RITES LIMITED

(A GOVERNMENT OF INDIA ENTERPRISE)

NIT No.02/OT/NTPC-LARA/MAJOR BRIDGE/PKG-III / 2015 Dated 01-12-2015

NAME OF WORK: Construction of Major Bridges (Package- III) 1 no Rail


bridge across Kelo river at Ch: 16/839Km of span
(7x30.5m, open web girder), 1 no Road Bridge on NH-49
at Ch: 18/010Km of span (3x36.0m+1x18.0m) , 1 no road
bridge on SH at Ch: 3/048 Km of span (1x36.0m) and 1 no
road bridge on PWD road at Ch: 17/475Km of span
(1x36.0m) along with its approach road work with RE wall
technique on NTPC-Lara MGR Railway siding Project in
Raigarh District, Chhattisgarh State

PART – 2
FINANCIAL BID
SCHEDULE (BILL) OF QUANTITIES
(PERCENTAGE RATE CONTRACT)

Issued to (Name of Tenderer):________________________________________

Address of tenderer:_________________________________________________

Signature of officer issuing the documents___________________

Designation _______________________________

Date of Issue___________________

RITES LIMITED
(A Govt. of India Enterprise)
Regional Project Office, RAIGARH
40/424, Rajat Shree House, 1st Floor,
Near SBI Kotra Road, Raigarh-496001 (Chhattisgarh)
E-mail: raigarhpo@gmail.com, raigarhpo@rites.com
1|Page
Signature of the tenderer
under the seal of the firm
PART – 2

FINANCIAL BID

SCHEDULE (BILL) OF QUANTITIES

PERCENTAGE RATE CONTRACT

Name of work: Construction of Major Bridges (Package- III) 1 no Rail


bridge across Kelo river at Ch: 16/839Km of span
(7x30.5m, open web girder), 1 no Road Bridge on NH-49
at Ch: 18/010Km of span (3x36.0m+1x18.0m) , 1 no road
bridge on SH at Ch: 3/048 Km of span (1x36.0m) and 1 no
road bridge on PWD road at Ch: 17/475Km of span
(1x36.0m) along with its approach road work with RE wall
technique on NTPC-Lara MGR Railway siding Project in
Raigarh District, Chhattisgarh State

POINT TO BE NOTED WHILE QUOTING PERCENTAGE RATE

1. The time allowed for completion will be 18 (Eighteen) months from the
date of start which is defined in schedule-F under clause 5.1a of clause of
contract.
2. Where tender has been invited on percentage rate basis, percentages on
the estimated cost (whether above or below) are to be quoted for
schedule.

2|Page
Signature of the tenderer
under the seal of the firm
(PERCENTAGE TO BE QUOTED BY THE BIDDER)

Schedule-A
Construction of Br. No-58 LP (Kelo River) at C: 16/839Km, 61 LP(ROB) at Ch: 17/475Km & 62 LP (ROB) at Ch: 18/010Km

SECTION DESCRIPTION TOTAL PERCENTAGE ABOVE (+) OR TOTAL QUOTED AMOUNT BASED ON
ESTIMATED BELOW (-) OF TOTAL PERCENTAGE QUOTED (+) OR (-)
COST(IN ESTIMATED COST (RUPEES) (SECTION WISE)
RUPEES) (SECTION WISE)
IN WORDS IN FIGURES IN WORDS IN FIGURES
(RUPEES) (RUPEES)

I Earth work in 6,09,45,740.00


Formation
II Road work 18,29,02,617.00

III Bridge work 46,63,08,752.00

TOTAL AMOUNT OF 71,01,57,109.00 ______


SCHEDULE-A (RUPEES)
LESS REBATE ( %) IF ANY (IN WORDS) ______

LESS REBATE ( %) IF ANY (IN FIGURES) ______

NET QUOTED COST OF SCHEDULE-A _______

* Strike out which is not applicable

i) SIGNATURE OF AUTHORISED
SIGNATORY OF TENDERER
ii) NAME OF SIGNATORY
iii) NAME AND SEAL OF TENDERER
iv) DATE
v) PLACE
Note:
TENDERERS ARE REQUESTED TO QUOTE THEIR RATE IN THIS PAGE ONLY AND NOT IN SCHEDULES, BASIC ESTIMATED RATES HAS BEEN SHOWN IN
SCHEDULES FOR GUIDENCE

3|Page
Signature of the tenderer
under the seal of the firm
(PERCENTAGE TO BE QUOTED BY THE BIDDER)

Schedule-B
Construction of Br. No-9 LP (ROB) Ch: 3.048 Km

SECTION DESCRIPTION TOTAL PERCENTAGE ABOVE (+) OR TOTAL QUOTED COST BASED ON
ESTIMATED BELOW (-) OF TOTAL PERCENTAGE QUOTED (+) OR (-)
COST(IN ESTIMATED COST (SECTION (RUPEES) (SECTION WISE)
RUPEES) IN WORDS WISE)IN FIGURES IN WORDS IN FIGURES
(RUPEES) (RUPEES)
I Earth work in 2,08,67,247.00
Formation
II Road work 9,31,44,301.00

III Bridge work 9,93,66,520.00

TOTAL AMOUNT OF 21,33,78,068.00 ______


SCHEDULE-B (RUPEES)
LESS REBATE ( %) IF ANY (IN WORDS) ______

LESS REBATE ( %) IF ANY (IN FIGURES) ______

NET QUOTED COST OF SCHEDULE-B _______

* Strike out which is not applicable

i) SIGNATURE OF AUTHORISED
SIGNATORY OF TENDERER
ii) NAME OF SIGNATORY
iii) NAME AND SEAL OF TENDERER
iv) DATE
v) PLACE
Note:
TENDERERS ARE REQUESTED TO QUOTE THEIR RATE IN THIS PAGE ONLY AND NOT IN SCHEDULES, BASIC ESTIMATED RATES HAS BEEN SHOWN IN
SCHEDULES FOR GUIDENCE

4|Page
Signature of the tenderer
under the seal of the firm
SL. Description of Item UNIT QTY. Rate Amount
No. in Rs. in Rs.
Schedule-A
Construction of Major Bridge (Package-III) Br. No-58 LP (Kelo River) at C: 16/839Km,
61 LP(ROB) at Ch: 17/475Km & 62 LP (ROB) at Ch: 18/010Km
Section-I (Earth work in Formation )
1 Clearing jungle including uprooting of rank Sqm 126220 7.64 9,64,321.00
vegetation, grass, brush wood, trees and
saplings of girth upto 30 cm measured at a
height of 1m above ground level and
removal of rubbish upto a distance of 50 m
outside the periphery of the area cleared.

