ACTIVITY CHECKLIST: Div 5 – Metals Fabrication - 25x25mm Framing Work

Project : Urban Square Mall - Udaipur Date :

Area: ………………………………………. Status Comments

General items checklist Where applicable to this section. ………. …………………………


Delivered materials Fabricated from approved shop drawings, if
required, and meet specifications of steel fabrication, riveting,
welding, galvanizing, sheet metal or other metals required. ………. …………………………
Templates Provided for correct placement and anchorage if
required. ………. …………………………
Provisions For adequate bracing, blocking and anchorage of
items. ………. …………………………
Sleeves, bolts, cut-outs, holes and connectors Located and
provided as required. ………. …………………………
Protection Materials are protected from damage before and after
installation. ……… …………………………
Opening bucks, angles and thresholds Adequately braced,
anchored and aligned and bear labels if required. ………. …………………………
Railings Check that heights, vertical spacing, returns and
anchorage will meet code requirements after installation. ………. …………………………
Metal stairs Bearing of supports, levelness, variation of risers,
coordination with adjacent finish surfaces, spacing and tolerances
required are adequate. Nosings of pan treads and protected. ………. …………………………
Installation techniques and workmanship Smooth and ground
welds, touch up. Caulking, galvanizing, touch-up shop coats etc ………. …………………………
Verify design Closed risers, Weld joins smooth edging,
intermediate support as per design with 1coat Primer (Red Oxide).
………. …………………………

Project-Specific Items:
…………………………………………………………………………… ………. …………………………

…………………………………………………………………………… ………. …………………………

…………………………………………………………………………… ………. …………………………

…………………………………………………………………………… ………. …………………………

…………………………………………………………………………… ………. …………………………

…………………………………………………………………………… ………. …………………………

…………………………………………………………………………… ………. …………………………

…………………………………………………………………………… ………. …………………………

…………………………………………………………………………… ………. …………………………

…………………………………………………………………………… ………. …………………………

…………………………………………………………………………… ………. …………………………

…………………………………………………………………………… ………. …………………………

…………………………………………………………………………… ………. …………………………

…………………………………………………………………………… ………. …………………………
ACTIVITY CHECKLIST: Div 5 – Metals Fabrication - 25x25mm Framing Work

…………………………………………………………………………… ………. …………………………

…………………………………………………………………………… ………. …………………………

Upon completion of works

Signature: …………………..…….... Name: …………..……..……….. Date: …………….