I PEKERJAAN PERSIAPAN
1.1 Mobilisasi dan Demobilisasi LS 1.00 - 175,000,000.00
1.11 Pengukuran dan bouplank M3 260.00 48,800.00 52,725.00
Sub Total. 1 ...............
II PEKERJAAN TANAH
2.1 Pek. Galian Tanah Pondasi M3 1,043.79 - 112,650.00
2.2 Pek. Timbun Kembali Hasil Galian M3 562.67 - 32,600.00
2.3 Pek. Urug Sirtu Peninggian Peil Lantai M3 717.93 264,000.00 42,500.00
2.4 Pek. Urug Pasir dibawah Pondasi M3 99.44 264,000.00 47,000.00
2.5 Pek. Urugan Pasir Bawah Lantai M3 150.20 264,000.00 47,000.00
Sub Total. 2 ...............
III PEKERJAAN PONDASI
3.1 Pek. Pas. Batu Kosong M3 151.64 892,800.00 200,265.00
3.2 Pek. Pas. Pondasi Batu Kali 1:4 M3 289.75 1,237,700.00 385,125.00
3.3 Pek. Pas. Pondasi Trassraam 1:3 m3 38.38 1,615,050.00 1,422,000.00
Sub Total. 3 ...............
IV PEKERJAAN BETON LT 1 DAN LT 2
4.1 Pek. Beton Lantai Kerja Pondasi Foot Plat M3 21.66 1,013,700.00 311,875.00
4.2 Pek. Beton Pondasi Telapak Foot Plat K.300 M3 77.20 4,557,255.06 2,056,320.90
4.3 Pek. Beton Pedestal Kolom 90X110 cm K.300 M3 15.84 4,894,552.51 2,284,732.59
4.4 Pek. Beton Pedestal Kolom 60/60 K.300 M3 21.60 5,664,285.83 2,741,989.56
4.5 Pek. Beton Sloof 30/50 K.300 M3 5.70 6,509,116.56 2,701,884.93
4.6 Pek. Beton Sloof 20/30 K.300 M3 25.12 8,504,167.39 3,332,670.23
4.7 Pek. Beton Sloof 15/20 K.250 M3 9.60 7,412,415.92 3,603,694.59
4.8 Pek. Baut Angker 30 mm Ttk
4.9 Pek. Beton Rabat Lantai T 10 Cm m3 135.98 1,013,700.00 311,875.00
4.10 Pek. Kolom Praktis LT 1 & LT 2 m' 1,338.71 66,020.00 40,410.00
4.11 Pek. Kolom Tangga 25 x25 m3
4.12 Pek. Balok Konsol LT 1 & LT 2 m3 2.70 7,075,700.00 1,833,600.00
4.13 Pek. Plat Kanopy LT 1 & LT 2 m3 5.00 6,652,650.00 1,356,400.00
4.14 Pek. Ring Balk Praktis LT 1 & LT 2 m' 947.46 84,740.00 66,725.00
5.5 Pek. Penebalan Kolom LT 1 & LT 2 m3 41.36 3,867,700.00 2,256,700.00
4.15 Pek. Tangga Beton:
4.15.1 Tangga utama Ke Lantai 2, (2 Unit) m3 11.59 6,288,174.76 3,335,626.12
4.15.2 Tangga Dalam Ke Lantai 2, (2 Unit) m3 8.91 6,288,174.76 3,335,626.12
4.15.3 Tangga Putar Ke Top Floor (2 Unit) m3 7.03 6,288,174.76 5,837,345.70
4.16 Pek. Plat Lantai 2 (System Bondek) m2 1,323.20 882,287.91 333,468.75
4.17 Pek. Plat Beton atap Belakang (System Bondek) m2 220.00 882,287.91 400,162.50
4.18 Pek. Lisplank Beton tebal 10 cm LT 1 & LT 2 m3 12.41 6,319,950.00 1,355,845.00
1,543.20
Sub Total. 4 ...............
V PEKERJAAN LANTAI DAN DINDING I-2 285.20
5.1 Pek. Pasangan dinding batako LT 1 & LT 2 m2 2,852.01 150,145.00 142,200.00
5.2 Pek. Plesteran dinding LT 1 & LT 2 m2 5,704.03 21,456.00 77,025.00
5.3 Pek. Plesteran beton LT 1 & LT 2 m2 570.40 27,425.60 77,025.00
5.4 Pek. Acian Dinding LT 1 & LT 2 m2 5,333.26 6,175.00 51,350.00
5.6 Pek. Sponingan sudut/benangan LT 1 & LT 2 M' 33.09 6,150.00 90,200.00
5.7 Pek. Pasangan lantai Keramik 60 x 60 Cm (Granitto) LT1 & LT 2 m2 2,708.87 315,187.67 179,725.00
5.8 Pek. Pasangan Keramik tangga (granitto) m2 82.11 378,225.20 215,670.00
5.9 Pek. Pasangan lantai Keramik 20 x 20 Cm m2 66.50 135,520.00 179,725.00
5.10 Pek. Pasangan Keramik Dinding 20 x 25 Cm m2 471.32 148,390.00 231,075.00
5.11 Pek. Pasangan Border Keramik m1 269.33 70,666.00 18,415.00
a b c d e f
5.12 Pek. Water Proofing Plat atap Belakang m2 288.00 72,500.00 86,700.00
5.13 Pek. Plint Lantai, LT 1 & LT 2 m' 1,751.35 35,943.78 31,915.00
Sub Total. 5 ...............
VI PEKERJAAN KAYU DAN PLAFON LT & LT 2
6.1 Pek. Kusen Pintu dan Jendela LT 1 & LT 2 m3 5.20 5,775,000.00 5,183,500.00
6.2 Pek. Plafon Gysum + rangka LT 1 & LT 2 m2 2,708.87 89,260.00 115,725.00
6.3 Pek. Plafon Tripleks + rangka Lantai 1 m2 66.50 80,670.00 115,725.00
6.4 Pek. List Plafon LT 1 & LT 2 m2 1,751.35 16,050.00 17,775.00
6.5 Pek. Daun Pintu Panil Kayu m2 69.21 220,000.00 740,500.00
6.6 Pek. Daun Pintu Teakwood m2 20.68 143,400.00 518,350.00
6.7 Pek. Daun Pintu Besi m2 3.00 863,750.00 115,925.00
6.8 Pek. Daun Jendela dan Ventilasi m2 89.89 147,500.00 592,400.00
6.9 Pek. Kaca pintu dan Jendela m2 29.96 165,000.00 15,190.50
6.10 Pek. Pekerjaan Railing m2 220.00 450,000.00 135,000.00
6.11 Pek. Pekerjaan List kayu untuk dinding m 250.00 55,000.00 13,750.00
Sub Total. 6 ...............
VII PEKERJAAN INSTALASI BAJA STRUKTUR
7.1 Kolom Lantai 1 321x309x21.7x13.8 (inlud Join) Kg 26,715.92 38,460.00 10,845.27
7.2 Kolom Lantai 2 321x309x21.7x13.9 (inlud Join) Kg 11,431.07 38,460.00 10,845.27
7.3 Balok LT2 UB 200 Kg 6,519.55 38,460.00 10,845.27
7.4 Balok Lantai 2 UB 310 Kg 3,165.97 38,460.00 10,845.27
7.5 Balok Lantai 2 UB 610 Kg 102,498.82 38,460.00 10,845.27
7.6 Balok Balkon Tangga, UB 610 dan UB 610 (+Pbarikasi) Kg 800.00 22,626.25 39,128.31
7.8 Balok Lantai Top Floor UB 200 Kg 2,521.31 38,460.00 10,845.27
7.9 Balok Lantai Top Floor UB 310 Kg 1,729.18 38,460.00 10,845.27
7.10 Balok Lantai Top Floor UB 610 Kg 11,165.55 38,460.00 10,845.27
7.11 Balok Ring UB 310 Kg 8,052.04 38,460.00 10,845.27
7.12 Baut Angkur @4 x Ø22 mm Btg 120.00 85,000.00 120,827.21
7.13 Baut Joint aneka ukuran Bh 8,500.00 8,600.00 2,150.00
7.18 Pemasangan baut/mur Angkur Geser Bh 422.50 - 29,611.54
Sub Total. 7 ...............
VIII PEKERJAAN RANGKA ATAP
8.1 Pek. Base Plate dan anchor bolt
8.1.1. Base Plat 20 x 900x400mm (8 Pcs) Bh 8.00 3,605,568.36 930,502.87
8.1.2. Base Plat 20 x623x275 mm (8Pcs) Bh 8.00 1,640,909.88 527,476.21
8.1.3. ANCHOR BOLT Ø32 MM X675MM (STD-00-1AB019) btg 160.00 250,000.00 263,344.98
8.2 Pek. Rangka kuda-kuda pipa Type K1 Unit 4.00 91,683,383.90 41,826,654.28
8.3 Pek. Rangka kuda-kuda pipa Type K2 Unit 4.00 97,936,244.48 45,676,847.96
8.4 Pek. Rangka kuda-kuda Type K3 Unit 4.00 97,570,746.68 45,258,293.93
8.5 Pek. Rangka kuda-kuda Type K4 Unit 4.00 76,786,339.45 36,490,118.67
8.6 Pek. Rangka kuda-kuda Type K5 Unit 2.00 94,536,989.90 40,417,230.07
8.7 Pek. Rangka kuda-kuda Type KB1 Unit 1.00 55,696,801.90 26,312,212.27
8.8 Pek. Rangka kuda-kuda Type KB2 Unit 2.00 41,917,996.08 20,631,251.70
8.9 Pek. Rangka kuda-kuda Type KB2A Unit 2.00 29,357,664.91 15,196,316.28
8.10 Pek. Rangka kuda-kuda Type KB3 Unit 2.00 16,965,920.67 8,755,109.93
8.11 Pek. Rangka kuda-kuda Type KB4 Unit 2.00 21,830,184.58 10,448,641.78
8.12 Pek. Rangka kuda-kuda Type KB4A Unit 2.00 26,947,999.05 13,389,202.67
8.14 Pek. Rangka kuda-kuda Type KB5 Unit 2.00 92,136,989.90 37,764,465.21
8.15 Pek. Pipa Gording D2,5 Inc SCh-40 m 2,242.98 180,307.87 118,347.04
8.16 Pek. Kuda Kuda Pipa Penghubung , Kb1 s/d Kb7 m 162.60 1,700,000.00 680,000.00
8.17 Pek. Kuda Kuda Pipa atap Ornamen , OR1 s/d OR6 m 40.00 1,105,000.00 442,000.00
8.18 Pek. Rangka Pipa Kotak Frem Luar (F1 dan F2) m 1,674.26 88,746.08 77,315.67
Sub Total. 8 ...............
IX PEKERJAAN PENUTUP ATAP 4,326.85
9.1 Pek. Kaso Hollow 4x4x2,3 m 6,025.10 88,746.08 77,315.67
9.2 Pek. Pasangan Plywood 9mm M2 3,313.81 69,575.96 26,675.00
9.3 Pek. Pasangan Membrane Aspal (Underlayer Torching Polygum 3 M2 3,313.81 7,150.00 57,728.57
9.4 Pek. Genteng Aspal ( IKO Marathon) M2 3,313.81 421,666.67 63,000.00
9.5 Pek. Pasangan Flasing M2 493.63 60,350.00 69,825.00
9.6 Pek. Pekerjaan Lisplan M 493.63 62,000.00 54,700.00
Sub Total. 9 ...............
X PEKERJAAN PENGECATAN
10.1 Pek. Cat dinding/tembok (Mowilex/Jotun) LT 1 & LT 2 M2 5,374.62 29,173.33 15,690.50
10.2 Pek. Cat Plafon Latai 1-2 M2 2,775.37 5,500.00 34,285.00
10.3 Pek. Cat Kayu dan besi LT 1 & LT 2 M2 416.31 34,050.00 30,115.00
a b c d e f
10.4 Pek. Cat Melamin Kusen, Pintu dan Jendela LT 1 & LT 2 M2 367.09 103,000.00 86,075.00
Sub Total. 10 ...............
XI PEKERJAAN PENGGANTUNG DAN PENGUNCI LT 1 & LT 2
11.1 Pek. Kunci Pintu Double Psg 37.00 350,000.00 125,700.00
11.2 Pek. Kunci Pintu Tanam Psg 14.00 250,000.00 91,850.00
11.3 Pek. Kunci Pintu Cilider Psg 14.00 150,000.00 91,850.00
11.4 Pek. Engsel Pintu Psg 98.00 35,000.00 31,425.00
11.5 Pek. Engsel Jendela Psg 120.00 25,000.00 20,950.00
11.6 Pek. Handel Pintu Psg 37.00 355,000.00 104,750.00
11.7 Pek. Grendel Pintu Double Psg 37.00 215,000.00 45,620.00
11.8 Pek. Grendel Jendela Psg 120.00 50,000.00 4,012.99
11.9 Pek. Hak Angin Jendela dan Ventilasi Psg 120.00 28,000.00 31,425.00
11.10 Pek. Door Closer Psg 14.00 350,000.00 104,750.00
11.11 Pek. Door Stop Psg 14.00 80,000.00 20,950.00
Sub Total. 11 ...............
XII PEKERJAAN INTERIOR DAN EXTERIOR LT 1 & LT 2
12.1 Pek. Ornamen Kolom lantai 1 dan 2 Bh 60.00 250,000.00 50,000.00
12.2 Pek. Ornamen Pintu lantai 1 dan 2 Bh 51.00 200,000.00 40,000.00
12.3 Pek. Ornamen Dinding lantai 1 dan 2 Bh 60.00 350,000.00 70,000.00
12.4 Pek. Akuistic Syitem Ruang Aula m2 850.00 145,000.00 29,000.00
12.5 Pek. List Profil Beton m 85.00 200,000.00 40,000.00
12.6 Pek. Pasanga Batu Tempel m2 245.00 275,000.00 55,000.00
12.7 Pek. Pekerjaan Pot Beton Bh 18.00 500,000.00 100,000.00
12.8 Pek. Pekerjaan Stage Aula Ls 1.00 45,000,000.00 9,000,000.00
Sub Total. 12 ...............
XIII PEKERJAAN MEKANICAL /PLUMBING/SANITAIR LT 1 & LT 2
13.1 Pek. Pengadaan Air Besih (sumur dalam) Ls 1.00 250,000,000.00 87,500,000.00
13.2 Pek. Water Tank 2200 tr Unit 3.00 3,250,000.00 864,400.00
13.3 Pek. Ground Reservoar isi 16 m3 Unit 1.00 50,068,624.18 19,686,651.25
13.4 Pek. Saptiptenk dan Peresapan Unit 3.00 11,442,408.00 9,221,639.57
13.5 Pek. Instalasi Pipa Air Bekas
13.5.1. Pipa Pvc Ø 4 Inc m 140.00 38,021.88 39,092.50
13.5.2. Pipa Pvc Ø 3 Inc m 100.00 26,450.00 39,092.50
13.5.3. Pipa Pvc Ø 2 1/2 Inc m 60.00 16,531.25 26,055.00
13.6 Pek Instalasi Pipa Air Kotor
13.6.1. Pipa Pvc 6 Inc 60.00 38,021.88 39,092.50
13.6.1. Pipa Pvc 4 Inc 80.00 95,881.25 39,092.50
13.7 Pek Instalasi Pipa Air Bersih
13.7.1. Pipa Gif Ø 2 Inc 80.00 129,166.67 52,110.00
13.7.2. Pipa Gif Ø 1 1/2 Inc 100.00 96,875.00 52,110.00
13.7.3. Pipa Gif Ø 1 Inc 120.00 64,583.33 30,915.00
13.7.4. Pipa Gif Ø 3/4 Inc 80.00 48,437.50 30,915.00
13.8 Pek Instalasi Fire Hydrant
13.8.1. Pipa Pressure Ø 4 Inc m 120.00 860,516.35 434,952.53
13.8.2. Pipa Pressure Ø 3 Inc m 80.00 612,540.00 612,540.00
13.8.3. Pipa Pressure Ø 2 Inc m 40.00 408,360.00 408,360.00
13.8.4. Fleksible joint dia 4" Bh 2.0000 1,080,000.00 216,000.00
13.8.5. Air relief valve Bh 1.0000 2,925,000.00 585,000.00
13.8.6. Jocky Pump unit 1.0000 22,500,000.00 4,500,000.00
13.8.7. Electric Pump unit 1.0000 112,500,000.00 22,500,000.00
13.8.8. Pressure Switch Bh 2.0000 750,000.00 150,000.00
13.8.9. Pressure Tank Bh 2.0000 5,250,000.00 1,050,000.00
13.8.10. Gate Valve dia. 4" Flens 10 K bh 4.0000 5,025,000.00 1,005,000.00
13.8.11. Straner 4" merk Kitz Flens 10 K bh 1.0000 5,062,500.00 1,012,500.00
13.8.12. Fot Valve 4" merk Socla PN 16 bh 1.0000 10,530,000.00 2,106,000.00
13.8.13. Check Valve 4 " merk KitzFlens 10 K bh 1.0000 3,450,000.00 690,000.00
13.8.14. Hydrant Pilar 3 " One Way bh 6.0000 7,275,000.00 1,455,000.00
13.8.15. Pressure Gauge dia. 3 " bh 1.0000 180,000.00 36,000.00
13.8.16. Knee Las 4 " (Elbow GIP 90° 4 ") bh 20.0000 144,000.00 28,800.00
13.8.17. Flange Buta 8 " bh 2.0000 630,000.00 126,000.00
13.8.18. Flange 8 " bh 2.0000 630,000.00 126,000.00
13.8.19. Flange 4 " bh 18.0000 112,500.00 22,500.00
13.8.20. Fire Hose Box (komplit) untuk Hydrant Pilar Roll 6.0000 3,525,000.00 705,000.00
13.8.21. Hydrant Box (komplit) Fire Hose 35 m unit 3.0000 9,000,000.00 1,800,000.00
13.9 Pek Intalasi Pembuangan Air hujan
a b c d e f
13.9.1. Pipa PVC AW Ø 6 Inc m 45.0000 95,881.25 39,092.50
13.9.2. Pipa PVC AW Ø 4 Inc m 120.0000 38,021.88 39,092.50
13.10 Pek. Closet duduk (lengkap) set 21.00 2,491,000.00 719,685.00
13.11 Pek. Urinoir bh 6.00 2,420,400.00 363,500.00
13.12 Pek. Washtafel dinding bh 19.00 1,004,000.00 481,500.00
13.13 Pek. Shower Spray bh 21.00 600,000.00 120,000.00
13.14 Pek. Soap Holder bh 19.00 150,000.00 30,000.00
13.15 Pek. Double Robe Hock bh 19.00 150,000.00 30,000.00
13.16 Pek. Cermin Toilet bh 19.00 600,000.00 120,000.00
13.17 Pek. Kran dinding bh 25.00 90,000.00 18,000.00
13.18 Pek. Floor drain bh 27.00 61,600.00 210,767.50
13.19 Pek. Partition Plate bh 6.00 350,000.00 70,000.00
Sub Total. 13 ...............
XIV PEKERJAAN ELECTRICAL LT 1 & LT 2
14.1 PEKERJAAN PANEL dan DAYA
14.1.1. Pek. Penyambungan Daya dan KWH meter Digital Unit 1.00
14.1.2. Pek. Pengadaan Genset Type Sealent 150 Kva Unit 1.00 175,000,000.00 26,250,000.00
14.1.3. Pek. Panel LVMDP 1 Utama + AMF Unit 1.00 85,000,000.00 12,750,000.00
14.1.4. Pek. Panel Skalator Unit 1.00 45,000,000.00 6,750,000.00
14.1.5. Pek. Panel Pompa (Hydrant) Star Delta Unit 1.00 45,000,000.00 6,750,000.00
14.1.6. Pek. Panel Penerangan, Stop Kontak Lantai 01 Unit 1.00 15,000,000.00 2,250,000.00
14.1.7. Pek. Panel AC Lantai 01 Unit 1.00 16,000,000.00 2,400,000.00
14.1.8. Pek. Panel Penerangan, Stop Kontak Lantai 02 Unit 1.00 15,000,000.00 2,250,000.00
14.1.9. Pek. Panel AC Lantai 02 Unit 1.00 16,000,000.00 2,400,000.00
14.1.10. Pek. Panel Penerangan Outdoor Unit 1.00 15,000,000.00 2,250,000.00
14.1.11. Pek. Panel Pompa Hydrant Unit 1.00 35,000,000.00 5,250,000.00
14.1.12. Pek. Panel Power Hose / Genset Unit 1.00 5,000,000.00 750,000.00
Sub Total. 14.A ...............
14.2 PEKERJAAN KABEL FEEDER
14.2.1. Kabel NYY 1 x 300 mm (Feeder Utama) M 80.00 495,000.00 99,000.00
14.2.2. Kabel NYY 4 x 250 mm M 150.00 1,170,000.00 234,000.00
14.2.3. Kabel NYY 4 x 50 mm (Feeder Lt. 01 Penerangan) M 65.00 585,000.00 117,000.00
14.2.4. Kabel NYY 4 x 50 mm (Feeder Lt. 01 AC) M 65.00 585,000.00 117,000.00
14.2.5. Kabel NYY 4 x 50 mm (Feeder Lt. 02 Penerangan) M 75.00 585,000.00 117,000.00
14.2.6. Kabel NYY 4 x 70 mm (Feeder Lt. 02 AC M 75.00 765,000.00 153,000.00
14.2.7. Kabel Feeder Pompa Hydrant NYY 4 x 25 mm M 20.00 630,000.00 126,000.00
14.2.8. Kabel Feeder Lampu Jalan NYFGBY 4 x 16 mm M 255.00 360,000.00 72,000.00
14.2.9. Kabel Feeder GSG NYY 4 x 50 mm M 100.00 585,000.00 117,000.00
14.2.10. Kabel Feeder Power Hose NYY 4 x 6 mm M 256.00 360,000.00 72,000.00
14.2.11. Schum Cable 50 mm Bh 64.00 63,000.00 12,600.00
14.2.12. Schum Cable 75 mm Bh 10.00 90,000.00 18,000.00
14.2.13. Schum Cable 250 mm Bh 8.00 135,000.00 27,000.00
14.2.14. Schum Cable 300 mm Bh 16.00 153,000.00 30,600.00
14.2.15. Kabel Tee 20 x 20 x 300 cm Pcs 1,000.00 15,000.00 3,000.00
Sub Total. 14B ...............