2 Felling trees of the girth (measured at a


height of 1 m above ground level),
including cutting of trunks and branches,
removing the roots and stacking of
serviceable material and disposal of
unserviceable material.

a) Girth over 30 cm and upto 60 cm Each 176 128.28 22,577.00


b) Girth over 60 cm and upto 1.5m Each 178 350.11 62,320.00
c) Girth over 1.5m upto 3 m Each 163 695.33 1,13,339.00
d) Girth over 3 m Each 53 1166.39 61,819.00
3 Dismantling cement concrete manually / by Cum 39 1086.07 42,357.00
mechanical means including disposal of
material upto a lead of 2Km including
loading, unloading & stacking as per
direction of Engineer-in - charge. (For
encased pipe culvert)The rate shall
include cost of labour, tools & plants &
other incidental charges as complete work
in all respect as per direction of Engineer-
in-charge

4 Dismantling R.C.C. work by manually Cum 63 1503.73 94,735.00


/mechanical means and disposal of
dismantled materials up to a lead of 2
kilometre including loading, unloading &
stacking serviceable and unserviceable
material separately including cutting
reinforcement bars. (For encased pipe
culvert)The rate shall include cost of
labour, tools & plants & other incidental
charges as complete work in all respect

5|Page
Signature of the tenderer
under the seal of the firm
SL. Description of Item UNIT QTY. Rate Amount
No. in Rs. in Rs.
5 Dismantling Brick work masonry manually / Cum 170 895.90 1,52,303.00
by mechanical means including stacking of
serviceable material and disposal of
unserviceable material upto a lead of 2Km
including loading, unloading & stacking as
per direction of Engineer-in Charge: The
rate shall include cost of labour, tools &
plants & other incidental charges as
complete work in all respect as per
direction of Engineer-in-charge

6 Removing all type of hume pipes and -


stacking within a lead up to 1000 meters
including earthwork and dismantling of
masonry works around pipes complete as
per direction of Engineer-In-Charge.

a) Up to 1000 mm dia Meter 35.00 400.00 14,000.00

7 Earth work in filling in railway/road Cum 129351 259.46 335,61,410.00


formation for , guide bunds, around buried
type abutments, bridge gaps, trolley
refuges, rain bunds, if provided, platforms
etc. in layers not more than 30cm
compacted thick with contractor's labour,
material, crew, fuel etc.as per profile and
specification in all types of soil, other than
black cotton soil from outside the NTPC
land boundary entirely arranged by the
contractor at his own cost as per RDSO's
latest guidelines and specifications and
special condition of contract including all
leads, lifts, ascents, descents, handling/re-
handling, crossing of nallahs or any other
obstructions. The rates shall include
breaking clouds, spreading & dressing of
bank to final profile etc as a complete job
but excluding compaction. The rate also
includes all taxes, octroi, royalty, testing &
all incidental charges.

6|Page
Signature of the tenderer
under the seal of the firm
SL. Description of Item UNIT QTY. Rate Amount
No. in Rs. in Rs.
8 Supplying and Spreading of approved Cum 45118 454.78 205,18,764.00
quality of blanketing material in
railway/road formation in layers not
more than 30cm compacted thick as per
IR Specifications and RDSO's guide lines
GE:G1 July 2003/as per MORTH
specification, inclusive of all taxes, royalty,
transport charges, handing, re-handling,
dressing of the formation including making
good all undulations. The rate is inclusive
of surfacing & leveling to give required
slope, benching, if required on existing
bank slope, dressing and finishing of bank,
all lead & lift, ascent, descent, crossing of
nallahs / other obstructions, spreading the
material and final dressing of slopes and
top surface as per specified camber using
contractor’s own machinery, equipment,
T&P, labour etc. as a complete job but
excluding compaction.

9 Extra for mechanical compaction of Cum 174469 18.36 32,03,251.00


earth/blanketing material filled in
embankment with contractor’s rollers of
suitable capacity, type and size to achieve
specified density as per specification,
testing as per IS codes including cost of
water, T&P, consumable material and all
labour as a complete job. The work is to be
executed as per Latest edition of
"Guidelines for Earthwork in Railway
Projects" issued by RDSO, Lucknow.

10 Providing & laying stone pitching hand Cum 1136 1879.00 21,34,544.00
packed over ground or bank dressed to
section as directed by Engineer in charge.
The rate shall include cost of all materials,
leads & lifts, taxes, royalty, transportation
ascent & descent labour, tools & plants &
other incidental charges as complete work
in all respect. Stone boulders not less
than 30 kg each and not more than 54kg
each).

Total of section-I of Sch-A= 6,09,45,740.00

7|Page
Signature of the tenderer
under the seal of the firm
SL. Description of Item UNIT QTY. Rate Amount
No. in Rs. in Rs.
Section-II ( ROAD WORK)
11 Dismantling of flexible pavements and
disposal of dismantled materials up to a
lead of 1000 meters, stacking serviceable
and unserviceable materials separately and
as per relevant clauses of section-200.
11.1 Bituminous courses Cum. 1127 542.00 6,10,834.00
12 Scarifying Existing Granular Surface to a Sqm 8726 18.00 1,57,068.00
depth of 50 mm (Scarifying the existing
granular road surface to a depth of 50 mm
and disposal of scarified material within all
lifts and leads up to 1000 meters ) as per
clause 305.4.3 of MORTH Specification
13 Construction of granular sub-base by
providing graded Material, carriage of
mixed Material to work site, spreading in
uniform layers, with motor grader on
prepared surface watering, rolling and
compacting with vibratory power roller at
OMC to achieve the desired density,
complete as per clause 401 of MORTH
Specification
13.1 For Sub-base cum drainage layer or upper Cum. 16250 1363.00 221,48,750.00
sub-base with Grading-VI Material as
per table 400-1 of MORTH specification
NOTE: Plant mix method (with
Mechanically crushed stone only)
14 Wet Mix Macadam (Providing, laying, Cum. 8274 1434.00 118,64,916.00
spreading and compacting graded stone
aggregate to wet mix macadam
specification including premixing the
Material with water at OMC in mechanical
mix plant carriage of mixed Material by
tipper to site, laying in uniform layers with
paver in sub- base / base course on well
prepared surface and compacting with
vibratory roller to achieve the desired
density as per clause 406. of MORTH
Specification
15 Water Bound Macadam (Providing, laying,
spreading and compacting stone
aggregates of specific sizes to water bound
macadam specification including spreading
in uniform thickness, hand packing, rolling
with vibratory roller 8-10 tonnes in stages
to proper grade and camber, applying and

