Inspection Checklist - M&E (2.03.2018) - 6

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

MC/MEP/CTray

RFWI No. :
Cable Tray/ Ladder/ Trunking
Installation
Reference Drawing Attached : YES / NO

Project Name : 1st 2nd (Re-Inspection)

Location/ Gridline/ Area : dd/mm/yy dd/mm/yy

1) Preparatory Works SC MC CR SC MC CR

a) Approved materials (type, brand, size, etc.)


b) Setting out of location and position marked and checked as per drawing
c) Material finish properly with approved colour code/ band
d) No visible damage or rusty material

2) Installation of Cable Tray/ Ladder SC MC CR SC MC CR

a) Hanger rods and struts securely installed at correct interval and level
b) Tray rested on struts and screws securely fastened
c) Metal tray/ ladder properly earthed/ bonded
d) Provision of splice plates/ accessories at joints as per drawing

3) Installation of Cable Trunking SC MC CR SC MC CR

a) Hanger rods and brackets securely installed at correct interval and level
b) Trunking securely fixed and screws fastened
c) Metalic trunking properly earthed/ bonding
d) Provision of accessories as per drawing

4) Others SC MC CR SC MC CR

a) Fire stop at wall penetration area completely done according to specification


b) Completed works protected from any paint drops/ stains
c) Sufficient headroom clearance according to drawing

Remark for Failure / Re-inspection :

Non-Conformance Report (NCR) Raised During Inspection / Re-inspection

NCR No.: _______________________________________________ Closed Outstanding

Inspected & Confirmed by : Sub-Contractor Main Contractor Consultant Representatives

Signature

Name
Designation
Date
Inspection Status :  = Acceptable, X = Not Acceptable, - = Not Applicable
Revision No: 1 Issue No: 1 Effective date: 2/03/2018