Professional Documents
Culture Documents
Explicatii Xls TTM1 Proiect
Explicatii Xls TTM1 Proiect
Clove oil
SF=1,74
DRUMS 55
0,88x0,61 (PALLET)
CH1FU = CH1FL
DAR!!! Eu am scos un rand de sus in all cargo holds up
pentru ca la final mi-a iesit un displacement mai mare de
Dmax of summer
Deci:
CH1AL
14m/1,27m=11 randuri in lungimea (Free space= 0.02m)
13,8m/1,14m= 12 randuri in latimea (Free space= 0.10m)
CH1AU
11*12*4= 528 pallets with drums
528*1,257= 663,6 tone
CH2U
63,7m/1,27m= 50 randuri in lungimea (Free space= 0,15m)
13,8m/1,14m= 12 randuri in latimea (Free space= 0,10m)
50*12*4= 2400 pallets with drums
2400*1,257=3016,8 tone
CH2L
57,4m/1,27m= 45 randuri in lungimea (Free space= 0,19m)
13,8m/1,14m=12 randuri in latimea (Free space =0,10m)
45*12*5=2700 pallets with drums
2700*1,257= 3393,9 tone
Momentele= w*d
w-weight
d-distanta
7. Calcul TRIM
Am calculat pentru trim initial= 0,00m cu ajutorul Chapter 10
Hydrostatics (Stability loading manual)
Trebuie sa scot valorile de LCB, MCTC si d pentru
deplasamentul meu
In cazul meu, deplasamentul nu era in tabel si am facut
interpolari
Trim= ((LCG-LCB)/100*MCTC)*Displacement
LCB- longitudinal center of buoyancy [m]
MCTC- Moment change trim [Tonm/cm]
Trim= ((56,68-59,797)/100*176,71)*13150,2=-2,34 --- Nava
este apupata
Valoarea de trim trebiue sa incadreze in [-1,2….-1,4]-----
Balastez nava in prova ca sa incadrez in valorile si recalculez
trim tinind cont ca deplasamentul si LCG s-a modificat
Dupa balastarea trim mi-a iesit -1,2
10. Stability
Calculez G`G= FSM/D= 399,28/13483,2= 0.02
Calculez VCG`=G`G+VCG= 6.80
!!!VCG` trebuie sa fie mai mic de VCG max
VCG max pentru trim scoatem din TABLES OF MAXIMUM VCG
In cazul meu VCG max for trim -1,2= 7,38