Labour Rates (Basic) Code Description Unit 2021 Fixed Rate Rs
Labour Rates (Basic) Code Description Unit 2021 Fixed Rate Rs
Labour Rates (Basic) Code Description Unit 2021 Fixed Rate Rs
2021 Fixed
Code Description Unit
Rate Rs.
2021 Fixed
Code Description Unit
Rate Rs.
BO - 103 Concrete / Asphalt mixer ( 400 ltrs ) With Hoist day ( 8 hrs ) 5,500.00
BO - 104 Water tank + 50mm. Pump* (2000 ltrs) day ( 8 hrs ) 2,250.00
BO - 107 Plate compactor (90 kg) less operator day ( 8 hrs ) 3,500.00
BO - 109 Vibrating roller (1/2 - 1 ton ) less operator day ( 8 hrs ) 4,000.00
BO - 110 Vibrating roller ( smooth - 10 tons ) with operator day ( 8 hrs ) 20,000.00
BO - 111 Smooth /road roller (8-10 tons : static ) with operator day ( 8 hrs ) 10,200.00
BO - 112 Pneumatic road roller (8-10 tons) with operator hour 5,000.00
9
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR 2021
2021 Fixed
Code Description Unit
Rate Rs.
BO - 136 Concrete mixer, with weigh batcher 14/10 - with operator day ( 8 hrs ) 9,000.00
10
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR 2021
2021 Fixed
Code Description Unit
Rate Rs.
BO - 157 Pneumatic Hand held breaker (demolisher) less operator day 1,500.00
BO - 161 Chain saw (with operator and fuel) day (8 hrs) 6,000.00
BO - 163 Rock dril hand held (less drill steel) hour 350.00
11
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR 2021
2021 Fixed
Code Description Unit
Rate Rs.
BO - 164 Dozer d3c /d40 hour 3,200.00
2021 Fixed
Code Description Unit
Rate Rs.
BO - 201 Approved soil type i & ii for bases & shoulders cu.m 750.00
MANUAL PRODUCTION
2021 Fixed
Code Description Unit
Rate Rs.
PLANT PRODUCTION
2021 Fixed
Code Description Unit
Rate Rs.
BO - 308 (19mm ) aggregate cu.m 3,000.00
12
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR 2021
2021 Fixed
Code Description Unit
Rate Rs.
SAND
2021 Fixed
Code Description Unit
Rate Rs.
BO - 331 River sand for road surface applications ( sscm table 1701 - 9 ) cu.m 3,900.00
2021 Fixed
Code Description Unit
Rate Rs.
13
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR 2021
2021 Fixed
Code Description Unit
Rate Rs.
BO - 395A Firewood (grandis & jungle firewood) without transport cu.m 2,000.00
BO - 395B Firewood (phinus & gliricedia etc) without transport cu.m 2,000.00
2021 Fixed
Code Description Unit
Rate Rs.
BO - 401A Portland cement ( for all work) without vat bag (50.kg) 950.00
BO - 401B Portland cement ( for all work) with vat bag (50.kg) 1,026.00
2021 Fixed
Code Description Unit
Rate Rs.
BO - 411 MILD STEEL (for 6mm dia. Wire coils) (With vat) kg 147.00
BO - 412 MILD STEEL (for 10mm, 12mm, 16mm, & 20mm dia) (With vat) kg 147.00
14
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR 2021
BO - 449 Paving slab 450 x 450 x 50 mm g20 wirh r/f concrete 1 no 470.00
15
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR 2021
BLASTING MATERIALS
2021 Fixed
Code Description Unit
Rate Rs.
PAINTS
2021 Fixed
Code Description Unit
Rate Rs.
BO - 531 Bituminous emulsion paint ( crs-2 ) litre 77.00
2021 Fixed
Code Description Unit
Rate Rs.
BO - 601 Industrial kerosene oil litre 70.00
16
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR 2021
MISCELLANEOUS
2021 Fixed
Code Description Unit
Rate Rs.
17
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR 2021
2021 Fixed
Code Description Unit
Rate Rs.
BO - 711 Cement, sand & water for jointing hume pipes 152mm diameter joint 25.00
BO - 716 Coir string for cutting side drains ( per 2.83 cu.m ) item 25.00
Minor repairs of parapets with cement, sand & water ( per 9.29
BO - 718 item 100.00
sq.m )
Fuel * ( for loosening road surface in manual breaking 50mm depth
BO - 720 item 30.00
x 307 sq.m)*
BO - 723 Fuel forge etc. ( per 2.83 cu.m blasting ) item 35.00
2021 Fixed
Code Description Unit
Rate Rs.
BO - 751 Sand paper & cott. Waste ( per 9.29 sq.m ) item 100.00
BO - 762 Timber post, horizontal etc. ( for barricading work 4 l.m ) item 300.00
2021 Fixed
Code Description Unit
Rate Rs.
BO - 781 Allow for water for mixing by machine per cu.m 55.00
BO - 782 Allow for watr for mixing manually per cu.m 55.00
18
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR 2021
2021 Fixed
Code Description Unit
Rate Rs.
BO - 787 Allow for water supply (by bucket & coir rope) item 30.00
2021 Fixed
Code Description Unit
Rate Rs.
BO - 792 White washing timber posts, horizontals, etc. ( in 4 l.m barricading ) item 25.00
BO - 793A Welded Mesh 2'' X 2'' gauge 10 Below 50 Sheets sq.m 425.00
BO - 793B Welded Mesh 2'' X 2'' gauge 10 Over 50 Sheets sq.m 400.00
BO - 793D WELDED MESH 4'' X 4'' gauge 6 (> 100) sq.m 800.00
BO - 793F WELDED MESH 6'' X 6'' gauge 6 (> 100) sq.m 545.00
BO - 793H WELDED MESH 8'' X 8'' gauge 6 (> 100) sq.m 410.00
19
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR 2021
2021 Fixed
Code Description Unit
Rate Rs.
