NOTES:

R.O.W / BUILDING LINE

R.O.W / BUILDING LINE


ROW - AS EXISTING SITE CONDITIONS

CL

SHARED USE PATH PARKING BAY CARRIAGEWAY CARRIAGEWAY PARKING BAY SHARED USE PATH

PROPOSED TEMPORARY
ACCESS FOR R.O.W. USERS TO BE DEWATERING PIPELINE
MAINTAINED AND PROTECTION
PROVIDED TO THE APPROVAL OF SEE NOTE 8
ASHGHAL PIPE CROWN TO
FINISHED ROAD
SEE NOTE 8 ERL LEVEL TO BE 600 MIN.

T T
E E
W (L+ITS)
W
E

QAF
(L+ITS)
(D)
E GAS E
(D) E CW (T)
(T) TSE
ACCESS FOR R.O.W. USERS TO BE
MAINTAINED AND PROTECTION
PROVIDED TO THE APPROVAL OF
CONTRACTOR TO CONFIRM LINE SEE NOTE 7
SEE NOTE 7 ASHGHAL
AND LEVEL OF EXISTING UTILITIES
SW
S

ALTERNATIVE LOCATIONS

PIPES INSTALLED BY
TRENCHLESS CONSTRUCTION
METHODS MAY INCLUDE
OVERSIZED SLEEVE PIPES

TEMPORARY ROAD CROSSING - OPEN CUT


(LOW TRAFFIC VOLUME ROADS AND ROADS MORE
LEGEND:
THAN FIVE YEARS SINCE CONSTRUCTION)

R.O.W / BUILDING LINE


R.O.W / BUILDING LINE

ROW - AS EXISTING SITE CONDITIONS


DIRECTIONAL
DRILLING MACHINE
SHARED USE PATH SERVICE ROAD CARRIAGEWAY MEDIAN CARRIAGEWAY SERVICE ROAD SHARED USE PATH RECEIVING PIT
PROPOSED TEMPORARY
DEWATERING PIPELINE
ENTRY PIT

ERL

QAF T CW QAF
TSE S.W.D. T
E GAS E E E GAS E
W E (L+ITS) (T) TSE E W 0 28JUN15 ISSUED FOR USE
(L+ITS) (T) (L+ITS)
(T&D) (T&D) Rev. Date Revision Details Appd.

SW
SEE NOTE 8 SW SEE NOTE 8

APPROX. 3000 DEPTH

S S
PIPES INSTALLED BY
TRENCHLESS CONSTRUCTION
METHODS MAY INCLUDE
OVERSIZED SLEEVE PIPES
QCS Section:
Section 1 - General
Part 24 - Construction Dewatering
TEMPORARY ROAD CROSSING - DIRECT DRILLING (HDD) Drawing Title:

(HIGH TRAFFIC VOLUME ROADS AND ROADS LESS


THAN FIVE YEARS SINCE CONSTRUCTION) TEMPORARY ROAD
CROSSING DETAILS

Approved: Sheet No:


1 OF 1
Date: Scale:
JUNE 2015 N.T.S.
Drawing Number: Revision:

SD 1-24-101 0