Date : 04/11/2021

Ref : 2021/10/374/10788/72/02/Q1
To : Intelligent Design
Attn. : Mr. Marc Arroyo
Project : Adidas Showroom (FF067B) at Place Vendome Mall
Subject : Technical and Financial Offer

Dear Sir,
Reference to a/m subject & upon your request, Al-Kashaf has the honour to submit its quotation for
Architecture Review & Modification, MEP & Civil Defence Design, GSAS Services, Obtain Authorities
approvals, DC1 & DC2 and Supervision works, Obtain Completion Certificate according to the following: -
I. Technical offer:

1. Project description.

Adidas Showroom ( FF067B) at Place Vendome Mall with approximate area = 336 m2

2. Scope of work
❖ Task One: Design & Supervision Services
➢ Stage One: (Design)
✓ Architecture Review & Modification

✓ Fire Safety Design

✓ Electrical System Design

- ELV, Telephone & Data

✓ Obtain DC1

✓ Civil Defense Design


- Fire Fighting

- Fire Alarm

✓ MEP System Design


- HVAC System

✓ Obtain Authorities approval (Municipality, Civil Defence) and (Kahramaa, Ooreedoo (If

required))

✓ Obtain DC2
✓ Prepare BOQ & Specifications for MEP Systems only

➢ Stage Two: (Supervision)

Supervision Services & technical Support shall cover the following engineering system:

▪ Fire Safety Works


▪ Mechanical Systems
▪ Electrical Systems
✓ Supervision Works:

1) Review / approval of submitted Shop drawing

2) Review / approval of material submitted.

3) Review / approval as built drawings.

4) Inspection of installation works in site.

5) Attend Testing & Commissioning done by contractor

6) Attending the Authorities inspections

7) Collect all documents & prepare a file to upload to authority’s website.

8) Follow up Authorities comments complying with the contractor to obtain the permit

9) Obtain Completion Certificate


✓ Obtain Completion Certificate from Municipality.
1) Review Site Survey Report with updated date.
2) Technical Report from the Consultant.
✓ Proposed Supervision Engineer
• One Civil or Architecture Engineer (Approximately 3 Visits)
• One Mechanical Engineer (Approximately 5 Visits)
• One Electrical Engineer (Approximately 5 Visits)

❖ Task Two: GSAS Design & Construction Stage


➢ Stage One: GSAS Design Stage

• Project registration on GSAS gate.


• Collecting all design drawings (Architecture & MEP drawings), Materials data sheets,
Evidences & Plans.
• Review & approval of the drawings and documents in accordance with GSAS requirements.
• Submitting the drawings and documents to GORD for review & approval.
• Following up & complying the comments until obtaining “GSAS Design approval
certificate”.

➢ Stage Two: GSAS Construction Stage


• Site supervision during the construction & Collecting site evidences.
• Ensure the Conformance between the site works & the previously approved design
documents.
• Submitting to GORD requesting Site Audit.
• Conducting GORD Site Audit.
• Following up & complying the comments until obtaining “Final GSAS approval certificate”.
3. Time Schedule:

❖ Task One: Design & Supervision Services


Stage Item Scope of works Approximately Time
No. No.
01 Architecture Review & Modification

02 Fire Safety Design

03 Electrical System Design ( ELV, Telephone & Data) 2 weeks

04 Fire Alarm & Fire Fighting Design


Stage
05 HVAC System Design
One

06 Obtain DC1 4-8 Weeks

07 Obtain Authorities approval (Municipality & Civil


Defence) and (Kahramaa, Ooreedoo, (If required))
4-8 Weeks
08 Obtain DC2

09 Prepare BOQ & Specifications for MEP Systems only 1 week

10 Review / approval of submitted Shop drawing

11 Review / approval of material submitted.


Depend on the
12 performance of
Review / approval as built drawings.
contractor
13 Inspection of installation works in site.

Stage 14 Attend Testing & Commissioning done by contractor


Two
15 Attending the Authorities inspections

Collect all documents & prepare a file to upload to


16
authority’s website. Depends on type of
comments
17 Follow up Authorities comments complying with the
contractor to obtain the permit
18 Obtain Completion Certificate from Municipality.
❖ Task Two: GSAS Design & Construction Stage

Stage Item
Scope of works (Phases) Approximately Time
No. No.

01 Project registration on GSAS gate.

Collecting all design drawings (Architecture & MEP


02
drawings), Materials data sheets, Evidences & Plans.
Stage
One Review & approval of the drawings and documents in
03
accordance with GSAS requirements.

Submitting the drawings and documents to GORD for


04
review & approval.

Following up & complying the comments until obtaining Depends on the


05
“GSAS Design approval certificate”. performance of contractor
and comments from
Site supervision during the construction & Collecting site GSAS Authority
06
evidences.

Ensure the Conformance between the site works & the


07
previously approved design documents.

Stage
Two 08 Submitting to GORD requesting Site Audit.

