Design Basis Report For Balance of Plant Equipments (Mechanical)
Design Basis Report For Balance of Plant Equipments (Mechanical)
Date 06.01.15
DOCUMENT NO JP0025-75990100-DBR-001 Rev 04
No. of pages 68
DESIGN BASIS REPORT –BALANCE OF PLANT EQUIPMENTS
CONTENTS
INTRODUCTION 3
1.
PROJECT DETAILS & SITE DATA 3
PROJECT :
1 X 50MW EXTN. THERMAL POWER PLANT FOR
PROJECT ID : JP0025
M/s. SPECTRUM COAL & POWER LIMITED.
PREPARED BY VERIFIED BY APPROVED BY DATE : 06.01.15
S.VIJAYASEKAR T. THANAPAL BRR SHEET : 2 of 68
DESIGN BASIS REPORT –BALANCE OF PLANT EQUIPMENTS
01.00.00 INTRODUCTION
01.00.01 The purpose of this design basis report is to elaborate the sizing and specification of
BOP equipments and systems for the extension of 50MW thermal power plant
proposed at the village Ratija, District Korba and state Chattisgarh.
02.00.01 Air cooled condenser and its auxiliaries shall be provided for cooling of turbine
Exhaust steam. The proposed Air-cooled condenser is designed for 50 MW TMCR
condition with design ambient temperature as 38°C to maintain 0.18 bar (a) exhaust
pressure during 50 MW generation.
Pump capacity & Head 190 m3/hr & 150 MWC (Tentative)
MOC Aluminum.
Type KL / LL Finned tube.
Ejector
Hogging ejector
Quantity 1 X 100 %
Capacity 70% vacuum in 30 minutes
No. of Stages One (1).
Holding Ejector
Quantity 2 X 100 %
No. of Stages Two (2).
Inter / After condenser tubes
Stainless Steel (ERW)
MOC
Manual changeover of hogging to holding
Changeover ejector and working to standby holding
ejector
MOC
Terminal points
two sections called the main condenser section and the vent or Dephlegmator sections.
The arrangement shall be such that the steam flows and condenses inside the tubes
with the cooling air flowing outside the tubes. The air flow outside the tubes shall be
cross flow type entering the tube bundles at the bottom and leaving the bundles at the top.
2.1.2 The ACC shall be divided into a number of modules with each of the modules served by
one fan. Each of the modules shall be designed with a number of condenser tube bundles
and a vent/ dephlegmator bundle.
2.1.3 The exhaust steam duct from the turbine exhaust flange and up to the inlet of the steam
distribution manifold shall be of all welded construction with necessary expansion joints for
limiting the thermal load on the turbine and the ACC and also to restrict the expansion
stresses in the ducting itself. At the turbine end necessary transition piece shall be provided
for connecting the circular ducting to the rectangular outlet flange of the turbine. Necessary
bifurcation in the ducting shall be provided for supplying the exhaust steam to the multiple
modular rows of the ACC. Necessary supports and guides for the ducting shall be provided.
Adequate number of access openings shall be provided in the horizontal run of the steam
duct and in the ACC steam manifold.
2.1.4 An adequately designed drain pot (hot well) shall be provided in the horizontal portion of
the steam ducting immediately down stream of the turbine exhaust. The hot well shall be
adequate for receiving the initial condensate from the ducting (at the time of start up),
condensate from the gland steam condenser, LP Heater normal drain and low temperature
drains from the piping. The condensate from the hot well shall be pumped to the
condensate storage tank.
2.1.5 A rupture disc designed to rupture at a pressure of 0.3 kg/Sq.cm (g) shall be located at a
suitable location in the steam ducting with proper venting arrangement to a location outside
the building.
2.1.6 RCC supporting Structure including Fan Deck & deck slab, supporting columns, beams,
condensate tank supporting structure with platform, duct supports, ejector-supporting
structure with platform, stair case & walk way shall be provided
2.1.7 All Gratings and handrails shall be of Mild steel painted type.
PROJECT :
1 X 50MW EXTN. THERMAL POWER PLANT FOR
PROJECT ID : JP0025
M/s. SPECTRUM COAL & POWER LIMITED.
