The document outlines plans for substation automation in Odisha, India. It lists over 150 substations that will undergo conventional automation schemes by 2022-23, along with the number of personnel required and planned boundary wall construction timelines. Tables also show unmanned substations each fiscal year, resulting manpower requirements and redistribution plans to optimize resources across manned substations. The overall goal is to automate substations in a phased manner while managing personnel needs.
Original Description:
Automation
Original Title
SS Unmanning Plan 06_06_2021 bounwall updated 16-1-22
The document outlines plans for substation automation in Odisha, India. It lists over 150 substations that will undergo conventional automation schemes by 2022-23, along with the number of personnel required and planned boundary wall construction timelines. Tables also show unmanned substations each fiscal year, resulting manpower requirements and redistribution plans to optimize resources across manned substations. The overall goal is to automate substations in a phased manner while managing personnel needs.
The document outlines plans for substation automation in Odisha, India. It lists over 150 substations that will undergo conventional automation schemes by 2022-23, along with the number of personnel required and planned boundary wall construction timelines. Tables also show unmanned substations each fiscal year, resulting manpower requirements and redistribution plans to optimize resources across manned substations. The overall goal is to automate substations in a phased manner while managing personnel needs.
M/s Tech Support M/s Power Point Pvt. Ltd. Unmanning in FY 21-22 Car reqd in FY 21-22 Substation to Manpower requied for Substation to be Manpower to be relieved FY remain Manned balance Manned Unmanned by Unmanning at the end of FY substation 21-22 150 221 796 1547 22-23 122 99 565 693 23-24 99 0 607 0 371 1968 Total Manpower Manpower Required Manpower Deployed at Manpower to be relocated = Required at the for MOC the beginning of FY H-G beginning of FY = E+F 350 1897 1968 71 280 973 1547 574 231 231 693 462 861 1107