14.3 PEKERJAAN INSTALASI LISTRIK
14.3.1. Pek. Instalasi Titik Cahaya Lampu LT 1 & LT 2 Titik 250.00 179,650.00 211,250.00
14.3.2. Pek. Instalasi Titik Exhaust Fan Titik 28.00 179,650.00 211,250.00
14.3.3. Pek. Instalasi Titik Stop Kontak LT 1 & LT 2 Titik 98.00 234,500.00 211,250.00
14.3.4. Pek. Instalasi Power AC 1 Phase LT 1 & LT 2 Titik 38.00 1,092,750.00 211,250.00
14.3.5. Pek. Instalasi Power AC 3 Phase LT 1 & LT 2 Titik 12.00 1,572,750.00 211,250.00
14.3.6. Pek. Armatur LT 1 & LT 2:
14.3.6.1. Lampu TL 1 x 36 Watt Balok Outbow Unit 30.00 225,000.00 45,000.00
14.3.6.2. Lampu TL 2 x 36 Watt Inbow Unit 54.00 720,000.00 144,000.00
14.3.6.3. Lampu SL 18 Watt Bh 150.00 55,000.00 11,000.00
14.3.6.4. Lampu Down Light Silver 150 PLC 18 Watt Unit 238.00 221,400.00 44,280.00
14.3.6.5. Lampu Down Light Gold 150 Unit 8.00 198,000.00 39,600.00
14.3.6.6. Lampu Baret 32 Watt Kap Kaca (LB 2) Unit 60.00 675,000.00 135,000.00
14.3.6.7. Lampu Baret 40 Watt Kap Kaca (LB 1) Unit 60.00 810,000.00 162,000.00
14.3.6.8. Lampu Sorot 500 Watt Unit 4.00 2,160,000.00 432,000.00
14.3.6.9. Lampu Dinding Unit 8.00 990,000.00 198,000.00
14.3.6.10. Lampu Hias (LH 1) Bh 8.00 48,000,000.00 9,600,000.00
14.3.6.11. Lampu Hias (LH 2) Bh 8.00 9,000,000.00 1,800,000.00
14.3.6.12. Lampu Fitting PLC Bh 42.00 171,000.00 34,200.00
14.3.6.13. Saklar Tunggal Bh 60.00 86,400.00 17,280.00
a b c d e f
14.3.6.14. Saklar Tunggal Tukar Bh 4.00 90,000.00 18,000.00
14.3.6.15. Saklar Seri Tukar Bh 4.00 135,000.00 27,000.00
14.3.6.16. Saklar Seri Bh 50.00 99,000.00 19,800.00
14.3.6.17. Saklar Triple Bh 16.00 108,000.00 21,600.00
14.3.6.18. Stop Kontak Arde Bh 164.00 117,000.00 23,400.00
14.3.6.19. Stop Kontak Lantai Bh 20.00 810,000.00 162,000.00
14.3.6.20. Stop Kontak AC Bh 76.00 225,000.00 45,000.00
14.3.7. Exhaust Fan LT 1 & LT 2 Bh 10.00 625,000.00 125,000.00
14.3.8. Tranking Cable LT 1 & LT 2 M 300.00 145,140.50 170,088.50
14.3.9. Kabel Tee 20 x 20 x 300 cm Pcs 1,200.00 15,000.00 3,000.00
14.3.10. Grounding Pentanahan Panel Unit 4.00 5,600,000.00 1,120,000.00
14.3.11. Unimax Klem (Kuku Macan) Bh 6.00 81,000.00 16,200.00
Sub Total. 14C ...............
14.4 PEKERJAAN INSTALASI LAMPU JALAN dan HALAMAN
14.4.1. Pek. Instalasi Titik Cahaya Lampu Titik 20.00 428,625.00 85,725.00
14.4.2. Pek. Armatur :
14.4.2.1. Lampu TL 1 x 36 Watt Balok Outbow Unit 8.00 187,500.00 37,500.00
14.4.2.2. Lampu Jalan Sodium (SON) 250 Watt lengkap, 6.00 375,000.00 75,000.00
14.4.2.3. Trafo, Capasitor Unit 28.00 2,700,000.00 540,000.00
14.4.2.4. Lampu Sorot Unit 6.00 990,000.00 198,000.00
14.4.2.5. Saklar Tunggal Bh 10.00 86,400.00 17,280.00
14.4.2.6. Saklar Seri Unit 8.00 99,000.00 19,800.00
14.4.3. Pek.. Kabel NYFGBY 4 x 4 mm Mtr 750.00 27,000.00 5,400.00
14.4.4. Pek. Grounding Panel Ls 1.00 5,600,000.00 1,120,000.00
14.4.5. Pek. Unimax Klem Bh 4.00 81,000.00 16,200.00
14.4.6. Pek. Tiang Lampu Jalan Tunggal lengkap dengan MCB 6 Unit 4.00 4,500,000.00 900,000.00
14.4.7. Pek. Tiang Lampu Jalan Cabang (Dobel) lengkap dengan MUnit 16.00 6,300,000.00 1,260,000.00
14.4.8. Pek. Lampu Taman + Tiang Bh 27.00 1,350,000.00 270,000.00
14.4.9. Pek. Galian Tanah dan Urugan Pasir pada Kabel Feeder d m3 30.00 303,741.60 60,748.32
Sub Total. 14D ...............
14.5 PEKERJAAN PENANGKAL PETIR
14.5.1. Air Terminal Prevectron S660 Unit 1.00 75,000,000.00 15,000,000.00
14.5.2. Kabel NYA 75 mm² Mtr 120.00 175,000.00 35,000.00
14.5.3. Grounding Unit 1.00 865,100.00 350,000.00
14.5.4. Klem Bh 120.00 15,000.00 3,000.00
14.5.5. Grounding Box Bh 1.00 5,000,000.00 1,000,000.00
14.5.6. Booring untuk Arde Ttk 1.00 5,500,000.00 1,100,000.00
Sub Total. 14E ...............
XV SITE DEVELOPMENT
15.1 Pek.Pematangan Tanah dan Penimbunan area M3 7,680.00 264,000.00 42,500.00
15.2 Pekerjaan Pagar tembok Keliling (belakang +samping) m -
15.3 Pekerjaan Pagar Depan m -
15.4 Saluran Keliling Bangunan m 200.00 167,698.68 313,612.50
15.5 Pekerjaan Saluran Type 1 m 800.00 209,804.04 272,601.41
15.6 Pekerjaan Saluran Type 2 m 1,200.00 758,305.31 497,546.96
15.7 Pekerjaan Taman Inklud m2 1,700.00 550,000.00 165,000.00
15.8 Pekerjaan Parking Area m2 2,800.00 475,000.00 142,500.00
Sub Total. 15 ...............
XVI PEKERJAAN ENTERANCE DEPAN
16.1 Pekerjaan Tanah
16.1.1 Galian tanah M3 59.63 - 112,650.00
Urugan Ex Galian M3 52.62 - 32,600.00
Urugan Pasir M3 0.79 264,000.00 47,000.00
40,834,642,621.18
- 40,834,642,621.18
JUMLAH HARGA (Rp)
TOTAL HARGA KETERANGAN
MATERIAL JASA
g h i j
- 175,000,000.00 175,000,000.00
12,688,000.00 13,708,500.00 26,396,500.00
12,688,000.00 188,708,500.00 201,396,500.00
- 117,582,380.25 117,582,380.25
- 18,342,882.26 18,342,882.26
189,533,520.00 30,512,025.00 220,045,545.00
26,252,450.40 4,673,731.70 30,926,182.10
39,652,800.00 7,059,400.00 46,712,200.00
255,438,770.40 178,170,419.21 433,609,189.61
- - -
175,000,000.00 26,250,000.00 201,250,000.00
85,000,000.00 12,750,000.00 97,750,000.00
45,000,000.00 6,750,000.00 51,750,000.00
45,000,000.00 6,750,000.00 51,750,000.00
15,000,000.00 2,250,000.00 17,250,000.00
16,000,000.00 2,400,000.00 18,400,000.00
15,000,000.00 2,250,000.00 17,250,000.00
16,000,000.00 2,400,000.00 18,400,000.00
15,000,000.00 2,250,000.00 17,250,000.00
35,000,000.00 5,250,000.00 40,250,000.00
5,000,000.00 750,000.00 5,750,000.00
467,000,000.00 70,050,000.00 537,050,000.00
- 6,716,756.25 6,716,756.25
- 1,715,310.13 1,715,310.13
207,900.00 37,012.50 244,912.50
- - -
- - -
- - -
- - -
478,000,877.31 137,729,792.25 615,730,669.57
TERBILANG : Empat Puluh Lima Milyar Sembilan Ratus Tiga Puluh Delapan Juta Sembilan Ratus Tujuh Puluh Ribu Rupiah
1 Galian Pondasi
P1 2.2 2.2
Pa 3 3
1.6 2
Urugan Pasir
Bawah Bawah Pondasi
P1 2.2 2.2
Pa 3 3
0.5 9.5
Batu Kali pond utama 418.6 1.2
Batu Kali pond prakts 320 0.1
Pek. Beton
PEKERJAAN PADA ELEVASI (BOC -3,15 S/D TOC. -0,05)
Lantai Kerja
Bawah Bawah Pondasi
P1 2.2 2.2
Pa 3 3
PA 2 2
Pedestal Kolom
K1. 60/60 2 0.6
KA. 0.9 1.1
Slof
s1 20/30 418.6
20/30 418.6 0.2
15/20 320 0.2
slof penghubung pa 0.5 0.3
Beton Pembungkus UB
Kolom Praktis lt 1 1004.3107 1
Kolom Praktis lt 2 334.4 1
Lisplan Beton Lt 2
,- Luar 24 1.2
,- Dalam (pembatas Plafod) 33 1.2
Batu Kosong
418.6 1.2
320 0.8
plit keramik
lt1 1,329 1
lt2 73 1
42 1
28 1
14 1
10 1
10 1
20 1
Beton Tangga
Tangga Utama
- Pondasi tangga 1.000 1
- Plat,bordes, anak tangga 4.793 1
Tangga Dalam
- Pondasi tangga 1.000 1
- Plat,bordes, anak tangga 3.457 1
Tangga Ke atap
- Plat,bordes, anak tangga 2.019 1
- balok, anak tangga 0.791 1
Beton Honay
Dinding Honay 2.52 0.15
Atap Honai 6.37 1
2 30 290.40
3 8 216.00
9.5 4 121.60
628.00
0.5 1 251.16
0.25 1 63.97 187
315.13 132.46
943.13 m3 320
0.1 30 14.52
0.1 8 7.20
0.1 4 1.90
0.1 1 50.23
0.8 1 25.59
99.44 m3
0.1 1 194.25 m3
0.8 1 1,554.00 m3
1 1 562.67
0.05 30 7.26
0.2 8 14.40
21.66
0.07 1 135.98 m3
1 30 42.00
1.1 8 35.20
77.20 m3
Solid
0.6 30.00 21.60 3.06
2 8 15.84 0.9 1.1 1.22 8
37.44 m3
0.3 1 25.12
0.15 1.00 9.60 m3
9.5 4 5.70 2.5733333
1 1 1,004.31
1 1 334.40
1,338.71
0.25 8 1.00
1 1 738.46
1 1 209.00
947.46
0.1 1 2.88
0.1 1 3.91
6.79
0.1 2 5.62
12.41
1 1 158.78
1 1 26.40 185
1 1 144.14 Lbr
1 1 72.07 Lbr 0.163 1.2 0.196 2.329
1 1 23.97 Lbr
0.109 1.2 0.131 1.553
0.8 1 184.18 m3
0.7 1 83.96
0.3 8 21.60
289.75
0.2 1 100.46
0.2 1 51.18
151.64 m3
0.4 1 38.38
0.1 1 4.81 m3 0.00399533
1 1 1,311.18
1 1 100.00
1 1 41.00
1,452.18 m2 brut
1 1 18.00
1 1 28.50
1 4 20.00
66.50 m2
1,385.68 m2 net
1 1 1,323.20
2,708.87 m2
1 1 1,329.23
1 2 146.00
1 2 84.00
1 2 55.23
1 1.25 16.88
2 2 40.00
1 6 60
1 1 20
1,751.35
1 2 2.00
1 2 9.59
11.59
1 2 2.00
1 2 6.91
8.91
1 2 4.04
1 2 1.58
5.62
26.5 1 59.63 21
52.62
0.05 7 0.79
0.05 7 0.79
0.35 3 1.64
0.35 2 2.19 3.83
26.5 1 3.18
6 4 3.84
6 2 1.92
4 2 0.48 6.24
43.5 1 8.16
24.27 1 3.34
36.9 1 2.21 13.71
1 1 16.99
40.32 1 8.06
17.1 1 1.37 9.43
17.1 1 6.46
1 1 6.37 12.83
9.66 61%
ANALISA HARGA SATUAN PEKERJAAN
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR
PEKERJAAN : PEMBANGUNAN KANTOR KLASIS
LOKASI :
TAHUN ANGG : 2017
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
3 1 M3 Membuat dan Memasang Pintu Klamp Standar, Kayu Kelas II 480,775.00 221,500.00 259,275.00
- Kayu kelas I (papan) 0.040 M3 5,500,000.00 220,000.00 220,000.00
- Paku biasa 0.050 Kg 30,000.00 1,500.00 1,500.00
- Pekerja 0.350 O/h 150,000.00 52,500.00 52,500.00
- Tukang Kayu 1.050 O/h 175,000.00 183,750.00 183,750.00
- Kep.Tukang 0.105 O/h 185,000.00 19,425.00 19,425.00
- Mandor 0.018 O/h 200,000.00 3,600.00 3,600.00
JUMLAH : 480,775.00 221,500.00 259,275.00
4 1 M2 Membuat dan Memasang Daun Pintu Panel Kayu Kelas I 960,500.00 220,000.00 740,500.00
- Kayu kelas I (papan) 0.040 M3 5,500,000.00 220,000.00 220,000.00
- Pekerja 1.000 O/h 150,000.00 150,000.00 150,000.00
- Tukang Kayu 3.000 O/h 175,000.00 525,000.00 525,000.00
- Kep.Tukang 0.300 O/h 185,000.00 55,500.00 55,500.00
- Mandor 0.050 O/h 200,000.00 10,000.00 10,000.00
JUMLAH : 960,500.00 220,000.00 740,500.00
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
5 1 M2 Membuat dan Memasang Pintu dan Jendela Jalusi Kayu Kelas I 1,092,500.00 352,000.00 740,500.00
- Kayu kelas I (papan) 0.064 M3 5,500,000.00 352,000.00 352,000.00
- Pekerja 1.000 O/h 150,000.00 150,000.00 150,000.00
- Tukang Kayu 3.000 O/h 175,000.00 525,000.00 525,000.00
- Kep.Tukang 0.300 O/h 185,000.00 55,500.00 55,500.00
- Mandor 0.050 O/h 200,000.00 10,000.00 10,000.00
JUMLAH : 1,092,500.00 352,000.00 740,500.00
6 1 M2 Membuat dan Memasang Daun Pintu dan Jendela Kaca Kayu Kelas I 739,900.00 147,500.00 592,400.00
- Kayu kelas I (papan) 0.026 M3 5,500,000.00 143,000.00 143,000.00
- Lem kayu 0.300 Kg 15,000.00 4,500.00 4,500.00
- Pekerja 0.800 O/h 150,000.00 120,000.00 120,000.00
- Tukang Kayu 2.400 O/h 175,000.00 420,000.00 420,000.00
- Kep.Tukang 0.240 O/h 185,000.00 44,400.00 44,400.00
- Mandor 0.040 O/h 200,000.00 8,000.00 8,000.00
JUMLAH : 739,900.00 147,500.00 592,400.00
7 1 M2 Membuat Pintu Kayu Lapis (Plywood), Rangkap, Rangka Tertutup Kayu Kelas II (Lebar sampai 90cm) 661,750.00 143,400.00 518,350.00
- Kayu kelas II (papan) 0.025 M3 2,600,000.00 65,000.00 65,000.00
- Paku biasa 0.030 Kg 30,000.00 900.00 900.00
- Lem kayu 0.500 Kg 15,000.00 7,500.00 7,500.00
- Plywood tebal 4 mm ( 90 x 220 ) cm 1.000 Lembar 70,000.00 70,000.00 70,000.00
- Pekerja 0.700 O/h 150,000.00 105,000.00 105,000.00
- Tukang Kayu 2.100 O/h 175,000.00 367,500.00 367,500.00
- Kep.Tukang 0.210 O/h 185,000.00 38,850.00 38,850.00
- Mandor 0.035 O/h 200,000.00 7,000.00 7,000.00
JUMLAH : 661,750.00 143,400.00 518,350.00
8 1 M2 Membuat Pintu Kayu Lapis (Plywood), Rangkap, Rangka Expose Kayu Kelas I dan II 737,360.00 144,960.00 592,400.00
- Kayu kelas II (papan) 0.026 M3 2,600,000.00 66,560.00 66,560.00
- Paku biasa 0.030 Kg 30,000.00 900.00 900.00
- Lem kayu 0.500 Kg 15,000.00 7,500.00 7,500.00
- Plywood tebal 4 mm ( 90 x 220 ) cm 1.000 Lembar 70,000.00 70,000.00 70,000.00
- Pekerja 0.800 O/h 150,000.00 120,000.00 120,000.00
- Tukang Kayu 2.400 O/h 175,000.00 420,000.00 420,000.00
- Kep.Tukang 0.240 O/h 185,000.00 44,400.00 44,400.00
- Mandor 0.040 O/h 200,000.00 8,000.00 8,000.00
JUMLAH : 737,360.00 144,960.00 592,400.00
9 1 M2 Pasang Jalusi Kusen Kayu Kelas I 889,000.00 334,500.00 554,500.00
- Kayu kelas I (papan) 0.060 M3 5,500,000.00 330,000.00 330,000.00
- Paku biasa 0.150 Kg 30,000.00 4,500.00 4,500.00
- Pekerja 0.670 O/h 150,000.00 100,500.00 100,500.00
- Tukang Kayu 2.000 O/h 175,000.00 350,000.00 350,000.00
- Kep.Tukang 0.200 O/h 185,000.00 37,000.00 37,000.00
- Mandor 0.335 O/h 200,000.00 67,000.00 67,000.00
JUMLAH : 889,000.00 334,500.00 554,500.00
10 1 M2 Pasang Teakwood Rangkap, Rangka Expose Kayu Kelas I 825,300.00 232,900.00 592,400.00
- Kayu kelas I (papan) 0.025 M3 5,500,000.00 137,500.00 137,500.00
- Paku biasa 0.030 Kg 30,000.00 900.00 900.00
- Lem kayu 0.300 Kg 15,000.00 4,500.00 4,500.00
- Teakwood tebal 4 mm ( 90 x 220 ) cm 1.000 Lembar 90,000.00 90,000.00 90,000.00
- Pekerja 0.800 O/h 150,000.00 120,000.00 120,000.00
- Tukang Kayu 2.400 O/h 175,000.00 420,000.00 420,000.00
- Kep.Tukang 0.240 O/h 185,000.00 44,400.00 44,400.00
- Mandor 0.040 O/h 200,000.00 8,000.00 8,000.00
JUMLAH : 825,300.00 232,900.00 592,400.00
11 1 M2 Pasang Teakwood Rangkap Lapis Formika, Rangka Expose Kayu Kelas II 847,425.00 217,900.00 629,525.00
- Kayu kelas II (papan) 0.025 M3 2,600,000.00 65,000.00 65,000.00
- Paku biasa 0.030 Kg 30,000.00 900.00 900.00
- Lem kayu 0.800 Kg 15,000.00 12,000.00 12,000.00
- Teakwood tebal 4 mm ( 90 x 220 ) cm 1.000 Lembar 90,000.00 90,000.00 90,000.00
- Formika 0.500 Lembar 100,000.00 50,000.00 50,000.00
- Pekerja 0.850 O/h 150,000.00 127,500.00 127,500.00
- Tukang Kayu 2.550 O/h 175,000.00 446,250.00 446,250.00
- Kep.Tukang 0.255 O/h 185,000.00 47,175.00 47,175.00
- Mandor 0.043 O/h 200,000.00 8,600.00 8,600.00
JUMLAH : 847,425.00 217,900.00 629,525.00
12 1 M2 PASANG KACA tebal 6 mm
Kaca Polos 1.1000 m2 150,000.00 165,000.00 165,000.00
Pekerja 0.0430 o/h 150,000.00 6,450.00 6,450.00
Tukang 0.0430 o/h 175,000.00 7,525.00 7,525.00
Kep.Tukang 0.0043 o/h 185,000.00 795.50 795.50
Mandor 0.0021 o/h 200,000.00 420.00 420.00
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
21 1 M' Pasang Lisplank Ukuran (3 X 20) cm, Kayu Kelas I atau II 117,100.00 62,400.00 54,700.00
- Kayu kelas I (papan) 0.011 M3 5,500,000.00 59,400.00 59,400.00
- Paku biasa 0.100 Kg 30,000.00 3,000.00 3,000.00
- Pekerja 0.100 O/h 150,000.00 15,000.00 15,000.00
- Tukang Kayu 0.200 O/h 175,000.00 35,000.00 35,000.00
- Kep.Tukang 0.020 O/h 185,000.00 3,700.00 3,700.00
- Mandor 0.005 O/h 200,000.00 1,000.00 1,000.00
JUMLAH : 117,100.00 62,400.00 54,700.00
22 1 M' Pasang List Plafond Kayu Profil 23,145.00 15,750.00 7,395.00
- Kayu profil 1.050 m 15,000.00 15,750.00 15,750.00
- Pekerja 0.021 O/h 150,000.00 3,150.00 3,150.00
- Tukang Kayu 0.021 O/h 175,000.00 3,675.00 3,675.00
- Kep.Tukang 0.002 O/h 185,000.00 370.00 370.00
- Mandor 0.001 O/h 200,000.00 200.00 200.00
JUMLAH : 23,145.00 15,750.00 7,395.00
23 1 M' Pasang Lisplank Ukuran (3 X 30) cm, Kayu Kelas I atau II 115,600.00 60,900.00 54,700.00
- Kayu kelas I (papan) 0.011 M3 5,500,000.00 59,400.00 59,400.00
- Paku biasa 0.050 Kg 30,000.00 1,500.00 1,500.00
- Pekerja 0.100 O/h 150,000.00 15,000.00 15,000.00
- Tukang Kayu 0.200 O/h 175,000.00 35,000.00 35,000.00
- Kep.Tukang 0.020 O/h 185,000.00 3,700.00 3,700.00
- Mandor 0.005 O/h 200,000.00 1,000.00 1,000.00
JUMLAH : 115,600.00 60,900.00 54,700.00
24 1 M2 Pasang Rangka Dinding Pemisah (60 X 120) cm , Kayu Kelas II atau III 185,675.00 74,500.00 111,175.00
- Kayu kelas II (balok) 0.028 M3 2,500,000.00 70,000.00 70,000.00
- Paku biasa 0.150 Kg 30,000.00 4,500.00 4,500.00
- Pekerja 0.150 O/h 150,000.00 22,500.00 22,500.00
- Tukang Kayu 0.450 O/h 175,000.00 78,750.00 78,750.00
- Kep.Tukang 0.045 O/h 185,000.00 8,325.00 8,325.00
- Mandor 0.008 O/h 200,000.00 1,600.00 1,600.00
JUMLAH : 185,675.00 74,500.00 111,175.00
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
25 1 M2 Pasang Dinding Pemisah Teakwood Rangkap, Rangka Kayu Kelas II 288,675.00 177,500.00 111,175.00
- Kayu kelas II (balok) 0.028 M3 2,500,000.00 70,000.00 70,000.00
- Paku biasa 0.150 Kg 30,000.00 4,500.00 4,500.00
- Teakwood tebal 4 mm ( 120 x 240 ) cm 0.860 Lembar 110,000.00 94,600.00 94,600.00
- Lem kayu 0.560 Kg 15,000.00 8,400.00 8,400.00
- Pekerja 0.150 O/h 150,000.00 22,500.00 22,500.00