PREPARED BY VERIFIED BY APPROVED BY DATE : 06.01.15
S.VIJAYASEKAR T. THANAPAL BRR SHEET : 8 of 68
DESIGN BASIS REPORT –BALANCE OF PLANT EQUIPMENTS
2.1.8 2 MT chain pulley block with monorail for maintenance of fans, fan motors and gear box
shall be provided
2.1.9 Mineral wool Insulation with aluminum cladding for condensate storage tank and
condensate piping from CEP discharge up to inlet of Deaerator shall be provided.
2.1.10 Surface preparation shall be of with wire brush cleaning and Painting shall be two coats of
anti-corrosive primer (min. 35 micron DFT / coat) (as per IS 2074) + two coats of synthetic
enamel finish paint (min. 35 DFT/ coat) (as per IS 2932). The total dry film thickness of
Primer and finish coat shall be minimum 140 DFT microns combined for all painting
applicable area’s of ACC and it’s auxiliaries.
2.1.11 Air cooled condenser design will provide adequate bowing and sloping of tubes to assure
complete drainage of tubes.
2.1.12 Thermal performance of ACC will be measured at TG exhaust flange.
2.1.13 The ACC design will ensure no steam back flow is possible in any operating condition in
case of non operation of fan.
2.1.14 Entire operation and control of Air cooled condenser including Sequence control of fans, hot
well level control, condensate tank level control & CEP minimum recirculation control shall
be from Main control room. Detailed control philosophy of Air cooled condenser shall be
provided during detail engineering.
PROJECT :
1 X 50MW EXTN. THERMAL POWER PLANT FOR
PROJECT ID : JP0025
M/s. SPECTRUM COAL & POWER LIMITED.
PREPARED BY VERIFIED BY APPROVED BY DATE : 06.01.15
S.VIJAYASEKAR T. THANAPAL BRR SHEET : 9 of 68
DESIGN BASIS REPORT –BALANCE OF PLANT EQUIPMENTS
03.01.01 Existing raw water storage tank shall be applicable for this extn. Power plant.
03.02.01 Water treatment plant is totally Excluded from Isgec scope of supply (Shall be Suitably
sized by M/s.SCPL)
03.02.01.1 DM Water shall be taken from existing MB outlet line and if required booster pump
will be provided to feed the DM tank. 250 m^3 IS2062 Gr.B MSEP tank (1no.) shall be
provided for storing the DM water which is available from existing water treatment
plant. This water shall be utilized for initial filling of boiler and make-upping at
condensate storage tank to compensate the DM water loss occurred during boiler blow
down. GA of DM Tank is attached herewith.
03.02.01.2 Filtered / soft water shall be taken from existing soft water storage tank by extending
existing CT Make-water pump suction header to have a suction source of Isgec
proposed CT Make-up pump.
03.02.01.3 Isgec will take necessary tapping for raw water from existing raw water reservoir /
piping and / or ETP discharge (Tapping point will be finalized during mutual
discussion) for further distribution up to individual consuming points like Boiler (for
Blow down quenching), HCSD, etc.
03.02.01.4 Potable and Service water storage tanks (2m^3 HDPE / each) shall be provided at the
top of control room for drinking and other sanitary water requirements of proposed
plant. Source of tapping for the same shall be taken from existing inlet piping of
potable & service water tanks.
03.02.01.5 Quality and Quantity requirement of initial filling & make-up water for Boiler cooling
tower make-up, raw water and service water shall be as per the following.
PROJECT :
1 X 50MW EXTN. THERMAL POWER PLANT FOR
PROJECT ID : JP0025
M/s. SPECTRUM COAL & POWER LIMITED.
PREPARED BY VERIFIED BY APPROVED BY DATE : 06.01.15
S.VIJAYASEKAR T. THANAPAL BRR SHEET : 10 of 68
DESIGN BASIS REPORT –BALANCE OF PLANT EQUIPMENTS
S.
Description unit Quantity Remarks
No
1. Cooling tower capacity m3/hr 910
0.05% of cooling tower
2. Drift loss m3/hr 0.455
capacity.
(Temperature difference: 8 /
3. Evaporation loss m3/hr 11.91 6.11)
% of cooling tower capacity.
((Evaporation loss /
(Cycles of concentration – 1))
4. Blow down loss m3/hr 2.5225
– (Drift loss)).