8|Page
Signature of the tenderer
under the seal of the firm
SL. Description of Item UNIT QTY. Rate Amount
No. in Rs. in Rs.
brooming requisite type of
screening/binding Materials to fill up the
interstices of coarse aggregate, watering
and compacting to the required density as
per clause-404 of MORTH Specification.)
a) Grading- II ( 63 to 45 mm size aggregate)
i) Using Screening Crushable type such as Cum 1643 1449.00 23,80,707.00
Moorum or Gravel
b) Grading- III ( 53 to 22.4 mm size aggregate)
i) Using Screening Crushable type such as Cum 1612 1476.00 23,79,312.00
Moorum or Gravel
16 Prime coat (Providing and applying primer
coat with oil based bitumen emulsion (SS-
1, grade confirming to IS:8887) on
prepared surface of granular Base including
clearing of road surface and spraying
primer using mechanical means as per
clause 502 of MORTH Specification
16.1 on WBM/WMM surface @0.85 Kg/Sqm. Sqm 42483 64.00 27,18,912.00
17 Tack coat Providing and applying tack coat
with bitumen emulsion (RS-1, grade
confirming to IS:8887) using emulsion
pressure distributor on the prepared
bituminous/granular surface cleaned with
mechanical broom and as per clause 503 as
per MORTH Specification
17.1 Granular surfaces treated with primes @ Sqm 42483 17.00 7,22,211.00
0.30 kg /Sqm
18 Dense Bituminous Macadam (Providing
and laying dense bituminous macadam
with minimum 40-60 TPH capacity HMP
using crushed aggregates of specified
grading, premixed with bituminous binder
@ 4.0 to 4.5% by weight of total mix of mix
and filler, transporting the hot mix to work
site, laying with a hydrostatic paver finisher
to the required grade, level and alignment,
required thickness, rolling with smooth
wheeled, vibratory and tandem rollers to
achieve the desired compaction as per
MORTH specification clause No.505
complete in all respects as per MORTH
Specification)
18.1 for Grading-I (37.5 mm nominal size, Cum 2253 7269.00 163,77,057.00
bitumen content 4.0%)

9|Page
Signature of the tenderer
under the seal of the firm
SL. Description of Item UNIT QTY. Rate Amount
No. in Rs. in Rs.
19 Bituminous Concrete (Providing and laying
bituminous concrete with minimum 40-60
TPH capacity hot mix plant using crushed
aggregates of specified grading, premixed
with bituminous binder @ 5.0 to 6.0% by
weight of total mix of mix and filler,
transporting the hot mix to work site,
laying with a hydrostatic paver finisher to
the required grade, level and alignment,
and required thickness, rolling with smooth
wheeled, vibratory and tandem rollers to
achieve the desired compaction as per
MORTH specification clause No. 507 as per
MORTH Specification complete in all
respects)
19.1 for Grading I (19 mm nominal size) with Cum 889 9282.00 82,51,698.00
bitumen 5.5 %
20 Mastic Asphalt (Providing and laying 25mm Sqm 13586 511.00 69,42,446.00
thick mastic asphalt wearing course with
paving grade bitumen meeting the
requirements given in table 500-39
prepared by using mastic cooker and laid
to required level and slope after cleaning
the surface, including providing antiskid
surface with fine-grained hard stone
chipping of 13.2 mm nominal size pre-
coated with bitumen at the rate of
0.005cum per 10 Sqm and at an
approximate spacing of 10 cm center to
center in both directions, pressed into
surface when the temperature of surfaces
not less than 1000C, protruding 1 mm to 4
mm over mastic surface, all complete as
per clause-516 as per MORTH
Specification.)
21 Open-Graded Premix Surfacing (Providing,
laying and rolling of open - graded premix
surfacing of 20 mm thickness composed of
13.2 mm to 5.6 mm aggregates either using
bitumen to required line, grade and level
to serve as wearing course on a previously
prepared base, including mixing in a
suitable plant, laying and rolling with a
smooth wheeled roller 8-10 tonne
capacity, finished to required level and
grades as per clause 510 of MORTH
Specification)

10 | P a g e
Signature of the tenderer
under the seal of the firm
SL. Description of Item UNIT QTY. Rate Amount
No. in Rs. in Rs.
a) Mechanical method using Bitumen and Sqm 15798 122.00 19,27,356.00
minimum 40-60 TPH capacity hot mix
plant. With mechanical paver finisher.
22 Seal Coat (Providing and laying seal coat
for sealing the voids in a bituminous
surface laid to the specified levels, grade
and cross fall including rolling and finishing
using Type A and B seal coats as per clause
511 of MORTH Specification)
a) Type-„A‟ (Providing and laying liquid seal Sqm 15798 62.00 9,79,476.00
coat comprising of an application of a layer
of binder followed by a cover of stone
chips of 6.7mm size)
23 Retro- reflectorized Traffic signs (Providing
and fixing of retro reflectorized cautionary,
mandatory and informatory sign as per
IRC:67-2012 made of Micro prismatic grade
type reflective sheeting vide clause 801.3,
fixed over aluminum sheeting, 1.5 mm
thick supported on a mild steel frame of
size 40 x 40 x 5 mm and mild steel angle
iron post 75 mm x75 mm x 6mm firmly
fixed to the ground by means of properly
designed foundation with M15 grade
cement concrete 45 cm x 45cm x 60cm, 60
cm below ground level as per approved
drawing)
a 90 cm equilateral triangle Each 12 5170.00 62,040.00
b 60 cm circle Each 4 4460.00 17,840.00
c 80 cm x 60 cm rectangular Each 4 6533.00 26,132.00
24 Painting Lines, Dashes, Arrows etc on
Roads in Two Coats on New Work (Painting
lines, dashes, arrows etc on roads in two
coats on new work with ready mixed road
marking paint conforming to IS:164 on
bituminous surface, including cleaning the
surface of all dirt, dust and other foreign
matter, demarcation at site and traffic
control )
24.1 Over 10 cm in width Sqm 44 92.00 4,048.00
24.2 Up to 10 cm in width Sqm 22 82.00 1,804.00
REINFORCED EARTH RETAINING WALL
25 Construction of Reinforced Earth Structure
(RES) complete as per approved drawings
and Technical specifications clause 3100 as
per MORTH Specification.