20
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR 2021
4x150mm Roll
BO 823 Geotextile - KET 11 (1.5 mm Thick) 69,285.00
( 600M2)
01 LM
BO 824 Geotextile - KET 11 (1.5 mm Thick) 500.00
(=4.0M2)
4x125mm Roll
BO 825 Geotextile - KET 15 (1.9 mm Thick) 74,245.00
( 500M2)
01 LM
BO 826 Geotextile - KET 15 (1.9 mm Thick) 620.00
(=4.0M2)
4x100mm Roll
BO 827 Geotextile - KET 28 (2.9 mm Thick) 120,000.00
( 400M2)
01 LM
BO 828 Geotextile - KET 28 (2.9 mm Thick) 1,275.00
(=4.0M2)
21
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR - 2021
T1-002 Transport 100m to 0.5 km by any means (excluding loading) cu.m 288.00
T1 - 003 Transport 0.5 km to 1.0 km by any means (excluding loading) cu.m 308.60
T1 - 013 Loading barrels of bitumen inclusive of rolling upto 25m : nos. 45.00
T1 - 014 Unloading barrels of bitumen inclusive of rolling and stacking : nos. 13.50
22
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR - 2021
SECTION 1
TRANSPORT
SPEC / PAY
CODE DESCRIPTION UNIT RATE
ITEM
23
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR - 2021
SECTION 1
TRANSPORT
SPEC / PAY
CODE DESCRIPTION UNIT RATE
ITEM
T1-036 Loading and unloading 152 mm dia, 2.44 m long hume pipes : nos. 90.00
T1 - 037 Loading and unloading 229 mm dia, 2.44 long hume pipes : nos. 108.00
T1 - 038 Loading and unloading 305 mm dia, 2.44 m long hume pipes : nos. 234.00
T1-039 Loading and unloading 457 mm dia 2.44 m long hume pipes: nos. 378.00
T1 - 040 Loading and unloading 610 mm dia, 2.44 m long hume pipes : nos. 486.00
T1 - 041 Loading and unloading 915 mm dia, 1.22 m long hume pipes : nos. 900.00
T1 - 042 Loading and unloading 1220 mm dia, 1.22 m long hume pipes : nos. 1,800.00
24
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR - 2021
SECTION I I
ROADWAY AND FOUNDATION / TRENCH EXCAVATION
( INCLUDING LOADING, UNLOADING AND TRANSPORTING WITHIN 25 METERS DISTANCE UNLESS OTHERWISE
SPEC / PAY
CODE DESCRIPTION UNIT RATE
ITEM
301.2(e)/301
E1 - 001 Excavation in loose soil ( dry ) (11)
cu.m 679.90
301.2 ( g) /
E1 - 002 Excavation in loose soil ( wet) in slips : 301(15)
cu.m 842.90
301.2(e)/301
E1 - 003 Excavation in ordinary soil (cutting measurment) (11)
cu.m 1,005.90
301.2(e)/301
E1 - 004 Excavation in ordinary soil ( vehicle measurement ) (11)
cu.m 905.30
301.2(e)/301
E1 - 005 Excavation in medium soil (cutting measurement) (11)
cu.m 1,331.90
301.2(e)/301
E1 - 006 Excavation in medium soil ( vehicle measurement ) (11)
cu.m 1,132.10
301.2(e)/301
E1 - 007 Excavation in hard soil (cutting measurement) (11)
cu.m 1,983.80
301.2(e)/301
E1 - 008 Excavation in hard soil ( vehicle measurement ) (11)
cu.m 1,686.20
301.2(e)/301
E1 - 009 Excavation in unclassified soil (cutting measurement) (11)
cu.m 1,440.50
301.2 (c )/
E1 - 010 Excavation in soft rock (cutting measurement) 301(1)
cu.m 2,146.80
301.2 (e )/
E1 - 010 A Excavation in mud/marshy material (cutting measurement)
301(14)
cu.m 1,657.80
E1 - 019 Excavating soft rock, not exceeding 1.5m depth 302.2/302(2) cu.m 2,635.80
25
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR - 2021
SECTION I I
ROADWAY AND FOUNDATION / TRENCH EXCAVATION
( INCLUDING LOADING, UNLOADING AND TRANSPORTING WITHIN 25 METERS DISTANCE UNLESS OTHERWISE SPECIFIED)
SPEC / PAY
CODE DESCRIPTION UNIT RATE
ITEM
301.2(b)/301
E1 - 025 Rock requiring blasting : (8)
cu.m 2,877.30
301.2(b)/301
E1 - 026 Rock requiring blasting sledging & piling : (8)
cu.m 3,768.30
301.2(b)/301
E1 - 026B Rock requiring blasting sledging & piling (Using Chemical)
(8)
cu.m 6,548.20
26
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR - 2021
SECTION III
AGGREGATE / RUBBLE PILING INCLUDING LOADING & UNLOADING
SPEC / PAY
CODE DESCRIPTION UNIT RATE
ITEM
A1 - 002 Supplying 150 - 225 mm rubble including loading and unloading cu.m 1,907.70
403,403(2),
Supplying 50 mm aggregate, single size crusher production
A1 - 009 cu.m 2,933.90
including loading,unloading and pilling TABLE1701-4
403,403(2),
Supplying 37.5 mm aggregate, single size crusher production
A1 - 010 cu.m 3,053.90
including loading,unloading and pilling TABLE1701-4
403,403(2),
Supplying 19 mm aggregate, single size crusher production
A1 - 011 cu.m 3,773.90
including loading,unloading and pilling TABLE1701-4
403,403(2),
12.5 mm aggregate, single size crusher production including
A1 - 012 cu.m 3,773.90
loading,unloading and pilling TABLE1701-4
Aggregate 37.5 mm, down graded including piling & loading TABLE
A1 - 013
1701.5
cu.m 2,753.90
and unloading (abc)
27
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR - 2021
SECTION IV
APPROVED EARTH FILLING & COMPACTION
NOTE
RATES FOR BORROW EARTH SUPPLY GIVEN UNDER ITEM CODES EW1 - 001 & EW1 - 011 IN THIS SHEDULE IS
rates for borrow earth supply given under item codes ew1 - 001 & ew1 - 011 in this shedule is based on manual
excavation and intended for small works involving less than 300 cu.m. in the case of borrow earth supply exceeds 300
SPEC / PAY
CODE DESCRIPTION UNIT RATE
ITEM
EW1 - 002 Spreading piled approved soil ( loose volume ) : cu.m 227.50
Approved soil spread & rolled including roller hire charges, fuel &
EW1 - 003 watering ( loose volume ) * see general notes section iv.5 for 401/401(1) cu.m 460.50
rate on compacted volume.