09 Conducting GORD Site Audit.

Following up & complying the comments until obtaining


10
“Final GSAS approval certificate”.
The above time schedules starting date (Day zero) the date of received written notification for starting works,
receiving down payment, required official documents, technical data and Architecture drawings (CD).
4. Deliverables:
- One Soft copy (CD)
- One Hard copy (A3 format)
II. Financial offer
1. Fees:
Al- Kashaf total fees for completing above services as mentioned in technical offer shall be as the following:
❖ Task One: Design & Approvals
Stage Item
Scope of works Fees (Q.R)
No. No.

01 Architecture Review & Modification

02 Fire Safety Design

03 Electrical System Design ( ELV, Telephone & Data) 24,000

04 Fire Alarm & Fire Fighting Design


Stage
05 HVAC System Design
One
06 Prepare BOQ & Specifications for MEP Systems only 6,000

07 Obtain DC1

08 Obtain Authorities approval (Municipality & Civil


6,000
Defence) and (Kahramaa, Ooreedoo, (If required))
09 Obtain DC2

10 Review / approval of submitted Shop drawing

11 Review / approval of material submitted.

12 Review / approval as built drawings.

13 Inspection of installation works in site.


Stage
14 Attend Testing & Commissioning done by contractor 13,000
Two
15 Attending the Authorities inspections

16 Collect all documents & prepare a file to upload to


authority’s website.
17 Follow up Authorities comments complying with the
contractor to obtain the permit
18 Obtain Completion Certificate from Municipality.

Total for Task One 49,000


❖ Task Two: GSAS Design & Construction Stage
Stage Item
Scope of works (Phases) Fees (Q.R)
No. No.

01 Project registration on GSAS gate.

02 Collecting all design drawings (Architecture & MEP


drawings), Materials data sheets, Evidences & Plans.
Stage
One Review & approval of the drawings and documents in
03 10,000
accordance with GSAS requirements.
04 Submitting the drawings and documents to GORD for
review & approval.
Following up & complying the comments until obtaining
05
“GSAS Design approval certificate”.
Site supervision during the construction & Collecting site
06
evidences.
Ensure the Conformance between the site works & the
07
previously approved design documents.
Stage
Two 08 Submitting to GORD requesting Site Audit. 4,000

09 Conducting GORD Site Audit.

Following up & complying the comments until obtaining


10
“Final GSAS approval certificate”.

Total for Task Two 14,000

2. Payments:
❖ Total Contract Fees for Task One & Two = 63,000 QR
▪ Down Payment : 50 % of total Contract Fees (Upon sign of contract). (31,500 QR)
✓ Task One:
❖ Total Contract Fees for Task One = 49,000 QR
▪ First Payment : 30 % (Upon Finish Civil Defence & MEP Design) (14,700 QR)
▪ Second Payment : 10 % (Upon Obtain Building Permit) (4,900 QR)
▪ Third Payment : 10 % (Upon Obtain Completion Certificate) (4,900 QR)
✓ Task Two:
❖ Total Contract Fees for Task Two = 14,000 QR
▪ First Payment : 30 % (Upon Obtain GSAS Design approval certificate) (4,200 QR)
▪ Second Payment : 20 % (Upon Obtain GSAS Final Approval Certificate) (2,800 QR)
3. Conditions:
- A/m fees excluded any other works that are not determined in technical offer.
- A/m fees payments will be due after a week from the submission date.
- This proposal is valid for one month only from date of offer submission.
- Final architecture drawing including section drawings, elevation and reflecting ceiling drawings
(Auto Cad drawing) is required.
- Architecture modification includes only plans & sections, excluded any elevation details, finish
materials (Only for authority approval).
- A/m fees excluded any special system design which is not mentioned in technical offer (CCTV,
Access Control, etc.) and it shall be done by specialists.
- All material list and material data sheets are required.
- A/m fees excluded the following.
• Attending weekly progress meeting.
• Any fee payable to GORD for the Certification. The registration and certification fee or any
other fee associated with GORD shall be directly paid by the client.
• Any third party tests required for certification.
• Any traffic, environment reports/approvals
• Any governmental fees & any GSAS registration fees.
• Full Time On-Site GSAS CGP Coordinator (Provisional)
• Taxes & Insurance.
- A/m fees excluded any structure works.
- All old approved drawings, all as-built drawings, permits and completion certificate of the building
is required.
- A/m fees excluded equipment and tools needed to apply tests work and/or any works not mentioned
in technical offer.
- Documents and data required to upload for authorities inspection permit shall be provided by the
contractor/owner.
- Maximum number of visits is as mentioned in the technical offer.
- The number of supervision visits for each Engineer will increase for the following:
i. Major Modifications in Architecture Drawings effected on the Project.
ii. Repeated mistakes by the contractor to submitted the materials and Drawings.
iii. Repeated mistakes by the contractor in the Installation works or Tests.
That’s make Al-Kashaf has the right to claim for additional fees equals to A/m rates.
Agreed to proceed …………………………………………………………………………………...............................
Print Name Signature Date
Awaiting your favourable reply, thanking you in advance for your attention, we remain, restating our
interest in working with your company.
Thanks, Best Regards
Eng. Ahmed Abbas

You might also like