Construction of under ground drianage from Katta Lakshmamma (H) to Vadla Ramulu (H) at Madanpally (V) of shamshabad (M)
Sl.no Description of item As per Working estimate As per Workdone Excess less Rremarks
17456 17456
0.90m depth 1 no 2.00 8727.80 2.00 8727.80
1 Rmt
129.00 Supply and delivery of 8 " Dia SWG SP-1 pipe conforming to ISI 651 - Including cost of pipes and
2 (One running Rs. 485.00
Rmt transportation charges loading and Unloading Charges etc Complete (Rs. Three Hundred Fourteen only)
meter) 62565.00
Lowering and laying in ready made trench true to alignment and gradient, jointing, and testing of
3
129.00 stone ware pipes including cost of jointing material such as cement mortar (1:1) proportion and 1 Rmt Rs. 189.13
Rmt hemp yarn but excluding cost and conveyance of pipe. (Reference to specifications BIS No. (One running (Rs. one hundred Eighty Nine and paise Thirteen
6530/72) meter) only) 24398.00
Constructon of 0.90 M Circular Sewer Man hole of 0.90 mts x 0.55 m of 1.00 M depth with 2 nd
class bricks in cm 1:6 prop and corbelling too including cc bed ( 1: 4 : 8 ) prop using 40 mm gauge
HG Metal 0.10 mt thick and CC (1:2:4) Prop benching / chanelling,internal plastreng with 20 mm
4 thick cm 1:4 and External Plasterng with 12mm thick CM (1:4) with fine rendering including cost
and fixing of CI steps and fixing FC/ CI cover and frame but excluding the cost of cover and frame,
including the cost and conveyance of all materials at site complete and curing for 21 days
complete all taxes seignarage charges as per specification etc complete.
Rs.4897.09
11 1 No (Rs. Four thousand Eight Hundred Ninty Seven
nos 0.80 mt depth (one number only) and paise Nine only) 53868.00
Rs.5395.19
3 1 No (Rs. Five thousand Three Hundred Ninty Five and
nos 0.90 mt depth (one number only) paise Ninteen only) 16186.00
Manufacture as per BIS:12592 (Part 1&2) Supply & Delivery of manhole covers and frames with ISI
5 14.00 marking anywhere in A.P., F.O.R. destination including, loading, un-loading & stacking at site but
excluding central excise duty, sales tax, octroi and other Govt levies etc., as applicable. I.S.I Mark
1no. Rs. 1543.00 21602.00
nos one number only Rs.One thousand Five Hunderd Forty Three only
Contractor signature