304.4(b)(Vii),
Trimming, leveling and compaction of original ground / subgrade
EW1 - 010 304(3),304.3 sq.m 63.70
to 95% std. Density. ©
304.2,304.3,
Approved soil excavation for embankment filling including
EW1 - 011 304(1),304(2 cu.m 1,361.70
loading and piling ( loose volume ) )
Approved soil excavation using machinary for Base & Shoulder 601.1 TO
EW1 - 013
601.4,601(2)
cu.m 1,063.00
construction including loading and piling, ( loose volume )
28
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR - 2021
SECTION V
RUBBLE PITCHING / PAVING ( RUBBLE TO BE PAID SEPARATELY )
SPEC / PAY
CODE DESCRIPTION UNIT Rate
ITEM
29
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR - 2021
SECTION VI
AGGREGATE SPREADING & COMPACTION
COST OF WATERING TO BE DEDUCTED FROM RATE, IF NOT CARRIED OUT UNDER THE RELEVANT ITEMS.
SPEC / PAY
CODE DESCRIPTION UNIT RATE
ITEM
30
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR - 2021
SECTION VII
ROAD SURFACE TREATMENT
( TRANSPORT OF EMULSION / BITUMEN TO BE PAID SEPARATELY.)
SPEC / PAY
CODE DESCRIPTION UNIT RATE
ITEM
31
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR - 2021
SECTION VII
ROAD SURFACE TREATMENT
( TRANSPORT OF EMULSION / BITUMEN TO BE PAID SEPARATELY.)
SPEC / PAY
CODE DESCRIPTION UNIT RATE
ITEM
Tack coat with 30% cut back bitumen (80/100) using 0.5 ltr/sq.m
S1 - 018 502,502(2) sq.m 83.00
including brushing and cleaning road surface ( manual ) :
Tack coat with 30% cut back bitumen (80/100)using 0.5 ltr/sq.m
S1 - 019 502,502(1) ltr. 165.90
including brushing and cleaning road surface ( manual ) :
Tack coat with 30% cut back bitumen (80/100) using 0.75
S1 - 020 ltr/sq.m including brushing and cleaning road surface ( manual ) 502,502(2) sq.m 107.80
(sscm 503.4 (d) ) :
32
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR - 2021
SECTION VII
ROAD SURFACE TREATMENT
( TRANSPORT OF EMULSION / BITUMEN TO BE PAID SEPARATELY.)
SPEC / PAY
CODE DESCRIPTION UNIT RATE
ITEM
Prime coat with MC30 cut back bitumen using 1 ltr/sq.m
including blinding with sand at the rate of 250 sq.m/cu.m and
S1 - 022A 503 , 503(1) sq.m 181.10
brushing cleaning and moistening road surface (rate include the
transport of bitumen to the site)
Prime coat with emulsion cold bituen ( css - 1 ) using 1 ltr/sq.m
501,501(5)(a
S1 - 023 without blinding, but including of brushing, cleaning and )
sq.m 122.50
moistening road surface :
Prime coat with MC30 cut back bitumen using 1 ltr/sq.m without
S1 - 023A blinding, but including of brushing, cleaning and moistening road 503 , 503(2) sq.m 159.70
surface (rate include the transport of bitumen to the site)
Prime coat with 30% cut back bitumen 80/100 using 1 ltr/sq.m
S1 - 024 including blinding with sand at the rate of 250 sq.m/cu.m and 501,501(5) sq.m 155.90
brushing, cleaning and moistening road surface :
Prime coat with 30% cut back bitumen using 1 ltr/sq.m including
501,501(5)(a
S1 - 025 without blinding with sand but inclusive of brushing, cleaning and )
sq.m 133.40
moistening road surface :
33
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR - 2021
Supply lay and compact asphalt bound premix ( 37.5 mm, binder
( 60/70 ) 3.53% mix) - dense base bridge decking, reinstatement
S1 - 032 506,506(2) m.t. 12,463.90
of trenches etc. ( transport of premix to be paid separately. ) ( for
other binder contents see general notes -section vii : item 7. )
Supply, lay and compact asphalt concrete binder course surfacing
S1 - 034 506,506(2) m.t. 11,660.30
(binder60/70 )
Supply, lay and compact asphalt concrete wearing course
S1 - 034A 506,506(2) m.t. 11,660.30
surfacing (binder60/70 )
SECTION VIII
ROAD SURFACE MAINTENANCE
SPEC / PAY
CODE DESCRIPTION UNIT RATE
ITEM
MN1 - 017 50mm - 19mm aggregate roller patching : 1102(9) Cu.m. 4,453.40
MN1 - 018 50mm - 19mm aggregate stamped patching : 1102(9) Cu.m. 5,501.00
34
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR - 2021
SECTION IX
ROAD SIDE AND DRAINAGE SYSTEM
SPEC / PAY
CODE DESCRIPTION UNIT RATE
ITEM
DR1 - 001 Cutting new side drains in ord. Soil : 701/301A(5) cu.m 897.00
DR1 - 002 Cutting new side drains in med. Soil : 701/301A(5) cu.m 1,244.70
DR1 - 003 Cutting new side drains in hard soil : 701/301A(5) cu.m 1,592.40
DR1 - 004 Cutting new side drains in soft rock : 701/301A(2) cu.m 1,766.20
DR1 - 005 Cutting new side drains in unclassified soil : 701/301A(5) cu.m 1,244.70
DR1 - 006 Cutting new side drains in rock : 701/301A(4) cu.m 3,439.80
DR1 - 013 Clearing choked culverts ( with head room > 1 m ** ) : * cu.m 1,331.90
35
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR - 2021
SECTION X
BRIDGES, CULVERTS & RETAINING WALLS ETC.
