Surface Preparation & Comments
• The surface to be coated should be clean, dry and free from contamination. Prior to paint application all surfaces should
be assessed and treated in accordance with ISO 8504:2000
• Abrasive blast clean to Sa 2½ (ISO 8501-1:1988) or SSPC-SP10. If oxidation has occurred between blasting and
application, the surface should be reblasted to the specified visual standard. Surface defects revealed by the blast
cleaning process, should be ground, filled, or treated in the appropriate manner
• Stripe coats should be applied to all welds, lap joints, plate edges, corners, sharp edges, and any other areas where
spray application of the overall coating system may prove difficult resulting in low dry film thickness'
No VS DFT TSR
Product Name Description Over coating 25°C Min-Max
Colour % micron m2/l
1 Interzinc 2280 Green grey Inorganic Zinc Rich 63 70 9 4,5 Hour - extended
coating
70
All technical service and advising is based on laboratory trials and/or practical trials and shall be seen as a guidance when choosing products and
working procedure
Imants Kruzkops
FROSIO Inspector No. 7792
SIA „Interkrāsas Latvija”
Tel. +371 29198350