NG Projects Limited Ref: NGPL/Chetak/38 Date: 25-11-2019 To, The Project Manager, Chetak Enterprises Ltd, 804, Naman Center, 8" Floor, G- Block, Bandra Kurla complex, ‘Opp. Dena Bank, Bandra (E) Mumbai -400051 Sub: - Six lanning of Shamlaji to Mota Chiloda from Km. 401+200 to km, 494+410 (length 93.210 Km) Section of NH-8 in state of Gujarat under NHDP Phase ~ V (Package VI) - Reg: - Submission of Mix Design for DBM Gr-l! with RAP for MCW — (REMINDER-1) Ref.: 1] NGPL/Chetak/32 dated on 18" November 2019. 2) TPFSITC/SEPL/G1/SMC/2019/307 dated on 7 November 2019. Dear Sir, Please confirm that the reply given vide letter no 32 dated 18,.11.2019 by NGPL is forwarded to Team Leader who raised issues regarding use of RAP in the mix design submitted for DBM vide letter no 307 dated 07.11.2019 or not. Further to note that we have received emall from Mr Ravikant Pandey, Manager (QA/QC) regarding his reservations for using of RAP material citing certain clauses of the technical specifications. Please find enclosed detailed point wise submission by Mr Ankur from Anu lab which perhaps will satisfy your doubts, In the light of above considerations we request you submit our letter to the Team Leader at the earliest for approval of the mix design submitted as it has a huge financial impact on us which may be please noted. Thanking You, Xs For, NG Projects Limited : wy ey WAN iy aor ‘RyitOrized Signatory Enclosed:- 1. ANULAB Clarification Report, NG Circle, Mehtapura, Himmatnagar - 383001, Dist. - Sabarkantha, Gujarat Ph: 02772-222404/05 | E-mail: ngpthmtt@gmail.com AR JANULAB CE. SS INDUSTRIAL TESTING & ANALYTICAL LABORATORIES Post Dhaurte, tehsil Elmadpur, Agra 283202, Uilor Pradesh, tac Cell #91-9837052095, Ph: +91 -562-2852093, Fax: ¥9-562-28520, ReasTerco | approver | accrenrren }Emol: research@anutab.ovs CENTRE FOR INSPECTION, TESTING & CERTIFICATION OF MATERIALS-CITCOM No, COAJLIR/2019-20/231 17 Date: 23.11.2019 To, As MG: rolee|s timid ‘e-mail transmission Hmnmatnage (“extuipateiegmaii.com iailbnrleby ba | com Sobar Koutha-283001, Gujrat, India Kind Atin.: Mr. Atul Palel, MD (Mobile: 9810137565} Dear Sir, This is with reference fo the email dated 21.11.2019 from M/s CEL regarding the clarification on the observations raised on DBM Grading 2 JMF with 30% RAP (RBM Passing 6.3 mm). As desired please find below the point wise reply of the same. 1, The JMF has been designed al 4% air voids in accordance with IRC 111: 2009 the value slated in paragragh 5.0 conforms fo IRC & MORTH requirement as per Clause 3.1 & Table | of IS 2:1940 RA 2016. The value 4.03 is read as 4.0 as per Rule II & 4 as per Rule | of rounding off values. 2, the criteria mentioned in Table 11.3 of MS-2is applicable to a different design methodology where virgin (fresh) binder grade is not finalized. This methodology was not adopted by the laboratory far IMF design as the contractor has decided to use VG-40 as binder for DBM works. The design methodology for JMFis per Clause 11.4.2 of MS-2 where Ihe RTFO aged recovered binder is evaluated by DSR test. Please refer page 76/88 of TC No, 016-4901-89402 dated 10.08.2019. 3, The Table 11.1 of MS-2 clearly specifies the disadvantages of Methods 2 that it increases the \VMA giving incorrect design. This was the reason Method 2 & 2a were not used. Whereas the specific gravity-G,, of RAP was determined by Method 1 on the sample recovered after Binder Content Tes! by Ignition Method whose resulls are given is clause |.7 as per ASTM D6307-19. The other physical properties on milled RBM aggregates were conducted on the aggregate recovered by solvent extraction method as specified in Clause 11.3.1 of MS-2& Clause 519.2.4 of MORTH V" Rev. 2013. 4, The combined flakiness & elongation index mentioned in Clause 1,2 of JMF like all the other tests mentioned in the tablo of Clause 1.2 of JMF was conducted on milled RBM material, The individual test report of recovered aggregale evaluation No. 016-4901-89 402 dated 10.08.2019 also states the same ast was necessary to establish the suitability of the aggregate for DBM works as per Clause 519.2.4, MORTH V" Rev. 2013. The Clause 1.0 on page 4/88 of JMF has (*) marked after RBM. The foot note cleary shows that aggregate in RAP was used aller sieving R8M Ihrough 6.3 mm IS sieve, Nowever In the IMF (Clause 1,2) o in the lest report {TC 89402] laboratory has claimed conducting these tests on 6.3 mm passing material. (Fase ANULAB IBUSTRIALTESTING & ANALYTICAL LABORATORIES 212 km Milestone. NH-2, Agra Kanpur Road, Nagk Rambaksh Post: Dhauce, Tehsit Etmetcipuy, Acre-283202, Ulta! Pradesh. Ini. GH, F91-9837082003. Ph: #91-562-2852093, Fox: #9 1-549-2652026 Reaerenrd | arproven | accreorten |Emak: research@anvlab.org Vlebsiie: www anulod.rg No, COMLIR/2019-20/23117 Date: 23.11.2019 5, the retained lensite strength test value of 88.7% mentioned in clause 1.2. 