Professional Documents
Culture Documents
SD 1-24-101 Rev0
SD 1-24-101 Rev0
CL
SHARED USE PATH PARKING BAY CARRIAGEWAY CARRIAGEWAY PARKING BAY SHARED USE PATH
PROPOSED TEMPORARY
ACCESS FOR R.O.W. USERS TO BE DEWATERING PIPELINE
MAINTAINED AND PROTECTION
PROVIDED TO THE APPROVAL OF SEE NOTE 8
ASHGHAL PIPE CROWN TO
FINISHED ROAD
SEE NOTE 8 ERL LEVEL TO BE 600 MIN.
T T
E E
W (L+ITS)
W
E
QAF
(L+ITS)
(D)
E GAS E
(D) E CW (T)
(T) TSE
ACCESS FOR R.O.W. USERS TO BE
MAINTAINED AND PROTECTION
PROVIDED TO THE APPROVAL OF
CONTRACTOR TO CONFIRM LINE SEE NOTE 7
SEE NOTE 7 ASHGHAL
AND LEVEL OF EXISTING UTILITIES
SW
S
ALTERNATIVE LOCATIONS
PIPES INSTALLED BY
TRENCHLESS CONSTRUCTION
METHODS MAY INCLUDE
OVERSIZED SLEEVE PIPES
ERL
QAF T CW QAF
TSE S.W.D. T
E GAS E E E GAS E
W E (L+ITS) (T) TSE E W 0 28JUN15 ISSUED FOR USE
(L+ITS) (T) (L+ITS)
(T&D) (T&D) Rev. Date Revision Details Appd.
SW
SEE NOTE 8 SW SEE NOTE 8
S S
PIPES INSTALLED BY
TRENCHLESS CONSTRUCTION
METHODS MAY INCLUDE
OVERSIZED SLEEVE PIPES
QCS Section:
Section 1 - General
Part 24 - Construction Dewatering
TEMPORARY ROAD CROSSING - DIRECT DRILLING (HDD) Drawing Title:
SD 1-24-101 0