Course Content - Primavera Basic and Advanced Levels (Level I GÇô II)
Course Content - Primavera Basic and Advanced Levels (Level I GÇô II)
Course Content - Primavera Basic and Advanced Levels (Level I GÇô II)
Requirements:
Project Management Basic Knowledge (Relations, duration calculation, AON and Project Network ...
etc.).
Basic background in Project Management Required.
Content:
By using Primavera:
Primavera Types and Versions.
Setup Primavera.
Program Icons Introduction.
Create EPS and usages.
Adding Project.
Creating Project Calendars.
Project WBS Meaning and creating.
Creating Project Activities and relations.
Project Resources.
Profiles and Spreadsheets.
Monitoring and Controlling
Project Controlling Reports Example
Layout and Printing.
Advanced Orders.
How to make combinations between projects.
Extracting Project Start Dates from Contract.
Time Schedules Types (Tender Plan, Baseline, Recovery, Revised).
Creating Project Calendar (Ordinary Calendar & Procurement Calendar).
Creating WBS and WPc using Primavera.
Adding activities.
Calculating Durations and assigning durations.
Make Relations according site phases.
Grouping and sort techniques and usage.
Assigning Activity codes and real usages (Engineers, project phases, types or milestones).
Activity Types (Milestones, LOE, WBS Summery, Resource dependent).
Preparing Program for adding resources (Currency, Rate Type, units of measures).
Estimating project resources.
Creating and assign resources.
Activities Profiles, Spreadsheets and Resources Profiles, Spreadsheets.
Making Baseline or more than one.
Updating using Primavera (Time and Cost Updates).
Earned Value using primavera and performance evaluation.
Time, Cost Evaluation from primavera.
Indications of EV numbers from primavera and solutions.
Filtering usages and techniques (Activities, Codes, Look Ahead …. Etc.).
Export data from primavera to or from primavera, Excel.
Basic Reports from Primavera.
Printing Project and printing techniques.
Construction Project Case study from A: Z from contract phase till closing phase.
Starting by Small Project Using Basic Primavera Tools.
Narrative Report for Projects.
How to Revise Time Schedule (Revision Points of view).
Global Change Usages.
Resource Curve usages.
Updating Types (Physical, Duration, Units).
Updating Methods (Status, Progress spot light …. Others).
Import Updating from Excel to Primavera.
Importing External Baseline for Progress.
Periodic Site Progress and adding to primavera.
Leveling, Crashing Usage in Primavera.
User defined columns.
User defined and global change columns for showing costs types.
Using contractual milestones.
Project Constraints Types.
Cash flow and estimating project ending costs.
MEP Activities in Projects and sequencing.
Infrastructure Activities and Time schedule structure.
Residential Project from A: Z Using Primavera.
Non-Residential Project from A: Z.
Updating and projects Case studies.
Main Points Required at Report (Contractor, Owner, Consultant).