FTA Diagram of Ammonia Leak
FTA Diagram of Ammonia Leak
1 2 3 4
E2
E3 E11 E12
E5
Pipe Rupture Flange Leaks Flange Leaks
Pipe Rupture
Over Pressure
Corrosion
B Leaks from
Leaks from nozzle
E6
E9 filter flange
Over Pressure Corrosion Over Pressure Loose nuts
Gasket Pressure Loose nuts Safety relief Corrosion Gasket Pressure
system fails Over filling Over O
temperature M Hose
A E8 Ruptures
B C D A B C D Leaks from the
joints of the
connecting pipes
P
F E7
G H I K
J
17 17
a b c g h i j
d e f
Figure 1: FTA overview for Ammonia release
Ammonia Leak
1 2 4
E1 Release of ammonia from Release of ammonia from Release of ammonia from the
E13
inlet/ outlet E4 vessel filling point
E2 E3 E6 E8 E9
E7
Leaks from
filter flange Leaks from the Hose
Defective valve Inlet valve Failure NaOH Exothermic Exposure
Over Gasket Loose joints of the Ruptures
Corrosion fails to of level Corrosion chemical to external
Pressure Pressure nuts connecting pipes
hold indicator reaction heat source
B C D G H M
A I K P
Blockage J N Leaks from
in Pipe
nozzle
F
O
17 17
a b c g h j
d e f i Figure 2: Minimal Cut Sets for the FTA in Figure 1
Formulation of Bow-tie Diagram
Strengthening
Human errors, such Liquid
the relevant Wearing personal Reduce exposure
as overfilling due to ammonia leak
training and protective to ammonia and
improper operation qualification of equipment harm to the body
workers