SPEC / PAY
CODE DESCRIPTION UNIT RATE
ITEM
202.2/202(1)
ST1 - 001 Demolishing dry coursed masonary including stacking or loading.
a
cu.m 3,955.10
Random rubble masonary in approved cement & sand mortar 1:6 1006.3/
ST1 - 006
1006(1)a
cu.m 10,491.50
with available rubble 150-225mm :
Random rubble masonary in approved cement & sand mortar 1:5 1006.3/
ST1 - 007
1006(1)b
cu.m 10,895.50
with available rubble 150-225mm :
1006.3 (b)
ST1 - 008 Dry masonary with available heavy rubble or boulders
/1006(2)
cu.m 5,867.50
1006.3 (b)
ST1 - 010 Dry random masonary with available rubble 150-225mm :
/1006(2)a
cu.m 4,694.00
Clay puddled & laid behind masonry walls ( excl. Transport of clay 705.3/705(3)
ST1 - 012
a
cu.m 2,366.20
)
Grouting coursed stone masonary joints with approved cement & 804.2 ( C )
ST1 - 013
/804(1)a
sq.m 471.80
sand mortar 1:3 :
Grouting rubble paving with approved cement & sand mortar 804.2 ( C )
ST1 - 015
/804(1)b
sq.m 768.60
(1:3) :
ST1 - 016 Forming weep holes in masonary construction ( labour only ) : 706.3/706(2) nos. 451.00
Forming weep holes using p.v.c pipes of int. Dia. Not less than 706.3
ST1 - 017
/706(1)
l.m. 640.10
100 mm, complete with dripledge and surround finish smooth :
36
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR - 2021
SECTION X
BRIDGES, CULVERTS & RETAINING WALLS ETC.
SPEC / PAY
CODE DESCRIPTION UNIT RATE
ITEM
ST1 - 021 Lifiting soil for every 1.5 m beyond the initial 1.5 m : cu.m 651.90
ST1 - 022 Lifting wedge stone every 1.5 m beyond the initial 1.5m : cu.m 1,955.80
ST1 - 023 Lifting rubble or concrete every 1.5 m beyond the initial 1.5 m : cu.m 977.90
ST1 - 024 Lowering wedged stones every 1.5 m beyond the initial 1.5 m : cu.m 1,303.90
1006.3/1006
ST1 - 028 Rendering 19 mm thick in cement sand mortar 1:2 mix ( rough ) :
(3)
sq.m 1,064.80
Rendering 12.5 mm thick in cement sand mortar 1:3 mix ( rough ) 1006.3/1006
ST1 - 030
(3)
sq.m 742.50
:
Mixing & laying manually cement concrete 1:4:8 (50 mm) using
1001.4/1001
ST1 - 034 crusher run aggregate ( volume batching ) ( excl. Transport of
(4)a,
cu.m 13,920.80
aggregate & piling ) : 1001.8©
Mixing & laying using concrete mixer, cement concrete 1:4:8 (50 1001.8(d),10
ST1 - 035 mm ) ( volume batching )using crusher run aggregate ( excl. 01 cu.m 13,549.80
Transport of aggregate & piling) (3),1001(4)b
37
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR - 2021
SECTION X
BRIDGES, CULVERTS & RETAINING WALLS ETC.
SPEC / PAY
CODE DESCRIPTION UNIT RATE
ITEM
38
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR - 2021
SECTION X
BRIDGES, CULVERTS & RETAINING WALLS ETC.
SPEC / PAY
CODE DESCRIPTION UNIT RATE
ITEM
Mixing & laying using concrete mixer ( w/batching ), cement
concrete for grade 25 ( 19 mm ) using crusher run aggregate in 1001.8(d),10
ST1 - 048
01 (3)d
cu.m 18,630.00
foundation & floors ( excluding transport of aggregate & piling )
:*
Mixing & laying using concrete mixer ( w/batching ), cement
1001.8(d),10
ST1 - 048A concrete for grade 25 (70% 37.5+30% 19 ) using crusher run
01 (3)d
cu.m 17,251.50
aggregate, ( excluding transport of aggregate & piling ) :*
1008.1-
Supplying & fixing 25 mm thick planks of plywood as shuttering.
ST1 - 057 1008.3/1008 sq.m 540.70
Including removing : (1)
Supplying & fixing class ii timber bearers, joists, etc. Including 1008.3(a)/10
ST1 - 058
08 (3)a
cu.deci.m 70.70
dismantling in shuttering. )
1008.3(a)/10
ST1 - 059 100 - 150 mm dia. Round jungle timer supplted & fixed as props :
08 (3)b
l.m. 115.70
1008.3(a)/10
ST1 - 060 150-200 mm dia, round jungle timber supplied & fixed as props. :
08 (3)c
l.m. 119.60
1008.1-
Formwork smooth finish with ply wood for bridge beams, bridge
ST1 - 061 1008.3/1008 sq.m 2,508.60
deck under sides and sides including dismantling. (1)
Formwork smooth finish with ply wood, for bridge column shafts 1008.1-
ST1 - 062
1008.3/1008
sq.m 2,191.00
including dismantaling.
39
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR - 2021
SECTION X
BRIDGES, CULVERTS & RETAINING WALLS ETC.
