Professional Documents
Culture Documents
Fiber Cement Board Machine 20181231
Fiber Cement Board Machine 20181231
,Ltd
Tel: +86-371-85617657 Web:www.cnyayuan.com
QUOTATION
Quotation NO:2018123102 Quotation Date: December 31,2018
FROM:
TO: The seller:Gongyi Yayuan Trade Co.,Ltd
The buyer: Address: Address: Beishankou Town,Gongyi City,Henan,
TEL: China
Email: TEL:+86-371-85617657
Email:cnhnyayuan@163.com
Thank you for your inquiry and we submit our quotation as follow:
Power
No. Category Names and specifications
Picture Quantity (KW) Price(USD)
Feeding pulp
1 3 7100
machine
Pool for back
water 1 Earth works
Φ2000*2000
Pool for back
Water and material 1 Earth works
waste Φ1600*1800
3
recycling
system
Water and
waste
3
recycling
Mixer for back
system 1 11 2000
material
Slurry pump 1 15
Washing cloth
1 3
machine
Blank
4 making Vacuum pump 1 18.5 3000
system
Vacuum tank 1
Blank making
host machine 1 18 5950
Machine for
receiving and
Receiving 2 4*2
transporting
and
5 blank 7900
conveyor
system Chassis for
1 2.2
slitting
Three stations
for Upper mold 1
host machine
Three Hydraulic
stations 1 11
station
6 for Upper 25700
mold Negative
machine 1 7.5
pressure fan
Control cabinet 1
Machine for
7 1 9900
demoulding
Hydraulic
8 8000T 22 189600
press
Buyer
Small transporter 20
preparation
9
Pipes, valves and other materials Buyer
for on-site installation preparation
Engineer
10 Installation period 2 months 2people*2months 10800
salary
Note:
1 Board size 2440*1220*4-20mm
Workshop
2 Length≥60m Width≥15m Height≥4.5m
size
Water
3 About 10 tons of water everyday,and Water can be recycled
Consumption
4 Voltage : 380V/50Hz
Raw
5 Cement, Glass Wire, Stone Powder, Coal Ash, Pulp
material
6 Capacity Annual output 3 million square meters
Power
7 60 kilowatts per hour
consumption
Remark:
1,Payment term:T/T 40% as deposit,60% against before delivery.
2,MOQ:1set/sets
3,Port of shipment:FOB Qingdao
4,Delivery time:110 days after prepayment and balance peyment down.
5,Valid time of quotation:Within 15 days
6,Warranty time:1 year warranty
7,After-sales Service Provided:Engineers available to service machinery overseas.
8,Installation period:At least two months if everything goes well
9,Troubleshooting:We will train the workers. If problems arise during the warranty
period, we will help solve them. However, we will not be responsible for any errors
caused by human error, but we can help solve the problem.