Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1 2 3 4 1 2 3 4 1 2 3 4

15066 15066 15066


6462 4500 4104 6462 4500 4104 6462 4500 4104
1398 3500 2061 2500 1650 3957 4459 2500 2500 1504 2347 1756 4459 2503 2500 1348 2500 1756

4 N 44° 35' W, 15.00 M 1 4 N 44° 35' W, 15.00 M 1 4 N 44° 35' W, 15.00 M 1

150
150

150
F F F

150

150
PIPE CHASE PIPE CHASE PIPE CHASE
FIRE EXIT FIRE EXIT FIRE EXIT

2090
2090

2090

1960
1960

1960
1940

1940
PRINTING AREA OPEN OPEN CARGO LIFT EE CABINET
OPEN
800 kilos EE CABINET 800 kilos EE CABINET

3123
MACHINE ROOM
3123

3123
CARGO LIFT w/ CARGO LIFT w/
FULL MESH FULL MESH

MESS HALL
E E AREA PROVISION FOR
E

2999
FUTURE TOILETS
HE

3341
3341
3343
SHE HE
SHE
ON-LINE DEPARTMENT

900
9200

3015

8037
8037

8037

2100
PWD

14301

1658
14548
HR DEPARTMENT SUPPLY ROOM CLINIC/ LACTATION RM.

10957
D D D PRIVATE
TOI.

1950

4500
CONFERENCE ROOM

8195

3400
SERVER

5101

1450
7500
7500

7500

1800
MEETING ROOM

2400
2400

2400
ELEV. ELEV. ELEV.
31700

RECEPTION AREA

37810
C C
37810

37810

15500
ELEV. LOBBY ELEV. LOBBY
ELEV. LOBBY

2700
2700
3000

9000
OPEN WORKSPACE

8999
8750

S 45° 24' W, 37.81 M


S 45° 24' W, 37.81 M

S 45° 24' W, 37.81 M

N 45° 30' E, 37.79 M


N 45° 30' E, 37.79 M

N 45° 30' E, 37.79 M


CENTRALIZED PRINTING AREA

2400
2400

8000
8000

8000
2100

DOCUMENTATION

19101
ROOM

1500
1500

1500
1400
B B B

OPEN WORKSPACE

5000
5000

5000

8400
8400

7000

7000
STUDIO & SAMPLE ROOM

A A A

6000
6000

6000

4000

4000
4000

4000

4000

4000
3 2 3 2 3 2
SIDEWALK S 44° 40' E, 15.00 M SIDEWALK SIDEWALK S 44° 40' E, 15.00 M SIDEWALK SIDEWALK S 44° 40' E, 15.00 M SIDEWALK

EXISTING MERALCO POST

11737 3263 11737 3263 9362 5638


15000 15000 15000

1 SECOND FLOOR LIGHTING LAYOUT 2 THIRD FLOOR LIGHTING LAYOUT 3 FOURTH FLOOR LIGHTING LAYOUT

ARCHITECT: PROFESSIONAL ELECTRICAL ENGINEER: OWNER: PROJECT TITLE AND LOCATION: SHEET CONTENTS: SHEET NO.:
REPUBLIC ACT NO. 9266 SECTION 33
THESE DRAWINGS & SPECIFICATIONS AS INSTRUMENT OF SERVICE ARE
AS SHOWN

E-06
THE INTELLECTUAL PROPERTY OF AR. SHEREE ANN CRUZ-ACUTINA
IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE, COPY AND
REPRODUCE, IN PART OR IN WHOLE, WITHOUT THE WRITTEN CONSENT
OF THE ARCHITECT. AR. SHREE ANN CRUZ- ACUTINA, uap, aia-ia ENGR. VIRGILIO C. SESE ALBERTO SHOES CORPORATION PROPOSED 4-STOREY OFFICE BUILDING with MEZZANINE and ROOFDECK
ALL MEASUREMENTS ARE TO BE VERIFIED ON THE SITE BY
CONTRACTOR. ALL DISCREPANCIES ARE TO BE PRC REG. NO. : 34675 PTR NO. : 0599358 D PRC REG. NO. : 001452 PTR NO. : 0694710 D
IMMEDIATELY REPORTED TO THE ARCHITECT AND PROJECT MANAGER.
CONTRACTOR ARE TO PREPARE AND SUBMIT SHOP DRAWINGS TO
UAP IAPOA NO. : 29896 DATE ISSUED : JAN. 5, 2021 VALID UNTIL : NOV. 27, 2023 DATE ISSUED : JAN. 4, 2021 APPROVED BY: MR. ALBERT GAERLAN filename:
ARCHITECT PRIOR TO COMMENCEMENT OF WORKS.
T. I. N. : 220-641-421 PLACE ISSUED : QUEZON CITY T. I. N. : 106-454-406 PLACE ISSUED : QUEZON CITY
#14 P. TUAZON BLVD., CUBAO, QUEZON CITY Alberto Shoes Corp._4-Storey Office Bldg.

You might also like