- Tukang Kayu 0.450 O/h 175,000.00 78,750.00 78,750.00
- Kep.Tukang 0.045 O/h 185,000.00 8,325.00 8,325.00
- Mandor 0.008 O/h 200,000.00 1,600.00 1,600.00
JUMLAH : 288,675.00 177,500.00 111,175.00
26 1 M2 Pasang Dinding Pemisah Plywood Rangkap, Rangka Kayu Kelas II 295,500.00 147,400.00 148,100.00
- Kayu kelas II (balok) 0.028 M3 2,500,000.00 70,000.00 70,000.00
- Paku biasa 0.150 Kg 30,000.00 4,500.00 4,500.00
- Plywood tebal 4 mm ( 120 x 240 ) cm 0.860 Lembar 75,000.00 64,500.00 64,500.00
- Lem kayu 0.560 Kg 15,000.00 8,400.00 8,400.00
- Pekerja 0.200 O/h 150,000.00 30,000.00 30,000.00
- Tukang Kayu 0.600 O/h 175,000.00 105,000.00 105,000.00
- Kep.Tukang 0.060 O/h 185,000.00 11,100.00 11,100.00
- Mandor 0.010 O/h 200,000.00 2,000.00 2,000.00
JUMLAH : 295,500.00 147,400.00 148,100.00
27 1 M2 Pasang Dinding Lambriziring dari Papan Kayu Kelas I 497,050.00 52,750.00 444,300.00
- Kayu kelas I (papan) 0.007 M3 5,500,000.00 38,500.00 38,500.00
- Paku biasa 0.100 Kg 30,000.00 3,000.00 3,000.00
- Paku sekrup 0.150 Kg 75,000.00 11,250.00 11,250.00
- Pekerja 0.600 O/h 150,000.00 90,000.00 90,000.00
- Tukang Kayu 1.800 O/h 175,000.00 315,000.00 315,000.00
- Kep.Tukang 0.180 O/h 185,000.00 33,300.00 33,300.00
- Mandor 0.030 O/h 200,000.00 6,000.00 6,000.00
JUMLAH : 497,050.00 52,750.00 444,300.00
28 1 M2 Pasang Dinding PARTISI dari Plywood ( 120 X 240 ) cm 50,055.00 31,500.00 18,555.00
- Plywood tebal 4 mm ( 120 x 240 ) cm 0.400 Lembar 75,000.00 30,000.00 30,000.00
- Paku biasa 0.050 Kg 30,000.00 1,500.00 1,500.00
- Pekerja 0.025 O/h 150,000.00 3,750.00 3,750.00
- Tukang Kayu 0.075 O/h 175,000.00 13,125.00 13,125.00
- Kep.Tukang 0.008 O/h 185,000.00 1,480.00 1,480.00
- Mandor 0.001 O/h 200,000.00 200.00 200.00
JUMLAH : 50,055.00 31,500.00 18,555.00
29 1 M2 Pasang Dinding Bilik, Rangka Kayu Kelas II 158,580.00 132,905.00 25,675.00
- Bilik bambu 1.500 M2 65,000.00 97,500.00 97,500.00
- Kayu kelas II (balok) 0.014 M3 2,500,000.00 35,000.00 35,000.00
- Paku biasa 0.012 Kg 30,000.00 360.00 360.00
- Kayu profil 0.003 m 15,000.00 45.00 45.00
- Pekerja 0.100 O/h 150,000.00 15,000.00 15,000.00
- Tukang Kayu 0.050 O/h 175,000.00 8,750.00 8,750.00
- Kep.Tukang 0.005 O/h 185,000.00 925.00 925.00
- Mandor 0.005 O/h 200,000.00 1,000.00 1,000.00
JUMLAH : 158,580.00 132,905.00 25,675.00
VII PEKERJAAN BETON
1 1 M3 Membuat Beton Tumbuk, 1 PC : 3 PS : 5 KR 1,325,575.00 1,013,700.00 311,875.00
- Semen Portland 218.000 Kg 1,900.00 414,200.00 414,200.00
- Pasir beton 0.520 M3 400,000.00 208,000.00 208,000.00
- Koral beton 0.870 M3 450,000.00 391,500.00 391,500.00
- Pekerja 1.650 O/h 150,000.00 247,500.00 247,500.00
- Tukang batu 0.250 O/h 175,000.00 43,750.00 43,750.00
- Kep.Tukang 0.025 O/h 185,000.00 4,625.00 4,625.00
- Mandor 0.080 O/h 200,000.00 16,000.00 16,000.00
JUMLAH : 1,325,575.00 1,013,700.00 311,875.00
2 1 M3 Membuat Beton Tumbuk, 1 PC : 3 PS : 6 KR 1,297,175.00 985,300.00 311,875.00
- Semen Portland 197.000 Kg 1,900.00 374,300.00 374,300.00
- Pasir beton 0.470 M3 400,000.00 188,000.00 188,000.00
- Koral beton 0.940 M3 450,000.00 423,000.00 423,000.00
- Pekerja 1.650 O/h 150,000.00 247,500.00 247,500.00
- Tukang batu 0.250 O/h 175,000.00 43,750.00 43,750.00
- Kep.Tukang 0.025 O/h 185,000.00 4,625.00 4,625.00
- Mandor 0.080 O/h 200,000.00 16,000.00 16,000.00
JUMLAH : 1,297,175.00 985,300.00 311,875.00
3 1 M3 Membuat Beton Tumbuk, 1 PC : 4 PS : 6 KR 1,260,075.00 948,200.00 311,875.00
- Semen Portland 173.000 Kg 1,900.00 328,700.00 328,700.00
- Pasir beton 0.570 M3 400,000.00 228,000.00 228,000.00
- Koral beton 0.870 M3 450,000.00 391,500.00 391,500.00
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
23 1m² Pasang Atap Asbes Gelombang ( 2.7 x 1.08 m ) X 6mm 35,540.00 120.00 35,420.00
Asbes Gelombang 0.380 m2 - - -
Paku Pancing 60 x 230 0.120 Kg 1,000.00 120.00 120.00
Pekerja 0.140 O/h 150,000.00 21,000.00 21,000.00
Tukang Kayu 0.067 O/h 175,000.00 11,725.00 11,725.00
Kep.Tukang 0.007 O/h 185,000.00 1,295.00 1,295.00
Mandor 0.007 O/h 200,000.00 1,400.00 1,400.00
JUMLAH : 35,540.00 120.00 35,420.00
24 1m² Pasang Atap Asbes Gelombang ( 2.4 x 1.08 m ) X 6mm 35,540.00 120.00 35,420.00
Asbes Gelombang 0.460 m2 - - -
Paku Pancing 60 x 230 0.120 Kg 1,000.00 120.00 120.00
Pekerja 0.140 O/h 150,000.00 21,000.00 21,000.00
Tukang Kayu 0.067 O/h 175,000.00 11,725.00 11,725.00
Kep.Tukang 0.007 O/h 185,000.00 1,295.00 1,295.00
Mandor 0.007 O/h 200,000.00 1,400.00 1,400.00
JUMLAH : 35,540.00 120.00 35,420.00
25 1m² Pasang Atap Asbes Gelombang ( 2.1 x 1.08 m ) X 6mm 35,540.00 120.00 35,420.00
Asbes Gelombang 0.490 m2 - -
Paku Pancing 60 x 230 0.120 Kg 1,000.00 120.00 120.00
Pekerja 0.140 O/h 150,000.00 21,000.00 21,000.00
Tukang Kayu 0.067 O/h 175,000.00 11,725.00 11,725.00
Kep.Tukang 0.007 O/h 185,000.00 1,295.00 1,295.00
Mandor 0.007 O/h 200,000.00 1,400.00 1,400.00
JUMLAH : 35,540.00 120.00 35,420.00
26 1m² Pasang Atap Asbes Gelombang ( 1.80 x 1.08 m ) X 6mm 35,540.00 120.00 35,420.00
Asbes Gelombang 0.570 m2 - -
Paku Pancing 60 x 230 0.120 Kg 1,000.00 120.00 120.00
Pekerja 0.140 O/h 150,000.00 21,000.00 21,000.00
Tukang Kayu 0.067 O/h 175,000.00 11,725.00 11,725.00
Kep.Tukang 0.007 O/h 185,000.00 1,295.00 1,295.00
Mandor 0.007 O/h 200,000.00 1,400.00 1,400.00
JUMLAH : 35,540.00 120.00 35,420.00
27 1m' Pasang Bubung Stel Gelombang 0.92m 43,680.00 6,000.00 37,680.00
Asbes Gelombang 2.400 m2 - -
Paku Pancing 60 x 230 6.000 Kg 1,000.00 6,000.00 6,000.00
Pekerja 0.084 O/h 150,000.00 12,600.00 12,600.00
Tukang Kayu 0.125 O/h 175,000.00 21,875.00 21,875.00
Kep.Tukang 0.013 O/h 185,000.00 2,405.00 2,405.00
Mandor 0.004 O/h 200,000.00 800.00 800.00
JUMLAH : 43,680.00 6,000.00 37,680.00
28 1m' Pasang Nok Stel Gelombang 0.92m 37,680.00 - 37,680.00
Asbes Gelombang 2.400 m2 - -
Paku Sekrup 6.000 #N/A - -
Pekerja 0.084 O/h 150,000.00 12,600.00 12,600.00
Tukang Kayu 0.125 O/h 175,000.00 21,875.00 21,875.00
Kep.Tukang 0.013 O/h 185,000.00 2,405.00 2,405.00
Mandor 0.004 O/h 200,000.00 800.00 800.00
JUMLAH : 37,680.00 - 37,680.00
29 1m' Pasang Nok Stel Gelombang 1.05m 42,180.00 4,500.00 37,680.00
Asbes Gelombang 2.100 m2 - -
Paku Skrup 6.000 bj 750.00 4,500.00 4,500.00
Pekerja 0.084 O/h 150,000.00 12,600.00 12,600.00
Tukang Kayu 0.125 O/h 175,000.00 21,875.00 21,875.00
Kep.Tukang 0.013 O/h 185,000.00 2,405.00 2,405.00
Mandor 0.004 O/h 200,000.00 800.00 800.00
JUMLAH : 42,180.00 4,500.00 37,680.00
30 1m' Pasang Nok Stel Gelombang 1.08m 42,180.00 4,500.00 37,680.00
Asbes Gelombang 2.050 m2 - -
Paku Skrup 6.000 bj 750.00 4,500.00 4,500.00
Pekerja 0.084 O/h 150,000.00 12,600.00 12,600.00
Tukang Kayu 0.125 O/h 175,000.00 21,875.00 21,875.00
Kep.Tukang 0.013 O/h 185,000.00 2,405.00 2,405.00
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
3 1 M' PASANG NOK ATAP ALUMUNIUM (SPANDEK/SUPER DEK 227,670.00 48,820.00 178,850.00
- Nok Atap 1.200 M' 27,500.00 33,000.00 33,000.00
- Paku Atap 0.040 Kg 20,500.00 820.00 820.00
- Pekerja 0.100 o/h 150,000.00 15,000.00 15,000.00
- Tukang 1.000 o/h 175,000.00 175,000.00 175,000.00
- Kep.Tukang 0.010 o/h 185,000.00 1,850.00 1,850.00
- Mandor 0.010 o/h 200,000.00 2,000.00 2,000.00
JUMLAH : 227,670.00 48,820.00 178,850.00
4 1 M2 PASANG PELAPIS ALUMUNIUM FOIL 213,500.00 26,500.00 187,000.00
- Aluminium Foil 1.200 M' 2,500.00 3,000.00 3,000.00
- Pekerja 0.040 Kg 150,000.00 6,000.00 6,000.00
- Tukang 0.100 o/h 175,000.00 17,500.00 17,500.00
- Kep.Tukang 1.000 o/h 185,000.00 185,000.00 185,000.00
- Mandor 0.010 o/h 200,000.00 2,000.00 2,000.00
JUMLAH : 213,500.00 26,500.00 187,000.00
5 1 M2 PEKERJAAN GLASS WALL + KAWAT RAM 60,025.00 26,250.00 33,775.00
- Glass Wall 1.050 M2 25,000.00 26,250.00 26,250.00
- Kawat Ram - M2 20,000.00 - -
- Pekerja 0.150 o/h 150,000.00 22,500.00 22,500.00
- Tukang 0.050 o/h 175,000.00 8,750.00 8,750.00
Kep.Tukang 0.005 o/h 185,000.00 925.00 925.00
Mandor 0.0080 o/h 200,000.00 1,600.00 1,600.00
JUMLAH : 60,025.00 26,250.00 33,775.00
6 1 Kg RANGKA BAJA 38,460.00 17,250.00 21,210.00
- Besi Baja IWF X Pabrikasi 1.150 Kg 15,000.00 17,250.00 17,250.00
- Pekerja 0.060 o/h 150,000.00 9,000.00 9,000.00
- Tukang 0.060 o/h 175,000.00 10,500.00 10,500.00
Kep.Tukang 0.006 o/h 185,000.00 1,110.00 1,110.00
Mandor 0.003 o/h 200,000.00 600.00 600.00
JUMLAH : 38,460.00 17,250.00 21,210.00
7 1 Kg PEKERJAAN GORDING CANAL 38,460.00 17,250.00 21,210.00
Gording Canal 1.150 Kg 15,000.00 17,250.00 17,250.00
Pekerja 0.060 o/h 150,000.00 9,000.00 9,000.00
Tukang 0.060 o/h 175,000.00 10,500.00 10,500.00
Kep.Tukang 0.006 o/h 185,000.00 1,110.00 1,110.00
Mandor 0.003 o/h 200,000.00 600.00 600.00
JUMLAH : 38,460.00 17,250.00 21,210.00
8 100 Kg PEKERJAAN PERAKITAN KUDA-KUDA BAJA 55,685.00 10,000.00 45,685.00
Solar 1.000 Ltr 5,500.00 5,500.00 5,500.00
Minyak Pelumas 0.100 Ltr 45,000.00 4,500.00 4,500.00
Pekerja 0.100 o/h 150,000.00 15,000.00 15,000.00
Tukang 0.100 o/h 175,000.00 17,500.00 17,500.00
Kep.Tukang 0.001 o/h 185,000.00 185.00 185.00
Mandor 0.005 o/h 200,000.00 1,000.00 1,000.00
Sewa Alat 0.800 Jam 15,000.00 12,000.00 12,000.00
Jumlah 55,685.00 10,000.00 45,685.00
JUMLAH :
Untuk 1 Kg 556.85 100.00 456.85
9 1 Kg PEKERJAAN ERECTION KONSTRUKSI BAJA 10,845.27 1,287.50 9,557.77
Solar 0.125 Ltr 5,500.00 687.50 687.50
Minyak Pelumas 0.013 Ltr 45,000.00 600.00 600.00
Pekerja 0.015 o/h 150,000.00 2,307.69 2,307.69
Tukang 0.013 o/h 175,000.00 2,187.50 2,187.50
Kep.Tukang 0.012 o/h 185,000.00 2,176.47 2,176.47
Mandor 0.001 o/h 200,000.00 111.11 111.11
Sewa Alat 0.0037 Jam 750,000.00 2,775.00 2,775.00
JUMLAH : Jumlah 10,845.27 1,287.50 9,557.77
10 1 Kg PEKERJAAN KUDA-KUDA BAJA - 49,305.27 38,460.00 10,845.27
Besi Baja x Pabrikasi 1.000 Kg 38,460.00 38,460.00 38,460.00 -
Pemasangan/erction 1.000 Kg 10,845.27 10,845.27 - 10,845.27
JUMLAH : 49,305.27 38,460.00 10,845.27
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
14 1 m Pekerjaan Bending Pipa 3-SCH 40 Untuk Kuda-kuda bulat (Dom) 692,237.57 380,951.50 311,286.07
Pipa Ø3" -SCH 40 1.025 m 225,940.00 231,588.50 231,588.50
Pengelasan 27.000 cm 9,913.67 267,669.00 127,440.00 140,229.00
Minyak Pelumas 0.050 Lrt 45,000.00 2,250.00 2,250.00
Pekerja 0.036 o/h 150,000.00 5,357.14 5,357.14
Tukang 0.007 o/h 175,000.00 1,250.00 1,250.00
Kep.Tukang 0.001 o/h 185,000.00 264.29 264.29
Mandor 0.001 o/h 200,000.00 285.71 285.71
Sewa Alat Bending Pipa 0.250 Jam 71,428.57 17,857.14 17,857.14
Pemasangan/erction 15.28 kg 10,845.27 165,715.79 19,673.00 146,042.79
JUMLAH : 692,237.57 380,951.50 311,286.07
15 1 m Pekerjaan Bending Pipa 4-SCH 40 Untuk Kuda-kuda bulat (Dom) 722,609.68 502,285.30 220,324.38
Pipa Ø4" -SCH 40 1.025 m 321,332.00 329,365.30 329,365.30
Pengelasan 36.000 cm 9,913.67 356,892.00 169,920.00 186,972.00
Minyak Pelumas 0.067 Lrt 45,000.00 3,000.00 3,000.00
Pekerja 0.048 o/h 150,000.00 7,142.86 7,142.86
Tukang 0.010 o/h 175,000.00 1,666.67 1,666.67
Kep.Tukang 0.002 o/h 185,000.00 352.38 352.38
Mandor 0.002 o/h 200,000.00 380.95 380.95
Sewa Alat Bending Pipa 0.333 Jam 71,428.57 23,809.52 23,809.52
Pemasangan/erction kg 10,845.27 - - -
JUMLAH : 722,609.68 502,285.30 220,324.38
16 1 m Pekerjaan Bending Pipa 3-SCH 80 Untuk Kuda-kuda bulat (Dom) 924,848.52 612,540.00 312,308.52
Pipa Ø3" -SCH 80 1.025 m 451,880.00 463,177.00 463,177.00
Pengelasan 27.000 cm 9,913.67 267,669.00 127,440.00 140,229.00
Minyak Pelumas 0.050 Lrt 45,000.00 2,250.00 2,250.00
Pekerja 0.041 o/h 150,000.00 6,122.45 6,122.45
Tukang 0.008 o/h 175,000.00 1,428.57 1,428.57
Kep.Tukang 0.002 o/h 185,000.00 302.04 302.04
Mandor 0.002 o/h 200,000.00 326.53 326.53
Sewa Alat Bending Pipa 0.250 Jam 71,428.57 17,857.14 17,857.14
Pemasangan/erction 15.280 kg 10,845.27 165,715.79 19,673.00 146,042.79
JUMLAH : 924,848.52 612,540.00 312,308.52
17 1 m Pekerjaan Bending Pipa 4-SCH 80 Untuk Kuda-kuda bulat (Dom) 1,295,468.88 860,516.35 434,952.53
Pipa Ø4" -SCH 80 1.025 m 642,664.00 658,730.60 658,730.60
Pengelasan 36.000 cm 9,913.67 356,892.00 169,920.00 186,972.00
Minyak Pelumas 0.067 Lrt 45,000.00 3,000.00 3,000.00
Pekerja 0.048 o/h 150,000.00 7,142.86 7,142.86
Tukang 0.011 o/h 175,000.00 1,904.76 1,904.76
Kep.Tukang 0.002 o/h 185,000.00 402.72 402.72
Mandor 0.002 o/h 200,000.00 435.37 435.37
Sewa Alat Bending Pipa 0.333 Jam 71,428.57 23,809.52 23,809.52
Pemasangan/erction 22.420 kg 10,845.27 243,151.04 28,865.75 214,285.29
JUMLAH : 1,295,468.88 860,516.35 434,952.53
18 1 m Pekerjaan Bending Pipa Hollow 4x4x2,3 kaso (Dom) 14,678.10 1,200.00 13,478.10
Minyak Pelumas 0.027 Lrt 45,000.00 1,200.00 1,200.00
Pekerja 0.019 o/h 150,000.00 2,857.14 2,857.14
Tukang 0.004 o/h 175,000.00 761.90 761.90
Kep.Tukang 0.001 o/h 185,000.00 161.09 161.09
Mandor 0.001 o/h 200,000.00 174.15 174.15
Sewa Alat Bending Pipa 0.133 Jam 71,428.57 9,523.81 9,523.81
JUMLAH : 14,678.10 1,200.00 13,478.10
19 1 Unit Pekerjaan Pemasangan Kuda Kuda Pipa Type K1. 133,510,038.18 91,683,383.90 41,826,654.28
Pipa Ø3" -SCH 80 diroll 652.487 kg 30,172.00 19,686,824.49 19,686,824.49
Pipa Ø4" -SCH 80 diroll 1,208.438 kg 36,206.40 43,753,189.60 43,753,189.60
Pipa Ø6" -SCH 80 (41,83 kg/m) 5.456 M 1,124,082.67 6,132,995.03 6,132,995.03
Profil L 60.60.6 657.831 kg 19,980.00 13,143,459.78 13,143,459.78
Plat Buhul 10mm 99.000 kg 17,500.00 1,732,500.00 1,732,500.00
Plat skur sambunga 10mm 52.800 kg 17,500.00 924,000.00 924,000.00
Plat sambunga 16mm 156.288 kg 17,500.00 2,735,040.00 2,735,040.00
Plat gording 8 mm 21.450 kg 17,500.00 375,375.00 375,375.00
Mur Baut 19 mm 128.00 Ps 25,000.00 3,200,000.00 3,200,000.00
Pengelasan 713.437 CM 9,913.67 7,072,780.03 7,072,780.03
Pemasangan/erction 3,204.518 kg 10,845.27 34,753,874.25 34,753,874.25
JUMLAH : 133,510,038.18 91,683,383.90 41,826,654.28
19 1 Unit Pekerjaan Pemasangan Kuda Kuda Pipa Type K2. 143,613,092.44 97,936,244.48 45,676,847.96
Pipa Ø3" -SCH 80 diroll 647.108 kg 30,172.00 19,524,542.58 19,524,542.58
Pipa Ø4" -SCH 80 diroll 1,185.453 kg 36,206.40 42,920,986.08 42,920,986.08
Pipa Ø6" -SCH 80 (41,83 kg/m) 5.456 M 1,124,082.67 6,132,995.03 6,132,995.03
Profil L 60.60.6 646.985 kg 19,980.00 12,926,768.29 12,926,768.29
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
34 1 Bh Pekerjaan Pemasangan Plat Joint Balok PL. 12 THK 311,116.13 112,377.19 198,738.94
Plat Buhul 12mm 1.000 bh 177,561.23 177,561.23 61,091.22 116,470.01
Pengelasan 10.000 cm 9,913.67 99,136.67 47,200.00 51,936.67
Pemasangan/erction 3.174 kg 10,845.27 34,418.23 4,085.97 30,332.26
JUMLAH : 311,116.13 112,377.19 198,738.94
35 1 Bh Pekerjaan Pemasangan Plat Joint Balok PL. 16 THK 1,231,043.99 380,295.00 850,748.99
Plat Buhul 16mm 1.000 bh 931,272.03 931,272.03 297,466.20 633,805.83
Pengelasan 13.333 cm 9,913.67 132,182.22 62,933.33 69,248.89
Pemasangan/erction 15.453 kg 10,845.27 167,589.74 19,895.47 147,694.27
JUMLAH : 1,231,043.99 380,295.00 850,748.99
36 1 Bh Pekerjaan Pemasangan Plat Joint Balok PL. 25 THK 2,413,286.88 700,716.30 1,712,570.57
Plat Buhul 25mm 1.000 bh 1,911,326.50 1,911,326.50 578,137.55 1,333,188.95
Pengelasan 17.778 cm 9,913.67 176,242.96 83,911.11 92,331.85
Pemasangan/erction 30.033 kg 10,845.27 325,717.41 38,667.64 287,049.77
JUMLAH : 2,413,286.88 700,716.30 1,712,570.57
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
50 1 M' Pasang Talang 1/2 Lingkaran D - 10 cm, Seng BJLS 30" 151,025.00 79,900.00 71,125.00
- Seng Plat 3' x 6 " bjls 30 0.300 Lembar 50,000.00 15,000.00 15,000.00