SPEC / PAY
CODE DESCRIPTION UNIT RATE
ITEM
1008.1-
Supplying & fixing 25 mm thick planks and struts of class ii timber
ST1 - 064 1008.3/1008 sq.m 1,569.60
as formwork rough finish, in Foundation etc, including removing. (2)
707.3 ( C) -
Supplying Laying & jointing 152 mm dia. Concrete pipes (
ST1 - 066 707.4/707(6) l.m. 2,771.20
transport and bedding material paid separately ) (a)
707.3 ( C) -
Supplying Laying & jointing 229 mm dia. Concrete pipes (
ST1 - 067 707.4/707(6) l.m. 3,963.50
transport and bedding material paid separately ) (a)
707.3 ( C) -
Supplying Laying & jointing 305 mm dia. Concrete pipes (
ST1 - 068 707.4/707(6) l.m. 4,440.60
transport and bedding material paid separately ) (a)
707.3 ( C) -
Supplying Laying & jointing 457 mm dia. Concrete pipes (
ST1 - 069 707.4/707(6) l.m. 5,768.40
transport and bedding material paid separately ) (a)
707.3 ( C) -
Supplying Laying & jointing 610 mm dia. Concrete pipes (
ST1 - 070 707.4/707(6) l.m. 8,953.30
transport and bedding material paid separatelly ) (a)
707.3 ( C) -
Supplying Laying & jointing 915 mm dia. Concrete pipes (
ST1 - 071 707.4/707(6) l.m. 14,780.30
transport and bedding material paid separately ) (a)
ST1 - 096 Demolishing reinforced concrete and debris cleared : 202.2/202(2) cu.m 5,083.00
a
Supplying & fixing m.s. dowels, spliced and dove tailed with
ST1 - 098 wedge at one end, 16 mm dia. And 1 m long, boring holes to 0.3 1010(1) nos. 861.90
m depth in fixing : (Without VAT)
Fabricate & lay 12mm. Diameter 0.60m long m.s. dowels at the
ST1 - 098A 1010(1) nos. 139.40
construction joints : (Without VAT)
Supplying & fixing m.s. dowels, spliced and dove tailed with
ST1 - 099 wedge at one end, 20 mm dia. And 1 m long, boring holes to 0.3 1010(1) nos. 1,080.60
m depth in fixing :
Supplying & fixing m.s. dowels, spliced and dove tailed with
ST1 - 100 wedge at one end, 25 mm dia. And 1 m long, boring holes to 0.3 1010(1) nos. 1,453.50
m depth in fixing :
40
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR - 2021
SECTION X
BRIDGES, CULVERTS & RETAINING WALLS ETC.
SPEC / PAY
CODE DESCRIPTION UNIT RATE
ITEM
41
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR - 2021
SECTION XI
KILOMETER POSTS AND GUARD STONES
SPEC / PAY
CODE DESCRIPTION UNIT RATE
ITEM
1406.3
RF1 - 001 White washing, two coats to gride / guard stones :
1406(7)
nos. 75.80
1406.3
RF1 - 001A Painting two coats to gride / guard stones with imulsion paint :
1406(8)
nos. 423.50
White washing two coats k.m. stones inc. Numbering & tar
RF1 - 002 1406(7) nos. 792.40
skirting :
Painting two coats k.m. stones with imulsion paint including
RF1 - 002A 1406(8) nos. 1,487.60
numbering & tar skirting :
RF1 - 003 Painting white back ground on parapets etc. & stencillingt nos. : nos. 302.20
808.3(b),
RF1 - 004 Fixing guard stones in any soil :
808(s)
nos. 230.60
Casting std. K.m. stones with r.c.c. ( 1:2:4 ( 19 mm ) & cement 819.1-
RF1 - 005
819.3/819(1)
nos. 6,741.70
282.5 kg/cu.m ), including curing, for "a" and "b" class roads :
Casting std. K.m. stones with r.c.c ( 1:2:4 ( 19 mm ) & cement 819.1-
RF1 - 006
819.3/819(1)
nos. 4,538.10
282.5 kg/cu.m ), including curing, for "c" and "d" class roads :
RF1 - 007 Fixing standard type k.m. stones in any soil : 819/819(2) nos. 1,712.70
42
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR - 2021
SECTION XII
NOTICE BOARDS & SIGN BOARDS
SPEC / PAY
CODE DESCRIPTION UNIT RATE
ITEM
Notice & traffic sign boards etc. Fixed in concrete ( 1:3:6 (37.5mm
RS1 - 001 nos. 1,638.00
) and cement 219 kg/cu.m ), ( excluding transport of aggregate ) :
Cleaning & whitewashing 2 coat town name boards ( inc. Tar skirt
RS1 - 002 nos. 426.20
)
Cleaning, painting one coat & relettering etc. Traffic sign boards
RS1 - 003 nos. 2,456.60
inc. Paint post in b/w
RS1 - 004 Cleaning and painting 1 coat on notice board nos. 362.30
43
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR - 2021
SECTION XIII
MISCELLANEOUS
SPEC / PAY
CODE DESCRIPTION UNIT RATE
ITEM
44
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR - 2021
SECTION XIII
MISCELLANEOUS
SPEC / PAY
CODE DESCRIPTION UNIT RATE
ITEM
separatel ) :
MS1 - 031 Weeding masonry culverts small bridges and retaining walls : nos. 223.20
301.3/1201.3
MS1 - 034 Reducing high sides in ordinary soil
©/1201(4)
cu.m 694.30
301.3/1201.3
MS1 - 035 Reducing high sides in medium soil
©/1201(4)
cu.m 1,020.30
301.3/1201.3
MS1 - 036 Reducing high sides in Hard soil
©/1201(4)
cu.m 1,346.30
301.3/1201.3
MS1 - 037 Reducing high sides in soft rock :
©/1201(4)
cu.m 1,672.30
301.3/1201.3
MS1 - 038 Reducing high sides in rock requiring blasting :
©/1201(4)
cu.m 3,216.90
1403.3(e),
MS1 - 039 White washing 1 coat to parapets of bridges and culverts.
1403(7)
sq.m 48.40
45
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR - 2021
SECTION XIII
MISCELLANEOUS
SPEC / PAY
CODE DESCRIPTION UNIT RATE
ITEM
1403.3(e),
MS1 - 040 White washing 2 coat to parapets of bridges and culverts.
