Inspection Checklist - M&E (2.03.2018) - 6
Inspection Checklist - M&E (2.03.2018) - 6
Inspection Checklist - M&E (2.03.2018) - 6
RFWI No. :
Cable Tray/ Ladder/ Trunking
Installation
Reference Drawing Attached : YES / NO
1) Preparatory Works SC MC CR SC MC CR
a) Hanger rods and struts securely installed at correct interval and level
b) Tray rested on struts and screws securely fastened
c) Metal tray/ ladder properly earthed/ bonded
d) Provision of splice plates/ accessories at joints as per drawing
a) Hanger rods and brackets securely installed at correct interval and level
b) Trunking securely fixed and screws fastened
c) Metalic trunking properly earthed/ bonding
d) Provision of accessories as per drawing
4) Others SC MC CR SC MC CR
Signature
Name
Designation
Date
Inspection Status : = Acceptable, X = Not Acceptable, - = Not Applicable
Revision No: 1 Issue No: 1 Effective date: 2/03/2018