1.3 & 1.4 of the JMF 016-4901-89402 dated 10.08.2019 was conducted on the final mix with proporties of RBM:CAL:CA2:FA= 30:40:15:15 on 09.08.2019 the evidence as test data sheet is attached on page 64/88 of JMF. The copy of same can also be found on individual test report of RBM page 10/15 of TC O16- 4910-89407 dated 10.08.2019. having code no. 8740-11 6. The performance tess specified in MORTH V"" Rey. 2013 for Moisture Sensetity as per AASHTO 7983-14 has been conducted on the final mix & it has conformed fo the minimum requirement of 80%. The test was conducled at 7% voids as per specification 8 subject fo freeze & than cycles of -18°C & 60°C, the same can be verified on DBM core samples also. The other performance test mentioned in IRC 37-2018is [he resilient modulus tes! on bituminous mixes at 35°C, commanly known as M, value. The M, value of the designed JMF should be 3000 N/mm? for VG 40. The result of our JMF mix is 4094 N/mm? when conducted on 19 test specimens at all 3 test frequencies and all 5 load % as per IRC 37-2018 & ASTM D41 23. Please refer page 9/88 JMF for the acceptance criteria and page 48 to 63/88 of JMF to verity the haversine loading pattern of test by CONTROLS- IPC Global, Italy instrument, the same can bbe verified on D&M core samples also. There are only two performance criteria mentioned in clause 519, MORTH V" Rev. 2013 for which the designed mix is to be tested & both have been performed by the laboratory on DBM Gr. 2 mix. 7. The evaluation of recovered binder was conducted in accordance with clause 519.2.5 of MORTH VP Rev. 2013 [as the RAP contents were greater than 10%) and results of the same were given in clause 1.7; SI. No. 3 & 4 of on page 6/88 of the JMF, The recovered binder from RAP [RBM passing 6.3 mm) and recovered binder after JMF blend were evaluated for penetration value & the results were conforming to the requirements of Table 500-48 MORTH Ym Rev. 2013. The target value of bitumen penetration after blending is achieved that fultills the acceptance criteria of Clause 519.6.3 MORTH VP Rev, 2013, hence the use of reluvinator Is not required, the unwanted use of rejuninator can cause rutting as i will soften the binder, reducing stability of the mix The design methodology has been clearly given in our JMF. The blended binder in the final IMF has been evaluated for the complex Modulus- DSR (G*/sinB) as pet AASHTO T315-17 BI conforms to the requirement of 2.2 kPa on RIFO aged samples as per ASTM D2872-19- Thanking You, With Regards. Arlen Mr, Ankur Singh B.Tech (Civil), M.Tech (Transportation Engg.) Life Member IRC, ICI, IGS usine-uan, Quality Manager Saraaaaaaaee Goxe 7) A ANULAB INDUSTRIAL TESTING & ANALYTIC AL LABORATORIES ksh Jhin Mileslone, NH-2. Agra Kanpur Road, NagkeRambe Pos Dhounes Tehsit Etnmeaciour, Agie-283202, Uitex Practeshy Inclicy San: £9129857052093, Ph: 491-542 2652024, Fox: ¥91~562-2582026 Teaurenco | approveo | AccreoiTen | fiil: researchBanulab.org ‘obsites vow anata ore No. COA/LIR/2019-20/231 17 Copy of Client’s Email } ANULAB AGRA. From: Rava Pandey CSANJELY KUMAR BHATNAOAR - Sanjay Shrivastava sanjay shivasta(gehotaindia com> =nsolhmll@amsil.com>, “ com>, Dear sit allowing observation in your mix design for DAM grade 2 with 30% RAP. ‘Observation of mix design for DBM g-2 with 30% RAP. ‘Your tk asin Osta ‘ur observation ‘10. erate sper IRC114-2009 C1 42.1) Binder content sh 4 as pormix design pura 5.0 Ar vais s a ie selected to obtain 4 sl volds in the mix design, ] feletanafedercontentOe not election of ae Grade using Mor than 28% AS fut asnertas2 S23 table 113 er MS-2 CL4.32 Conducting the bulk sp ravty of fscovered aggregates not vary accurate. The ignition estan fect te aggregate Inthe rap by changing Rs seal charctristis o's not recommended that he sp. Solent entation of Binder doesnot aay veal the spat from pores of aggregsteleding to In per ix design Ro, 894077 , uk fame erorn measured bulk so. Grevity ograpateoftar poi grey by pyenometer method. Wards. “p psperiMc.a.2racovered Age Fty sper 1$2386;0r 3 minimum seve se retlned 63 eh lngation 2 tls possible? 8 aspervarat.2a.3and 1.4 Ret anit ext without of mix ens strengths 88.70 6 lertoranceTest~ Its net doneln formance Test shal be cared out In mix before alice design Rtn, Thermal cracking, Fatigue, Date: 23.11.2019 nd hel e |Molsture Sensitivity, Durability. ng ot Rejverator ie RAP Dat are 7 if rejuvenator may be mandatory In case when target sper Morth Pines cetyl oy vase (Foas Oat)

You might also like