11 | P a g e
Signature of the tenderer
under the seal of the firm
SL. Description of Item UNIT QTY. Rate Amount
No. in Rs. in Rs.
25.1 (a) Providing and erecting precast concrete Sqm 19669 1283.61 252,47,325.00
facia panels of 0.18m thickness of M35
grade concrete complete as per MORTH
technical specification 3100 or as directed
by the Engineer-in-charge including all
fasteners required for connecting
reinforcing elements.
25.2 (b) Providing and placing With reinforcing Sqm 83826 217.08 181,96,948.00
elements of synthetic geogrids of grade as
per design in accordance with clause 3100
as per MORTH specification with min grade
shall be type -3 as per IRC 102: 2014.
NOTE FOR RE WALL: The Design and
approval from RITES/Railways/Concerned
Road Authorities is scope of Contractor for
RE Wall construction.
26 Providing and laying of Back fill material Cum. 2453 905.00 22,19,965.00
consisting of granular materials of GW, GP,
SW groups as per IS 1498-1970 in required
profile behind boulder filling of abutments,
wing walls / return walls etc above bed
level with all labour and material complete
job as per drawing and technical
specification of RDSO Guidelines.
27 Earth fill with selected granular material in Cum 39496 905.00 357,43,880.00
layers in approaches of ROB over Geo
synthetic Grid mesh which is to be retained
by wall including, grading and compaction
complete (Earth will be predominantly
coarse grained soil with angle of friction
not less than 30 degree and only 10 % of
particles of soil are allowed to pass through
75 micron sieve) as per drawing and and
MORTH Technical specifications clause
3100/ or as directed by the Engineer-in-
charge.

28 construction of Sub surface drain 200m dia Per 3180 738.00 23,46,840.00
using geotextiles treated with carbon black Metre
with physical properties as given in clause
702.2.3 formed in to a stable network and
planar geocomposite structure, joints
wrapped with geotextile to prevent ingress
of soil etc as per IRC SP 102-2014 and
MORTH Technical specifications clause
3100 or as directed by the Engineer-in-
charge.

12 | P a g e
Signature of the tenderer
under the seal of the firm
SL. Description of Item UNIT QTY. Rate Amount
No. in Rs. in Rs.
29 Providing and laying of Filter media with Cum. 11202 1926.00 215,75,052.00
granular materials/stone crushed
aggregates satisfying the requirements laid
down in clause 2504.2.2. of MORTH
specifications to a thickness of not less
than 600 mm with smaller size towards the
soil and bigger size towards the wall and
provided over the entire surface behind
abutment, wing wall and return wall to the
full height compacted to a firm condition
complete as per drawing and technical
specifications 710.1.4 of I.R.C. 78 and 2200
as per MORTH Specification.
Total of section-II of Sch-A= 18,29,02,617.00
Section-III ( Bridge Work)
30 Earthwork in excavation for foundations
and floors of the bridges, Abutment, pier,
RCC box, retaining walls, drop wall, drain
etc. including setting out, dressing of sides,
ramming of bottom, getting out the
excavated material, back filling in layers
with approved material and consolidation
of the layers by ramming and watering etc.
including all lift, disposal of surplus soil
upto a lead of 50m, all types of shoring and
strutting with all labour and material
complete as per drawing and technical
specification as directed by Engineer in
charge
30.1 All conditions & all types of soil except Cum. 13111 301.40 39,51,655.00
rock
30.2 All conditions & all types of Soft Rock not Cum. 2929 428.60 12,55,369.00
requiring blasting
30.3 Hard rock requiring blasting Cum. 306 454.35 1,39,031.00
NOTE FOR EARTHWORK IN EXCAVATION:
I. Payment shall be made only for the
quantity of earthwork to be excavated
so as to cover the length, breadth and
depth of the foundation (as per
approved drawings below ground level)
II. Payment will be made @75% of the
quantity of work done after excavation
and balance 25% after backfilling
/removing the excess earth work as per
the direction of Engineer-in Charge.

13 | P a g e
Signature of the tenderer
under the seal of the firm
SL. Description of Item UNIT QTY. Rate Amount
No. in Rs. in Rs.
III. In case the ground is undulated, it will
be the first dressed and no extra
payment will be made on this account
IV. The quantity of earthwork shall be
calculated on the basis of specified
dimension of the finished foundation
and no allowance shall be made for
side slopes etc. The contractor shall
however provide adequate slopes,
Shoring, Shuttering to ensure safety
against slope failure.
31 Leading of cut spoil/excavated earth to
approach bank or at indicated places
beyond free lead of 50 m with all lifts as
directed by Engineer-in-Charge
31.1 Lead beyond 50m upto 1 km Cum. 3278 99.44 3,25,964.00
31.2 Lead beyond 1Km upto 2 km Cum. 3278 113.29 3,71,365.00
32 Supplying, spreading and filling coarse sand Cum. 115 910.25 1,04,679.00
of approved quality including watering and
ramming in foundation, plinth for a require
depth as per approved drawing and as per
direction of Engineer-in-charge. The rate
includes all lead, lift, ascent, descent,
crossing of Railway line etc. complete with
contractor’s labour, machinery, materials,
tools and plant.
33 Providing and laying in position machine
mixed, machine vibrated and machine
batched Design Mix Cement Concrete M-
20 grade (cast in-situ) for Apron, Drop
Wall, Wearing Course and couping etc
using 20mm graded crushed stone
aggregate with screening and cleaning of
aggregate and coarse sand of approved
quality. The rate includes cost of design of
concrete mix, cement, sand, aggregates,
admixture, providing of thermocoal at
expansion joint, labour, tools & plant,
manufacturing of concrete by batching
plant, Placement of concrete using
concrete pump, compaction, curing of
concrete up to specified period in all
respect including royalty of aggregates, all
lead, lift, crossing road / track etc and
finishing complete as per drawings and
technical specifications as directed by

14 | P a g e
Signature of the tenderer
under the seal of the firm
SL. Description of Item UNIT QTY. Rate Amount
No. in Rs. in Rs.
Engineer in charge. The contractor has to
construct the approach road to site at his
own cost, if required. No extra payment will
be made for this. Shuttering & centering
shall be paid separately.
33.1 All works upto avg ground level Cum 860 6220.00 53,49,200.00
33.2 All works above avg. ground level Cum 675 6938.00 46,83,150.00
34 Centering and shuttering including strutting, -
propping etc. and removal of form work for
CC/RCC raft foundation, Apron, Abutment,
pier, wing walls, return walls, drop wall, toe
wall, drain, road etc, Approach slab at
formation level, Dirt wall/ ballast wall at
formation level. In Bottom/top slab, side
walls, toe wall, parapet and haunches filling
head walls or any other component
including all complete
34.1 Foundations, footings, bases for columns of Sqm 3722 196.45 7,31,187.00
pier, abutment, return wall, toe wall , RE
wall footing etc)
34.2 Retaining walls, return walls, RCC Box walls Sqm 9013 360.80 32,51,890.00
(any thickness) including attached pilasters,
buttresses, plinth and string courses fillets,
kerbs and steps etc above footing.
34.3 Columns, piers, abutments, pillars, posts and Sqm 12817 453.35 58,10,587.00
struts above footing
34.4 Suspended floors, roofs, landings, balconies Sqm 1240 493.55 6,12,002.00
and access platform.
34.5 Walls (any thickness) including attached Sqm 877 360.80 3,16,422.00
pilasters, buttresses, plinth and string
courses etc
34.6 Lintels, beams, plinth beams, girders, Sqm 2385 423.65 10,10,405.00
bressumers and cantilevers. For construction
of composite girders etc & as instructed by
Engineer-in-Charge. The rate includes to
provide the suitable shuttering as per the
specifications of RDSO Drg/ Bridge Code.
35 Providing and laying in position machine
mixed, machine vibrated and machine
batched Design Mix Cement Concrete M-35
grade (cast in-situ RCC/CC) for bridge
construction of Apron, RCC box, return wall,
abutment, pier etc. using 20mm graded
crushed stone aggregate with screening and
cleaning of aggregate and coarse sand of
approved quality The rate includes cost of
design of concrete mix, cement, sand,