- Paku Biasa 0.100 Kg 30,000.00 3,000.00 3,000.00
- Kayu Kelas II (Papan) 0.019 M3 2,600,000.00 49,400.00 49,400.00
- Besi strip tebal 5 mm 0.500 Kg 25,000.00 12,500.00 12,500.00
- Pekerja 0.150 Oh 150,000.00 22,500.00 22,500.00
- Tukang Kayu 0.250 Oh 175,000.00 43,750.00 43,750.00
- Kep.Tukang 0.025 Oh 185,000.00 4,625.00 4,625.00
- Mandor 0.001 Oh 200,000.00 250.00 250.00
JUMLAH : 151,025.00 79,900.00 71,125.00
IX PEKERJAAN LANGIT - LANGIT
1 1 M2 PEKERJAAN RANGKA PLAFON 60/60
Kayu Kelas II (balok) 0.016 M3 2,500,000.00 40,750.00 40,750.00
Paku Biasa 0.250 Kg 30,000.00 7,500.00 7,500.00
Pekerja 0.200 o/h 150,000.00 30,000.00 30,000.00
Tukang 0.300 o/h 175,000.00 52,500.00 52,500.00
Kep.Tukang 0.030 o/h 185,000.00 5,550.00 5,550.00
Mandor 0.010 o/h 200,000.00 2,000.00 2,000.00
JUMLAH : 138,300.00 48,250.00 90,050.00
2 1 M2 Pasang Langit-Langit Gypsum Board, Ukuran (1200 x 2400 x 9) mm 66,685.00 41,010.00 25,675.00
- Gypsum Board 9 mm 0.364 Lembar 90,000.00 32,760.00 32,760.00
- Paku sekrup 0.110 Kg 75,000.00 8,250.00 8,250.00
- Pekerja 0.100 O/h 150,000.00 15,000.00 15,000.00
- Tukang Kayu 0.050 O/h 175,000.00 8,750.00 8,750.00
- Kep.Tukang 0.005 O/h 185,000.00 925.00 925.00
- Mandor 0.005 O/h 200,000.00 1,000.00 1,000.00
JUMLAH : 66,685.00 41,010.00 25,675.00
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
10 1 M2 Pasang Langit-Langit Teakwood (60 x 120) cm, tebal 4 mm 31,450.00 900.00 30,550.00
- Plywood 4 mm Ukuran 122 x 244 cm 0.375 #N/A - -
- Paku biasa 0.030 Kg 30,000.00 900.00 900.00
- Pekerja 0.070 O/h 150,000.00 10,500.00 10,500.00
- Tukang Kayu 0.100 O/h 175,000.00 17,500.00 17,500.00
- Kep.Tukang 0.010 O/h 185,000.00 1,850.00 1,850.00
- Mandor 0.004 O/h 200,000.00 700.00 700.00
JUMLAH : 31,450.00 900.00 30,550.00
11 1 M2 Pasang Langit-Langit Lat Kayu Kelas I 284,150.00 136,050.00 148,100.00
- Kayu Kelas I (papan) 0.024 M3 5,500,000.00 132,000.00 132,000.00
- Paku biasa 0.010 Kg 30,000.00 300.00 300.00
- Paku sekrup 0.050 Kg 75,000.00 3,750.00 3,750.00
- Pekerja 0.200 O/h 150,000.00 30,000.00 30,000.00
- Tukang Kayu 0.600 O/h 175,000.00 105,000.00 105,000.00
- Kep.Tukang 0.060 O/h 185,000.00 11,100.00 11,100.00
- Mandor 0.010 O/h 200,000.00 2,000.00 2,000.00
JUMLAH : 284,150.00 136,050.00 148,100.00
12 1 M2 Pasang Langit-Langit Lat Kayu Kelas II 214,550.00 66,450.00 148,100.00
- Kayu Kelas II (papan) 0.024 M3 2,600,000.00 62,400.00 62,400.00
- Paku biasa 0.010 Kg 30,000.00 300.00 300.00
- Paku sekrup 0.050 Kg 75,000.00 3,750.00 3,750.00
- Pekerja 0.200 O/h 150,000.00 30,000.00 30,000.00
- Tukang Kayu 0.600 O/h 175,000.00 105,000.00 105,000.00
- Kep.Tukang 0.060 O/h 185,000.00 11,100.00 11,100.00
- Mandor 0.010 Oh 200,000.00 2,000.00 2,000.00
JUMLAH : 214,550.00 66,450.00 148,100.00
13 1 M' Pasang List Langit-Langit Kayu Profil 33,825.00 16,050.00 17,775.00
- kayu profil 1.050 m 15,000.00 15,750.00 15,750.00
- Paku biasa 0.010 Kg 30,000.00 300.00 300.00
- Pekerja 0.050 O/h 150,000.00 7,500.00 7,500.00
- Tukang Kayu 0.050 O/h 175,000.00 8,750.00 8,750.00
- Kep.Tukang 0.005 O/h 185,000.00 925.00 925.00
- Mandor 0.003 O/h 200,000.00 600.00 600.00
JUMLAH : 33,825.00 16,050.00 17,775.00
X PEKERJAAN SANITASI
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
24 Memasang 1 Buah Bak Kontrol Pasangan Batu Bata ukuran ( 45 x 45 ) cm Tinggi 50 cm 1,146,167.22 484,972.22 661,195.00
- Batu Tela (m3) 0.250 M3 763,888.89 190,972.22 190,972.22
- Semen portland 77.000 Kg 1,900.00 146,300.00 146,300.00
- Pasir Pasang 0.130 M3 400,000.00 52,000.00 52,000.00
- Kerikil 0.020 M3 450,000.00 9,000.00 9,000.00
- Besi beton 2.600 Kg 19,500.00 50,700.00 50,700.00
- Pasir beton 0.090 M3 400,000.00 36,000.00 36,000.00
- Pekerja 3.200 Oh 150,000.00 480,000.00 480,000.00
- Tukang batu 1.015 Oh 175,000.00 177,625.00 177,625.00
- Kep.Tukang 0.002 Oh 185,000.00 370.00 370.00
- Mandor 0.016 Oh 200,000.00 3,200.00 3,200.00
JUMLAH : 1,146,167.22 484,972.22 661,195.00
25 Memasang 1 Buah Bak Kontrol Pasangan Batu Bata ukuran ( 60 x 60 ) cm Tinggi 65 cm 1,409,722.78 731,027.78 678,695.00
- Batu Tela (m3) 0.371 Buah 763,888.89 283,402.78 283,402.78
- Semen portland 114.000 Kg 1,900.00 216,600.00 216,600.00
- Pasir Pasang 0.184 M3 400,000.00 73,600.00 73,600.00
- Kerikil 0.033 M3 450,000.00 14,850.00 14,850.00
- Besi beton 4.850 Kg 19,500.00 94,575.00 94,575.00
- Pasir beton 0.120 M3 400,000.00 48,000.00 48,000.00
- Pekerja 3.200 Oh 150,000.00 480,000.00 480,000.00
- Tukang batu 1.015 Oh 175,000.00 177,625.00 177,625.00
- Kep.Tukang 0.002 Oh 185,000.00 370.00 370.00
- Mandor 0.016 Oh 200,000.00 3,200.00 3,200.00
- Tukang gali 0.100 Oh 175,000.00 17,500.00 17,500.00
JUMLAH : 1,409,722.78 731,027.78 678,695.00
26 Memasang 1 Buah Cuci Piring Stainles Steel 562,850.00 500,000.00 62,850.00
- Bak cuci stainless steel 1.000 Bh 450,000.00 450,000.00 450,000.00
- Water drain + asesories 1.000 Set 50,000.00 50,000.00 50,000.00
- Pekerja 0.030 Oh 150,000.00 4,500.00 4,500.00
- Tukang Batu 0.300 Oh 175,000.00 52,500.00 52,500.00
- Kep.Tukang 0.030 Oh 185,000.00 5,550.00 5,550.00
- Mandor 0.002 Oh 200,000.00 300.00 300.00
JUMLAH : 562,850.00 500,000.00 62,850.00
27 Memasang 1 Buah Kran Diameter 3/4" atau 1/2" 56,975.00 35,125.00 21,850.00
- Kran Air Stainless 1.000 Buah 35,000.00 35,000.00 35,000.00
- Seal tape 0.025 Buah 5,000.00 125.00 125.00
- Pekerja 0.010 Oh 150,000.00 1,500.00 1,500.00
- Tukang Batu 0.100 Oh 175,000.00 17,500.00 17,500.00
- Kep.Tukang 0.010 Oh 185,000.00 1,850.00 1,850.00
- Mandor 0.005 Oh 200,000.00 1,000.00 1,000.00
JUMLAH : 56,975.00 35,125.00 21,850.00
28 1 UNIT GROUND RESERVOAR
Galian Tanah Pondasi / Bak 16.000 M3 112,650.00 1,802,400.00 - 1,802,400.00
Urugan Tanah kembali 1.600 M3 32,600.00 52,160.00 - 52,160.00
Pondasi Poer Plat 2.520 M3 6,149,495.00 15,496,727.40 12,079,998.00 3,416,729.40
Sloof Beton Bertulang 15/20 0.360 M3 11,016,110.51 3,965,799.78 2,668,469.73 1,297,330.05
Kolom Beton Bertulang 25/25 0.216 M3 14,492,938.54 3,130,474.73 2,147,756.13 982,718.59
Plat Dinding & Lantai tebal 10 cm 2.680 M3 8,437,180.00 22,611,642.40 18,511,296.00 4,100,346.40
Plat Penutup tebal 12 cm 0.800 M3 8,009,050.00 6,407,240.00 5,322,120.00 1,085,120.00
Balok Beton 20/30 0.288 M3 8,909,300.00 2,565,878.40 2,037,801.60 528,076.80
Lantai Cor 1 : 3 : 5 tebal 10 cm 0.800 M3 1,325,575.00 1,060,460.00 810,960.00 249,500.00
Plester pada Plat Lantai 6.000 M2 100,999.40 605,996.40 605,996.40 462,150.00
Plesteran Bak Air 22.800 M2 100,999.40 2,302,786.32 2,302,786.32 1,756,170.00
Pasang Keramik 20/20 22.000 M2 315,245.00 6,935,390.00 2,981,440.00 3,953,950.00
Tangga Besi turun ke Reservoar 1.000 Unit 250,000.00 250,000.00 250,000.00
Pintu Besi Bak Kontrol 50/50 + Acc 1.000 Unit 350,000.00 350,000.00 350,000.00
JUMLAH : 67,536,955.43 50,068,624.18 19,686,651.25
29 1 Unit PEKERJAAN SEPTICTANK & REMBESAN
Galian tanah 21.365 M3 112,650.00 2,406,767.25 - 2,406,767.25
Urugan tanah kembali 6.410 M3 32,600.00 208,949.70 - 208,949.70
Urugan Pasir 0.380 M3 311,000.00 118,180.00 118,180.00 16,872.00
Pasangan Pondasi Batu Kali 1 : 4 1.219 M3 1,682,925.00 2,051,485.58 1,582,018.20 469,467.38
Pasangan Tembok 1 pc : 4 psr 22.240 M2 319,350.00 7,102,344.00 1,145,360.00 786,184.00
Cor rabat 1 pc : 3 psr : 5 krl 0.218 M3 1,325,575.00 288,975.35 220,986.60 67,988.75
Sloof, Kolom, Ringbalk 0.578 M3 11,016,110.51 6,367,311.87 4,284,376.40 2,082,935.47
Beton Plat Penutup 0.424 M3 8,009,050.00 3,395,837.20 2,820,723.60 575,113.60
Plesteran 1 pc : 2 psr 30.897 M2 100,999.40 3,120,578.46 740,737.04 2,379,841.43
Urugan Kerikil 0.448 M3 306,500.00 137,312.00 118,272.00 19,040.00
Pekerjaan Ijuk 0.522 M3 250,000.00 130,500.00 130,500.00
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
URAIAN HARGA SATUAN
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN TOTAL HARGA ( Rp )
( Rp ) MATERIAL JASA/ALAT
ANALISA
DAFTAR UPAH DAN BAHAN
HARGA SATUAN
NO. NAMA BARANG / BAHAN / TENAGA SATUAN
(Rp.)
1 Semen Portland Kg 1,900.00
2 Semen Putih Kg 3,750.00
3 Semen Warna Kg 8,000.00
4 Air Bersih m3 200.00
5 Kawat beton Kg 35,000.00
6 Kawat Duri Kg 28,000.00
7 Kawat Ram m2 20,000.00
8 Kawat Las Listrik Dos 125,000.00
9 Plywood 3 mm Ukuran 122 x 224 cm Lembar 58,000.00
10 Plywood tebal 4 mm ( 90 x 220 ) cm Lembar 70,000.00
11 Plywood tebal 4 mm ( 120 x 240 ) cm Lembar 75,000.00
12 Plywood 4 mm Lembar 75,000.00
13 Plywood 5 mm Lembar 85,000.00
14 Plywood 6 mm Lembar 95,000.00
15 Plywood 9 mm Lembar 135,000.00
16 Plywood 12 mm Lembar 180,000.00
17 Plywood 18 mm Lembar 250,000.00
18 Teakwood tebal 4 mm ( 90 x 220 ) cm Lembar 90,000.00
19 Teakwood tebal 4 mm ( 120 x 240 ) cm Lembar 110,000.00
20 Dolken Kayu Dia. 8-10/400 cm Batang 25,000.00
21 Formika Lembar 100,000.00
22 Gypsum Board 9 mm Lembar 90,000.00
23 Akustik 60 x 60 cm Lembar 46,500.00
24 Akustik 30 x 30 cm Lembar 11,625.00
25 Akustik 60 x 120 cm Lembar 58,125.00
26 List Plafond M1 20,000.00
27 Paku Kg 20,000.00
28 Sekrup Sekrup Biji 500.00
29 Vinil J Channel Btg 25,000.00
30 Paku Biasa Kg 30,000.00
31 Paku Seng Kg 25,000.00
32 Paku Plywood Kg 25,000.00
33 Paku Atap Kg 20,500.00
34 Paku Beton Kg 100,000.00
35 Paku sekrup Kg 75,000.00
38 Paku Skrup bj 750.00
36 Paku Hak Pnjang 15 cm Kg 750.00
37 Paku Pancing 60 x 230 Kg 1,000.00
36 Besi Baja IWF Kg 15,000.00
37 Gording Canal Kg 21,500.00
38 Besi strip tebal 5 mm Kg 25,000.00
39 Mur Baut Dia. 12 - 14 mm Batang 15,000.00
40 Mur Baut Dia. 14 - 19 mm Batang 25,000.00
41 Aluminium Foil m 2,500.00
42 Glass Wall m2 25,000.00
Upah&Bahan
HARGA SATUAN
NO. NAMA BARANG / BAHAN / TENAGA SATUAN
(Rp.)
43 Genteng Aspal Shingles Owen Bdl 1,150,000.00
44 Genteng Aspal Shingles Owen m2 383,333.33
45 Genteng Aspal Bitumen Merethon 20 Bdl 1,022,727.00
46 Genteng Aspal Bitumen Merethon 20 m2 340,909.00
47 Membrane Aspal m2 6,500.00
48 Mebrane Underlayer Armourbase Pro m2 5,583.33
49 Flashing m 52,500.00
50 Seng Gelombang BJLS 0.30 Lembar 60,000.00
51 Seng Gelombang BLJS 20 Lembar 50,000.00
52 Seng Gelombang BJLS 30' Lembar 55,000.00
53 Seng Plat BJLS 0.20 Lembar 45,000.00
54 Seng Plat 3' x 6 " bjls 30 Lembar 50,000.00
55 Genteng Metal Multiroof Polos Lembar 85,000.00
56 Nok Genteng Metal Multiroof Lembar 35,000.00
57 Ardek Gelombang Besar Lembar 50,000.00
58 Ardek Gelombang Kecil Lembar 42,000.00
59 Seng Aluminium lebar 60 cm Lembar 37,500.00
60 Seng Aluminium lebar 55 cm Lembar 35,000.00
61 Atap Super Deck (type lebar 80 cm) Lembar 400,000
62 Nok Atap m 27,500
63 Pintu Besi Baja m2 750,000.00
64 Genteng Metal Lembar 35,000.00
65 Bubungan Genteng Metal Buah 45,000.00
66 Polycarbonate M2 300,000.00
67 Lumbersharing @4m Lembar 25,000.00
68 Kaca Polos M2 150,000.00
69 Kaca Bening 3 mm M2 100,000.00
70 Kaca Bening 4 mm M2 150,000.00
71 Kaca Bening 5 mm M2 200,000.00
72 Kaca Bening 8 mm M2 225,000.00
73 Kaca Louvers 5 mm, 8 klip Set 190,000.00
74 Kaca Louvers 5 mm, 7 klip Set 180,000.00
75 Jendela Nako Ser 175,000.00
76 Kaca Ryben 5 mm M2 170,000.00
77 Batu belah 15/20 M3 650,000.00
78 Batu Kali M3 600,000.00
79 Batu pecah 5/7 M3 700,000.00
80 Batu Kali, ex quarry Mile 32 M3 600,000.00
81 Batu Kali, ex quarry Iwaka M3 600,000.00
82 Kerikil M3 450,000.00
83 Kerikil Koral M3 450,000.00
84 Koral beton M3 450,000.00
85 Kerikil Kali, ex quarry Kilo 7,8,14 M3 450,000.00
86 Kerikil (Batu Pecah) : M3
87 Split 1 - 2 cm M3 1,000,000.00
88 - Split 2 - 3 cm M3 1,000,000.00
89 - Split 3 - 5 cm M3 850,000.00
90 Sirtu Timbunan 220,000.00
Upah&Bahan
HARGA SATUAN
NO. NAMA BARANG / BAHAN / TENAGA SATUAN
(Rp.)
91 Sirtu Timbunan, ex quarry Mile 32 M3 220,000.00
92 Sirtu Timbunan, ex quarry Iwaka M3 180,000.00
93 Sirtu Timbunan, ex quarry Kilo 7,8,14 M3 150,000.00
94 Pasir Pasang M3 400,000.00
95 Pasir Beton M3 400,000.00
96 Pasir Urug M3 220,000.00
97 Tanah Timbunan ex quarry Kilo 7,8,14 M3 175,000.00
98 Kayu kelas I (balok) M3 5,250,000.00
99 Kayu kelas II (balok) M3 2,500,000.00
100 Kayu kelas II (papan) M3 2,600,000.00
101 Kayu Kelas II Matoa ( Balok ) M3 2,500,000.00
102 Kayu kelas I (papan) M3 5,500,000.00
103 Kayu Kelas I Besi ( Papan ) M3 5,500,000.00
104 Kayu Kelas II Matoa ( Papan ) M3 2,600,000.00
105 Kayu profil m 15,000.00
106 Reng ( 2 x 3 ) cm M3 2,500,000.00
107 Bambu Dia. 6 - 8 / 600 cm Batang 20,000.00
108 Bilik Bambu M2 65,000.00
109 Batu Tela Buah 2,200.00
110 Batu Tela (m3) M3 763,888.89
111 Batu batako 10 x 18 x 24 cm Buah 2,500.00
112 Batu Hebel 10 x 18 x 40 cm Buah
112 Bata berongga ekspose Buah 6,000.00
113 Roster/terawang Buah 6,000.00
114 Batu Bunga/Loster Buah 8,000.00
115 Batu Tempel Hitam M2 66,500.00
116 Batu Apung Kg 25,000.00
117 Marmer ex lokal M2 340,000.00
118 Keramik Granitto 60 x 60 cm Dus 260,000.00
119 Keramik Granitto 60 x 60 cm Buah 86,666.67
120 Keramik 10 x 60 cm Buah 17,333.33
121 List Keramik 6/20 cm Buah 10,000.00
122 Tegel Keramik 40 x 40 cm Buah 11,600.00
123 Tegel Keramik 30 x 30 cm Buah 6,500.00
124 Tegel Keramik 20 x 25 cm Buah 5,000.00
125 Tegel Keramik 20 x 20 cm Buah 3,200.00
126 Tegel Keramik 10 x 20 cm Buah 1,000.00
127 Tegel Porselin 11 x 11 cm Buah 548.00
128 Tegel Mozaik 30 x 30 cm Buah 6,000.00
129 Tegel Teraso 30 x 30 cm Buah 6,000.00
130 Tegel PC Abu-Abu 20 x 20 cm Buah 2,400.00
131 Plint keramik artistik Buah 4,500.00
132 Batu Alam Palimanan Buah 15,000.00
133 Pipa PVC dia 1/2" - 4m Batang 17,000.00
134 Pipa PVC dia 1/2" M 4,250.00
135 Pipa PVC dia 3/4" - 4m Batang 22,000.00
136 Pipa PVC dia 3/4" M 5,500.00
137 Pipa PVC dia 1" - 4m Batang 27,000.00
Upah&Bahan
HARGA SATUAN
NO. NAMA BARANG / BAHAN / TENAGA SATUAN
(Rp.)
138 Pipa PVC dia 1" M 6,750.00
139 Pipa PVC dia 2" - 4m Batang 50,000.00
140 Pipa PVC dia 2" M 12,500.00
141 Pipa PVC dia 3" - 4m Batang 80,000.00
142 Pipa PVC dia 3" M 20,000.00
143 Pipa PVC dia 4" - 4m Batang 115,000.00
144 Pipa PVC dia 4" M 28,750.00
145 Pipa PVC dia 5" - 4m Batang 263,958.00
146 Pipa PVC dia 5" M 65,989.50
147 Pipa PVC dia 6" - 4m Batang 290,000.00
148 Pipa PVC dia 6" M 72,500.00
148 Koppling PVC dia 2" - 4m Buah 15,000.00
149 Koppling PVC dia 4" - 6m Buah 20,000.00
150 Pipa GIV Dia 1/2" - 4 m Batang 125,000.00
151 Pipa Gip Ø ½ " M 20,833.33
151 Pipa GIV Dia 3/4" - 4 m Batang 187,500.00
152 Pipa Gip Ø ¾ " M 31,250.00
152 Pipa GIV dia 1" - 6m Batang 250,000.00
153 Pipa Gip Ø 1 " M 41,666.67
154 Pipa GIV dia 1 1/4" - 6m Batang 315,000.00
155 Pipa Gip Ø 1 ¼ " M 52,500.00
156 Pipa GIV dia 1 1/2" - 6m Batang 375,000.00
157 Pipa Gip Ø 1 ½ " M 62,500.00
158 Pipa GIV Dia 2" - 6 m Batang 500,000.00
159 Pipa Gip Ø 2 " M 83,333.33
160 Pipa GIV dia 3" - 6m Batang 750,000.00
161 Pipa Gip Ø 3 " M 125,000.00
162 Pipa GIV dia 4" - 6m Batang 1,000,000.00
163 Pipa Gip Ø 4 " M 166,666.67
164 Pipa Leding dia 1 1/2" - 6 mtr Batang 12,000.00
165 Pipa Leding dia 1 1/2" M 2,000.00
166 Pipa Ø2½" -SCH 40 M 173,213.33
Pipa Ø2½" -SCH 4 diroll Kg 24,137.60
167 Pipa Ø3" -SCH 40 M 225,940.00
Pipa Ø3" -SCH 40 diroll Kg
168 Pipa Ø3½" -SCH 40 M 263,596.67
Pipa Ø3½" -SCH 40 diroll Kg
169 Pipa Ø4" -SCH 40 M 321,332.00
Pipa Ø4" -SCH 40 diroll Kg
170 Pipa Ø6" -SCH 40 M 562,041.33
Pipa Ø6" -SCH 40 diroll Kg
171 Pipa Ø3" -SCH 80 M 451,880.00
Pipa Ø3" -SCH 80 diroll Kg 30,172.00
172 Pipa Ø4" -SCH 80 M 642,664.00
Pipa Ø4" -SCH 80 diroll Kg 36,206.40
173 Pipa Ø6" -SCH 80 (41,83 kg/m) M 1,124,082.67
Pipa Ø6" -SCH 80 diroll Kg 43,447.68
174 Pipa Kotak 4x4x2,3 ( Hollow) M 50,000.00
Upah&Bahan
HARGA SATUAN
NO. NAMA BARANG / BAHAN / TENAGA SATUAN
(Rp.)
