Estimate No.
Estimate for replacement of MNR sph Meters by good one at various locations in O & M -2 sec, USD kola
Sl.
Name of the Material Unit Qnty Rate
No.
Credit
Sl no materials Qnty in KG's Rate Amount
Eletronic Meter,5-20/5-30amps 1.Ph
1 36 76 2736
Class-1 Accuracy.
CERTIFICATE : -
Certified that I have prepared the estimate by using Schedule of Rates for most economical and safe way of
executing the work.
REPORT : -
This estimate has been prepared for Fixing of MNR single phase Meters by good one. The above work w
be carried out by ME staff of O&M 2 section, USD, Kolar. The RR no list is enclosed with this estimate.This
estmimate may be sanctioned at an earliest.
Amount
59719
59719
tive Engineer(Ele)
BESCOM, USD, Kolar
BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED
Estimate No.
Estimate for replacement of MBO 3 phase Meters by good one for High Mast lamps at various locations in O
M -2 sec, USD kolar.
Sl.
Name of the Material Unit Qnty Rate
No.
Credit
Sl no materials Rate Amount
1 3 phase electronic meter (MBO) no value no value
CERTIFICATE : -
Certified that I have prepared the estimate by using Schedule of Rates for most economical and safe way of
executing the work.
REPORT : -
This estimate has been prepared for replacing of MBO three phase Meters by good one for High mast
lamps . The above work will be carried out by ME staff of O&M 2 section, USD, Kolar. The RR no list is
enclosed with this estimate.This estmimate may be sanctioned at an earliest.
Amount
31698
31698
tive Engineer(Ele)
BESCOM, USD, Kolar
BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED
Estimate No.
Estimate for replacement of MBO sph Meters by good one for street lights at various locations in O & M -2 sec,
USD kolar.
Sl.
Name of the Material Unit Qnty Rate Amount
No.
Credit
Sl no materials Rate Amount
1 sph electronic meter(MBO) no value no value
CERTIFICATE : -
Certified that I have prepared the estimate by using Schedule of Rates for most economical and safe way of
executing the work.
REPORT : -
This estimate has been prepared for replacing of MBO single phase Meters by good one for street light in
O&M - 2, section, usd kolar. The above work will be carried out by ME staff of O&M 2 section, USD, Kolar.
The RR no list is enclosed with this estimate.This estmimate may be sanctioned at an earliest.
Estimate No.
Estimate for replacement of MBO sph Meters by good one for street lights at various locations in O & M -2 sec,
USD kolar.
date:
Sl.
Name of the Material Unit Qnty Rate Amount
No.
Total 4026
Credit
CERTIFICATE : -
Certified that I have prepared the estimate by using Schedule of Rates for most economical and safe way of
executing the work.
REPORT : -
This estimate has been prepared for replacing of MBO single phase Meters by good one for street light in
O&M - 2, section, usd kolar. The above work will be carried out by ME staff of O&M 2 section, USD, Kolar.
The RR no list is enclosed with this estimate.This estmimate may be sanctioned at an earliest.The meter fixed to
the above installation are out of guarantee period.
Sl No RR No.
1 KRUSLB1
2 KRUSLB2
3 KRUSLB3
4 KRUSLB4
5 KRUSLB5
6 KRUSLB6
Estimate No.
Estimate for replacement of MNR 3ph Meters by good one at various locations in O & M -2
sec, USD kolar.
Sl.
Name of the Material Unit Qnty Rate Amount
No.
Eletronic Meter,5-20/5-
1 30amps 3 Ph Class-1 Nos. 2 1761 3522
Accuracy.
Total 3522
Credit
Qnty in
Sl no materials Rate Amount
KG's
Eletronic Meter,5-20/5-
1 30amps 3Ph Class-1 2 76 152
Accuracy.
CERTIFICATE : -
Certified that I have prepared the estimate by using Schedule of Rates for most economical and
safe way of executing the work.
REPORT : -
This estimate has been prepared for Fixing of MNR three phase Meters by good one.
The above work will be carried out by ME staff of O&M 2 section, USD, Kolar. The RR no
list is enclosed with this estimate.This estmimate may be sanctioned at an earliest.
Asst.Engineer (El)
BESCOM, O&M II, Kolar Asst. Executive Engineer(Ele)
USD BESCOM, USD, Kolar
Estimate No.
date:
Estimate for supply and fixing of 3ph energy meter for IP Set installation in O & M -2 sec,
USD kolar.
Eletronic Meter,5-20/5-
1 30amps 3 Ph Class-1 Nos. 5 1731 8655 200 1000
Accuracy.
14655 2500
Total 17155
CERTIFICATE : -
Certified that I have prepared the estimate by using Schedule of Rates for most economical and
safe way of executing the work.
