(A wholly-owned member of the Hong Kong Exchanges and Clearing Limited Group)
Rundown for the Connectivity Session (CS) with Volume Test for the Increase of the Minimum
Bandwidth Requirement for HKEX Orion Market Data Platform – Securities Market (OMD-C)
Premium Datafeed
Systems: OMD-C
12:00 – 12:10 Closing Auction Session (CAS) To check their systems healthiness.
Upon Day close
completion of
Matching
(~12:10)
12:30 System Shutdown Clients to take appropriate actions to clean
all test messages disseminated during the
testing period
Test Result Confirmation
By 12:30 Please confirm your test result by completing the online Test Result Confirmation
Form on or before 12:30
* In Trading Session Status (20) message, values “1 – Manual” and “0” will be published in the message fields
“TradingSesControlFlag” and “EndDateTime” respectively
2. All messages disseminated during the testing period should be treated as non-production data and should be cleaned
after the CS.
3. In any case, all participating Clients/ EPs should complete the appropriate day-end works including file / database
backup, system restoration / fallback and etc. before, during and / or after the CS.
4. Contingency Arrangements on Typhoon, Extreme Conditions and Rainstorm Warning on the day of the CS:
a. In case Typhoon Signal No. 8 or above or Extreme Conditions or Black Rainstorm Warning is issued/
announced or continues to be in force anytime from 07:00 to before 09:00 on the day of CS, the CS will be
cancelled and will not be resumed for the rest of the day.
b. In case Typhoon Signal No. 8 or above or Extreme Conditions is issued on or after 09:00 on the CS, the CS
will be terminated 15 minutes thereafter.
c. In case Black Rainstorm Warning is issued on or after 09:00 on the day of CS, the CS will continue until
completion.
d. In any case, all participating Clients/ EPs should complete the appropriate day-end works including file /
database backup, system restoration / fallback and etc before, during and / or after the CS.