Pipa Kotak 4x4x2,3 ( Hollow) diroll Kg
282 Profil L 60.60.6 Kg 19,980.00
260 Besi Plat 8 mm M2 17,500.00
261 Besi Plat 10 mm M2 17,500.00
262 Besi Plat 12 mm M2 17,500.00
263 Besi Plat 16 mm M2 17,500.00
264 Besi Plat 18 mm M2 17,500.00
265 Besi Plat 19 mm M2 17,500.00
266 Besi Plat 20 mm M2 17,500.00
267 Besi Plat 22 mm M2 17,500.00
268 Besi Plat 25 mm M2 17,500.00
269 Plat strip t = 4 mm Batang 15,000.00
175 Pipa Mediuh Hitam 2½" Inc M 256,080.00
176 Kabel ITC 2 x 2 x 0.6 mm2 m 2,500.00
177 Kabel NYM 2 X 2,5 mm2 m 6,240.00
178 Kabel NYM 3 X 2,5 mm2 m 10,800.00
179 Kabel NYM 3 x 4 mm2 m 29,000.00
180 Kabel NYM 4 x 4 mm2 m 45,000.00
181 Kabel NYM HY 3 X 2,5 mm2 m 10,800.00
182 Kawat BC 2,5 mm m 55,000.00
183 Kabel BC 50 mm m 1,176,000.00
184 Klem PVC Clipsal m 1,675.00
185 Las Dop Legrand 4 mm2 Bh 1,800.00
186 Pipa Clipsal PVC 3/4 Bh 3,750.00
187 Pipa PVC Maspion 5/8 Bh 2,800.00
188 T.Doos PVC 3/4 Bh 5,000.00
189 Elbo Clipsal PVC 3/4 Bh 5,000.00
190 Sock PVC Clipsal 3/4 Bh 5,000.00
191 Isolasi Unibel Bh 12,000.00
192 Kran Leding (Plastik) Buah 15,000.00
193 Kran Leding (Stainles) Buah 75,000.00
194 Ijuk Kg 50,000.00
195 Pompa Air Sanyo PH 100 Unit 1,100,000.00
196 Pompa Air Honda (Alkon) Unit 3,500,000.00
197 Permite/Penjaga jarak bekisting/spacer Buah 15,000.00
198 Seal tape Roll 5,000.00
199 Minyak Bekesting Liter 15,000.00
200 Rapidrant Galon 250,000.00
201 Bak Cuci Stainless Steel Buah 450,000.00
202 Water Drain + Acesories Set 150,000.00
203 Floor Drain Buah 55,000.00
204 Tangki Air fibre Kap. 1000 Liter Buah 1,800,000.00
205 Kloset jongkok porselen Buah 250,000.00
206 Kloset Jongkok Biasa Buah 100,000.00
207 Kloset Duduk Keramik KIA Buah 1,800,000.00
208 Urinoir Buah 1,850,000.00
209 Kloset duduk / monoblok Set 2,350,000.00
210 Wastafel lengkap TOTO Buah 850,000.00
Upah&Bahan
HARGA SATUAN
NO. NAMA BARANG / BAHAN / TENAGA SATUAN
(Rp.)
211 Floor Drain Stainless Steel Buah 75,000.00
212 Kran Air Stainless Buah 35,000.00
213 Lampu TL 2 x 40 Watt Phillips + Mirror inbow Buah 35,000.00
214 Lampu TL 2 x 20 Watt Buah 27,000.00
215 Lampu TL 20 Watt Buah 39,000.00
216 Lampu Down Light + SL 15 Watt Lengkap Buah 80,000.00
217 Lampu Baret SL 18 Watt Buah 25,000.00
218 Lampu Pijar 5 - 100 Watt + Fitting Buah 20,000.00
219 Kabel Snoor 2 x 0,23 "Supreme" roll 160,200.00
220 Kabel NYA 2,5 sqmm "Supreme" roll 333,760.00
221 Kabel NYA 1,5 sqmm "Supreme" roll 211,380.00
222 Kabel NYA 2,5 sqmm "Supreme" M1 3,337.60
223 Kabel NYA 1,5 sqmm "Supreme" M1 2,113.80
224 Kabel NYM 2 x 1,5 sqmm "Supreme" M1 12,000.00
225 Kabel NYM 2 x 2,5 mm (eterna) M1 7,500.00
226 Kabel NYM 2 x 4 sqmm "Supreme" M1 18,750.00
227 Kabel NYM 3 x 1,5 sqmm "Supreme" M1 18,000.00
228 Kabel NYM 3 x 2,5 mm M1 11,000.00
229 Kabel NYM 4 x 4 mm2 M1 27,000.00
230 Kabel NYM 3 x 4 sqmm "Supreme" M1 25,000.00
231 Kabel NYY 3 x 6 sqmm "Supreme" M1 30,000.00
232 Kabel NYF GbY 4 x 25 mm M1 250,000.00
249 Vitting Buah 35,000.00
250 Stop Kontak 1000 W Buah 26,396.00
251 Stop Kontak 5000 W Buah 32,000.00
252 Sekring 1 Group Buah 35,000.00
253 Sekring 3 Group Buah 110,000.00
254 Sekring Otomatis Buah 60,000.00
255 Saklar Seri Buah 20,000.00
256 Saklar Tunggal Buah 20,000.00
257 Box Sekring Grup 79,000.00
258 MCB (Miniatur Circuit Breaker) Buah 50,000.00
259 Box MCB Group 50,000.00
270 Besi Ø 6 Kg 25,000.00
271 Besi Beton (UK 8 mm x 12) Batang 45,000.00
272 Besi Beton Segala Ukuran ( Polos ) Kg 17,000.00
273 Besi beton Kg 19,500.00
274 Besi Ø 10 Kg 66,000.00
275 Besi Ø 12 Kg 93,000.00
276 Besi Siku 20.20-2m Batang 50,000.00
277 Besi Siku 30.30-3m Batang 95,000.00
278 Besi Siku 40 x 40 x 3mm Batang 100,000.00
279 Besi Siku 40.40-6m Batang 150,000.00
280 Besi Siku 50.50-4m Batang 175,000.00
281 Besi Siku 50.50-6m Kg 20,000.00
283 Besi Siku 100.100-6m Batang 475,000.00
284 Wiremesh BRC Standar SNI, M8 Lembar 950,000.00
285 Wiremesh BRC Standar SNI, M9 Lembar 1,180,000.00
Upah&Bahan
HARGA SATUAN
NO. NAMA BARANG / BAHAN / TENAGA SATUAN
(Rp.)
286 Wiremesh BRC Standar SNI, M10 Lembar 1,332,000.00
287 Wiremesh BRC Standar SNI, M12 Lembar 1,939,500.00
288 Plat Bondek 0,75 mm X 1 m m1 142,500.00
289 Plat Bondek 0,85 mm X 1 m m2 187,500.00
290 Plat Bondek 1,00 mm X 1 m m3 202,500.00
291 Cat Dasar Kaleng 20,000.00
292 Cat Dasar Tembok Kg 31,333.33
293 Meni Kayu Kg 20,000.00
294 Melamine IMPRA Liter 75,000.00
295 Wood Filler Kg 50,000.00
296 Thinner Kg 45,000.00
297 Sending Kg 50,000.00
298 Clear Kg 45,000.00
299 Pewarna Kg 25,000.00
300 Kertas gosok Lbr 10,000.00
301 Cat Kilat Kayu Kaleng 65,000.00
302 Politur Dasar Kaleng 25,000.00
303 Cat Vernis/Politur Kaleng 45,000.00
304 Cat Tembok Kg 94,000.00
305 - Merk Mowilex Kaleng 2,350,000.00
306 - Merk Jotun Kaleng 2,350,000.00
307 Cat Plafon Kg 50,000.00
308 Cat Residu Kg 25,000.00
309 Meni Besi Kg 20,000.00
310 Cat Teak oil Kaleng 30,000.00
311 Cat Alluminium Kaleng 55,000.00
312 Soda Api Kg 20,000.00
313 Minyak Cat Kg 25,000.00
314 Water proofing Kg 25,000.00
315 Sabun 1,800.00
316 Plamur Tembok Kg 16,000.00
317 Plamur Kayu Kg 26,000.00
318 Dempul Kg 15,000.00
319 Kuas Biasa Buah 15,000.00
320 Kuas Roll (Besar) Buah 20,000.00
321 Ampelas Lembar 3,000.00
322 Lem kayu Kg 15,000.00
323 Lem Aibon Kaleng 45,000.00
324 Kunci Tanam Buah 250,000.00
325 Kunci Tanam 2 Slaag SES/Kend Buah 350,000.00
326 Kunci Tanam Silinder 1 Slaag SES/Kend Buah 150,000.00
327 Kunci Kuda Terbang 1 Slaag Buah 60,000.00
328 Kunci Kuda Terbang 2 Slaag Buah 75,000.00
329 Kunci lemari Buah 35,000.00
330 Kunci Yale Besar Buah 150,000.00
331 Kunci H Jendela Pasang 18,000.00
332 Kunci H Pintu Pasang 24,000.00
333 Engsel jendela Pasang 25,000.00
Upah&Bahan
HARGA SATUAN
NO. NAMA BARANG / BAHAN / TENAGA SATUAN
(Rp.)
334 Engsel Pintu Pasang 35,000.00
335 Kunci Gembok Besar Buah 50,000.00
336 Kunci Gembok Sedang Buah 25,000.00
337 Kunci Gembok Kecil Buah 15,000.00
338 Grendel Jendela Buah 50,000.00
339 Grendel Pintu Buah
340 Grendel Pintu Double Buah 215,000.00
341 Door holder Buah 355,000.00
342 Door Closer Buah 350,000.00
343 Door Stop Buah 80,000.00
344 Hak Angin Biasa Buah 28,000.00
345 Hak Angin Lipat Buah 11,500.00
346 Solar Ltr 5,500.00
347 Minyak Pelumas Lter 45,000.00
TENAGA KERJA
Pekerja O/h 150,000.00
1 Pekerja Tukang Aspal O/h 150,000.00
2 Tukang O/h 175,000.00
3 Tukang Kayu O/h 175,000.00
4 Tukang Batu O/h 175,000.00
5 Tukang besi O/h 175,000.00
6 Tukang gali O/h 175,000.00
7 Tukang Cat O/h 175,000.00
8 Tukang Bongkar O/h
9 Tukang Listrik O/h 175,000.00
10 Tukang Las 175,000.00
10 Tukang Pipa O/h 175,000.00
11 Tukang Aspal O/h 175,000.00
12 Kep.Tukang O/h 185,000.00
13 Mandor O/h 200,000.00
14 Pengawas / Ahli Teknik O/h 366,666.67
15 Ahli ukur O/h 185,000.00
16 Asisten ahli ukur O/h 150,000.00
PERALATAN
1 Mesin penyaring 8 HP jam 50,000.00
2 Chip Spreader jam 50,000.00
3 Mesin penghampar 1820 MM 30 HP jam 181,000.00
4 Thriller gandeng 1 ton jam 184,000.00
5 Dump Truck 3,5 ton 44 HP jam 118,000.00
6 Pompa air (D 5 cm) 30 m3 / jam jam 11,000.00
7 Thriller 1ton jam 15,000.00
8 Traktor jam 15,000.00
9 Alat Bor jam 150,000.00
10 Sewa Alat Ukur Hr 275,000.00
11 Beton Molen jam 25,000.00
12 Mata Cutter bh 1,000,000.00
13 Mesin Cutter jam 60,000.00
14 Motor Walls jam 20,000.00
15 Peralatan Las jam 75,000.00
16 Sprayer jam 48,000.00
Upah&Bahan
HARGA SATUAN
NO. NAMA BARANG / BAHAN / TENAGA SATUAN
(Rp.)
19 Sewa Schafolding set/Hr 10,625.00
17 Sewa Alat Bending Pipa jam 71,428.57
18 Alat bantu untuk pekerjaan analisa - E ls 1,500.00
Upah&Bahan
UKURAN
P L
m m
Bawah 48
atas 29.4
Beton K300 4 m3 2 2
D22 68.40 m
D16 71.64 m
Ø 12 m
Pa
Ø 10 - m
Ø8 - m
Bawah 68.4
atasD16 56.24
tegahD16 15.4
slof 20/30
slof 30/50
Beton K300 m3 0.3 0.5
D19 7.00 m
D16 - m
Ø 12 2.00 m
sp
Ø 10 13.33 m
Ø8 m
slof 30/40
Beton K300 m3 0.3 0.4
D19 m
D16 7.00 m
Ø 12 2.00 m
s1
Ø 10 9.33 m
Ø8 m
s1
UKURAN Volume BESI BETON
Bekisting
T Panjang (m/m3)
(m3/m) (unit/m3) (m2/m3)
m
d22 D19 D16 Ø 12 Ø 10
I PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi LS 1.00 - 175,000,000.00
### Pengukuran dan bouplank M3 260.00 48,800.00 52,725.00
0.012 Kayu Kelas II Matoa ( Balok ) M3 3.12 2,500,000.00
0.007 Kayu Kelas II Matoa ( Papan ) M3 1.82 2,600,000.00
0.02 Paku Biasa Kg 5.20 30,000.00
0.15 Pekerja O/h 39.00 150,000.00
0.15 Tukang O/h 39.00 175,000.00
0.015 Kep.Tukang O/h 3.90 185,000.00
0.006 Mandor O/h 1.56 200,000.00
II PEKERJAAN TANAH
2 Pek. Galian Tanah Pondasi M3 1,043.79 - 112,650.00
0.109 Pekerja Org 113.77 150,000.00
0.054 Mandor Org 56.36 200,000.00
Harga pemakaian alat berat
0.054 EXCAVATOR 150 HP Kobelco SK200 jam 56.36 750,000.00
0.100 DUMP TRUCK 3-4 M3 / 6 ton jam 104.38 350,000.00
1.000 Alat bantu ls 1,043.79 10,000.00
2 Pek. Beton Pondasi Telapak Foot Plat K.300 M3 77.20 4,557,255.06 2,056,320.90
1 Beton K.300 77.20 1,362,604.76 1,153,500.00
131.6797763 Besi beton 10,165.68 21,000.00 2,484.50
3.75 Bekisting 289.50 114,500.00 133,510.00
0.5 Tuk.Bongkar Bekisting 38.60 150,000.00
PEMBESIAN/M2
1.172 Besi beton polos untuk angkur kg 1,550.58 21,000.00 2,484.50
0.218 wiramesh SNI M9 Lbr 288.28 1,180,000.00
0.085 Kawat beton kg 112.47 35,000.00
20.000 Pengelasan cm 26,463.92 4,720.00 5,193.67
0.100 Pekerja O/h 132.32 150,000.00
0.050 Tukang besi O/h 66.16 175,000.00
0.025 Kep.Tukang O/h 33.08 185,000.00
0.013 Mandor O/h 16.54 200,000.00
BEKISTING
1.030 Plat Bondek 1,00 mm X 1 m m2 1,362.89 202,500.00
- Kayu kelas III - -
0.100 Paku biasa Kg 132.32 30,000.00
- Minyak bekisting - -
0.030 Kayu kelas II (balok) m3 39.70 2,500,000.00
- Plywood tebal 9 mm - - -
0.034 Beqisting Pinggir m2 44.99 291,250.00 229,455.00
0.500 Sewa Schafolding Set 661.60 10,625.00
0.170 Pekerja O/h 224.94 150,000.00
0.080 Tukang kayu O/h 105.86 175,000.00
0.015 Kepala tukang O/h 19.85 185,000.00
0.010 Mandor O/h 13.23 200,000.00
17 Pek. Plat Beton atap Belakang (System Bondek) m2 220.00 882,287.91 400,162.50
PENGECORAN
0.120 Pekerjaan beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2)M3
cm, w/c 26.40
44.520 =Semen
0,58 Portland Kg 9,794.40 1,900.00
0.060 Pasir beton M3 13.16 400,000.00
file:///conversion/tmp/activity_task_scratch/571297716.xlsx
1 2 3 4 5.00 6.00
0.093 Split 1 - 2 cm M3 20.47 1,000,000.00
25.800 Air Bersih m3 5,676.00 200.00
0.864 Pekerja O/h 190.08 150,000.00
0.144 Tukang batu O/h 31.68 175,000.00
0.014 Kep.Tukang O/h 3.17 185,000.00
0.043 Mandor O/h 9.50 200,000.00
-
PEMBESIAN/M2 -
1.172 Besi beton polos untuk angkur kg 257.81 21,000.00 2,981.40
0.218 wiramesh SNI M9 Lbr 47.93 1,180,000.00
0.085 Kawat beton kg 18.70 35,000.00
20.000 Pengelasan cm 4,400.00 4,720.00 6,232.40
0.120 Pekerja O/h 26.40 150,000.00
0.060 Tukang besi O/h 13.20 175,000.00
0.030 Kep.Tukang O/h 6.60 185,000.00
0.015 Mandor O/h 3.30 200,000.00
-
BEKISTING -
1.030 Plat Bondek 1,00 mm X 1 m m2 226.60 202,500.00
- Kayu kelas III - - -
0.100 Paku biasa Kg 22.00 30,000.00
- Minyak bekisting - - -
0.030 Kayu kelas II (balok) m3 6.60 2,500,000.00
- Plywood tebal 9 mm - - -
0.034 Beqisting Pinggir m2 7.48 291,250.00 275,346.00
0.600 Sewa Schafolding Set 132.00 - 10,625.00
0.204 Pekerja O/h 44.88 - 150,000.00
0.096 Tukang kayu O/h 21.12 - 175,000.00
0.018 Kepala tukang O/h 3.96 - 185,000.00
0.012 Mandor O/h 2.64 - 200,000.00
7 Pek. Pasangan lantai Keramik 60 x 60 Cm (Granitto) LT1 & LT 2 m2 2,708.87 315,187.67 179,725.00
3.100 Keramik 60/60 cm Buah 8,397.50 86,666.67
0.045 Pasir Pasang M3 121.90 400,000.00
8.190 Semen portland KG 22,185.66 1,900.00
1.620 Semen Warna Kg 4,388.37 8,000.00
0.700 Pekerja Oh 1,896.21 150,000.00
0.350 Tukang batu Oh 948.11 175,000.00
0.035 Kep.Tukang Oh 94.81 185,000.00
0.035 Mandor Oh 94.81 200,000.00
file:///conversion/tmp/activity_task_scratch/571297716.xlsx
1 2 3 4 5.00 6.00
Balok Balkon Tangga, UB 610 dan UB 610 (+Pbarikasi) Kg 800.00 22,626.25 39,128.31
1.000 Besi Baja Ub kg 800.00 38,460.00
0.005 Kawat Las Listrik Dus 4.00 125,000.00
0.004 LPG 15 Kg Btl 3.00 260,000.00
0.003 ACETELIn Btl 2.50 500,000.00
0.038 Mata Gurinda Bh 30.00 20,000.00
0.006 Cat Baja m2 5.00 41,885.00
0.018 Pekerja o/h 14.00 150,000.00
0.018 Tukang Las o/h 14.00 - 175,000.00
0.003 Kep.Tukang o/h 2.00 - 185,000.00
0.001 Mandor o/h 1.00 - 200,000.00
0.053 alat Jam 42.00 - 35,714.29
1.000 Pemasangan/erction kg 800.00 10,845.27
15 Pek. Kuda Kuda Pipa Penghubung , Kb1 s/d Kb7 m 162.60 1,700,000.00 680,000.00
1.000 Material 162.60 1,700,000.00
1.000 Jasa 162.60 680,000.00
16 Pek. Kuda Kuda Pipa atap Ornamen , OR1 s/d OR6 m 40.00 1,105,000.00 442,000.00
1.000 Material 40.00 1,105,000.00
1.000 Jasa 40.00 442,000.00
17 Pek. Rangka Pipa Kotak Frem Luar (F1 dan F2) m 1,674.26 88,746.08 77,315.67
1.000 Material 1,674.26 88,746.08
1.000 Jasa 1,674.26 77,315.67
4 Pek Cat Melamin Kusen, Pintu dan Jendela LT 1 & LT 2 M2 367.09 103,000.00 86,075.00
1.000 Material 367.09 103,000.00
1.000 Jasa 367.09 86,075.00
9 Pek Hak Angin Jendela dan Ventilasi Psg 120.00 28,000.00 31,425.00
1.000 Material 120.00 28,000.00
1.000 Jasa 120.00 31,425.00
Knee Las 4 " (Elbow GIP 90° 4 ") bh 20.00 144,000.00 28,800.00
1.000 Material 20.00 144,000.00
1.000 Jasa 20.00 28,800.00
Fire Hose Box (komplit) untuk Hydrant Pilar Roll 6.00 3,525,000.00 705,000.00
file:///conversion/tmp/activity_task_scratch/571297716.xlsx
1 2 3 4 5.00 6.00
1.000 Material 6.00 3,525,000.00
1.000 Jasa 6.00 705,000.00
2 Pek. Pengadaan Genset Type Sealent 150 Kva Unit 1.00 175,000,000.00 26,250,000.00
1.000 Material 1.00 175,000,000.00
1.000 Jasa 1.00 26,250,000.00
file:///conversion/tmp/activity_task_scratch/571297716.xlsx
1 2 3 4 5.00 6.00
4 Pek. Panel Skalator Unit 1.00 45,000,000.00 6,750,000.00
1.000 Material 1.00 45,000,000.00
1.000 Jasa 1.00 6,750,000.00
5 Pek. Panel Pompa (Hydrant) Star Delta Unit 1.00 45,000,000.00 6,750,000.00
1.000 Material 1.00 45,000,000.00
1.000 Jasa 1.00 6,750,000.00
6 Pek. Panel Penerangan, Stop Kontak Lantai 01 Unit 1.00 15,000,000.00 2,250,000.00
1.000 Material 1.00 15,000,000.00
1.000 Jasa 1.00 2,250,000.00
8 Pek. Panel Penerangan, Stop Kontak Lantai 02 Unit 1.00 15,000,000.00 2,250,000.00
1.000 Material 1.00 15,000,000.00
1.000 Jasa 1.00 2,250,000.00
3 Pek. Instalasi Titik Stop Kontak LT 1 & LT 2 Titik 98.00 234,500.00 211,250.00
1.000 Material 98.00 234,500.00
1.000 Jasa 98.00 211,250.00
- Lampu Down Light Silver 150 PLC 18 Watt Unit 238.00 221,400.00 44,280.00
1.000 Material 238.00 221,400.00
1.000 Jasa 238.00 44,280.00
- Lampu Baret 32 Watt Kap Kaca (LB 2) Unit 60.00 675,000.00 135,000.00
1.000 Material 60.00 675,000.00
file:///conversion/tmp/activity_task_scratch/571297716.xlsx
1 2 3 4 5.00 6.00
1.000 Jasa 60.00 135,000.00
- Lampu Baret 40 Watt Kap Kaca (LB 1) Unit 60.00 810,000.00 162,000.00
1.000 Material 60.00 810,000.00
1.000 Jasa 60.00 162,000.00
2 Pek. Armatur : -
- Lampu TL 1 x 36 Watt Balok Outbow Unit 8.00 187,500.00 37,500.00
1.000 Material 8.00 187,500.00
1.000 Jasa 8.00 37,500.00
- Lampu Jalan Sodium (SON) 250 Watt lengkap, 6.00 375,000.00 75,000.00
1.000 Material 6.00 375,000.00
1.000 Jasa 6.00 75,000.00
6 Pek. Tiang Lampu Jalan Tunggal lengkap dengan MCB 6 A Unit 4.00 4,500,000.00 900,000.00
1.000 Material 4.00 4,500,000.00
1.000 Jasa 4.00 900,000.00
7 Pek. Tiang Lampu Jalan Cabang (Dobel) lengkap dengan MCB 2 x 6 A Unit 16.00 6,300,000.00 1,260,000.00
1.000 Material 16.00 6,300,000.00
1.000 Jasa 16.00 1,260,000.00
9 Pek. Galian Tanah dan Urugan Pasir pada Kabel Feeder dan Lampu Jalan m3 30.00 303,741.60 60,748.32
1.000 Material 30.00 303,741.60
1.000 Jasa 30.00 60,748.32
file:///conversion/tmp/activity_task_scratch/571297716.xlsx
1 2 3 4 5.00 6.00
16.1. Pekerjaan Beton
Lantai Kerja Pondasi Poot Plat 0.79 1,013,700.00 311,875.00
1.000 Material 0.79 1,013,700.00
1.000 Jasa 0.79 311,875.00
- -
file:///conversion/tmp/activity_task_scratch/571297716.xlsx
NG ESTIMATE
40,834,642,621.18
- 40,834,642,621.18
JUMLAH HARGA (Rp) BOBOT (%)
TOTAL HARGA
BAHAN UPAH BAHAN UPAH JML
7.00 8.00 9.00 10 11 12
-
111,926,503.25 111,926,503.25 0.274% 0.274%
31,665,970.56 31,665,970.56 0.078% 0.078%
123,145,441.07 123,145,441.07 0.302% 0.302%
6,827,691.36 6,827,691.36 0.017% 0.017%
142,905,168.00 142,905,168.00 0.350% 0.350%
27,787,116.00 27,787,116.00 0.068% 0.068%
2,937,495.12 2,937,495.12 0.007% 0.007%
9,527,011.20 9,527,011.20 0.023% 0.023%
file:///conversion/tmp/activity_task_scratch/571297716.xlsx
7.00 8.00 9.00 10 11 12
file:///conversion/tmp/activity_task_scratch/571297716.xlsx
7.00 8.00 9.00 10 11 12
45,000,000.00 6,750,000.00 51,750,000.00 0.110% 0.017% 0.127%
45,000,000.00 45,000,000.00 0.1102% - 0.110%
6,750,000.00 6,750,000.00 - 0.0165% 0.017%
file:///conversion/tmp/activity_task_scratch/571297716.xlsx
7.00 8.00 9.00 10 11 12
- -
file:///conversion/tmp/activity_task_scratch/571297716.xlsx
BILL OF QUANTITY
PEKERJAAN BAJA
GEDUNG KANTOR KLASIS GKI MIMIKA
PAPUA
a b c d
I PEKERJAAN PERSIAPAN
1.1 Mobilisasi dan Demobilisasi LS 1.00 - 175,000,000.00
1.11 Pengukuran dan bouplank M3 260.00 48,800.00 52,725.00
Sub Total. 1 ...............