Cycles of concentration: 5
Total make up water to
5. m3/hr ~14.9 (2)+(3)+(4)
the cooling tower
S.
Description unit Quantity Remarks
No
1. HCSD m3/hr 40 As per Isgec Reference data
Boiler blow down
2. m3/hr 10 As per Isgec Reference data
quenching
Semi automatic fin
Intermittent filling of 1 m3
3. cleaning system for m3/hr 1
tank
ACC
Total service water
4. required at m3/hr 51 (1)+(2)+(3)
consumption point
M/s. SCPL has to provide the raw water quantity 51 m³/hr considering 24 hours
operation at one point near proposed CFBC Boiler column.
S.
Description unit Quantity Remarks
No
Drinking and Service 45 liters per head per day
1. m3/hr ~1
water requirement (Assume - 22 persons /
Shift)
12 Provided thickness mm 6
PROJECT :
1 X 50MW EXTN. THERMAL POWER PLANT FOR
PROJECT ID : JP0025
M/s. SPECTRUM COAL & POWER LIMITED.
PREPARED BY VERIFIED BY APPROVED BY DATE : 06.01.15
S.VIJAYASEKAR T. THANAPAL BRR SHEET : 13 of 68
DESIGN BASIS REPORT –BALANCE OF PLANT EQUIPMENTS
8 Provided thickness 10
Boiler blow down – Shall be conveyed through the drain trench sloped towards guard pond
Cooling tower blow down – Shall be conveyed through piping sloped towards guard pond
Waste water:
Plant domestic waste and sanitary water shall be collected by gravity to septic tank / soak pit for
anaerobic treatment.
S.
Description Value
No
Counter flow
1 Type of cooling tower
Induced draft fan
Cold water Basin with partition wall : RCC
Casing & superstructure : RCC
Fan deck : RCC
Fan stack : FRP
Hot water basin : RCC
Staircase : RCC
Fill support & louvers : RCC
Fills - PVC Film flow type.
Drift eliminator – Multi pass herringbone type / PVC
Cellular type / Double pass blade type.
Fan – Axial flow Propeller type
Fan blade – FRP
2 Construction Features Fan drive- Energy efficient motor
Spray nozzle – Polypropylene low pressure non clog.
Gear box –Spherical bevel cum helical will be
provided if required.
Common steel suction header shall be provided for
interconnecting cold water basins of all cells and
common suction headers for circulating water pumps
Vibration switch & level indicators will be provided
for fan & gearbox.
Hand railing will be provided at fan deck level
Common lifting arrangement for Fan, gearbox &
motor will be provided.
Two speed motor will be provided.
Cold water outlet
3 33
temperature in Deg C
Hot water inlet temperature
4 41
in Deg C
Design wet bulb temperature
5 28
in Deg C
6 Range in Deg C 8
7 Approach in Deg C 5
Relative Humidity %
(a) Performance/Design : 60
8.
(b) Maximum : 83
(c) Min
: 33
9 Cooling water treatment Sodium hypochlorite dosing system
Cooling water
S. No Description Remarks
Flow in CMH
05.00.01 Specification
S.
No Pump Boiler initial
Name Auxiliary DM Water filling and Cooling
cooling water transfer Deaerator tower make-
pumps pumps emergency up pumps
filling pumps
Description
Centrifugal Centrifugal
Centrifugal Centrifugal
Horizontal Horizontal
Type Horizontal Horizontal
Split casing / End suction
End suction End suction
End suction
Filtered /
Cooling
1. Medium DM Water DM Water Softened
Water
water
Quantity in
2. 2 (1W+1S) 2 (1W+1S) 1 (1W+0S) 2 (1W+1S)
nos.
FLOW
9 No. of pumps 1W + 1S
Capacity of pump considering 10 %
10 910 CMH (8) * (1.10)
margin.
11 Selected capacity of pump. 910 CMH
HEAD
Line losses (including fittings, valves,
12 10 MWC
etc.,)
13 Pressure required at the system inlet 20 MWC
ACW PUMP
FLOW
4 No. of pumps 1W + 1S
HEAD
Line losses (including fittings, valves,
10 15 mWC
etc.,)
Make up @
11 Static head 10 mWC
condensate tank
12 Level control valve pressure drop 5 mWC
DMWT PUMP
HEAD
Line losses (including fittings, valves,
6 15 mWC
etc.,)
Top level of riser
pipe of steam drum
(highest elevation
of water fill in
7 Static head 82 mWC
boiler) (or)
deaerator
emergency fill up
(57+25)
8 Total head 97 mWC (6)+(7)
BIF PUMP
PROJECT :
1 X 50MW EXTN. THERMAL POWER PLANT FOR
PROJECT ID : JP0025
M/s. SPECTRUM COAL & POWER LIMITED.
