A1 Schedule

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 2

SCHEDULE - A1

PRICE SCHEDULE (FOR GOODS TO BE OFFERED FROM


OUTSTAND THE PURCHASER'S COUNTRY)
(Price indicated below shall be on "FIRM" price basis)
Cost*

Handing at
Madras Port, Insurance
Item No.as per C1.2 of Country of Total Cost* FOB Port inland transport Charges (Inland Total* Col (6+7+8)
Description Qty
Sec.GIS-3 origin of loading Total CIF Cost Port Entry and unloading transit, storage
charges at erection Testing
site/stores at & Commg)
Madras

1 2 3 4 5 6 7 8 9
I.PACKAGE - 1
FOB Shanghai, China
(230KV)
230kV GIS &
SUPPLY China 3 bays US$1,192,083.75 US$1,251,687.94 US$25,033.76 US$12,767.22 US$1,289,488.91
Feeder Bay
230kV GIS &
Transformer China 2 bays US$611,325.00 US$641,891.25 US$12,837.83 US$6,547.29 US$661,276.37
Bay
230kV GIS &
China 4 bays US$313,706.25 US$329,391.56 US$6,587.83 US$3,359.79 US$339,339.19
Protection Bay

Spare Parts and


China 1 lot US$242,068.61 US$254,172.04 US$5,083.44 US$2,592.55 US$261,848.04
Special Tools

Sub-Total: US$2,359,183.61 US$2,477,142.79 US$49,542.86 US$25,266.86 US$2,551,952.51 US$3,700,331.13

Price of
erection
ERECTION: 1 lot US$60,491.89 - - - US$60,491.89 US$87,713.24
supervision
only.
Total for package-1 US$2,612,444.39 US$3,788,044.37
II.PACKAGE-II
(33KV)
SUPPLY: 33 KV GIS ITALY 13 PANELS US$1,221,428.57 US$1,282,500.00 US$25,650.00 US$13,081.50 US$1,321,231.50 US$1,915,785.67
Sub-Total
ERECTION: 13 PANELS INR 1800000 INR 1800000

TOTAL FOR
PACKAGE-II
TOTAL FOR
PACKAGE I&II

DISCOUNT OFFERED
i) For Common items of
PACKAGE-I&II

ii) Towards larger


volume of PACKAGES

Total Bid Price

SIGNATURE…………………………..
DESIGNATION………………………..
COMPANY SEAL…………………….
COMPANY…………………………….
DATE:………………………………….

NOTE: 1. In case of discrepancy between UNIT PRICE and total cost, the unit price shall prevail
2. Customs duties and other levies, local taxes and levies if any etc, shall not be included in the prices quoted. These details shall be indicated in the
enclosed Annexure-I to Schedule GIS-21B.

3. Indian Agents commission (LAC), if any, should be included in the FOB cost and the same shall also be indicated separately in Indian repees. The
IAC as percentage of quoted FOB cost should also be indicated separately.

4. Notation*: currencies to be used in accordance with clause 16 of the Instruction to bidders.


SCHEDULE A1
PRICE SCHEDULE (FOR GOODS TO BE OFFERED FROM
OUTSIDE THE PURCHASER'S COUNTRY)
(Price indicated below shall be on "FIRM" price basis)
Cost*

Handling at Insurance
Madras Port, Charges
Item No. as per CI.2 of Country of inland transport (Inland transit, Total* Col (6+7+8)
Description Qty Total Cost* FOB Port of loading Total CIF Cost
Sec.GIS-3 origin and unloading storage
Port Entry
charges at erection
site/stores at Testing &
Madras Commg)

1 2 3 4 5 6 7 8 9
I.PACKAGE-1(230KV
Cable 1x1200 Sq.mm
24.75 kms US$6,431,040.00 US$6,752,592.00 US$135,051.84 US$68,876.44 US$6,956,520.28
Aluminium XLPE Cable)
IN kms
230KV Cable termination
24 NOS US$282,466.56 US$296,589.89 US$5,931.80 US$3,025.22 US$305,546.90
IN No's
230KV Cable accessories
LOT US$528,792.64 US$555,232.27 US$11,104.65 US$5,663.37 US$572,000.29
including joints in LOT
SUPPLY US$7,834,067.47 US$11,359,397.83
Sub-Total:

ERECTION: LOT
Total for package-1
DISCOUNT OFFERED
i) For common items of
PACKAGE
ii) Towards larger volume of
PACKAGES
Total Bid Price

SIGNATURE………………………………
DESIGNATION…………………………..
COMPANY SEAL………………………..
COMPANY……………………………….
DATE……………………………………..

NOTE: 1. In case discrepancy between UNIT PRICE and total cost, the unit price shall prevail.

Customs duties and other levies, local taxes and levies if any etc, shall not be included in the prices quoted. These details shall be
2.
indicated in the enclosed Annexure-I Schedule GIS-21B.

Indian Agents commission (LAC) if any, should be included in the FOB cost and the same shall also be indicated separately in Indian
5.
rupees. The IAC as percentage of quoted FOB cost should also be indicated separately.

6. Notation*: currencies to be used in accordance with clause 16 of the Instruction to bidders.

You might also like