II PEKERJAAN TANAH
2.1 Pek. Galian Tanah Pondasi M3 1,043.79 - 112,650.00
2.2 Pek. Timbun Kembali Hasil Galian M3 562.67 - 32,600.00
2.3 Pek. Urug Sirtu Peninggian Peil Lantai M3 717.93 264,000.00 42,500.00
2.4 Pek. Urug Pasir dibawah Pondasi M3 99.44 264,000.00 47,000.00
2.5 Pek. Urugan Pasir Bawah Lantai M3 150.20 264,000.00 47,000.00
Sub Total. 2 ...............
III PEKERJAAN PONDASI
3.1 Pek. Pas. Batu Kosong M3 151.64 892,800.00 200,265.00
3.2 Pek. Pas. Pondasi Batu Kali 1:4 M3 289.75 1,237,700.00 385,125.00
3.3 Pek. Pas. Pondasi Trassraam 1:3 m3 38.38 1,615,050.00 1,422,000.00
Sub Total. 3 ...............
IV PEKERJAAN BETON LT 1 DAN LT 2
4.1 Pek. Beton Lantai Kerja Pondasi Foot Plat M3 21.66 1,013,700.00 311,875.00
4.2 Pek. Beton Pondasi Telapak Foot Plat K.300 M3 77.20 4,557,255.06 2,056,320.90
4.3 Pek. Beton Pedestal Kolom 90X110 cm K.300 M3 15.84 4,894,552.51 2,284,732.59
4.4 Pek. Beton Pedestal Kolom 60/60 K.300 M3 21.60 5,664,285.83 2,741,989.56
4.5 Pek. Beton Sloof 30/50 K.300 M3 5.70 6,509,116.56 2,701,884.93
4.6 Pek. Beton Sloof 20/30 K.300 M3 25.12 8,504,167.39 3,332,670.23
4.7 Pek. Beton Sloof 15/20 K.250 M3 9.60 7,412,415.92 3,603,694.59
4.8 Pek. Baut Angker 30 mm Ttk
4.9 Pek. Beton Rabat Lantai T 10 Cm m3 135.98 1,013,700.00 311,875.00
4.10 Pek. Kolom Praktis LT 1 & LT 2 m' 1,338.71 66,020.00 40,410.00
4.11 Pek. Kolom Tangga 25 x25 m3
4.12 Pek. Balok Konsol LT 1 & LT 2 m3 2.70 7,075,700.00 1,833,600.00
4.13 Pek. Plat Kanopy LT 1 & LT 2 m3 5.00 6,652,650.00 1,356,400.00
4.14 Pek. Ring Balk Praktis LT 1 & LT 2 m' 947.46 84,740.00 66,725.00
5.5 Pek. Penebalan Kolom LT 1 & LT 2 m3 41.36 3,867,700.00 2,256,700.00
4.15 Pek. Tangga Beton:
4.15.1Tangga utama Ke Lantai 2, (2 Unit) m3 11.59 6,288,174.76 3,335,626.12
4.15.2Tangga Dalam Ke Lantai 2, (2 Unit) m3 8.91 6,288,174.76 3,335,626.12
4.15.3Tangga Putar Ke Top Floor (2 Unit) m3 7.03 6,288,174.76 5,837,345.70
4.16 Pek. Plat Lantai 2 (System Bondek) m2 1,323.20 882,287.91 333,468.75
4.17 Pek. Plat Beton atap Belakang (System Bondek) m2 220.00 882,287.91 400,162.50
4.18 Pek. Lisplank Beton tebal 10 cm LT 1 & LT 2 m3 12.41 6,319,950.00 1,355,845.00
10.3 Pek. Cat Kayu dan besi LT 1 & LT 2 M2 416.31 34,050.00 30,115.00
10.4 Pek. Cat Melamin Kusen, Pintu dan Jendela LT 1 & LT 2 M2 367.09 103,000.00 86,075.00
Sub Total. 10 ...............
XI PEKERJAAN PENGGANTUNG DAN PENGUNCI LT 1 & LT 2
11.1 Pek. Kunci Pintu Double Psg 37.00 350,000.00 125,700.00
11.2 Pek. Kunci Pintu Tanam Psg 14.00 250,000.00 91,850.00
11.3 Pek. Kunci Pintu Cilider Psg 14.00 150,000.00 91,850.00
11.4 Pek. Engsel Pintu Psg 98.00 35,000.00 31,425.00
11.5 Pek. Engsel Jendela Psg 120.00 25,000.00 20,950.00
11.6 Pek. Handel Pintu Psg 37.00 355,000.00 104,750.00
11.7 Pek. Grendel Pintu Double Psg 37.00 215,000.00 45,620.00
11.8 Pek. Grendel Jendela Psg 120.00 50,000.00 4,012.99
11.9 Pek. Hak Angin Jendela dan Ventilasi Psg 120.00 28,000.00 31,425.00
11.10 Pek. Door Closer Psg 14.00 350,000.00 104,750.00
11.11 Pek. Door Stop Psg 14.00 80,000.00 20,950.00
Sub Total. 11 ...............
XII PEKERJAAN INTERIOR DAN EXTERIOR LT 1 & LT 2
12.1 Pek. Ornamen Kolom lantai 1 dan 2 Bh 60.00 250,000.00 50,000.00
12.2 Pek. Ornamen Pintu lantai 1 dan 2 Bh 51.00 200,000.00 40,000.00
12.3 Pek. Ornamen Dinding lantai 1 dan 2 Bh 60.00 350,000.00 70,000.00
12.4 Pek. Akuistic Syitem Ruang Aula m2 850.00 145,000.00 29,000.00
12.5 Pek. List Profil Beton m 85.00 200,000.00 40,000.00
12.6 Pek. Pasanga Batu Tempel m2 245.00 275,000.00 55,000.00
12.7 Pek. Pekerjaan Pot Beton Bh 18.00 500,000.00 100,000.00
12.8 Pek. Pekerjaan Stage Aula Ls 1.00 45,000,000.00 9,000,000.00
Sub Total. 12 ...............
XIII PEKERJAAN MEKANICAL /PLUMBING/SANITAIR LT 1 & LT 2
13.1 Pek. Pengadaan Air Besih (sumur dalam) Ls 1.00 250,000,000.00 87,500,000.00
13.2 Pek. Water Tank 2200 tr Unit 3.00 3,250,000.00 864,400.00
13.3 Pek. Ground Reservoar isi 16 m3 Unit 1.00 50,068,624.18 19,686,651.25
13.4 Pek. Saptiptenk dan Peresapan Unit 3.00 11,442,408.00 9,221,639.57
13.5 Pek. Instalasi Pipa Air Bekas
13.5.1. Pipa Pvc Ø 4 Inc m 140.00 38,021.88 39,092.50
13.5.2. Pipa Pvc Ø 3 Inc m 100.00 26,450.00 39,092.50
13.5.3. Pipa Pvc Ø 2 1/2 Inc m 60.00 16,531.25 26,055.00
13.6 Pek Instalasi Pipa Air Kotor
13.6.1. Pipa Pvc 6 Inc 60.00 38,021.88 39,092.50
13.6.1. Pipa Pvc 4 Inc 80.00 95,881.25 39,092.50
13.7 Pek Instalasi Pipa Air Bersih
13.7.1. Pipa Gif Ø 2 Inc 80.00 129,166.67 52,110.00
13.7.2. Pipa Gif Ø 1 1/2 Inc 100.00 96,875.00 52,110.00
13.7.3. Pipa Gif Ø 1 Inc 120.00 64,583.33 30,915.00
13.7.4. Pipa Gif Ø 3/4 Inc 80.00 48,437.50 30,915.00
13.8 Pek Instalasi Fire Hydrant
13.8.1. Pipa Pressure Ø 4 Inc m 120.00 860,516.35 434,952.53
13.8.2. Pipa Pressure Ø 3 Inc m 80.00 612,540.00 612,540.00
13.8.3. Pipa Pressure Ø 2 Inc m 40.00 408,360.00 408,360.00
13.8.4. Fleksible joint dia 4" Bh 2.0000 1,080,000.00 216,000.00
13.8.5. Air relief valve Bh 1.0000 2,925,000.00 585,000.00
13.8.6. Jocky Pump unit 1.0000 22,500,000.00 4,500,000.00
13.8.7. Electric Pump unit 1.0000 112,500,000.00 22,500,000.00
13.8.8. Pressure Switch Bh 2.0000 750,000.00 150,000.00
13.8.9. Pressure Tank Bh 2.0000 5,250,000.00 1,050,000.00
13.8.10. Gate Valve dia. 4" Flens 10 K bh 4.0000 5,025,000.00 1,005,000.00
13.8.11. Straner 4" merk Kitz Flens 10 K bh 1.0000 5,062,500.00 1,012,500.00
13.8.12. Fot Valve 4" merk Socla PN 16 bh 1.0000 10,530,000.00 2,106,000.00
13.8.13. Check Valve 4 " merk KitzFlens 10 K bh 1.0000 3,450,000.00 690,000.00
13.8.14. Hydrant Pilar 3 " One Way bh 6.0000 7,275,000.00 1,455,000.00
13.8.15. Pressure Gauge dia. 3 " bh 1.0000 180,000.00 36,000.00
13.8.16. Knee Las 4 " (Elbow GIP 90° 4 ") bh 20.0000 144,000.00 28,800.00
13.8.17. Flange Buta 8 " bh 2.0000 630,000.00 126,000.00
13.8.18. Flange 8 " bh 2.0000 630,000.00 126,000.00
13.8.19. Flange 4 " bh 18.0000 112,500.00 22,500.00
13.8.20. Fire Hose Box (komplit) untuk Hydrant Pilar Roll 6.0000 3,525,000.00 705,000.00
13.8.21. Hydrant Box (komplit) Fire Hose 35 m unit 3.0000 9,000,000.00 1,800,000.00
file:///conversion/tmp/activity_task_scratch/571297716.xlsx
NO. JENIS PEKERJAAN SAT VOLUME
MATERIAL JASA
file:///conversion/tmp/activity_task_scratch/571297716.xlsx
RINCIAN
KEMAJUAN PEKERJAAN
40,834,642,621.18
- 40,834,642,621.18 100.00%
JUMLAH HARGA (Rp) BOBOT (%)
TOTAL HARGA MATERIAL JASA JML S/D.PRIODE LALU
MATERIAL JASA
MATERIAL JASA
e f g h i
137,837,857.50 42,407,203.13 180,245,060.63 0.338% 0.104% 0.441% #N/A #N/A #N/A #N/A
88,381,680.41 54,097,299.39 142,478,979.80 0.216% 0.132% 0.349% #N/A #N/A #N/A #N/A
19,104,390.00 4,950,720.00 24,055,110.00 0.047% 0.012% 0.059% #N/A #N/A #N/A #N/A
33,263,250.00 6,782,000.00 40,045,250.00 0.081% 0.017% 0.098% #N/A #N/A #N/A #N/A
80,288,078.18 63,219,518.72 143,507,596.89 0.197% 0.155% 0.351% #N/A #N/A #N/A #N/A
159,968,072.00 93,337,112.00 253,305,184.00 0.392% 0.229% 0.620% #N/A #N/A #N/A #N/A
72,853,535.16 38,645,897.04 111,499,432.20 0.178% 0.095% 0.273% 0.00% 0.00% 0.00% 0.00%
56,057,820.37 29,736,439.69 85,794,260.06 0.137% 0.073% 0.210% 0.00% 0.00% 0.00% 0.00%
44,186,689.64 41,018,736.38 85,205,426.02 0.108% 0.100% 0.209% 0.00% 0.00% 0.00% 0.00%
1,167,439,836.62 441,244,513.17 1,608,684,349.78 2.859% 1.081% 3.940% #N/A #N/A #N/A #N/A
194,103,340.74 88,035,749.41 282,139,090.15 0.475% 0.216% 0.691% #N/A #N/A #N/A #N/A
78,424,006.75 16,824,626.37 95,248,633.12 0.192% 0.041% 0.233% #N/A #N/A #N/A #N/A
3,027,385,203.03 1,314,904,967.81 4,342,290,170.84 7.414% 3.220% 10.634% #N/A #N/A #N/A #N/A
- - -
428,215,416.81 405,556,177.50 833,771,594.31 1.049% 0.993% 2.042% #N/A #N/A #N/A #N/A
122,385,560.40 439,352,525.63 561,738,086.03 0.300% 1.076% 1.376% #N/A #N/A #N/A #N/A
15,643,630.80 43,935,252.56 59,578,883.37 0.038% 0.108% 0.146% #N/A #N/A #N/A #N/A
32,932,901.34 273,863,074.31 306,795,975.65 0.081% 0.671% 0.751% #N/A #N/A #N/A #N/A
203,491.20 2,984,537.60 3,188,028.80 0.000% 0.007% 0.008% #N/A #N/A #N/A #N/A
853,803,044.98 486,852,020.20 1,340,655,065.18 2.091% 1.192% 3.283% #N/A #N/A #N/A #N/A
31,056,071.17 17,708,663.70 48,764,734.87 0.076% 0.043% 0.119% #N/A #N/A #N/A #N/A
9,012,080.00 11,951,712.50 20,963,792.50 0.022% 0.029% 0.051% #N/A #N/A #N/A #N/A
69,938,989.31 108,909,980.16 178,848,969.47 0.171% 0.267% 0.438% #N/A #N/A #N/A #N/A
file:///conversion/tmp/activity_task_scratch/571297716.xlsx
TOTAL HARGA
MATERIAL JASA
MATERIAL JASA
19,032,120.45 4,959,619.88 23,991,740.33 0.047% 0.012% 0.059% #N/A #N/A #N/A #N/A
20,880,000.00 24,969,600.00 45,849,600.00 0.051% 0.061% 0.112% #N/A #N/A #N/A #N/A
62,950,009.41 55,894,223.55 118,844,232.96 0.154% 0.137% 0.291% #N/A #N/A #N/A #N/A
1,666,053,315.88 1,876,937,387.57 3,542,990,703.45 4.08% 4.60% 8.68% #N/A #N/A #N/A #N/A
- - -
30,030,000.00 26,954,200.00 56,984,200.00 0.074% 0.066% 0.140% #N/A #N/A #N/A #N/A
241,793,914.72 313,484,212.20 555,278,126.92 0.592% 0.768% 1.360% #N/A #N/A #N/A #N/A
5,364,555.00 7,695,712.50 13,060,267.50 0.013% 0.019% 0.032% #N/A #N/A #N/A #N/A
28,109,111.33 31,130,184.04 59,239,295.36 0.069% 0.076% 0.145% #N/A #N/A #N/A #N/A
15,225,760.00 51,248,524.00 66,474,284.00 0.037% 0.126% 0.163% #N/A #N/A #N/A #N/A
2,965,225.20 10,718,441.30 13,683,666.50 0.007% 0.026% 0.034% #N/A #N/A #N/A #N/A
2,591,250.00 347,775.00 2,939,025.00 0.006% 0.001% 0.007% #N/A #N/A #N/A #N/A
13,258,185.00 53,248,466.40 66,506,651.40 0.032% 0.130% 0.163% #N/A #N/A #N/A #N/A
4,943,730.00 455,137.76 5,398,867.76 0.012% 0.001% 0.013% #N/A #N/A #N/A #N/A
99,000,000.00 29,700,000.00 128,700,000.00 0.242% 0.073% 0.315% #N/A #N/A #N/A #N/A
13,750,000.00 3,437,500.00 17,187,500.00 0.034% 0.008% 0.042% #N/A #N/A #N/A #N/A
457,031,731.25 528,420,153.20 985,451,884.44 1.12% 1.29% 2.41% #N/A #N/A #N/A #N/A
- - -
1,027,494,090.90 289,741,418.52 1,317,235,509.42 2.516% 0.710% 3.226% #N/A #N/A #N/A #N/A
439,639,096.23 123,973,126.96 563,612,223.19 1.077% 0.304% 1.380% #N/A #N/A #N/A #N/A
250,741,908.38 70,706,310.49 321,448,218.87 0.614% 0.173% 0.787% #N/A #N/A #N/A #N/A
121,763,263.74 34,335,828.37 156,099,092.11 0.298% 0.084% 0.382% #N/A #N/A #N/A #N/A
3,942,104,616.82 1,111,627,788.19 5,053,732,405.01 9.654% 2.722% 12.376% #N/A #N/A #N/A #N/A
18,101,000.00 31,302,644.21 49,403,644.21 0.044% 0.077% 0.121% 0.00% 0.00% 0.00% 0.00%
96,969,413.38 27,344,250.09 124,313,663.46 0.237% 0.067% 0.304% 77.41% 0.00% 0.18% 0.00%
66,504,441.25 18,753,481.23 85,257,922.48 0.163% 0.046% 0.209% 77.41% 0.00% 0.13% 0.00%
429,427,053.00 121,093,449.19 550,520,502.19 1.052% 0.297% 1.348% 77.41% 0.00% 0.81% 0.00%
309,681,581.47 87,326,614.82 397,008,196.29 0.758% 0.214% 0.972% 77.41% 0.00% 0.59% 0.00%
10,200,000.00 14,499,265.76 24,699,265.76 0.025% 0.036% 0.060% 100.00% 100.00% 0.02% 0.04%
73,100,000.00 18,275,000.00 91,375,000.00 0.179% 0.045% 0.224% 30.00% 0.00% 0.01%
- 12,510,875.28 12,510,875.28 0.000% 0.031% 0.031%
6,785,726,465.17 1,961,490,053.11 8,747,216,518.28 16.62% 4.80% 21.42% #N/A #N/A #N/A #N/A
- - -
#DIV/0! 95.00% #DIV/0! 0.00%
28,844,546.88 7,444,022.96 36,288,569.84 0.071% 0.018% 0.089% #N/A #N/A #N/A #N/A
13,127,279.00 4,219,809.69 17,347,088.69 0.032% 0.010% 0.042% #N/A #N/A #N/A #N/A
40,000,000.00 42,135,196.38 82,135,196.38 0.098% 0.103% 0.201% #N/A #N/A #N/A #N/A
366,733,535.62 167,306,617.11 534,040,152.73 0.898% 0.410% 1.308% 60.00% 0.00% 0.54% 0.00%
391,744,977.90 182,707,391.85 574,452,369.75 0.959% 0.447% 1.407% 60.00% 0.00% 0.58% 0.00%
390,282,986.72 181,033,175.72 571,316,162.44 0.956% 0.443% 1.399% 60.00% 0.00% 0.57% 0.00%
307,145,357.78 145,960,474.67 453,105,832.45 0.752% 0.357% 1.110% 60.00% 0.00% 0.45% 0.00%
189,073,979.80 80,834,460.14 269,908,439.94 0.463% 0.198% 0.661% 60.00% 0.00% 0.28% 0.00%
55,696,801.90 26,312,212.27 82,009,014.17 0.136% 0.064% 0.201% 60.00% 0.00% 0.08% 0.00%
83,835,992.15 41,262,503.39 125,098,495.55 0.205% 0.101% 0.306% 60.00% 0.00% 0.12% 0.00%
58,715,329.81 30,392,632.57 89,107,962.38 0.144% 0.074% 0.218% 60.00% 0.00% 0.09% 0.00%
33,931,841.34 17,510,219.87 51,442,061.20 0.083% 0.043% 0.126% 60.00% 0.00% 0.05% 0.00%
43,660,369.16 20,897,283.56 64,557,652.72 0.107% 0.051% 0.158% 60.00% 0.00% 0.06% 0.00%
53,895,998.10 26,778,405.33 80,674,403.43 0.132% 0.066% 0.198% 60.00% 0.00% 0.08% 0.00%
184,273,979.80 75,528,930.42 259,802,910.22 0.451% 0.185% 0.636% #DIV/0! 95.00% #DIV/0! 0.18%
404,427,311.35 265,450,279.78 669,877,591.13 0.990% 0.650% 1.640% #N/A #N/A #N/A #N/A
276,420,000.00 110,568,000.00 386,988,000.00 0.677% 0.271% 0.948% #N/A #N/A #N/A #N/A
44,200,000.00 17,680,000.00 61,880,000.00 0.108% 0.043% 0.152% #N/A #N/A #N/A #N/A
148,584,317.07 129,446,794.64 278,031,111.71 0.364% 0.317% 0.681%
3,114,594,604.38 1,573,468,410.36 4,688,063,014.74 7.63% 3.85% 11.48% #DIV/0! #N/A #DIV/0! #N/A
- - -
534,704,026.69 465,834,643.26 1,000,538,669.95 1.309% 1.141% 2.450% #N/A #N/A #N/A #N/A
230,561,164.13 88,395,748.38 318,956,912.50 0.565% 0.216% 0.781% #N/A #N/A #N/A #N/A
23,693,705.75 191,301,228.64 214,994,934.39 0.058% 0.468% 0.527% #N/A #N/A #N/A #N/A
1,397,321,108.33 208,769,715.00 1,606,090,823.33 3.422% 0.511% 3.933% #N/A #N/A #N/A #N/A
29,790,268.75 34,467,365.63 64,257,634.38 0.073% 0.084% 0.157% #N/A #N/A #N/A #N/A
30,604,750.00 27,001,287.50 57,606,037.50 0.075% 0.066% 0.141%
2,246,675,023.65 1,015,769,988.41 3,262,445,012.06 5.50% 2.49% 7.99% #N/A #N/A #N/A #N/A
- - -
156,795,679.26 84,330,528.07 241,126,207.33 0.384% 0.207% 0.590% #N/A #N/A #N/A #N/A
15,264,546.00 95,153,629.02 110,418,175.02 0.037% 0.233% 0.270% #N/A #N/A #N/A #N/A
file:///conversion/tmp/activity_task_scratch/571297716.xlsx
TOTAL HARGA
MATERIAL JASA
MATERIAL JASA
14,175,212.49 12,537,049.17 26,712,261.66 0.035% 0.031% 0.065% #N/A #N/A #N/A #N/A
37,810,682.00 31,597,616.05 69,408,298.05 0.093% 0.077% 0.170%
224,046,119.75 223,618,822.30 447,664,942.05 0.549% 0.548% 1.096% #N/A #N/A #N/A #N/A
- - -
12,950,000.00 4,650,900.00 17,600,900.00 0.032% 0.011% 0.043% #N/A #N/A #N/A #N/A
3,500,000.00 1,285,900.00 4,785,900.00 0.009% 0.003% 0.012% #N/A #N/A #N/A #N/A
2,100,000.00 1,285,900.00 3,385,900.00 0.005% 0.003% 0.008% #N/A #N/A #N/A #N/A
3,430,000.00 3,079,650.00 6,509,650.00 0.008% 0.008% 0.016% #N/A #N/A #N/A #N/A
3,000,000.00 2,514,000.00 5,514,000.00 0.007% 0.006% 0.014% #N/A #N/A #N/A #N/A
13,135,000.00 3,875,750.00 17,010,750.00 0.032% 0.009% 0.042% #N/A #N/A #N/A #N/A
7,955,000.00 1,687,940.00 9,642,940.00 0.019% 0.004% 0.024% #N/A #N/A #N/A #N/A
6,000,000.00 481,558.50 6,481,558.50 0.015% 0.001% 0.016% #N/A #N/A #N/A #N/A
3,360,000.00 3,771,000.00 7,131,000.00 0.008% 0.009% 0.017% #N/A #N/A #N/A #N/A
4,900,000.00 1,466,500.00 6,366,500.00 0.012% 0.004% 0.016% #N/A #N/A #N/A #N/A
1,120,000.00 293,300.00 1,413,300.00 0.003% 0.001% 0.003%
61,450,000.00 24,392,398.50 85,842,398.50 0.150% 0.060% 0.210% #N/A #N/A #N/A #N/A
- - -