PREPARED BY VERIFIED BY APPROVED BY DATE : 06.01.15
S.VIJAYASEKAR T. THANAPAL BRR SHEET : 20 of 68
DESIGN BASIS REPORT –BALANCE OF PLANT EQUIPMENTS
FLOW
HEAD
Line losses (including fittings, valves,
7 15 mWC
etc.,)
8 Static head 10 mWC
CTMW PUMP
05.00.02.1 Apart from above, Existing Raw water transfer pump, potable & service water transfer
pump, Fire Fighting Pumps, Other make-up pumps and de-watering pumps will be
utilized for interfacing. All interface/ terminal points design/ supply and work are
will be in Isgec scope.
PROJECT :
1 X 50MW EXTN. THERMAL POWER PLANT FOR
PROJECT ID : JP0025
M/s. SPECTRUM COAL & POWER LIMITED.
PREPARED BY VERIFIED BY APPROVED BY DATE : 06.01.15
S.VIJAYASEKAR T. THANAPAL BRR SHEET : 21 of 68
DESIGN BASIS REPORT –BALANCE OF PLANT EQUIPMENTS
Coal handling system is envisaged in this project to feed the coal to proposed 215 TPH
CFBC Boiler for continuous firing.
06.00.01 Coal shall be carried from existing coal handling system by extending tripper
conveyor up to proposed boiler Coal bunker.
One more stand-by tripper conveyor shall also be provided which shall get the coal
feeding from existing two way chutes and transfer to the proposed boiler coal bunker.
06.00.02 Coal handling system shall be complete with dust extraction system at bunker area of
the proposed boiler. Dust extraction system bag filter shall be with conventional cage
type bags.
06.00.04 Maximum moisture including surface and inherent –7.81%. (Best coal @ 2168.40
kcal/kg)
PROJECT :
1 X 50MW EXTN. THERMAL POWER PLANT FOR
PROJECT ID : JP0025
M/s. SPECTRUM COAL & POWER LIMITED.
PREPARED BY VERIFIED BY APPROVED BY DATE : 06.01.15
S.VIJAYASEKAR T. THANAPAL BRR SHEET : 22 of 68
DESIGN BASIS REPORT –BALANCE OF PLANT EQUIPMENTS
= Boiler outlet steam flow (TPH) * (Outlet steam enthalpy – Feed Water
enthalpy) (Kcal/kg)
= 215 * (828-242.67)
1800 * 0.842
= 83.03 TPH
= Boiler outlet steam flow (TPH) * (Outlet steam enthalpy – Feed Water
enthalpy) (Kcal/kg)
= 215 * (828-242.67)
1529 * 0.816
= 100.853 TPH
From the above, Washery Reject quantity @ 1529 kcal/kg is coming as maximum
i.e. ~101 TPH.
Selected coal handling system capacity is 300 TPH.
Operating hours for coal handling system = (101*24) / 300 hours.
Coal handling system operating hours required = 8 hours
Coal handling system shall be suitable for 24 hrs operation duty.
800mm width belt tripper conveyor shall be provided to match with existing tripper
conveyor.
BELT CONVEYOR
1 Process Specification
2 Mechanical Specification
2.1 General
PROJECT :
1 X 50MW EXTN. THERMAL POWER PLANT FOR
PROJECT ID : JP0025
M/s. SPECTRUM COAL & POWER LIMITED.
PREPARED BY VERIFIED BY APPROVED BY DATE : 06.01.15
S.VIJAYASEKAR T. THANAPAL BRR SHEET : 24 of 68
DESIGN BASIS REPORT –BALANCE OF PLANT EQUIPMENTS
2.3 Belt :
2.3.5 No of piles 3 3
PROJECT :
1 X 50MW EXTN. THERMAL POWER PLANT FOR
PROJECT ID : JP0025
M/s. SPECTRUM COAL & POWER LIMITED.