15 | P a g e
Signature of the tenderer
under the seal of the firm
SL. Description of Item UNIT QTY. Rate Amount
No. in Rs. in Rs.
aggregates, admixture, providing of thermo
coal at expansion joint, labour, tools & plant,
manufacturing of concrete by batching
plant, Placement of concrete using
concrete pump, compaction, curing of
concrete up to specified period in all respect
including all lead, lift, crossing road / track
etc and finishing complete as per drawings
and technical specifications as directed by
Engineer in charge. The contractor has to
construct the approach road to site at his
own cost, if required. No extra payment will
be made for this. Cost of steel
reinforcement, shuttering & centering shall
be paid separately.
35.1 All works upto avg ground level Cum. 4680 6449.00 301,81,320 .00
35.2 All works above avg ground level Cum. 5689 7168.00 407,78,752 .00
36 RCC M-40 design mix with contractor's well Cum. 1804 7244.00 130,68,176 .00
graded machine crushed aggregate of size
20mm and below, sand of approved quality
with contractor's staging, form work
complete in deck slab, cross girder, end
girder, diaphragm, bed block, pier cap,
abutment cap, dirt wall, padestral, and at
any other places as directed by engineer-in-
charge etc. of RCC girder as per approved
drawings, the rate includes all labour and
material with all lift, lead, royalty, taxes etc.
complete as required. The contractor has to
arrange water with any lead at their own
cost. The payment for reinforcement steel
will be made separately under relavant items
of the tender schedule.
37 Supplying and Laying steel reinforcement MT 1593 68100.00 1084,83,300.00
Thermo Mechanically Treated- TMT 500/550
in RCC works and surface reinforcement
of CC works including straightening,
cutting, bending, hooking, placing in
position and binding with contractor's
binding wire of requisite gauge all
complete as per approved drawing &
specifications. The rate include cost of all
tools and plants, testing etc. All
reinforcement steel shall be TMT 500/550
grade procured from primary producers
SAIL, TISCO & RINL.

16 | P a g e
Signature of the tenderer
under the seal of the firm
SL. Description of Item UNIT QTY. Rate Amount
No. in Rs. in Rs.
38 Providing and laying in position machine
mixed, machine vibrated and machine
batched Design Mix Cement Concrete M-25
grade (cast in-situ RCC/CC) for road, Drain
etc. using 20mm graded crushed stone
aggregate with screening and cleaning of
aggregate and coarse sand of approved
quality The rate includes cost of design of
concrete mix, cement, sand, aggregates,
admixture, providing of thermo coal at
expansion joint, labour, tools & plant,
manufacturing of concrete by batching
plant, Placement of concrete using
concrete pump, compaction, curing of
concrete up to specified period in all respect
including all lead, lift, crossing road / track
etc and finishing complete as per drawings
and technical specifications as directed by
Engineer in charge. The contractor has to
construct the approach road to site at his
own cost, if required. No extra payment will
be made for this. Cost of steel
reinforcement, shuttering & centering shall
be paid separately.
38.1 All works upto avg ground level Cum. 211 6296.15 13,28,488.00
38.2 All works above avg ground level Cum. 227 7014.55 15,92,303.00
39 Supplying and providing Boulder Backing Cum 718 504.15 3,61,980.00
behind wing wall, return wall, retaining wall
with hand packed boulders & cobbles with
smaller size boulders toward the back
including. The rate shall include cost of all
materials, leads & lifts, taxes, royalty,
transportation ascent & descent labor,
tools& plants & other incidental charges as
complete work in all respect. 600 mm thick
behind the walls with boulders size
200mm to 250mm dia approx.
40 Providing weep holes in Brick masonry/ Per 2362 321.00 7,58,202.00
Plain/ Reinforced concrete abutment, wing Metre
wall/return wall with 100 mm dia. AC pipe,
extending through the full width of the
structure with slope of 1 V: 20 H towards
drawing face. Complete as per drawing and
Technical specifications section 2706 and
2200 of MORTH Specification

17 | P a g e
Signature of the tenderer
under the seal of the firm
SL. Description of Item UNIT QTY. Rate Amount
No. in Rs. in Rs.
41 Providing and fixing in position strip seal Per 87 11124.00 9,67,788.00
type expansion joint with a total allowable Metre
movement of 80mm complete as per
MORTH drawing and specification as per
clause 2607 to 2610 of MORTH
specification of road and bridges work
including acceptance testing as specified
with manufacturer's recommendations.
Entire installation is to be carried out
strictly in presence of manufacturer’s
representative only. The seal of expansion
joint shall be such that so as not to permit
any dust collection at all times.
42 Supplying, laying, jointing, fitting and fixing Each 254 2007.00 5,09,778.00
in position of drainage spout with CI
grating of 250 mm x 250 mm size
connected with 150 mm dia G.I. pipe as
directed by engineer-in-charge including all
lead and lift etc. the rate includes supply of
G.I. pipe, cutting, threading, fitting, fixing
the pipe securing it in slab and parapet
wall.
43 Providing and applying two coats of coal Sqm 2768 192.80 5,33,670.00
tar or bitumen confirming to IS 3117 - 1965
on the top and sides of RCC
box/slabs/footings etc. @ 1.70 Kgs / Sqm
after cleaning the surface with all labour
and materials complete job as directed by
the Engineer
44 Supplying of all types of structural steel
conforming to Fe 410 B of IS:2062,
fabrication, assembling, erection / slewing
/ end launching of steel girders (Not
requiring traffic block) upto 45.7 M span on
sub-structure incl. provision of trolley
refuges, if reqd. complete as per approved
drawing incl. one coat of Zinc chrome
primer to 1S-104 & one coat of Zinc
Chrome Red Oxide to IS 2074 and painting
as per IRS-B-1 on all members, (Detailed
fabrication and erection drawings &
launching methodology will be prepared
and got approved by the contractor from
RITES/, Railway,/Respective authorities as
applicable). Rate include fabrication of all
the types of battens, bracings, ties,
stiffeners, packing, diaphragms, shop
18 | P a g e
Signature of the tenderer
under the seal of the firm
SL. Description of Item UNIT QTY. Rate Amount
No. in Rs. in Rs.
rivets / welding, T&F bolts, drifts, shop
welds, templates, jigs, fixtures, back up
supports, accessories, transporting various
components from fabrication shop. to site,
including loading, unloading, lift and taxes
complete. assembly of girders' on-
drifts/bolts, field riveting/welding,
assembling of temporary support for side
slewing, raising of girders to the bed block
level, providing sliding arrangements and
slewing the girder in position, lowering of
girder on bearings and bed plates. Grouting
holes in the bed block for fixing of HD
bolts/anchor pins of bed plates, all
temporary arrangements. The bearing sets
to - be provided with the girders will be
paid separately as per relevant item
separately.
Payment Schedule
(i) Material at site – 40%
(ii) Fabrication at site – 15%
(iii) Erection/Launching – 20%
(iv) Completion incl. painting & finishing –
25%
44.1 Open web Girder MT 435.37 146314.00 637,00,726.00
44.2 steel girders (For Composite Construction- MT 924 146314.00 13,51,94,136.00
ROB)
NOTE FOR GIRDER OF ITEM NO:44
I. All welds are to be made by approved
welder using approved welding
procedure.
II. The rates are deemed to include cost
of rivets, drifts, bolts and nuts,
riveting/welding etc.
III. Any temporary arrangement
strengthening of member (s) if
required in connection with launching
of girders shall be at contractor's cost
including restoring it back as per
original standard drawing.
IV. On completion of work the contractor
shall clear all temporary staging and
other arrangements and obstruction
and restore it to its original position.
V. Contractor has to ensure proper
camber as per drawing irrespective of
Launching scheme.

