Tower Light Inspection Checklist

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

MANSOUR AL-MOSAID

CONSTRUCTION DIVISION
Rabigh-II Refining and Petrochemical Project
Construction Of Storage Tanks 2 -HCTF

Tower Light Inspection- Checklist


Model: Date: From………………………….To ……………………………….
Iden. no: Electrician Name: _______________________________
Location: Electrician Signature: _______________________________
Check the appropriate box. Sat = Satisfactory & NR = Need Repair - For Any Additional comments use Comment Box.
SATURDAY SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY
ITEM FOR INSPECTION
SAT NR SAT NR SAT NR SAT NR SAT NR SAT NR SAT NR
1. Inspection
Monthly Inspection Sticker/Calibration of voltage

Color Code
2. Key off Inspection. (Visual)
General Body Condition
Earthing
Drip Tray
Tire Pressure & Condition
Sockets
Cable & Connection
Oil Leakage
Fire Extinguisher

Emergency stop is functional

Others ( If Any) 1.
3. Key on Inspection. (Operational)
Battery charging voltage & lights condition

Hydraulic Fluid level


Gauges
ELCB
KW/Day
Others ( If Any) 2.

ADDITIONAL COMMENTS (If Any) : _______________________________________


__________________________________________________________________________________
__________________________________________________________________________________
__________________________________________________________________________________
__________________________________________________________________________________
__________________________________________________________________________________
__________________________________________________________________________________

You might also like