1403(7)
sq.m 83.30
46
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR - 2021
SECTION XIV
SURVEYING, LEVELING AND DAYWORKS
SPEC / PAY
CODE DESCRIPTION UNIT RATE
ITEM
SV1 - 005 Clearing jungle ( light ) to a width of 1.22 metres for survey work : km 6,875.80
SV1 - 011 Changing traverse lines and taking off sets km 4,889.40
SECTION XIV
SPECIAL RATES
SPEC / PAY
CODE DESCRIPTION UNIT RATE
ITEM)
Patching road with premix (loose volume) after prep. Surface and
SR 11 cu.m 5,640.10
stamping (supply of premix (loose vol.) Paid separately) :
47
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR - 2021
SECTION XV
SPECIAL RATES
SPEC / PAY
CODE DESCRIPTION UNIT RATE
ITEM
48
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR - 2021
Grouting rubble paving with approved cement & sand mortar 804.2 ( C )
ST1 - 015 sq.m 783.00
(1:3) : /804(1)b
Mixing & laying manually cement concrete 1:4:8 (50 mm) using
ST1 - 034 crusher run aggregate ( volume batching ) 1001.4/1001(4) cu.m 14,210.80
( excl. Transport of aggregate & piling ) : a, 1001.8©
Mixing & laying using concrete mixer, cement concrete 1:4:8 (50
1001.8(d),1001
ST1 - 035 mm ) ( volume batching )using crusher run aggregate ( excl. cu.m 13,839.50
(3),1001(4)b
Transport of aggregate & piling)
49
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR - 2021
SECTION X
BRIDGES, CULVERTS & RETAINING WALLS ETC.
SPEC / PAY
CODE DESCRIPTION UNIT RATE
ITEM
Mixing & laying manually cement concrete 1:4:8 ( 50 mm ) with
1001.8(c),1001
ST1 - 036 20% plums ( volume batching ). Using crusher run Aggregate ( cu.m 13,333.40
(3),1001(4)c
excl.transport of aggregate & piling ) :
50
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR - 2021
SECTION X
BRIDGES, CULVERTS & RETAINING WALLS ETC.
SPEC / PAY
CODE DESCRIPTION UNIT RATE
ITEM
Mixing & laying using concrete mixer ( w/batching ), cement
concrete for grade 25 ( 19 mm ) using crusher run aggregate in 1001.8(d),1001
ST1 - 048 cu.m 19,209.40
foundation & floors ( excluding transport of aggregate & piling ) (3)d
:*
Mixing & laying using concrete mixer ( w/batching ), cement
1001.8(d),1001
ST1 - 048A concrete for grade 25 (70% 37.5+30% 19 ) using crusher run cu.m 17,785.90
(3)d
aggregate, ( excluding transport of aggregate & piling ) :*
51
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR - 2021
SECTION XI
KILOMETER POSTS AND GUARD STONES
SPEC / PAY
CODE DESCRIPTION UNIT RATE
ITEM
Casting std. K.m. stones with r.c.c. ( 1:2:4 ( 19 mm ) & cement 819.1-
RF1 - 005 nos. 6,869.70
282.5 kg/cu.m ), including curing, for "a" and "b" class roads : 819.3/819(1)
Casting std. K.m. stones with r.c.c ( 1:2:4 ( 19 mm ) & cement 819.1-
RF1 - 006 nos. 4,626.50
282.5 kg/cu.m ), including curing, for "c" and "d" class roads : 819.3/819(1)
SECTION XIV
SPECIAL RATES
SPEC / PAY
CODE DESCRIPTION UNIT RATE
ITEM)
52
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR - 2021
Transport of percast concrete hand rails. Up - rights and joints for l.m. /
T1 - 045 4.30
bridge works, including loading and unloading : k.m.
Transport of percast concrete slabs 450x450x50 mm for foot s.q./
T1 - 046 5.30
walks, including loading and unloading : k.m.
SECTION III
AGGREGATE / RUBBLE PILING INCLUDING LOADING & UNLOADING
SPEC / PAY
CODE DESCRIPTION UNIT RATE
ITEM
53
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR - 2021
SECTION VI
COST OF WATERING TO BE DEDUCTED FROM RATE, IF NOT CARRIED OUT UNDER THE RELEVANT ITEMS.
SPEC / PAY
CODE DESCRIPTION UNIT RATE
ITEM
54
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR - 2021
SECTION X
BRIDGES, CULVERTS & RETAINING WALLS ETC.