PREPARED BY VERIFIED BY APPROVED BY DATE : 06.01.15
S.VIJAYASEKAR T. THANAPAL BRR SHEET : 25 of 68
DESIGN BASIS REPORT –BALANCE OF PLANT EQUIPMENTS
2.3.12 Grade FR FR
PROJECT :
1 X 50MW EXTN. THERMAL POWER PLANT FOR
PROJECT ID : JP0025
M/s. SPECTRUM COAL & POWER LIMITED.
PREPARED BY VERIFIED BY APPROVED BY DATE : 06.01.15
S.VIJAYASEKAR T. THANAPAL BRR SHEET : 26 of 68
DESIGN BASIS REPORT –BALANCE OF PLANT EQUIPMENTS
PROJECT :
1 X 50MW EXTN. THERMAL POWER PLANT FOR
PROJECT ID : JP0025
M/s. SPECTRUM COAL & POWER LIMITED.
PREPARED BY VERIFIED BY APPROVED BY DATE : 06.01.15
S.VIJAYASEKAR T. THANAPAL BRR SHEET : 27 of 68
DESIGN BASIS REPORT –BALANCE OF PLANT EQUIPMENTS
2.13 Pulleys
Spherical Roller Spherical Roller
2.13.1 Type of bearing
Brg. Brg.
2.13.2 Make of bearing SKF/FAG SKF/FAG
2.14.10 -Qty 1 1
PROJECT :
1 X 50MW EXTN. THERMAL POWER PLANT FOR
PROJECT ID : JP0025
M/s. SPECTRUM COAL & POWER LIMITED.
PREPARED BY VERIFIED BY APPROVED BY DATE : 06.01.15
S.VIJAYASEKAR T. THANAPAL BRR SHEET : 28 of 68
DESIGN BASIS REPORT –BALANCE OF PLANT EQUIPMENTS
2.16.10 -Qty 1 1
3 Drive :
3.1 Motor -
PROJECT :
1 X 50MW EXTN. THERMAL POWER PLANT FOR
PROJECT ID : JP0025
M/s. SPECTRUM COAL & POWER LIMITED.
PREPARED BY VERIFIED BY APPROVED BY DATE : 06.01.15
S.VIJAYASEKAR T. THANAPAL BRR SHEET : 29 of 68
DESIGN BASIS REPORT –BALANCE OF PLANT EQUIPMENTS
3.2.2 Ratio 14 14
PROJECT :
1 X 50MW EXTN. THERMAL POWER PLANT FOR
PROJECT ID : JP0025
M/s. SPECTRUM COAL & POWER LIMITED.
PREPARED BY VERIFIED BY APPROVED BY DATE : 06.01.15
S.VIJAYASEKAR T. THANAPAL BRR SHEET : 30 of 68
DESIGN BASIS REPORT –BALANCE OF PLANT EQUIPMENTS
5 Technological Structure
6 Discharge Chute
7 Frames
Fabricated /
7.1 -Drive Fabricated / ISMC
ISMC
7.2 -Pulley (Head frame / Tail frame) ISMC ISMC
PROJECT :
1 X 50MW EXTN. THERMAL POWER PLANT FOR
PROJECT ID : JP0025
M/s. SPECTRUM COAL & POWER LIMITED.
PREPARED BY VERIFIED BY APPROVED BY DATE : 06.01.15
S.VIJAYASEKAR T. THANAPAL BRR SHEET : 31 of 68
DESIGN BASIS REPORT –BALANCE OF PLANT EQUIPMENTS
9 Tripper Details
Typical trailing cable arrangement detail is attached herewith (Drg. No.: JP0025-75440100-LYT-001)
Dust Extraction system ( Bag Filter) is considered for transfer points and bunker floor and the dust
emission level will be below 50 mg/Nm3.
Walkway of 750mm width on one side and 500mm width on other side along the conveyors shall
be provided. Walkways are provided with MS painted handrails with toe plate. Coal handling
conveyor layout shall be submitted separately.
Conveyor gallery shall be of closed type. Suitable exhaust fans shall be provided in the conveyor
gallery.
2 numbers of cross over walkway platform (1000 mm width) for interconnection of two galleries
R3
will be provided.
