Tap Stand Type 3 - Tap Stand To Be Constructed On Lined Canal Cover
Tap Stand Type 3 - Tap Stand To Be Constructed On Lined Canal Cover
75
0.05 X 0.05 Drip Hole 0.70 Concrete Existing Covered Lined Canal/Side Walk 0.05 X 0.05 Drip Hole Concrete Concrete
0.50 0.50 10 mm dia. def. bars
Water Barrier Water Barrier Water Barrier
PEDESTRIAN FOOT TRAFFIC 0.65 spaced at 0.20 OCBW with base of
1 1
2"Dia. GI Pipe S-40 2"
Dia. GI Pipe S-40 vertical bars welded to existing lined
Distribution Line Tap Distribution Line Tap 0.10 canal cover RSB
Existing lined canal cover RSB
Embedded on Existing Embedded on Existing
Concrete Lined Canal Cover PEDESTRIAN FOOT TRAFFIC Concrete Lined Canal Cover
To be chipped from existing lined canal
0.10 cover and expose existing RSB
2.45 1.70
Existing Curb Line Existing Curb Line
Widened Sidewalk
for Pedestrian Use 0.50 0.50
Existing Road Existing Road
Gutter Line Gutter Line
Adjusted Curb Line Adjusted Curb Line
0.50 0.50
1.70
2-FAUCET TAP STAND PLAN 1-FAUCET TAP STAND PLAN
SCALE 1:16
SCALE 1:16
0.90
1-FAUCET TAP STAND FRONT ELEVATION TYPICAL TYPE 3 TAP STAND LEFT SIDE ELEVATION
2-FAUCET TAP STAND FRONT ELEVATION
SCALE 1:16 SCALE 1:16
SCALE 1:16