15,000,000.00 3,000,000.00 18,000,000.00 0.037% 0.007% 0.044% #N/A #N/A #N/A #N/A
10,200,000.00 2,040,000.00 12,240,000.00 0.025% 0.005% 0.030% #N/A #N/A #N/A #N/A
21,000,000.00 4,200,000.00 25,200,000.00 0.051% 0.010% 0.062% #N/A #N/A #N/A #N/A
123,250,000.00 24,650,000.00 147,900,000.00 0.302% 0.060% 0.362% #N/A #N/A #N/A #N/A
17,000,000.00 3,400,000.00 20,400,000.00 0.042% 0.008% 0.050% #N/A #N/A #N/A #N/A
67,375,000.00 13,475,000.00 80,850,000.00 0.165% 0.033% 0.198% #N/A #N/A #N/A #N/A
9,000,000.00 1,800,000.00 10,800,000.00 0.022% 0.004% 0.026% #N/A #N/A #N/A #N/A
45,000,000.00 9,000,000.00 54,000,000.00 0.110% 0.022% 0.132%
307,825,000.00 61,565,000.00 369,390,000.00 0.754% 0.151% 0.905% #N/A #N/A #N/A #N/A
- - - #N/A #N/A #N/A #N/A
250,000,000.00 87,500,000.00 337,500,000.00 0.612% 0.214% 0.827% #N/A #N/A #N/A #N/A
9,750,000.00 2,593,200.00 12,343,200.00 0.024% 0.006% 0.030% #N/A #N/A #N/A #N/A
50,068,624.18 19,686,651.25 69,755,275.43 0.123% 0.048% 0.171% #N/A #N/A #N/A #N/A
34,327,224.01 27,664,918.72 61,992,142.73 0.084% 0.068% 0.152%
5,323,062.50 5,472,950.00 10,796,012.50 0.013% 0.013% 0.026% #N/A #N/A #N/A #N/A
2,645,000.00 3,909,250.00 6,554,250.00 0.006% 0.010% 0.016% #N/A #N/A #N/A #N/A
991,875.00 1,563,300.00 2,555,175.00 0.002% 0.004% 0.006%
2,281,312.50 2,345,550.00 4,626,862.50 0.006% 0.006% 0.011% #N/A #N/A #N/A #N/A
7,670,500.00 3,127,400.00 10,797,900.00 0.019% 0.008% 0.026%
10,333,333.33 4,168,800.00 14,502,133.33 0.025% 0.010% 0.036% #N/A #N/A #N/A #N/A
9,687,500.00 5,211,000.00 14,898,500.00 0.024% 0.013% 0.036% #N/A #N/A #N/A #N/A
7,750,000.00 3,709,800.00 11,459,800.00 0.019% 0.009% 0.028% #N/A #N/A #N/A #N/A
3,875,000.00 2,473,200.00 6,348,200.00 0.009% 0.006% 0.016%
103,261,962.00 52,194,303.76 155,456,265.76 0.253% 0.128% 0.381% #N/A #N/A #N/A #N/A
49,003,200.00 49,003,200.00 98,006,400.00 0.120% 0.120% 0.240% #N/A #N/A #N/A #N/A
16,334,400.00 16,334,400.00 32,668,800.00 0.040% 0.040% 0.080% #N/A #N/A #N/A #N/A
2,160,000.00 432,000.00 2,592,000.00 0.005% 0.001% 0.006% #N/A #N/A #N/A #N/A
2,925,000.00 585,000.00 3,510,000.00 0.007% 0.001% 0.009% #N/A #N/A #N/A #N/A
22,500,000.00 4,500,000.00 27,000,000.00 0.055% 0.011% 0.066% #N/A #N/A #N/A #N/A
112,500,000.00 22,500,000.00 135,000,000.00 0.276% 0.055% 0.331% #N/A #N/A #N/A #N/A
1,500,000.00 300,000.00 1,800,000.00 0.004% 0.001% 0.004% #N/A #N/A #N/A #N/A
10,500,000.00 2,100,000.00 12,600,000.00 0.026% 0.005% 0.031% #N/A #N/A #N/A #N/A
20,100,000.00 4,020,000.00 24,120,000.00 0.049% 0.010% 0.059% #N/A #N/A #N/A #N/A
5,062,500.00 1,012,500.00 6,075,000.00 0.012% 0.002% 0.015% #N/A #N/A #N/A #N/A
10,530,000.00 2,106,000.00 12,636,000.00 0.026% 0.005% 0.031% #N/A #N/A #N/A #N/A
3,450,000.00 690,000.00 4,140,000.00 0.008% 0.002% 0.010% #N/A #N/A #N/A #N/A
43,650,000.00 8,730,000.00 52,380,000.00 0.107% 0.021% 0.128% #N/A #N/A #N/A #N/A
180,000.00 36,000.00 216,000.00 0.000% 0.000% 0.001% #N/A #N/A #N/A #N/A
2,880,000.00 576,000.00 3,456,000.00 0.007% 0.001% 0.008% #N/A #N/A #N/A #N/A
1,260,000.00 252,000.00 1,512,000.00 0.003% 0.001% 0.004% #N/A #N/A #N/A #N/A
1,260,000.00 252,000.00 1,512,000.00 0.003% 0.001% 0.004% #N/A #N/A #N/A #N/A
2,025,000.00 405,000.00 2,430,000.00 0.005% 0.001% 0.006% #N/A #N/A #N/A #N/A
21,150,000.00 4,230,000.00 25,380,000.00 0.052% 0.010% 0.062% #N/A #N/A #N/A #N/A
27,000,000.00 5,400,000.00 32,400,000.00 0.066% 0.013% 0.079%
file:///conversion/tmp/activity_task_scratch/571297716.xlsx
TOTAL HARGA
MATERIAL JASA
MATERIAL JASA
4,314,656.25 1,759,162.50 6,073,818.75 0.011% 0.004% 0.015% #N/A #N/A #N/A #N/A
4,562,625.00 4,691,100.00 9,253,725.00 0.011% 0.011% 0.023% #N/A #N/A #N/A #N/A
52,311,000.00 15,113,385.00 67,424,385.00 0.128% 0.037% 0.165% #N/A #N/A #N/A #N/A
14,522,400.00 2,181,000.00 16,703,400.00 0.036% 0.005% 0.041% #N/A #N/A #N/A #N/A
19,076,000.00 9,148,500.00 28,224,500.00 0.047% 0.022% 0.069% #N/A #N/A #N/A #N/A
12,600,000.00 2,520,000.00 15,120,000.00 0.031% 0.006% 0.037% #N/A #N/A #N/A #N/A
2,850,000.00 570,000.00 3,420,000.00 0.007% 0.001% 0.008% #N/A #N/A #N/A #N/A
2,850,000.00 570,000.00 3,420,000.00 0.007% 0.001% 0.008% #N/A #N/A #N/A #N/A
11,400,000.00 2,280,000.00 13,680,000.00 0.028% 0.006% 0.034% #N/A #N/A #N/A #N/A
2,250,000.00 450,000.00 2,700,000.00 0.006% 0.001% 0.007% #N/A #N/A #N/A #N/A
1,663,200.00 5,690,722.50 7,353,922.50 0.004% 0.014% 0.018% #N/A #N/A #N/A #N/A
2,100,000.00 420,000.00 2,520,000.00 0.005% 0.001% 0.006%
984,435,374.78 390,478,293.72 1,374,913,668.50 2.411% 0.956% 3.367% #N/A #N/A #N/A #N/A
- - -
- -
175,000,000.00 26,250,000.00 201,250,000.00 0.429% 0.064% 0.493% #N/A #N/A #N/A #N/A
85,000,000.00 12,750,000.00 97,750,000.00 0.208% 0.031% 0.239% #N/A #N/A #N/A #N/A
45,000,000.00 6,750,000.00 51,750,000.00 0.110% 0.017% 0.127% #N/A #N/A #N/A #N/A
45,000,000.00 6,750,000.00 51,750,000.00 0.110% 0.017% 0.127% #N/A #N/A #N/A #N/A
15,000,000.00 2,250,000.00 17,250,000.00 0.037% 0.006% 0.042% #N/A #N/A #N/A #N/A
16,000,000.00 2,400,000.00 18,400,000.00 0.039% 0.006% 0.045% #N/A #N/A #N/A #N/A
15,000,000.00 2,250,000.00 17,250,000.00 0.037% 0.006% 0.042% #N/A #N/A #N/A #N/A
16,000,000.00 2,400,000.00 18,400,000.00 0.039% 0.006% 0.045% #N/A #N/A #N/A #N/A
15,000,000.00 2,250,000.00 17,250,000.00 0.037% 0.006% 0.042% #N/A #N/A #N/A #N/A
35,000,000.00 5,250,000.00 40,250,000.00 0.086% 0.013% 0.099% #N/A #N/A #N/A #N/A
5,000,000.00 750,000.00 5,750,000.00 0.012% 0.002% 0.014% #N/A #N/A #N/A #N/A
467,000,000.00 70,050,000.00 537,050,000.00 1.144% 0.172% 1.315% #N/A #N/A #N/A #N/A
- - -
39,600,000.00 7,920,000.00 47,520,000.00 0.097% 0.019% 0.116% #N/A #N/A #N/A #N/A
175,500,000.00 35,100,000.00 210,600,000.00 0.430% 0.086% 0.516% #N/A #N/A #N/A #N/A
38,025,000.00 7,605,000.00 45,630,000.00 0.093% 0.019% 0.112% #N/A #N/A #N/A #N/A
38,025,000.00 7,605,000.00 45,630,000.00 0.093% 0.019% 0.112% #N/A #N/A #N/A #N/A
43,875,000.00 8,775,000.00 52,650,000.00 0.107% 0.021% 0.129% #N/A #N/A #N/A #N/A
57,375,000.00 11,475,000.00 68,850,000.00 0.141% 0.028% 0.169% #N/A #N/A #N/A #N/A
12,600,000.00 2,520,000.00 15,120,000.00 0.031% 0.006% 0.037% #N/A #N/A #N/A #N/A
91,800,000.00 18,360,000.00 110,160,000.00 0.225% 0.045% 0.270% #N/A #N/A #N/A #N/A
58,500,000.00 11,700,000.00 70,200,000.00 0.143% 0.029% 0.172% #N/A #N/A #N/A #N/A
92,160,000.00 18,432,000.00 110,592,000.00 0.226% 0.045% 0.271% #N/A #N/A #N/A #N/A
4,032,000.00 806,400.00 4,838,400.00 0.010% 0.002% 0.012% #N/A #N/A #N/A #N/A
900,000.00 180,000.00 1,080,000.00 0.002% 0.000% 0.003% #N/A #N/A #N/A #N/A
1,080,000.00 216,000.00 1,296,000.00 0.003% 0.001% 0.003% #N/A #N/A #N/A #N/A
2,448,000.00 489,600.00 2,937,600.00 0.006% 0.001% 0.007% #N/A #N/A #N/A #N/A
15,000,000.00 3,000,000.00 18,000,000.00 0.037% 0.007% 0.044% #N/A #N/A #N/A #N/A
670,920,000.00 134,184,000.00 805,104,000.00 1.643% 0.329% 1.972% #N/A #N/A #N/A #N/A
- - -
44,912,500.00 52,812,500.00 97,725,000.00 0.110% 0.129% 0.239% #N/A #N/A #N/A #N/A
5,030,200.00 5,915,000.00 10,945,200.00 0.012% 0.014% 0.027% #N/A #N/A #N/A #N/A
22,981,000.00 20,702,500.00 43,683,500.00 0.056% 0.051% 0.107% #N/A #N/A #N/A #N/A
41,524,500.00 8,027,500.00 49,552,000.00 0.102% 0.020% 0.121% #N/A #N/A #N/A #N/A
18,873,000.00 2,535,000.00 21,408,000.00 0.046% 0.006% 0.052% #N/A #N/A #N/A #N/A
6,750,000.00 1,350,000.00 8,100,000.00 0.017% 0.003% 0.020% #N/A #N/A #N/A #N/A
38,880,000.00 7,776,000.00 46,656,000.00 0.095% 0.019% 0.114% #N/A #N/A #N/A #N/A
8,250,000.00 1,650,000.00 9,900,000.00 0.020% 0.004% 0.024% #N/A #N/A #N/A #N/A
52,693,200.00 10,538,640.00 63,231,840.00 0.129% 0.026% 0.155% #N/A #N/A #N/A #N/A
1,584,000.00 316,800.00 1,900,800.00 0.004% 0.001% 0.005% #N/A #N/A #N/A #N/A
40,500,000.00 8,100,000.00 48,600,000.00 0.099% 0.020% 0.119% #N/A #N/A #N/A #N/A
48,600,000.00 9,720,000.00 58,320,000.00 0.119% 0.024% 0.143% #N/A #N/A #N/A #N/A
8,640,000.00 1,728,000.00 10,368,000.00 0.021% 0.004% 0.025% #N/A #N/A #N/A #N/A
7,920,000.00 1,584,000.00 9,504,000.00 0.019% 0.004% 0.023% #N/A #N/A #N/A #N/A
384,000,000.00 76,800,000.00 460,800,000.00 0.940% 0.188% 1.128% #N/A #N/A #N/A #N/A
72,000,000.00 14,400,000.00 86,400,000.00 0.176% 0.035% 0.212% #N/A #N/A #N/A #N/A
7,182,000.00 1,436,400.00 8,618,400.00 0.018% 0.004% 0.021% #N/A #N/A #N/A #N/A
file:///conversion/tmp/activity_task_scratch/571297716.xlsx
TOTAL HARGA
MATERIAL JASA
MATERIAL JASA
5,184,000.00 1,036,800.00 6,220,800.00 0.013% 0.003% 0.015% #N/A #N/A #N/A #N/A
360,000.00 72,000.00 432,000.00 0.001% 0.000% 0.001% #N/A #N/A #N/A #N/A
540,000.00 108,000.00 648,000.00 0.001% 0.000% 0.002% #N/A #N/A #N/A #N/A
4,950,000.00 990,000.00 5,940,000.00 0.012% 0.002% 0.015% #N/A #N/A #N/A #N/A
1,728,000.00 345,600.00 2,073,600.00 0.004% 0.001% 0.005% #N/A #N/A #N/A #N/A
19,188,000.00 3,837,600.00 23,025,600.00 0.047% 0.009% 0.056% #N/A #N/A #N/A #N/A
16,200,000.00 3,240,000.00 19,440,000.00 0.040% 0.008% 0.048% #N/A #N/A #N/A #N/A
17,100,000.00 3,420,000.00 20,520,000.00 0.042% 0.008% 0.050% #N/A #N/A #N/A #N/A
6,250,000.00 1,250,000.00 7,500,000.00 0.015% 0.003% 0.018% #N/A #N/A #N/A #N/A
43,542,150.00 51,026,550.00 94,568,700.00 0.107% 0.125% 0.232% #N/A #N/A #N/A #N/A
18,000,000.00 3,600,000.00 21,600,000.00 0.044% 0.009% 0.053% #N/A #N/A #N/A #N/A
22,400,000.00 4,480,000.00 26,880,000.00 0.055% 0.011% 0.066% #N/A #N/A #N/A #N/A
486,000.00 97,200.00 583,200.00 0.001% 0.000% 0.001% #N/A #N/A #N/A #N/A
966,248,550.00 298,896,090.00 1,265,144,640.00 2.366% 0.732% 3.098% #N/A #N/A #N/A #N/A
- - -
8,572,500.00 1,714,500.00 10,287,000.00 0.021% 0.004% 0.025% #N/A #N/A #N/A #N/A
1,500,000.00 300,000.00 1,800,000.00 0.004% 0.001% 0.004% #N/A #N/A #N/A #N/A
2,250,000.00 450,000.00 2,700,000.00 0.006% 0.001% 0.007% #N/A #N/A #N/A #N/A
75,600,000.00 15,120,000.00 90,720,000.00 0.185% 0.037% 0.222% #N/A #N/A #N/A #N/A
5,940,000.00 1,188,000.00 7,128,000.00 0.015% 0.003% 0.017% #N/A #N/A #N/A #N/A
864,000.00 172,800.00 1,036,800.00 0.002% 0.000% 0.003% #N/A #N/A #N/A #N/A
792,000.00 158,400.00 950,400.00 0.002% 0.000% 0.002% #N/A #N/A #N/A #N/A
20,250,000.00 4,050,000.00 24,300,000.00 0.050% 0.010% 0.060% #N/A #N/A #N/A #N/A
5,600,000.00 1,120,000.00 6,720,000.00 0.014% 0.003% 0.016% #N/A #N/A #N/A #N/A
324,000.00 64,800.00 388,800.00 0.001% 0.000% 0.001% #N/A #N/A #N/A #N/A
18,000,000.00 3,600,000.00 21,600,000.00 0.044% 0.009% 0.053% #N/A #N/A #N/A #N/A
100,800,000.00 20,160,000.00 120,960,000.00 0.247% 0.049% 0.296% #N/A #N/A #N/A #N/A
36,450,000.00 7,290,000.00 43,740,000.00 0.089% 0.018% 0.107% #N/A #N/A #N/A #N/A
9,112,248.00 1,822,449.60 10,934,697.60 0.022% 0.004% 0.027% #N/A #N/A #N/A #N/A
286,054,748.00 57,210,949.60 343,265,697.60 0.701% 0.140% 0.841% #N/A #N/A #N/A #N/A
- - -
75,000,000.00 15,000,000.00 90,000,000.00 0.184% 0.037% 0.220% #N/A #N/A #N/A #N/A
21,000,000.00 4,200,000.00 25,200,000.00 0.051% 0.010% 0.062% #N/A #N/A #N/A #N/A
865,100.00 350,000.00 1,215,100.00 0.002% 0.001% 0.003% #N/A #N/A #N/A #N/A
1,800,000.00 360,000.00 2,160,000.00 0.004% 0.001% 0.005% #N/A #N/A #N/A #N/A
5,000,000.00 1,000,000.00 6,000,000.00 0.012% 0.002% 0.015% #N/A #N/A #N/A #N/A
5,500,000.00 1,100,000.00 6,600,000.00 0.013% 0.003% 0.016% #N/A #N/A #N/A #N/A
109,165,100.00 22,010,000.00 131,175,100.00 0.267% 0.054% 0.321% #N/A #N/A #N/A #N/A
- - -
2,027,520,000.00 326,400,000.00 2,353,920,000.00 4.965% 0.799% 5.765% #N/A #N/A #N/A #N/A
- - - 0.000% 0.000% 0.000%
- - - 0.000% 0.000% 0.000%
33,539,736.00 62,722,500.00 96,262,236.00 0.082% 0.154% 0.236% 0.00% 0.00% 0.00% 0.00%
167,843,232.00 218,081,124.00 385,924,356.00 0.411% 0.534% 0.945% 0.00% 0.00% 0.00% 0.00%
909,966,372.00 597,056,353.95 1,507,022,725.95 2.228% 1.462% 3.691% 0.00% 0.00% 0.00% 0.00%
935,000,000.00 280,500,000.00 1,215,500,000.00 2.290% 0.687% 2.977% 0.00% 0.00% 0.00% 0.00%
1,330,000,000.00 399,000,000.00 1,729,000,000.00 3.257% 0.977% 4.234% 0.00% 0.00% 0.00% 0.00%
5,403,869,340.00 1,883,759,977.95 7,287,629,317.95 13.23% 4.61% 17.85% #N/A #N/A #N/A #N/A
file:///conversion/tmp/activity_task_scratch/571297716.xlsx
#N/A #N/A
KEMAJUAN
PRIODE INI S/D.PRIODE INI TERTIMBANG
MATERIAL JASA MATERIAL JASA MATERIAL JASA TOTAL
j k l m n o p
file:///conversion/tmp/activity_task_scratch/571297716.xlsx
MATERIAL JASA MATERIAL JASA MATERIAL JASA TOTAL
file:///conversion/tmp/activity_task_scratch/571297716.xlsx
REKAPITULASI
KEMAJUAN PEKERJAAN
KEGIATAN : PEMBANGUANAN KANTOR KLASIS
PEKERJAAN :
LOKASI :
PRIODE :
TAHUN ANGG : 2017
I PEKERJAAN PERSIAPAN 0.031% 0.462% 0.493% 51.00% 50.07% 0.00% 0.00% 51.00% 50.07% 0.016% 0.231%
II PEKERJAAN TANAH 0.626% 0.436% 1.062% #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
III PEKERJAAN PONDASI 1.362% 0.481% 1.843% #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
IV PEKERJAAN BETON LT 1 DAN LT 2 7.414% 3.220% 10.634% #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
V PEKERJAAN LANTAI DAN DINDING I-2 4.080% 4.596% 8.676% #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
VI PEKERJAAN KAYU DAN PLAFON LT & LT 2 1.119% 1.294% 2.413% #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
VII PEKERJAAN INSTALASI BAJA STRUKTUR 16.618% 4.803% 21.421% #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
VIII PEKERJAAN RANGKA ATAP 7.627% 3.853% 11.481% #DIV/0! #N/A #VALUE! #N/A #VALUE! #N/A #VALUE! #N/A
IX PEKERJAAN PENUTUP ATAP 5.502% 2.488% 7.989% #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
X PEKERJAAN PENGECATAN 0.549% 0.548% 1.096% #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
XI PEKERJAAN PENGGANTUNG DAN PENGUNCI LT 1 & LT 2 0.150% 0.060% 0.210% #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
XII PEKERJAAN INTERIOR DAN EXTERIOR LT 1 & LT 2 0.754% 0.151% 0.905% #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
XIII PEKERJAAN MEKANICAL /PLUMBING/SANITAIR LT 1 & LT 2 2.411% 0.956% 3.367% #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
XIV PEKERJAAN ELECTRICAL LT 1 & LT 2 0.000% 0.000%
14.1 PEKERJAAN PANEL dan DAYA 1.144% 0.172% 1.315% #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
14.2 PEKERJAAN KABEL FEEDER 1.643% 0.329% 1.972% #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
14.3 PEKERJAAN INSTALASI LISTRIK 2.366% 0.732% 3.098% #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
14.4 PEKERJAAN INSTALASI LAMPU JALAN dan HALAMAN 0.701% 0.140% 0.841% #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
14.5 PEKERJAAN PENANGKAL PETIR 0.267% 0.054% 0.321% #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
XV SITE DEVELOPMENT 13.234% 4.613% 17.847% #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
PEKERJAAN ENTERANCE DEPAN 1.171% 0.337% 1.508%
PEKERJAAN ENTERANCE SAMPING 1.171% 0.337% 1.508%
TOTAL 69.937% 30.063% 100.000% #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
TERTIMBANG
TOTAL
n
0.247%
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#VALUE!
