OUTPUT - Waffle Raft Footing Analysis by:

Site: Lot 370 Greenhill Park


Reference: H0304
Date: 15/11/2021

Required Capacities
Long Span Short Span
Centre Heave

Ultimate Negative Moment: -19.2 kNm/m -17.4 kNm/m


Ultimate Positive Moment: 0.0 kNm/m 0.0 kNm/m
Max Shear: 11.4 kN/m 11.4 kN/m
Required Stiffness: 3.5 MNm2/m 2.4 MNm2/m

Edge Heave

Ultimate Negative Moment: -1.7 kNm/m -1.7 kNm/m


Ultimate Positive Moment: 0.2 kNm/m 0.4 kNm/m
Max Shear: 5.1 kN/m -6.1 kN/m
Required Stiffness: 1.0 MNm2/m 1.0 MNm2/m

RAFT REQUIREMENTS
Sub-beams: As Input mm wide x 310 mm deep
Slab: 85 mm thick 141 mm2/m steel
Subbeam top bars: 226 mm2 External 113 mm2 Internal
Subbeam bottom bars: 226 mm2 External 113 mm2 Internal
Concrete: 20 MPa
Waffle Box Height: 225 mm

Actual Capacities
Long Span Short Span
Centre Heave

Sub-beam depth: 310 mm 310 mm


Minimum top bars As Input mm2/beam As Input mm2/beam
Ultimate Moment Mu: 36.9 kNm/m 32.5 kNm/m
Cracking Moment Mcr: 16.4 kNm/m 14.1 kNm/m
Mu/M* = 2.40 2.33
Mu/Mcr = 2.25 2.31
Stiffness: 13.518 MNm2/m 11.706 MNm2/m

Edge Heave

Sub-beam depth: 310 mm 310 mm


Minimum bottom bars As Input mm2/beam As Input mm2/beam
Ultimate Moment Mu: 21.3 kNm/m 19.2 kNm/m
Cracking Moment Mcr: 11.5 kNm/m 10.0 kNm/m
Mu/M* = 122.24 63.37
Mu/Mcr = 1.84 1.92
Stiffness: 13.518 MNm2/m 11.706 MNm2/m