19 | P a g e
Signature of the tenderer
under the seal of the firm
SL. Description of Item UNIT QTY. Rate Amount
No. in Rs. in Rs.
VI. The rates are deemed to include all
labour, tools, plants, equipment,
machinery, cranes etc. all leads, lifts,,
fuel, electric charges etc., complete
for all material unless specified
otherwise.
VII. All but welds are to be examined
radio graphically. All other welds may
be examined by radiographic or any
other nondestructive methods which
are equally effective. All the welds
shall also be examined by liquid
penetrant flaw detection method or
by magnetic particle flaw detection
method as per IS- 3658 and 3703.
VIII. Detailed launching scheme along with
design of formwork should be
prepared by the contractor and shall
be got approved from RITES & Railway
& concerned authorities at his own
cost and nothing extra shall be paid
on this account.
IX. All Layers of painting should be
separately got approved by contractor
from engineer-in-charge or his
authorised representative.
X. Fabrication shall be done with RDSO
approved agency.
XI. Structural steel shall be procured
from
SAIL/TISCO/IISCO/RINL/JINDAL/ESSAR
/ISPAT Industries Ltd/LLOYED steel
only
XII. Fabricated Girders shall be got
inspected by Contractor from
RDSO/RITES. Inspection charges shall
be borne by Contractor. All welds are
to be made by approved welder using
approved welding procedure.

45 Supplying, fitting and fixing in position true


to line and level POT-PTFE bearing
consisting of a metal piston supported by a
disc or un reinforced elastomer confined
within a metal cylinder, sealing rings, dust
seals, PTFE surface sliding against stainless
steel mating surface, complete assembly to
be of cast steel / fabricated structural steel,
20 | P a g e
Signature of the tenderer
under the seal of the firm
SL. Description of Item UNIT QTY. Rate Amount
No. in Rs. in Rs.
metal and elastomer elements complete as
per IS 2062, IS:1030, AISI:304, AISI:316,
IS:6911, BS:3784, IS:3400, IS:226, BS-5400,
Bridge code and as per drawing and
approved Technical Specifications. The
design of the bearings shall be submitted
by the manufacturers/contractor and got
approved from Railway before fixing. Test
report of the bearings should be got
approved before the materials are lifted
from the manufacturer premises. Payment
is based on 250 MT capacity of Bearing
(Concrete face should be abraded by
chipping in grinding and properly cleaned
before laying epoxy mortar).
POT-PTFE Bearings Nos. 48 137310.00 65,90,880.00
46 Supplying, fitting and fixing in position true Per 1060290 1.00 10,60,290.00
to line and level elastomeric bearing Cubic
conforming to IRC: 83 (Part-II) section IX Centi
and clause 2005 of MORT&H specifications meter
complete including all accessories as per
drawing and Technical Specifications
section 2000 and 2200 of MORTH.
47 Load testing of one or more spans of
bridge as selected by the Engineer as per
approved load test procedure following
relevant IS/IRC/Railway codes with
contractor’s labour, deflection measuring
instruments, loading materials, recoding
and analyzing the load testing results
including all lead & lift, etc. complete as
required. The rates are all inclusive and will
be paid after load test is finished and girder
is cleared of the kentledges /loading
material etc. The load shall be 1.25 times
the stipulated design load Based on Design
load & not span
47.1 For Span design load upto 100 MT Each 2 83471.91 1,66,944.00
47.2 Extra for every increase of 100 MT or part Each 1 82121.41 82,121.00
thereof in the span load capacity upto 800 100m
MT

21 | P a g e
Signature of the tenderer
under the seal of the firm
SL. Description of Item UNIT QTY. Rate Amount
No. in Rs. in Rs.
Steel Channel Sleeper & Fastening

48 Supply and Transportation of Elastomeric Set 580 8569.82 49,70,496.00


Pads and elasomeric neoprene pads of
grooved rubber pads design of required
specifications, at the side of bridges with
contractors tools, plants, transportation,
labour, taxes, levies, etc. complete. (All
pads shall be procured from RDSO
approved suppliers with prior approval of
Engineer-in-charge. Contractor's have to
submit copies of challan and bill for such
procurement. Neoprene shall have to be
used in place of rubber.)-
One set Consists of
(i) 10 mm Thick Grooved Neoprene Ruber
Pad plates between main Rail and
canted bearing plate as per approved
drawing No- RDSO/T-5155.-2 Nos.
(ii) 6 mm Thick Grooved Rubber Pad below
Guard Rail as per drawing No- RDSO/T-
5163 --4 Nos.
(iii) Channel shaped pads covering Head to
T-bolts--4 Nos.
(iv) Elastomeric pad size (F-20) x 20 x 330
mm as per drawing No- RDSO/B-
1636/1R or (F-25) x 25 x 330 mm as per
drawing no. RDSO/B- 1636/1/R2 or ( F-
20) 25/30 x 245 mm as per drawing no-
RDSO/B-1636/1/R2 (ALT).-- 2 Nos.
49 Fabrication, assembling, galvanising, MT 116 130637.50 151,53,950.00
Transporting and supply of Mild steel
Channel Sleepers and Grooved packing
plates made from standard rolled sections
(confirming to IS: 2062) as per latest
standard / approved drawing and
specification, including supply of all fittings
and fixtures duly galvanised as per the
specifications indicated in the approved
drawings and instructions of the Engineer-
in-charge from time to time with all
contractor's tools, plants, materials,
consumables, labour handling, lead, lift
electricity, manufacturing facility etc.
complete as directed.

