Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

Job No:RBITS/MT/2019-20 Date: 19.02.

2020

CC KERB STONE (CORE) TEST REPORT

Name of Client : The Executive Engineer,


Project Central 10,
BBMP Bangalore.

Name of work : White Topping on Selected Roads in Bengaluru City, Under Pahse-2, Package
No 03.
No.of Sample Tested : 03
Location ID : Jayanagar
Date of Testing : 19.02.2020
Techinical Reference : IS:516-1959 (Reaffirmed 2008), SP-24:1983.

Correct Correction
Corrected Equivalent
ion Factor for
Dia of Height of Core Density of Failure Core Cylinder Cube
Sl. factor the Dia.
Core Core Wt Core H/D Load Strength Compressive Compressive
No. (Based (Strength of
D (mm) H (mm) (Kg) (kg / m3) (kN) ( N/mm2) Strength Strength
on the Core x
(N/mm2) (N/mm2)
H/D) 1.08)

1 65.00 109.00 0.823 2275.39 1.68 0.960 26.50 7.99 8.62 8.28 10.35

2 65.00 104.00 0.825 2390.58 1.60 0.960 28.80 8.68 9.37 9.00 11.25

3 65.00 109.00 0.826 2283.69 1.68 0.960 41.20 12.42 13.41 12.87 16.09

Note:
1. The report shall not be reproduced, except in full, without the written approval of the laboratory.
2. The results indicated above are based on the tests carried out on the samples received in the laboratory.
3. Any Query regarding the report must be reported immediately.
Job No:RBITS/MT/2019-20 Date: 19.02.2020

CC KERB STONE (CORE) TEST REPORT

Name of Client :

Name of work :

No.of Sample Tested :

Location ID :

Date of Testing :

Techinical Reference : IS:516-1959 (Reaffirmed 2008), SP-24:1983.

Correct Correction
Corrected Equivalent
ion Factor for
Dia of Height of Core Density of Failure Core Cylinder Cube
Sl. factor the Dia.
Core Core Wt Core H/D Load Strength Compressive Compressive
No. (Based (Strength of
D (mm) H (mm) (Kg) (kg / m3) (kN) ( N/mm2) Strength Strength
on the Core x
(N/mm2) (N/mm2)
H/D) 1.08)

1 65.00 105.00 0.840 2410.87 1.62 0.960 19.70 5.94 6.41 6.16 7.69

2 65.00 105.00 0.840 2410.87 1.62 0.960 19.70 5.94 6.41 6.16 7.69

2 65.00 109.00 0.834 2305.81 1.68 0.960 29.20 8.80 9.50 9.12 11.40

Note:
1. The report shall not be reproduced, except in full, without the written approval of the laboratory.
2. The results indicated above are based on the tests carried out on the samples received in the laboratory.
3. Any Query regarding the report must be reported immediately.

You might also like