Professional Documents
Culture Documents
8 Fire Protection Systems (Inspection and Testing) Final VD
8 Fire Protection Systems (Inspection and Testing) Final VD
8 Fire Protection Systems (Inspection and Testing) Final VD
is first obtained
APPLICATION Documents *
FC 01 – Application form for FC
FC 02 – Certificate of Maintenance
FC 03 – Fire Safety Manager’s inspection report.
Documents* submitted
Form FSSD FC 01
Form FSSD FC 02
Form FSSD FC 03
No Prescribed Fee
Enforcement
Yes
Action Not In Order
Check WD to owner
document
In Order Not In
Order WD to owner to
Yes rectify
Audit Inspection
Check irregularities
No In Order
• Dry riser(>10m TO
60m)
• Flow rate :
– 27 l/s (residential)
– 38 l/s (non-residential)
• Similar check/test
as detailed for wet
riser
• Automatic fire
alarm
Check Test/witness
a. Signal to FIB a. Lift homing
b. Signal to Decam b. Auto-sliding door
c. Smoke extract system
d. Atrium system
e. Pressurisation system
f. Magnetic door
Activate all fire pumps (wet riser, ring main, sprinkler, fire hosereel systems)
By-pass lifts
Check Test
a. Fire alarm main & a. Detectors
b. Manual call points
sub panel
c. Fire hosereel
b. Exit & directional sign d. Smoke cut-off switch in AHU
e. Fire pump (sprinkler/ring main
system
f. Diesel pump (fire)
g. Sprinkler control valves (water
proving test)
h. Pressurisation staircase (air
velocity test)
i. Private fire hydrant
We Set the Standards 39