22 | P a g e
Signature of the tenderer
under the seal of the firm
SL. Description of Item UNIT QTY. Rate Amount
No. in Rs. in Rs.
50 Fixing of steel channel sleeper on bridges Each 580 4180.40 24,24,632.00
at any spacing, often duly painting of Top
surface of girder with all its fitting and
fixtures including fixing of running Rails of
any size, elastomeric pads, Grooved rubber
pads, packing plates etc. with contractor's
tools and plants, materials, consumables,
labour handling, lead, lift, descent, ascent
including all incidental works and other
expenditure etc. complete as per
instruction of Engineer-in-charge. or his
authorized representative. (Fixing of
elastomeric pad shall be done free of cost
with contractor's supplied epoxy adhesive
and it shall be approved by RITES) (The
contractor shall have to collect 60 Kg Rails
free of cost from RITES/ NTPC store at Lara
STPP site. Handle including all lead and lift
and lay them at site, all at his cost).
NOTE:
I. Tenderer has to submit details
drawing of channel sleeper (on the
basis of Railway Standard drawing)
of the bridge after taking field
measurements of the bridge. This
drawing will be prepared in the
Auto Cad and he has to submit
drawing of every bridge in tracing
paper and CD. RITES/Railway will
approve this drawing. No extra
payment will be made for these
drawing. Any delay in
preparation/Submission of drawing
will be on contractors account.
II. The Rates shall be inclusive of Trial
assembling and fixing minimum 10
sleepers (Selected at random) on a
nominated bridge. The large scale
manufacturing is to be taken up
only when satisfactory
performance will be obtained on
trial.

III. The work includes cutting of steel


to size and shape, drilling,
assembling, welding, riveting,
bolting, holing, milling, grinding,
Galvanising and performance of
23 | P a g e
Signature of the tenderer
under the seal of the firm
SL. Description of Item UNIT QTY. Rate Amount
No. in Rs. in Rs.
any other activity required in
manufacturing of steel channel
sleeper and supply of all fittings
and fixtures excluding rubber /
elastomeric neoprene pads.

IV. (Care should be taken during the


transportation, loading, unloading
etc. to ensure that no damage is
done to the galvanizing. However
the galvanized surface is
advertantly damaged, should be
painted as detailed below).
V. Channel sleeper shall be fabricated
for 60 Kg Running Rail/52 Kg Guard
Rail.
VI. No drilling, cutting, punching or
exposing the bare metal, welding
etc. will be permitted after
galvanising.
VII. 90% of the above rate under item
no 36 & 37 will be paid on receipt
of Galvanised Steel Channel
Sleeper with fittings and fixtures at
the bridge site. 10% of above
payment will be made after fixing
of channel sleepers.
VIII. For Payment purpose, actual
weight of finished sleeper with all
M.S. fittings will be considered.
This should however not vary more
than 2.5% of nominal weight of
sleeper shown in / calculated from
standard / approved drawings.
IX. All nuts should have self-locking
screws threaded inserts (Stainless
steel helisert). No extra payment
shall be made for this.
X. Galvanising of steel channel
sleeper with M.S. fittings shall be
done by hot dip process of
thickness 100±5 microns with zinc
confirming to IS: 869-77 and IS:
2628-85.
XI. For all the supplied items the
contractor has to give one
indemnity bond and shall keep the
items in safe custody by deputing
24 | P a g e
Signature of the tenderer
under the seal of the firm
SL. Description of Item UNIT QTY. Rate Amount
No. in Rs. in Rs.
Day & night watchman up to the
completion of the work. RITES
willhave no responsibility on this
account for theft, damage, loss etc.
Payment will be entertained
accounting the material fitted & fixed
on the running lines, for the materials
paid for but not fixed on a bridge, pro-
rata recovery will be made.
XII. Painting of the Galvanized surface
adventantly damage due to
transportation, if any, welding and
drilling holes at site will be done as
advised below.
XIII. Application of two coats of paints
red lead confirming to IS: 102 as
priming coats on an approval
surface.
XIV. Application of two coats of paints
Aluminium confirming to IS: 2339
as covering coat as per the
approval of Engineer-in-charge.
XV. INSPECTION
 The finished steel channel sleepers and
grooved steel plates which are
inspected and passed to the work by
RITES/NTPC, should only be brought to
the work site by the contractor.
 Material shall be dispatched to site of
work by the contractor in full sets i.e.
channel sleepers with all matching
components fittings complete. The
matching components will be supplied
duly inspected and passed by RITES in
sealed gunny bags. The contractor will
have to arrange for RITES inspection at
their own cost and will be responsible
for furnishing all test certificate during
the dispatch of fitting. Payment will be
made only submission of all test
certificates to RITES.
51 Supply and Fixing of
51.1 steel chequrred plate 840 mm wide x 6 mm MT 28 125412.00 35,11,536.00
thick including nut & bolt for fittings with
sleeper including fixing charges etc.
complete as directed (Gas drilling is not
allowed)

25 | P a g e
Signature of the tenderer
under the seal of the firm
SL. Description of Item UNIT QTY. Rate Amount
No. in Rs. in Rs.
51.2 Tie angle of size 65 x 65 x 6 mm including MT 3 104510.00 3,13,530.00
nut & bolts for tieing with steel channel
sleeper including fixing charges complete
as directed. (Gas drilling is not allowed)

