PROFORMA OF SCHEDULES

SCHEDULE ‘A’
Schedule of materials to be issued to the contractor : Uploaded separately
Sl.No. Description of item Quantity Rates in figures & Place of
words at which the issue
material will be
charged to the
contractor
1 2 3 4 5

SCHEDULE ‘B’
Schedule of quantities : Uploaded separately
SCHEDULE ‘C’: Not Applicable
Tools and plants to be hired to the contractor

Sl.No. Description Hire charges per day Place of issue


1 2 3 4

SCHEDULE ‘D’: Not Applicable


Extra schedule for specific requirements / document for the work, if any.

SCHEDULE ‘E’
Reference to General Conditions of contract
Name of work : Geotechnical investigation at proposed Site of Alpha Solid waste
treatment Plant buildings in AWTF-PP complex, BARC, Trombay
LOCATION AND SCOPE OF THE WORK
Location:- AWTF, PP Complex, NRG, BARC, Mumbai.
Scope of work:“Geo technical investigations, cross bore hole test, pressure meter test,
SPT, submission of reports based on geo tech investigations etc ”.

(i) Estimated cost of work : ` 16 lakhs


(ii) Earnest money : ` 32,000/-
(to be returned after receiving
performance guarantee)
(iii) Performance Guarantee : 5% of tendered value
(iv) Security Deposit : 2.5% of tendered value
SCHEDULE ‘F’
GENERAL RULES & DIRECTIONS: Officer inviting tender Chief Engineer
Maximum percentage for quantity of items of work to be executed beyond which rates are to be
determined inaccordance with Clauses 12.2 & 12.3 see below
Definitions:

2(v) Engineer-in-Charge : SO/G, CE & QAS, NRG


2(viii) Accepting Authority : Chief Engineer, NRG
2(x) Percentage on cost of materials : 15%
andLabour to cover all overheads and
profits
2(xi) Standard Schedule of Rates : BARC Schedule of Rates 2015
2(xii) Department : BARC

Clause 1
Time allowed for submission of Performance : 15 days / Handing over of siteof the
Guarantee from the date of issue of letter of work, whichever is later
acceptance

Maximum allowable extension with late fee of : 15days


0.1% per day of Performance Guarantee amount
beyond the period provided in (i) above

Clause 2
Authority for fixing compensation under Clause 2 : Chief Engineer , Associate Director/
Director NRG

Clause 2A
Whether Clause 2A shall be applicable : No

Clause 5
Number of days from the date of issue of letter of : 15 days
acceptance for reckoning date of start after the
date of issue of work order or handing over of site
of work whichever is later
Table of Mile Stone(s)

Sl. Description of Time allowed in Amount to be with-held in case of


No. days(from date of non achievement of milestone
Milestone (Physical)
start)
1 1/8th of total work ¼th of total time 1% of value of work will be with
held for failure of each mile stones
2 3/8th of total work ½th of total time -- do --
3 3/4th of total work 3/4
th
of total time -- do --
4 Full of total work Full of total time -- do --

Time allowed for execution of work : 4 (Four) months

Authority to decide:

(i) Extension of time : Chief Engineer , Associate Director/ Director NRG


(ii) Rescheduling of mile stones : Chief Engineer , Associate Director/ Director NRG
Clause 6, 6A
Clause applicable – (6 or 6A) : Clause 6

Clause 7
Gross work to be done together : ` 10% of W.O. Value
with net payment / adjustment
of advancesfor material collected,
if any, since the last such
payment for being eligible to
interim payment
Clause 10A
List of testing equipment to be provided by the contractor at site lab.

1. 2. 3.
4. 5. 6.

Clause 10B(ii)
Whether Clause 10B(ii) shall be applicable : No
Clause 10C
Component of labour expressed as percent of value of work = 25 %
Clause 10CA

Materials covered under Nearest Materialsfor which All Base Price of all the
this clause (10 CA) IndiaWholesale Price Index to be Materials covered under
followed clause 10CA*
1. Cement Grey Cement ` 7,300.00/MT
2. Structural Steel Rolled sections and plates ` 40,000.00/MT

* Includes cement used in Ready Mix Concrete


Note: Base price for materials given above are for regulating operation of clause 10-CA. The
tenderers are requested to consider prevailing market rates while quoting the rates.

Clause 10CC
Clause 10CC to be applicable in contracts with stipulated period of : 12 months
completion exceeding the period shown in next column

Schedule of component of other Materials, Labour, P.O.L. etc. for price escalation.

Component of civil (except cement & steel)/Electrical construction Xm : 70%


Materials expressedas percent of total value of work
Component of Labourexpressed as percent of total value of work Y : 25%
Component of P.O.L.expressed as percent of total value of work Z : 5%
Clause 11
Specifications to be followed For execution of work : BARC Specifications
Clause 12

12.2 & Deviation Limit beyond which clauses12.2 : 30% for superstructure items &
12.3 & 12.3 shall apply for building work 50% for maintenance works
12.5 Deviation Limit beyond which clauses12.2 : 100% for sub-structure items
& 12.3 shall apply for foundation work
Clause 16
Competent Authority for deciding reduced rates : Chief Engineer
Clause 18
List of mandatory machinery, tools & plants to be deployed by the contractor at site :

1. 2. 3.
4. 5. 6.
Clause 25: Authority for levy of compensation and Arbitration : Chief Engineer /
Associate Director, NRG

Clause 36(i)

Requirement of Technical Representative(s) and recovery rate

Sl. Minimum Discipline Designation Minimum Number Rate at which


(PrincipalTech experience recovery shall be
No Qualification
nical made from the
of Technical
representative) contractor in the
Representative
event of not
fulfillingprovision
of clause 36(i)
Figures Words
1. Graduate Civil/ Principal Nil for 1 `15,000/- Rupee
Engineer(or)Di Mech. Technical Graduate s
ploma Representative and 5years Fifteen
Engineer for Thous
Diploma and
Engineer only

Assistant Engineers retired from Government services that are holding Diploma will be treated
at par with Graduate Engineers
Clause 42
(I) (a) Schedule / statement for determining theoretical quantity of cement & bitumen on
the basis of BARC Schedule of Rates 2015 printed by BARC
(II) Variations permissible on theoretical quantities
Cement
(a)
For works with estimated cost putto tender : 3% plus / minus
not more than Rs.5 Lakhs

For works with estimated cost putto tender : 2% plus / minus


more than Rs.5 Lakhs
(b) Bitumen all works : 2.5% plus only & nil onminus side
(c) Steel Reinforcement and structural : 2% plus / minus
steelSections for each diameter, section and
category
(d) All other materials : Nil
RECOVERY RATES FOR QUANTITIES BEYOND PERMISSIBLE VARIATION

Sl. Description of Item Rates in figures and words at which recovery shall be made
from the contractor
No.
Excess beyond permissible Less use beyond the
variation permissible variation
1. Cement NA
2. Steel reinforcement NA
3. Structural Section NA
4. Bitumen issued free
5. Bitumen issued at
stipulated fixed price

Statement of Wages: The minimum rate of daily wages payable to an employee employed on
daily wages shall be as under:

Sl. Category Basic SpecialAllowance Total Daily Wages


No. Payable
1. Skilled Labour ` 653.00

2. Semi skilled Labour ` 593.00


3. Unskilled Labour ` 536.00