Jam Pompa Penyedot Air Oprasiaonal
Jam Pompa Penyedot Air Oprasiaonal
DAY
No. Unit Work Unproductive Total Down PA UA
(Hours) (Hours) (Hours) (%) (%)
- Unit Loading
1 WP 408 3.00 8.00 11.00 - 100% 50%
2 WP 01 - - - 11.00 0% 0%
3 WP 02 - - - 11.00 0% 0%
4
5
DAILY
No. Unit Work Unproductive Total Down PA UA
(Hours) (Hours) (Hours) (%) (%)
- Unit Loading
1 WP 408-Mitsubshi 3.00 19.00 22.00 - 100% 50%
2 WP 01-150 - - - 22.00 0% 0%
3 WP 02-100 - - - 22.00 0% 0%
4
5
NIGHT
Fuel Fuel Cons. Work Unproductive Total Down PA UA Fuel Fuel Cons.
liter (Liter/Hr) (Hours) (Hours) (Hours) (%) (%) liter (Liter/Hr)
52.00 - - - - 11.00 0% 0% - -
- - - - - 11.00 0% 0% - -
MTD
Fuel Fuel Cons. Work Unproductive Total Down PA UA Fuel Fuel Cons.
liter (Liter/Hr) (Hours) (Hours) (Hours) (%) (%) liter (Liter/Hr)
362.00 120.67 97.50 166.50 264.00 22.00 96% 50% 751.00 7.70
52.00 - 45.00 33.00 78.00 208.00 43% 50% 161.00 3.58
- - 84.00 169.00 253.00 34.00 94% 50% 125.00 1.49
1,037.00
11.00 11.00
11.00 11.00
11.00 11.00
- -
- -
22.00 286.00
22.00 286.00
22.00 287.00
- -
- -