021 11:30 Review Track Works Embedded track . Ganesha velan.P Approved
MLRT/LNT/CS/08098 05-Aug-2021 06-Aug-2021 10:00 Witness Seche river bridge A1 abutment pilecap - 22935-A CC-029-REV-3 Sarath
MLRT/LNT/CH/08082 05-Aug-2021 06-Aug-2021 10:00 Review - - - CHARAN Submitted to RITES
MLRT/LNT/CB/02186 05-Aug-2021 06-Aug-2021 09:00 Review Trianon station Check for PCC laying K.N.Aravinth Rejected
MLRT/LNT/CB/02185 04-Aug-2021 05-Aug-2021 15:00 Review Curepipe Central Curepipe central DWG- WMS-CC- Sohail A. Approved
MLRT/LNT/CU/00024 04-Aug-2021 05-Aug-2021 15:00 Review Surveying & Mapping Condition Survey Condition survey - - -
MLRT/LNT/CR/01629 05-Aug-2021 05-Aug-2021 15:00 Review Track Works Embedded track Ganesha velan.P
MLRT/LNT/CB/02184 04-Aug-2021 05-Aug-2021 14:45 Witness Curepipe Central DWG- WMS-CC Sohail A. Approved
MLRT/LNT/CS/08097 04-Aug-2021 05-Aug-2021 14:30 Witness Curepipe FO Curepipe FO DWG- WMS-CC- Sohail A. Approved
MLRT/LNT/CH/08076 04-Aug-2021 05-Aug-2021 14:00 Witness Retaining wall SBC check for soil sbc Senthil Kumar R Rejected
MLRT/LNT/CH/08075 04-Aug-2021 05-Aug-2021 11:00 Witness Access road MLRT-LNT-WMS-CH-012 Gopisetti Ramoji Rao Approved
MLRT/LNT/CR/01628 04-Aug-2021 05-Aug-2021 11:00 Review Track Works Embedded track . Ganesha velan.P
MLRT/LNT/CH/08074 03-Aug-2021 04-Aug-2021 16:00 Review RCC T TYPE RETAINER Retainer Senthil Kumar R Rejected
MLRT/LNT/CS/08096 03-Aug-2021 04-Aug-2021 15:00 Witness MLRTLNTWMSCS/045 Ranjan Paul 58637462 Approved
MLRT/LNT/CH/08072 03-Aug-2021 04-Aug-2021 15:00 Review 6820 to 6840 RHS Drain Arup Laha (58637448) Approved
MLRT/LNT/CH/08071 03-Aug-2021 04-Aug-2021 14:00 Witness 3.760 to 3.980 LHS Access road - MLRT/LNT/WMS/CH/11 R Mathan / 58637422 Approved
MLRT/LNT/CR/01627 03-Aug-2021 04-Aug-2021 14:00 Review Track Works Embedded track Rail cladding Ganesha velan.P
MLRT/LNT/CH/08073 03-Aug-2021 04-Aug-2021 12:00 Witness RCC T TYPE RETAINER Retainer Senthil Kumar R Rejected
MLRT/LNT/SH/00353 03-Aug-2021 04-Aug-2021 11:00 Witness Depot Rolling Stock Lrvs Open Points closing - - - Radio
MLRT/LNT/CB/02183 03-Aug-2021 04-Aug-2021 08:00 Review Trianon station Check for PCC laying K.N.Aravinth Cancelled
MLRT/LNT/CH/08070 02-Aug-2021 03-Aug-2021 18:00 Review 1260 to 1280 lhs 25807 029 rev 03 Shamik Saraswati
MLRT/LNT/CH/08068 02-Aug-2021 03-Aug-2021 16:00 Witness RCC T TYPE RETAINER Excavation & PCC laying retainer Senthil Kumar R Rejected
MLRT/LNT/CS/08094 02-Aug-2021 03-Aug-2021 15:00 Witness MLRTLNTWMSCS/045 Ranjan Paul 58637462 Approved
MLRT/LNT/CH/08064 02-Aug-2021 03-Aug-2021 14:00 Review Subgrade 85057 Approved
MLRT/LNT/CU/00023 02-Aug-2021 03-Aug-2021 14:00 Review Surveying & Mapping Condition Survey - - - -
MLRT/LNT/CS/08095 02-Aug-2021 03-Aug-2021 12:00 Review RIVER SECHE BRIDGE A2 ABUTMENT PILECAP - 22938-A CC-029-REV-2 SARATH
MLRT/LNT/CH/08067 02-Aug-2021 03-Aug-2021 12:00 Witness RCC T TYPE RETAINER SBC check for soil retainer Senthil Kumar R Rejected
MLRT/LNT/SH/00352 02-Aug-2021 03-Aug-2021 10:30 Witness Depot Rolling Stock LRVs Open Points Closing - - -
MLRT/LNT/CH/08066 02-Aug-2021 03-Aug-2021 10:00 Witness 2030 TO 2070 LHS - CS-087-REV-0 SARATH Approved
MLRT/LNT/CH/08069 02-Aug-2021 03-Aug-2021 10:00 Witness 1260 to 1280 lhs 25807 029 rev 03 Shamik Saraswati
MLRT/LNT/CS/08093 02-Aug-2021 03-Aug-2021 09:00 Witness Sbc testing of soil MLRTLNTWMSCS/045 Ranjan Paul 58637462 Approved
MLRT/LNT/CH/08065 02-Aug-2021 02-Aug-2021 20:00 Review EMBEDDED TRACK BED - MLRT-LNT-WMS-CC-036 Arijit Malik-58637434 Approved
MLRT/LNT/CS/08092 02-Aug-2021 02-Aug-2021 15:00 Witness FOB-Ramp foundation Ramp foundation SBC TEST MLRT LNT WM CC 042 Mr.Kanchivanam Approved
MLRT/LNT/CH/08273 31-Aug-2021 01-Aug-2021 17:00 Review 1400 to 1420 lhs Retainer wall top lift 81999 rev D 045 rev 02 Shamik Saraswati Approved
MLRT/LNT/CH/08272 31-Aug-2021 01-Aug-2021 16:00 Witness 1400 to 1420 lhs Retainer wall top lift 81999 rev d 045 rev 02 Shamik Saraswati Approved
MLRT/LNT/CH/08271 31-Aug-2021 01-Aug-2021 15:00 Witness 1460 to 1500 lhs Sbc test 81999 rev D 045 rev 02 Shamik Saraswati Approved