SPEC / PAY
CODE DESCRIPTION UNIT RATE
ITEM
ST1 - 051 Mixing & laying cement concrete by hand : cu.m 5,664.30
Supplying Laying & jointing 1220 mm dia. Concrete pipes (
ST1 - 072 m. 22,098.40
transport and bedding material paid separately )
Supplying Laying & jointing 152 mm dia. Available concrete pipes
ST1 - 073 l.m. 771.20
and collars :
55
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR - 2021
56
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR - 2021
57
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR - 2021
58
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR - 2021
The cost includes loading, unloading and 20% profit and overhead
Distance Distance / Km Cost / M (Rs.cts) Distance/Km Cost / M (Rs.cts)
59
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT
HSR - 2021
The cost includes loading, unloading and 20% profit and overhead
Distance Distance / Km Cost / M (Rs.cts) Distance/Km Cost / M (Rs.cts)
0.5 Up to 1 82.00 52 478.10
2 92.70 53 485.40
3 103.40 54 492.70
4 114.10 55 500.00
5 124.80 56 507.30
6 135.50 57 514.60
7 146.20 58 521.90
8 156.90 59 529.20
9 164.20 60 536.50
10 171.50 61 543.80
11 178.80 62 551.10
12 186.10 63 558.40
13 193.40 64 565.70
14 200.70 65 573.00
15 208.00 66 580.30
16 215.30 67 587.60
17 222.60 68 594.90
18 229.90 69 602.20
19 237.20 70 609.50
20 244.50 71 616.80
21 251.80 72 624.10
22 259.10 73 631.40
23 266.40 74 638.70
24 273.70 75 646.00
25 281.00 76 653.30
26 288.30 77 660.60
27 295.60 78 667.90
28 302.90 79 675.20
29 310.20 80 682.50
30 317.50 81 689.80
31 324.80 82 697.10
32 332.10 83 704.40
33 339.40 84 711.70
34 346.70 85 719.00
35 354.00 86 726.30
36 361.30 87 733.60
37 368.60 88 740.90
38 375.90 89 748.20
39 383.20 90 755.50
40 390.50 91 762.80
41 397.80 92 770.10
42 405.10 93 777.40
43 412.40 94 784.70
44 419.70 95 792.00
45 427.00 96 799.30
46 434.30 97 806.60
47 441.60 98 813.90
48 448.90 99 821.20
49 456.20 100 828.50
50 463.50 101 835.80
51 470.80 102 843.10
60
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR - 2021
The cost includes loading, unloading and 20% profit and overhead
Distance Distance / Km Cost / M (Rs.cts) Distance/Km Cost / M (Rs.cts)
0.5 Up to 1 147.50 52 678.80
2 161.80 53 688.60
3 176.10 54 698.40
4 190.40 55 708.20
5 204.70 56 718.00
6 219.00 57 727.80
7 233.30 58 737.60
8 247.60 59 747.40
9 257.40 60 757.20
10 267.20 61 767.00
11 277.00 62 776.80
12 286.80 63 786.60
13 296.60 64 796.40
14 306.40 65 806.20
15 316.20 66 816.00
16 326.00 67 825.80
17 335.80 68 835.60
18 345.60 69 845.40
19 355.40 70 855.20
20 365.20 71 865.00
21 375.00 72 874.80
22 384.80 73 884.60
23 394.60 74 894.40
24 404.40 75 904.20
25 414.20 76 914.00
26 424.00 77 923.80
27 433.80 78 933.60
28 443.60 79 943.40
29 453.40 80 953.20
30 463.20 81 963.00
31 473.00 82 972.80
32 482.80 83 982.60
33 492.60 84 992.40
34 502.40 85 1,002.20
35 512.20 86 1,012.00
36 522.00 87 1,021.80
37 531.80 88 1,031.60
38 541.60 89 1,041.40
39 551.40 90 1,051.20
40 561.20 91 1,061.00
41 571.00 92 1,070.80
42 580.80 93 1,080.60
43 590.60 94 1,090.40
44 600.40 95 1,100.20
45 610.20 96 1,110.00
46 620.00 97 1,119.80
47 629.80 98 1,129.60
48 639.60 99 1,139.40
49 649.40 100 1,149.20
50 659.20 101 1,159.00
51 669.00 102 1,168.80
61
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR - 2021
Annexure III
Transport cost of 457 mm dia Hume Pipe
The cost includes loading, unloading and 20% profit and overhead
Distance Distance / Km Cost / M (Rs.cts) Distance/Km Cost / M (Rs.cts)
0.5 Up to 1 232.40 52 1,029.00
2 253.80 53 1,043.70
3 275.20 54 1,058.40
4 296.60 55 1,073.10
5 318.00 56 1,087.80
6 339.40 57 1,102.50
7 360.80 58 1,117.20
8 382.20 59 1,131.90
9 396.90 60 1,146.60
10 411.60 61 1,161.30
11 426.30 62 1,176.00
12 441.00 63 1,190.70
13 455.70 64 1,205.40
14 470.40 65 1,220.10
15 485.10 66 1,234.80
16 499.80 67 1,249.50
17 514.50 68 1,264.20
18 529.20 69 1,278.90
19 543.90 70 1,293.60
20 558.60 71 1,308.30
21 573.30 72 1,323.00
22 588.00 73 1,337.70
23 602.70 74 1,352.40
24 617.40 75 1,367.10
25 632.10 76 1,381.80
26 646.80 77 1,396.50
27 661.50 78 1,411.20
28 676.20 79 1,425.90
29 690.90 80 1,440.60
30 705.60 81 1,455.30
31 720.30 82 1,470.00
32 735.00 83 1,484.70
33 749.70 84 1,499.40
34 764.40 85 1,514.10
35 779.10 86 1,528.80
36 793.80 87 1,543.50
37 808.50 88 1,558.20
38 823.20 89 1,572.90
39 837.90 90 1,587.60
40 852.60 91 1,602.30
41 867.30 92 1,617.00
42 882.00 93 1,631.70
43 896.70 94 1,646.40
44 911.40 95 1,661.10
45 926.10 96 1,675.80
46 940.80 97 1,690.50
47 955.50 98 1,705.20
48 970.20 99 1,719.90
49 984.90 100 1,734.60
50 999.60 101 1,749.30
51 1,014.30 102 1,764.00
62
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR -2021
Annexure III
Transport cost of 610 mm dia Hume Pipe
The cost includes loading, unloading and 20% profit and overhead
Distance Distance / Km Cost / M (Rs.cts) Distance/Km Cost / M (Rs.cts)
63
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR -2021
The cost includes loading, unloading and 20% profit and overhead
Distance Distance / Km Cost / M (Rs.cts) Distance/Km Cost / M (Rs.cts)
64
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR -2021
The cost includes loading, unloading and 20% profit and overhead
Distance Distance / Km Cost / M (Rs.cts) Distance/Km Cost / M (Rs.cts)
65
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR -2021
The cost includes 20% profit and overhead & excluding the cost of loading & unloading.