#NAME?
#N/A
#N/A
#N/A
#N/A
0.000%
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
RINCIAN
KEMAJUAN PEKERJAAN
KEGIATAN : PEMBANGUNAN KANTOR KLASIS
PEKERJAAN :
LOKASI :
PRIODE :
TAHUN ANGG : 2017
a b c d
I PEKERJAAN PERSIAPAN
1.1 Mobilisasi dan Demobilisasi LS 1.00 - 175,000,000.00
1.11 Pengukuran dan bouplank M3 260.00 48,800.00 52,725.00
Sub Total. 1 ...............
II PEKERJAAN TANAH
2.1 Pek. Galian Tanah Pondasi M3 1,043.79 - 112,650.00
2.2 Pek. Timbun Kembali Hasil Galian M3 562.67 - 32,600.00
2.3 Pek. Urug Sirtu Peninggian Peil Lantai M3 717.93 264,000.00 42,500.00
2.4 Pek. Urug Pasir dibawah Pondasi M3 99.44 264,000.00 47,000.00
2.5 Pek. Urugan Pasir Bawah Lantai M3 150.20 264,000.00 47,000.00
Sub Total. 2 ...............
III PEKERJAAN PONDASI
3.1 Pek. Pas. Batu Kosong M3 151.64 892,800.00 200,265.00
3.2 Pek. Pas. Pondasi Batu Kali 1:4 M3 289.75 1,237,700.00 385,125.00
3.3 Pek. Pas. Pondasi Trassraam 1:3 m3 38.38 1,615,050.00 1,422,000.00
Sub Total. 3 ...............
IV PEKERJAAN BETON LT 1 DAN LT 2
4.1 Pek. Beton Lantai Kerja Pondasi Foot Plat M3 21.66 1,013,700.00 311,875.00
4.2 Pek. Beton Pondasi Telapak Foot Plat K.300 M3 77.20 4,557,255.06 2,056,320.90
4.3 Pek. Beton Pedestal Kolom 90X110 cm K.300 M3 15.84 4,894,552.51 2,284,732.59
4.4 Pek. Beton Pedestal Kolom 60/60 K.300 M3 21.60 5,664,285.83 2,741,989.56
4.5 Pek. Beton Sloof 30/50 K.300 M3 5.70 6,509,116.56 2,701,884.93
4.6 Pek. Beton Sloof 20/30 K.300 M3 25.12 8,504,167.39 3,332,670.23
4.7 Pek. Beton Sloof 15/20 K.250 M3 9.60 7,412,415.92 3,603,694.59
4.8 Pek. Baut Angker 30 mm Ttk - - -
4.9 Pek. Beton Rabat Lantai T 10 Cm m3 135.98 1,013,700.00 311,875.00
4.10 Pek. Kolom Praktis LT 1 & LT 2 m' 1,338.71 66,020.00 40,410.00
4.11 Pek. Kolom Tangga 25 x25 m3 - - -
4.12 Pek. Balok Konsol LT 1 & LT 2 m3 2.70 7,075,700.00 1,833,600.00
4.13 Pek. Plat Kanopy LT 1 & LT 2 m3 5.00 6,652,650.00 1,356,400.00
4.14 Pek. Ring Balk Praktis LT 1 & LT 2 m' 947.46 84,740.00 66,725.00
4.15 Pek. Tangga Beton: - - -
4.15.1 m3 11.59 6,288,174.76 3,335,626.12
4.15.2 m3 8.91 6,288,174.76 3,335,626.12
4.15.3 m3 7.03 6,288,174.76 5,837,345.70
4.16 Pek. Plat Lantai 2 (System Bondek) m2 1,323.20 882,287.91 333,468.75
4.17 Pek. Plat Beton atap Belakang (System Bondek) m2 220.00 882,287.91 400,162.50
4.18 Pek. Lisplank Beton tebal 10 cm LT 1 & LT 2 m3 12.41 6,319,950.00 1,355,845.00
Sub Total. 4 ...............
V PEKERJAAN LANTAI DAN DINDING I-2
5.1 Pek. Pasangan dinding batako LT 1 & LT 2 m2 2,852.01 150,145.00 142,200.00
5.2 Pek. Plesteran dinding LT 1 & LT 2 m2 5,704.03 21,456.00 77,025.00
5.3 Pek. Plesteran beton LT 1 & LT 2 m2 570.40 27,425.60 77,025.00
5.4 Pek. Acian Dinding LT 1 & LT 2 m2 5,333.26 6,175.00 51,350.00
5.5 Pek. Penebalan Kolom LT 1 & LT 2 m2 33.09 6,150.00 90,200.00
5.6 Pek. Sponingan sudut/benangan LT 1 & LT 2 M' 2,708.87 315,187.67 179,725.00
5.7 Pek. Pasangan lantai Keramik 60 x 60 Cm (Granitto) LT1 & LT 2 m2 82.11 378,225.20 215,670.00
5.8 Pek. Pasangan Keramik tangga (granitto) m2 66.50 135,520.00 179,725.00
5.9 Pek. Pasangan lantai Keramik 20 x 20 Cm m2 471.32 148,390.00 231,075.00
5.10 Pek. Pasangan Keramik Dinding 20 x 25 Cm m2 269.33 70,666.00 18,415.00
5.11 Pek. Pasangan Border Keramik m1 288.00 72,500.00 86,700.00
5.12 Pek. Water Proofing Plat atap Belakang m2 1,751.35 35,943.78 31,915.00
file:///conversion/tmp/activity_task_scratch/571297716.xlsx
NO. JENIS PEKERJAAN SAT VOLUME
MATERIAL JASA
file:///conversion/tmp/activity_task_scratch/571297716.xlsx
N
ERJAAN
33,517,826,222.76
7,316,816,398.42 40,834,642,621.18 81.44%
JUMLAH HARGA (Rp) BOBOT (%) KEMAJUAN PEKE
TOTAL HARGA MATERIAL JASA JML S/D.PRIODE LALU PRIODE INI
MATERIAL JASA
VOLUME KEMAJUAN VOLUME
e f g h i j
175,000,000.00 26,250,000.00
85,000,000.00 12,750,000.00 97,750,000.00 0.208% 0.031% 0.239% #N/A #N/A #N/A
45,000,000.00 6,750,000.00 51,750,000.00 0.110% 0.017% 0.127% #N/A #N/A #N/A
45,000,000.00 6,750,000.00 51,750,000.00 0.110% 0.017% 0.127% #N/A #N/A #N/A
15,000,000.00 2,250,000.00 17,250,000.00 0.037% 0.006% 0.042% #N/A #N/A #N/A
16,000,000.00 2,400,000.00 18,400,000.00 0.039% 0.006% 0.045% #N/A #N/A #N/A
15,000,000.00 2,250,000.00 17,250,000.00 0.037% 0.006% 0.042% #N/A #N/A #N/A
16,000,000.00 2,400,000.00 18,400,000.00 0.039% 0.006% 0.045% #N/A #N/A #N/A
15,000,000.00 2,250,000.00 17,250,000.00 0.037% 0.006% 0.042% #N/A #N/A #N/A
35,000,000.00 5,250,000.00 40,250,000.00 0.086% 0.013% 0.099% #N/A #N/A #N/A
5,000,000.00 750,000.00 5,750,000.00 0.012% 0.002% 0.014% #N/A #N/A #N/A
- - - 0.000% 0.000% 0.000% #N/A #N/A #N/A
467,000,000.00 70,050,000.00 335,800,000.00 0.715% 0.107% 0.822% #N/A
- - (201,250,000.00)
175,500,000.00 35,100,000.00 210,600,000.00 0.430% 0.086% 0.516% #N/A #N/A #N/A
38,025,000.00 7,605,000.00 45,630,000.00 0.093% 0.019% 0.112% #N/A #N/A #N/A
38,025,000.00 7,605,000.00 45,630,000.00 0.093% 0.019% 0.112% #N/A #N/A #N/A
43,875,000.00 8,775,000.00 52,650,000.00 0.107% 0.021% 0.129% #N/A #N/A #N/A
57,375,000.00 11,475,000.00 68,850,000.00 0.141% 0.028% 0.169% #N/A #N/A #N/A
12,600,000.00 2,520,000.00 15,120,000.00 0.031% 0.006% 0.037% #N/A #N/A #N/A
91,800,000.00 18,360,000.00 110,160,000.00 0.225% 0.045% 0.270% #N/A #N/A #N/A
58,500,000.00 11,700,000.00 70,200,000.00 0.143% 0.029% 0.172% #N/A #N/A #N/A
92,160,000.00 18,432,000.00 110,592,000.00 0.226% 0.045% 0.271% #N/A #N/A #N/A
4,032,000.00 806,400.00 4,838,400.00 0.010% 0.002% 0.012% #N/A #N/A #N/A
900,000.00 180,000.00 1,080,000.00 0.002% 0.000% 0.003% #N/A #N/A #N/A
1,080,000.00 216,000.00 1,296,000.00 0.003% 0.001% 0.003% #N/A #N/A #N/A
2,448,000.00 489,600.00 2,937,600.00 0.006% 0.001% 0.007% #N/A #N/A #N/A
15,000,000.00 3,000,000.00 18,000,000.00 0.037% 0.007% 0.044% #N/A #N/A #N/A
- - - 0.000% 0.000% 0.000% #N/A #N/A #N/A
631,320,000.00 126,264,000.00 757,584,000.00 1.546% 0.309% 1.855% #N/A
(39,600,000.00) (7,920,000.00) (47,520,000.00)
5,030,200.00 5,915,000.00 10,945,200.00 0.012% 0.014% 0.027% #N/A #N/A #N/A
22,981,000.00 20,702,500.00 43,683,500.00 0.056% 0.051% 0.107% #N/A #N/A #N/A
41,524,500.00 8,027,500.00 49,552,000.00 0.102% 0.020% 0.121% #N/A #N/A #N/A
18,873,000.00 2,535,000.00 21,408,000.00 0.046% 0.006% 0.052% #N/A #N/A #N/A
- - - 0.000% 0.000% 0.000% #N/A #N/A #N/A
6,750,000.00 1,350,000.00 8,100,000.00
38,880,000.00 7,776,000.00 46,656,000.00 0.095% 0.019% 0.114% #N/A #N/A #N/A
8,250,000.00 1,650,000.00 9,900,000.00 0.020% 0.004% 0.024% #N/A #N/A #N/A
52,693,200.00 10,538,640.00 63,231,840.00 0.129% 0.026% 0.155% #N/A #N/A #N/A
1,584,000.00 316,800.00 1,900,800.00 0.004% 0.001% 0.005% #N/A #N/A #N/A
40,500,000.00 8,100,000.00 48,600,000.00 0.099% 0.020% 0.119% #N/A #N/A #N/A
48,600,000.00 9,720,000.00 58,320,000.00 0.119% 0.024% 0.143% #N/A #N/A #N/A
8,640,000.00 1,728,000.00 10,368,000.00 0.021% 0.004% 0.025% #N/A #N/A #N/A
7,920,000.00 1,584,000.00 9,504,000.00 0.019% 0.004% 0.023% #N/A #N/A #N/A
384,000,000.00 76,800,000.00 460,800,000.00 0.940% 0.188% 1.128% #N/A #N/A #N/A
72,000,000.00 14,400,000.00 86,400,000.00 0.176% 0.035% 0.212% #N/A #N/A #N/A
7,182,000.00 1,436,400.00 8,618,400.00 0.018% 0.004% 0.021% #N/A #N/A #N/A
5,184,000.00 1,036,800.00 6,220,800.00 0.013% 0.003% 0.015% #N/A #N/A #N/A
360,000.00 72,000.00 432,000.00 0.001% 0.000% 0.001% #N/A #N/A #N/A
file:///conversion/tmp/activity_task_scratch/571297716.xlsx
TOTAL HARGA
MATERIAL JASA
VOLUME KEMAJUAN VOLUME
540,000.00 108,000.00 648,000.00 0.001% 0.000% 0.002% #N/A #N/A #N/A
4,950,000.00 990,000.00 5,940,000.00 0.012% 0.002% 0.015% #N/A #N/A #N/A
1,728,000.00 345,600.00 2,073,600.00 0.004% 0.001% 0.005% #N/A #N/A #N/A
19,188,000.00 3,837,600.00 23,025,600.00 0.047% 0.009% 0.056% #N/A #N/A #N/A
16,200,000.00 3,240,000.00 19,440,000.00 0.040% 0.008% 0.048% #N/A #N/A #N/A
17,100,000.00 3,420,000.00 20,520,000.00 0.042% 0.008% 0.050% #N/A #N/A #N/A
6,250,000.00 1,250,000.00 7,500,000.00 0.015% 0.003% 0.018% #N/A #N/A #N/A
43,542,150.00 51,026,550.00 94,568,700.00 0.107% 0.125% 0.232% #N/A #N/A #N/A
18,000,000.00 3,600,000.00 21,600,000.00 0.044% 0.009% 0.053% #N/A #N/A #N/A
22,400,000.00 4,480,000.00 26,880,000.00 0.055% 0.011% 0.066% #N/A #N/A #N/A
486,000.00 97,200.00 583,200.00 0.001% 0.000% 0.001% #N/A #N/A #N/A
- - - 0.000% 0.000% 0.000% #N/A #N/A #N/A
921,336,050.00 246,083,590.00 1,167,419,640.00 2.240% 0.599% 2.839% #N/A
(44,912,500.00) (52,812,500.00) (97,725,000.00)
- - - 0.000% 0.000% 0.000% #N/A #N/A #N/A
1,500,000.00 300,000.00 1,800,000.00
2,250,000.00 450,000.00 2,700,000.00 0.006% 0.001% 0.007% #N/A #N/A #N/A
75,600,000.00 15,120,000.00 90,720,000.00 0.185% 0.037% 0.222% #N/A #N/A #N/A
5,940,000.00 1,188,000.00 7,128,000.00 0.015% 0.003% 0.017% #N/A #N/A #N/A
864,000.00 172,800.00 1,036,800.00 0.002% 0.000% 0.003% #N/A #N/A #N/A
792,000.00 158,400.00 950,400.00 0.002% 0.000% 0.002% #N/A #N/A #N/A
20,250,000.00 4,050,000.00 24,300,000.00 0.050% 0.010% 0.060% #N/A #N/A #N/A
5,600,000.00 1,120,000.00 6,720,000.00 0.014% 0.003% 0.016% #N/A #N/A #N/A
324,000.00 64,800.00 388,800.00 0.001% 0.000% 0.001% #N/A #N/A #N/A
18,000,000.00 3,600,000.00 21,600,000.00 0.044% 0.009% 0.053% #N/A #N/A #N/A
100,800,000.00 20,160,000.00 120,960,000.00 0.247% 0.049% 0.296% #N/A #N/A #N/A
36,450,000.00 7,290,000.00 43,740,000.00 0.089% 0.018% 0.107% #N/A #N/A #N/A
9,112,248.00 1,822,449.60 10,934,697.60 0.022% 0.004% 0.027% #N/A #N/A #N/A
- - - 0.000% 0.000% 0.000% #N/A #N/A #N/A
277,482,248.00 55,496,449.60 332,978,697.60 0.676% 0.135% 0.811% #N/A
(8,572,500.00) (1,714,500.00) (10,287,000.00)
21,000,000.00 4,200,000.00 25,200,000.00 0.051% 0.010% 0.062% #N/A #N/A #N/A
865,100.00 350,000.00 1,215,100.00 0.002% 0.001% 0.003% #N/A #N/A #N/A
1,800,000.00 360,000.00 2,160,000.00 0.004% 0.001% 0.005% #N/A #N/A #N/A
5,000,000.00 1,000,000.00 6,000,000.00 0.012% 0.002% 0.015% #N/A #N/A #N/A
5,500,000.00 1,100,000.00 6,600,000.00 0.013% 0.003% 0.016% #N/A #N/A #N/A
- - - 0.000% 0.000% 0.000% #N/A #N/A #N/A
34,165,100.00 7,010,000.00 41,175,100.00 0.084% 0.017% 0.101% #N/A
(75,000,000.00) (15,000,000.00) (90,000,000.00)
- - - 0.000% 0.000% 0.000% #N/A #N/A #N/A
- - -
33,539,736.00 62,722,500.00 96,262,236.00
167,843,232.00 218,081,124.00 385,924,356.00 0.411% 0.534% 0.945% - 0.00% -
909,966,372.00 597,056,353.95 1,507,022,725.95 2.228% 1.462% 3.691% - 0.00% -
935,000,000.00 280,500,000.00 1,215,500,000.00 2.290% 0.687% 2.977% - 0.00% -
1,330,000,000.00 399,000,000.00 1,729,000,000.00 3.257% 0.977% 4.234% - 0.00% -
- - - 0.000% 0.000% 0.000% #DIV/0! #DIV/0! #DIV/0!
3,376,349,340.00 1,557,359,977.95 4,933,709,317.95 8.19% 3.66% 11.85% #N/A
file:///conversion/tmp/activity_task_scratch/571297716.xlsx
KEMAJUAN PEKERJAAN
PRIODE INI S/D.PRIODE INI
TERTIMBANG
KEMAJUAN VOLUME KEMAJUAN
k l m p
file:///conversion/tmp/activity_task_scratch/571297716.xlsx
REKAPITULASI
KEMAJUAN PEKERJAAN
KEGIATAN : PEMBANGUANAN KANTOR KLASIS
PEKERJAAN :
LOKASI :
PRIODE :
TAHUN ANGG : 2017
#VALUE!
NO. JENIS PEKERJAAN SAT VOLUME BOBOT (%) S/D.PRIODE LALU PRIODE INI S/D.PRIODE INI
#REF!
KEMAJUA KEMAJUA KEMAJUA
VOLUME VOLUME VOLUME
N N N
a b d e f g g i j k n
I PEKERJAAN PERSIAPAN LS 1.00 0.49% 0.50 50.13% - 0.00% 0.50 50.13% 0.2472%
II PEKERJAAN TANAH 1.00 1.06% #N/A #N/A #N/A #N/A #N/A #N/A #N/A
III PEKERJAAN PONDASI 1.00 1.84% #N/A #N/A #N/A #N/A #N/A #N/A #N/A
IV PEKERJAAN BETON LT 1 DAN LT 2 1.00 10.63% #N/A #N/A #N/A #N/A #N/A #N/A #N/A
V PEKERJAAN LANTAI DAN DINDING I-2 1.00 8.68% #N/A #N/A #N/A #N/A #N/A #N/A #N/A
VI PEKERJAAN KAYU DAN PLAFON LT & LT 2 1.00 2.41% #N/A #N/A #N/A #N/A #N/A #N/A #N/A
VII PEKERJAAN INSTALASI BAJA STRUKTUR 1.00 21.42% #N/A #N/A #N/A #N/A #N/A #N/A #N/A
VIII PEKERJAAN RANGKA ATAP 1.00 11.48% #DIV/0! #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
IX PEKERJAAN PENUTUP ATAP 1.00 7.99% #N/A #N/A #NAME? #NAME? #NAME? #NAME? #NAME?
X PEKERJAAN PENGECATAN 1.00 1.10% #N/A #N/A #N/A #N/A #N/A #N/A #N/A
XI PEKERJAAN PENGGANTUNG DAN PENGUNCI LT 1 & LT 2 1.00 0.21% #N/A #N/A #N/A #N/A #N/A #N/A #N/A
XII PEKERJAAN INTERIOR DAN EXTERIOR LT 1 & LT 2 1.00 0.90% #N/A #N/A #N/A #N/A #N/A #N/A #N/A
XIII PEKERJAAN MEKANICAL /PLUMBING/SANITAIR LT 1 & LT 2 1.00 3.37% #N/A #N/A #N/A #N/A #N/A #N/A #N/A
XIV PEKERJAAN ELECTRICAL LT 1 & LT 2
14.1 PEKERJAAN PANEL dan DAYA 1.00 1.32% #N/A #N/A #N/A #N/A #N/A #N/A #N/A
14.2 PEKERJAAN KABEL FEEDER 1.00 1.97% #N/A #N/A #N/A #N/A #N/A #N/A #N/A
14.3 PEKERJAAN INSTALASI LISTRIK 1.00 3.10% #N/A #N/A #N/A #N/A #N/A #N/A #N/A
14.4 PEKERJAAN INSTALASI LAMPU JALAN dan HALAMAN 1.00 0.84% #N/A #N/A #N/A #N/A #N/A #N/A #N/A
14.5 PEKERJAAN PENANGKAL PETIR 1.00 0.32% #N/A #N/A #N/A #N/A #N/A #N/A #N/A
XV SITE DEVELOPMENT 1.00 17.85% #N/A #N/A #N/A #N/A #N/A #N/A #N/A