PROJECT :
1 X 50MW EXTN. THERMAL POWER PLANT FOR
PROJECT ID : JP0025
M/s. SPECTRUM COAL & POWER LIMITED.
PREPARED BY VERIFIED BY APPROVED BY DATE : 06.01.15
S.VIJAYASEKAR T. THANAPAL BRR SHEET : 32 of 68
DESIGN BASIS REPORT –BALANCE OF PLANT EQUIPMENTS
A) TECHNICAL SPECIFICATION
MATERIAL Coal
BULK DENSITY 800 Kg/ CuM
CAPACITY Design / Rated 375 / 300 TPH
BELT WIDTH 800 mm
BELT SPEED 2.6 M/sec.
INCLINATION Horizontal tripper conveyor
IDLER TROUGHING Three Role type 35 Deg. Angle
TYPE OF IDLER Troughed Idlers
IDLER DIA 114.3 mm
BELT TYPE 315/3, Top-5mm, Bottom-2mm, FR , Nylon
BELT WEIGHT 8.8 Kg/mtr
BELT THICKNESS 12.9 mm
SYSTEM ACCURACY ±.5% on F.S
RATE INDICATION Digital
TOTALIZER Digital
ENCLOSURE Weatherproof - IP 65
B) LOADCELL
MAKE Precia Molen / Sartorius / IPA
TWIN frame with single idler machined idler
TYPE
supported on dual single point load cell
CAPACITY 375 TPH
WEIGHING RANGE 75 to 375 TPH with duel weighing setting
MIN. WEIGHING CAPACITY (MTPH) 75
MAX. WEIGHING CAPACITY (MTPH) 375
AVERAGE WEIGHING CAPACITY (MTPH): 90
ACCURACY ±.5% on F.S
PROTECTION Load cell are SS:IP68
C) ENCODER(Non Inductive Proximity Sensor)
MAKE P & F or Equivalent
TYPE Pulse output
RESOLUTION
D) BELT WEIGHER INDICATOR
Mounting Panel Mountable
ENCLOSURE Panel protection is IP65
DIMENSION 500 x 500 x 300 mm (Panel Size)
INDICATION Digital by 7 segment 13 mm
PROJECT :
1 X 50MW EXTN. THERMAL POWER PLANT FOR
PROJECT ID : JP0025
M/s. SPECTRUM COAL & POWER LIMITED.
PREPARED BY VERIFIED BY APPROVED BY DATE : 06.01.15
S.VIJAYASEKAR T. THANAPAL BRR SHEET : 33 of 68
DESIGN BASIS REPORT –BALANCE OF PLANT EQUIPMENTS
DETAILS OF INDICATION
R3
PROJECT :
1 X 50MW EXTN. THERMAL POWER PLANT FOR
PROJECT ID : JP0025
M/s. SPECTRUM COAL & POWER LIMITED.
PREPARED BY VERIFIED BY APPROVED BY DATE : 06.01.15
S.VIJAYASEKAR T. THANAPAL BRR SHEET : 34 of 68
DESIGN BASIS REPORT –BALANCE OF PLANT EQUIPMENTS
07.01.01 Bed ash shall be evacuated by Bed Ash Cooler Hoppers. Beneath each collection
hopper, suitable water cooled M.S. Surge Hopper & bypass chute, manually operated
isolation plate valve and Ash Conveying Vessel with RF type level Probe shall be
provided for initiation of conveying cycles.
07.01.02 The Ash from the Conveying Vessels shall be conveyed through individual ash
conveying pipeline of suitable size (100 NB) M.S. ERW (heavy class, as per IS: 1239)
complete with M.S. flanges, gaskets, M.S. fasteners and long radius (R=5D) alloy cast
iron bends of 400 to 450 BHN hardness (in segments of 45 deg or to suit).
07.01.03 Ash conveying pipeline shall terminate on top of existing Bed Ash Silo (RCC) of 460
m3 with the help of Individual terminal Boxes. Suitable opening shall be provided on
top of silo for this purpose.
07.01.06 Quantity of cooling water required / vessel shall be provided during detail design.
07.01.07 Cast iron Ash conveying vessel shall be of 9 CFT or 12 CFT capacity with operating
pressure of 4.5 kg/cm2 (g) shall be provided. Ash conveying vessels shall be kept in
above ground only.