66
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR -2021
Annexure III
Transport cost of Cement (50Kg bags)
The cost includes loading, unloading and 20% profit and overhead
Distance Distance / Km Cost / Bags (Rs. Cts) Distance/Km Cost / Bags (Rs. Cts)
67
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
HSR -2021
68
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT - UVA
Annexure 1
SPECIFICATIONS RELATED TO THE HSR ITEMS
EARTH WORKS
(a) Embankment construction -- SSCM section 304
Type I MDD>=1600hg/m^3
Type II MDD>=1500hg/m^3
HRS Items EW1-011, EW1-014
(b) Soil for road - shoulders and gravel surfacing - SSCM section 409 & 601:
Table 1708-1
Percentage
Sieve size (mm)
passing
37.5 100
19 75-100
4.75 40-100
2.36 30-80
0.6 18-50
0.075 05-25
Table 1708-2 Consistancy limits for road shoulder materials and gravel surfacings
Climatic Zone LL PL
Wet zone < 40 4-15
Dry zone < 50 6-25
2 Aggregates
(a) Single size aggregate bases - 50, 37.5, 19 & 12.5mm - SSCM section 403:
Table 1701-4
Percentage passing
Sieve Size
Normal size in mm
mm 50 37.5 19 12.5
63 100 - - -
50 85-100 100 - -
37.5 0-30 85-100 - -
25 0-7 0-30 100 -
19 0-2 0-7 85-100 100
12.5 - 0-2 0-35 85-100
9.5 - - 0-7 0-35
4.75 - - - 0-5
2.36 - - 0-2 0-2
AIV <=30%
FL<=35%
HSR Items M1-004, M1-007, M1-008, M1-009, A1-005 To A1-012
69
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT
(b) Water bound macadam and Dry bound macadam - SSCM section 404:
(50 or 63 mm and crusher fines)
Percentage passing
Sieve Size
Normal max size of agg in mm
Crusher fines
mm 63 50
75 100 - -
63 90 - 100 100 -
50 30 - 70 90 - 100 -
37.5 0 - 15 30 - 70 -
25 - 0 - 15 -
19 0-5 - -
12.5 - 0-5 -
9.5 - - 100
4.75 - - 85 - 100
0.15 - - 10 - 30
AIV <=30%
FL <=35%
HSR Items : M1-010, M1-011
AIV <=30%
FL <=35%
HSR Items : S1-037, S1-038
AIV <=30%
FL <=35%
CBR >=80%
HSR Items : M1-012, M1-013
70
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT
(e) Bitumen Bound base - SSCM section 407
Table 1701-6
Mixclassification no 1 2 3 4
Nominal maximum size
37.5 37.5 19 19
aggregate in mm
Course Dense graded Open graded Dense graded Open graded
Thickness mm - Max 100 100 50 40
- Min 50 50 30 30
Sieve size mm Total % by weight passing
50 100 100 - -
37.5 95 - 100 95 - 100 - -
25 75 - 90 35 - 65 100 100
19 - - 70 - 100 95 - 100
12.5 60 - 75 20-May - 35 - 65
9.5 - - 35 - 60 20 - 40
4.75 - - 15 - 35 -
2.36 30 - 45 0 - 10 5 - 20 20-May
0.075 0-6 0-2 0-4 0-2
Percent binder content by
3.0 - 4.0 2.5 - 3.5 3.5 - 4.5 3.0 - 4.0
total weight if mix.
AIV <=30%
Fl<=35%
HSR Items : B0-362, S1-032
3 Surfacing :
(a) Asphalt concrete - SSCM section 506:
Table 506-1
Wearing
Mix. Classification No. Wearing
Binder Course Course Type -
Course Course Type - 1
2
Thickness mm-
Max. 75 75 75
Min 35 35 35
Sieve size mm Total % by weight passing including filler if
25 100 100 -
19 88 - 100 90 - 100 100
12.5 - - 80 - 100
9.5 54 - 80 65 - 93 73 - 93
4.75 34 - 56 45 - 73 52 - 69
2.36 21 - 38 35 - 58 32 - 50
1.18 15 - 33 26 - 48 25 - 43
0.6 10 - 26 18 - 38 19 - 35
0.3 06 - 20 13 - 26 14 - 27
0.15 03 - 13 08 - 20 09 - 18
0.075 01 - 07 04 - 12 05 - 10
Percent binder content by
3.5 - 4.5 4.0 - 5.0 4.0 - 5.5
total weight of mix.
AIV <=30%
Fl<=35%
LAAV<=40%
71
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT
(b) Seal Coat treatments (Surface dressing) - SSCM section 505:
Table 1701-8
Percentage passing
Sieve Size
Nominal size in mm
mm 19 12.5 9.5 6.3
25 100 - - -
19 85 - 100 100 - -
12.5 0 - 25 85 - 100 100 -
9.6 0-7 0 - 25 85 - 100 100
6.3 - - 0 - 25 85 - 100
4.75 - 0-7 0 - 10 -
2.36 0-2 0-2 0-2 0 - 10
0.075 0 - 0.5 0 - 0.5 0 - 0.5 0 - 0.5
AIV<=30%
FL<=35%
LAAV<=40%
72
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT
Annexure - 02
THE QUANTITIES OF THE VARIOUS MATERIALS FOR CEMENT CONCRETE AND CEMENT MORTARS REQUIRED TO
YIELD AN AVERAGE WORKABLE MIX SHALL BE AS FOLLOWS.
# IN ITEMS 12-15 THE CEMENT QUANTITIES IS EXCLUSIVE OF THAT REQUIRED FOR SMOOTHING WHERE
NECESSARY.
* THE ABOVE MIX PROPORTIONS FOR GRADE CONCRETE ARE GIVEN FOR ESTIMATION PUROSES. THE
ACTUAL PROPORTION FOR GRADE CONCRETE SHALL BE DECIDED BY MIX DESIGNS AT SITE AND THE RATES
SHALL BE ADJUSTED WITH THE APPROVAL OF THE PD.
73
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT
Annexure - 03
Table 403 - 1 - Rates of Spread of Aggregate
Rate of Spread
Nominal thickness
Aggregates Size
of base layer Cubic metres per 100
Cubic ft per 100 sq.ft
sq.m
74
PROVINCIAL ROAD DEVELOPMENT DEPARTMENT