REPORT : -
This estimate has been prepared for for supply and fixing of 3ph energy meter for IP Set
installation in O & M -2 sec, USD kolar. The above work will be carried out by ME staff of
O&M 2 section, USD, Kolar. The RR no list is enclosed with this estimate.This estmimate may
be sanctioned at an earliest.This estimate has been prepared as per the instructions of Energy
Audit Nodal Officer.
Asst.Engineer (El)
BESCOM, O&M II, Kolar Asst. Executive Engineer(Ele)
USD BESCOM, USD, Kolar
BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED
Estimate No.
Estimate for replacement of MBO 3ph Meters by good one at various locations in O & M -2 sec, USD kol
Sl.
Name of the Material Unit Qnty Rate
No.
Eletronic Meter,5-20/5-30amps 3 Ph
1 Nos. 1 1761
Class-1 Accuracy.
Total
Credit
Sl no materials rate Amount
Eletronic Meter,5-20/5-30amps 3Ph
1 no value no value
Class-1 Accuracy.(MBO)
CERTIFICATE : -
Certified that I have prepared the estimate by using Schedule of Rates for most economical and safe way of
executing the work.
REPORT : -
This estimate has been prepared for Fixing of MBO three phase Meters by good one. The above work w
be carried out by ME staff of O&M 2 section, USD, Kolar. The RR no list is enclosed with this estimate.This
estmimate may be sanctioned at an earliest.
Amount
1761
1761
tive Engineer(Ele)
BESCOM, USD, Kolar
BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED
Estimate No.
Credit Estimate for releasing of idle LT rabbit/ 2 ACSR conductor in mochi palya locations in O & M -2 sec
USD kolar.
7th schedule
Sl. Year of
Materials UNIT Qty Rate
No erection
7 TOTAL CREDIT
CERTIFICATE : -
Certified that I have prepared the estimate by using Schedule of Rates for most economical and safe way of
executing the work.
REPORT : -
This credit estimate has been prepared for releasing idle Rabbit/ 2 Acsr conductor in mochipalya in o&m
usd kolar. The above mentioned Over head conductor is idle and is at hazardous condition (due to high sag) . T
OH lt line contains both Rabbit and 2 Acsr conductor. No of spans are 7. The above work will be carried out
ME staff of O&M 2 section, USD, Kolar. This estmimate may be sanctioned at an earliest.
Value
after
Amount Yr of Release % of Dp
Deprecia
tion
538.00
tive Engineer(Ele)
BESCOM, USD, Kolar
Estimate NO :
Estimate for Replacement of 11 KV jumps and maintenance of 11 KV GOS's of F22 fee
CERTIFICATE :-
Certified that I have prepared the estimate by using current S.R. for most econ
the work.
REPORT: This estimate has been prepared for Replacement weak and aged 11 kv jumps
maintenance of 11 KV GOS's.Due to the weak/aged jumps 11kv feeders of o&m 2 section
frequently and also due to 11 kv jump cut , consumers are facing power interruptions,re
reliability index. To over come this situation here we are proposing to replace weak/age
only essential materials are provided in the estimate. Hence this estimate may kindly be
Locations of 11 kv GOS
LINGAYATH GRAVEYARD
CHINMAYA SCHOOL
MAHILA SAMAJA SCHOL
SNR HOSPITAL
ACB OFFICE
ETCM HOSPITAL
Rate Amount
36497.00 14598.80
275.00 24750.00
39348.80
ht
YESHWANTH GOS
GANDHINAGAR
SOMESHWARA TEMPLE
KOLARAMMA TEMPLE
Estimate No.
Estimate for replacement of burnt out pot heads and straight through joints by good for AB cable in O & M
sec, USD kolar.
Sl.
Name of the Material Unit Qnty Rate
No.
11 kV AB CableTermination Kits for
1 95 to 120 Sqmm
set 3 2532
Total
CERTIFICATE : -
Certified that I have prepared the estimate by using Schedule of Rates for most economical and safe way of
executing the work.
REPORT : -
This estimate has been prepared for replacement of burnt out pot heads and staright through joint kits b
good one for 95 sqmm Ab cable in O&M -2 section, usd Kolar.The O&M-2 section has around 8 km (route len
of Ab cable, and F4 feeder is using Ab cable to feed SNR hospital and court compound. F4 is a dedicated feede
Since the Ab cable is laid more than 8 years back and because of this F4 feeder is facing many power interrupt
due to pot head failure and cable burnt out.Since the feeder is dedicated to SNR hospotal, we need to restore p
supply immediately . The above work will be carried out by ME staff of O&M 2 section, USD, Kolar. Hence
estimate may be kindly sanctioned at the earliest.
Amount
7596
20439
20439
tive Engineer(Ele)
BESCOM, USD, Kolar