nit - 3

Preparation of preliminary and detailed estimates working out estimates for


buildings whose plans, section and elevations are given.

Working out cost of construction based upon the plinth area rates, covered
ea rates etc.

Rate analysis of various items concrete, RCC brickwork etc. using the market
es CPWD (97) of materials and labor.

CPWD schedule of rates latest edition of 1997. Rates as given in schedule to


used as guidelines for making estimates.
DETAILED ESTIMATES
700
120

3000

120
400

450
400
200
THANK YOU