07.01.08 Metallic expansion joint (SS) shall be provided between hopper and ash vessel.
07.01.09 Integral fixed type screen for bottom ash shall be provided and the handling of over
sized particle will be through manual trolley once in shift. The screen size shall be of
10 mm.
R3
07.01.10 Suitable capacity of Reverse pulse jet Bag filter and level probe (High) will be
provided at top of Bed ash silo.
07.02.01.1 Fly Ash shall be evacuated from ECO Hopper and APH Hopper. Beneath each
collection hopper, suitable M.S. Surge Hopper, manually operated isolation plate valve
and Ash conveying Vessel are provided. RF Type Level Probe is provided in the surge
hopper for initiation of conveying cycles.
07.02.01.2 The Ash Conveying Vessel shall be connected through common conveying pipeline of
suitable size (100 NB) M.S. ERW (heavy class, as per IS: 1239) complete with M.S.
flanges, gaskets, M.S. fasteners and long radius (R=5D) alloy cast iron bends of 400 to
450 BHN hardness (in segments of 45º or to suit).
07.02.01.3 Pipeline shall terminate on top of existing fly ash Silo of 700 m3 with the help of
Terminal Box arrangement. . Suitable opening shall be provided on top of silo for this
purpose.
07.02.01.4 Cast iron Ash conveying vessel shall be of 9 CFT or 12 CFT capacity with operating
pressure of 4.5 kg/cm2 (g) shall be provided. Ash conveying vessels shall be kept in
above ground only.
07.02.01.5 Metallic expansion joint (SS) shall be provided between hopper and ash vessel.
07.02.01 Suitable capacity of Reverse pulse jet Bag filter and level probe (High) will be
provided at top of Fly ash silo.
R3
07.02.02 System below ESP Hoppers:
07.02.02.1 There shall be seven fields in ESP having two hoppers per field. Beneath each ESP
hopper, suitable M.S. adopter / suitable capacity surge chute, a manually operated
isolation plate valve and an Ash Conveying Vessel shall be provided. Set of fluidizing
pads shall be provided in surge hoppers for free flow of ash into ash conveying vessel.
RF type level probe shall be provided in ash conveying vessel to initiate the conveying
cycles. Suitable opening shall be provided on top of silo for this purpose.
07.02.02.2 The Ash Vessels below ESP 1st field & ESP 2nd field hoppers shall be connected
through individual ash conveying pipelines. The vessels beneath ESP 3rd, 4th, 5th, 6th&
7th field hoppers shall be connected in series through a common ash-conveying
pipeline in two rows. Each ash conveying pipelines shall be of suitable size M.S. ERW
PROJECT :
1 X 50MW EXTN. THERMAL POWER PLANT FOR
PROJECT ID : JP0025
M/s. SPECTRUM COAL & POWER LIMITED.
PREPARED BY VERIFIED BY APPROVED BY DATE : 06.01.15
S.VIJAYASEKAR T. THANAPAL BRR SHEET : 37 of 68
DESIGN BASIS REPORT –BALANCE OF PLANT EQUIPMENTS
(heavy class, as per IS: 1239) complete with M.S. flanges, gaskets, M.S. fasteners and
long radius (R=5D) Alloy C.I. bends (in segments of 45º or to suit). Each ash conveying
line shall terminate on top of existing Fly Ash silo of 750 m3 with the help of terminal
boxes.
07.02.03 The capacity calculation is attached below.
07.03.01 Common 3 No. (2W+1S) screw type oil lubricated compressors with receivers has been
considered for supplying Conveying air to transmit the ash from respective collection
points to silo and fluidization of ash hoppers.
07.03.02 Conveying air compressor capacity shall be selected in such a way that to convey the
total actual ash collected with 30% margin.
07.03.03 Conveying air requirement calculation for worst coal @ BMCR condition, Conveying
air compressor capacity & PID of conveying air compressor shall be submitted during
detail engineering.
PROJECT :
1 X 50MW EXTN. THERMAL POWER PLANT FOR
PROJECT ID : JP0025
M/s. SPECTRUM COAL & POWER LIMITED.
PREPARED BY VERIFIED BY APPROVED BY DATE : 06.01.15
S.VIJAYASEKAR T. THANAPAL BRR SHEET : 39 of 68