51.3 Packing plates for bridge approach sleepers Sets 2 36578.50 73,157.00
(1 set = 9 sleepers) including rail screw and
fixing charges.
52 Providing and fixing 150mm dia PVC pipes Per 614 189.10 1,16,107.00
for draining storm water to drain with all Metre
bends, clamps complete as per drawings
and MORTH technical specifications clause
2700 or as directed by the Engineer-in-
charge.
53 Providing and fixing 65mm dia GI pipes Per 3663 600.00 21,97,800.00
passed through a plate over a crash barrier Metre
as per drawing including welding, painting
with two or three coats of aluminium paint
with aluminium primer all complete
according to the MORTH Technical
Specifications clause 2703 including cost of
material complete as per approved
drawing.. .
54 Painting of Bridge number and span Each 6 201.00 1,206.00
arrangement as per MORTH Technical
Specifications clause 800.
55 Providing and laying Non Pressure NP-4
class (Heavy duty) R.C.C. pipes
collars/spigot jointed with stiff mixture of
cement mortar in the proportion of 1:2 (1
cement : 2 fine sand) including testing of
joints etc. complete where necessary. The
rates includes labour, supplying from the
manufacturers at site and concrete/mortar
mixing for collar joint etc. Complete as per
direction of Engineer-In-Charge.
a) 450 mm dia RCC pipes Meter 964 2195.75 21,16,703.00
b) 600 mm dia RCC pipes Meter 55 2870.45 1,57,875.00
56 "Any other items which are not covered 20,00,000.00
will be operated as per DSR-2014/SOR for
Bridge Works/SOR for Road Works, C.G,
P.W.D. w.e.f 01-01-2015,
Total Cost is Rs.20,00,000/-
Total of section-III of Sch-A= 46,63,08,752.00
Total of schedule-A (section I+II+III)= 71,01,57,109.00

26 | P a g e
Signature of the tenderer
under the seal of the firm
SL. Description of Item UNIT QTY. Rate Amount
No. in Rs. in Rs.
SCHEDULE- B
Construction of Br. No-9 LP (ROB) Ch: 3.048Km

Section-I( Earth work in Formation)


1 Clearing jungle including uprooting of rank Sqm 42295 7.64 3,23,134.00
vegetation, grass, brush wood, trees and
saplings of girth upto 30 cm measured at a
height of 1m above ground level and
removal of rubbish upto a distance of 50 m
outside the periphery of the area cleared.

2 Felling trees of the girth (measured at a


height of 1 m above ground level),
including cutting of trunks and branches,
removing the roots and stacking of
serviceable material and disposal of
unserviceable material.
a) Girth over 30 cm and upto 60 cm Each 110 128.28 14,111.00
b) Girth over 60 cm and upto 1.5m Each 132 350.11 46,215.00
c) Girth over 1.5m upto 3 m Each 83 695.33 57,712.00
d) Girth over 3 m Each 11 1166.39 12,830.00
3 Dismantling cement concrete manually / by Cum 10 1086.07 10,861.00
mechanical means including disposal of
material upto a lead of 2Km including
loading, unloading & stacking as per
direction of Engineer-in - charge. (For
encased pipe culvert)The rate shall
include cost of labour, tools & plants &
other incidental charges as complete work
in all respect

4 Dismantling R.C.C. work by manually Cum 17 1503.73 25,563.00


/mechanical means and disposal of
dismantled materials up to a lead of 2
kilometre including loading, unloading &
stacking serviceable and unserviceable
material separately including cutting
reinforcement bars. (For encased pipe
culvert)The rate shall include cost of
labour, tools & plants & other incidental
charges as complete work in all respect

27 | P a g e
Signature of the tenderer
under the seal of the firm
SL. Description of Item UNIT QTY. Rate Amount
No. in Rs. in Rs.
5 Dismantling Brick work masonry manually / Cum 76 896.90 68,088.00
by mechanical means including stacking of
serviceable material and disposal of
unserviceable material upto a lead of 2Km
including loading, unloading & stacking as
per direction of Engineer-in Charge: The
rate shall include cost of labour, tools &
plants & other incidental charges as
complete work in all respect

6 Earth work in filling in railway/road Cum 34775 259.46 90,22,722.00


formation for , guide bunds, around buried
type abutments, bridge gaps, trolley refuges,
rain bunds, if provided, platforms etc. in
layers not more than 30cm compacted thick
with contractor's labour, material, crew, fuel
etc.as per profile and specification in all
types of soil, other than black cotton soil
from outside the NTPC land boundary
entirely arranged by the contractor at his
own cost as per RDSO's latest guidelines and
specifications and special condition of
contract including all leads, lifts, ascents,
descents, handling/re-handling, crossing of
nallahs or any other obstructions. The rates
shall include breaking clouds, spreading &
dressing of bank to final profile etc as a
complete job but excluding compaction. The
rate also includes all taxes, octroi, royalty,
testing & all incidental charges.

7 Supplying and Spreading of approved Cum 22504 454.78 102,34,369.00


quality of blanketing material in
railway/road formation in layers not more
than 30cm compacted thick as per IR
Specifications and RDSO's guide lines GE:G1
July 2003, inclusive of all taxes, royalty,
transport charges, handing, re-handling,
dressing of the formation including making
good all undulations. The rate is inclusive of
initial site clearance, cutting of shrubs,
removal of roots of vegetation growth &
heavy grass, surfacing & leveling to give
required slope, benching, if required on
existing bank slope, dressing and finishing of
bank, all lead & lift, ascent, descent, crossing

28 | P a g e
Signature of the tenderer
under the seal of the firm
SL. Description of Item UNIT QTY. Rate Amount
No. in Rs. in Rs.
of nallahs / other obstructions, spreading
the material and final dressing of slopes and
top surface as per specified camber using
contractor’s own machinery, equipment,
T&P, labour etc. as a complete job but
excluding compaction.
8 Extra for mechanical compaction of Cum 57279 18.36 10,51,642.00
earth/blanketing material filled in
embankment with contractor’s rollers of
suitable capacity, type and size to achieve
specified density as per specification, testing
as per IS codes including cost of water, T&P,
consumable material and all labour as a
complete job. The work is to be executed as
per Latest edition of "Guidelines for
Earthwork in Railway Projects" issued by
RDSO, Lucknow.
Total of Section-I of Sch-B= 208,67,247.00
Section-II (ROAD WORK)
9 Dismantling of flexible pavements and
disposal of dismantled materials up to a lead
of 1000 meters, stacking serviceable and
unserviceable materials separately and as
per relevant clauses of section-200.
9.1 Bituminous courses Cum. 623 542.00 3,37,666.00
10 Scarifying Existing Granular Surface to a Sqm 6229 18.00 1,12,122.00
depth of 50 mm (Scarifying the existing
granular road surface to a depth of 50 mm
and disposal of scarified material within all
lifts and leads up to 1000 meters ) as per
clause 305.4.3 of MORTH Specification
11 Construction of granular sub-base by
providing graded Material, carriage of mixed
Material to work site, spreading in uniform
layers, with motor grader on prepared
surface watering, rolling and compacting
with vibratory power roller at OMC to
achieve the desired density, complete as per
clause 401 of MORTH Specification
11.1 For Sub-base cum drainage layer or upper Cum. 11634 1363.00 158,57,142.00
sub-base with Grading-VI Material as per
table 400-1 of MORTH specification.
NOTE: Plant mix method (with Mechanically
crushed stone only)

29 | P a g e
Signature of the tenderer
under the seal of the firm
SL. Description of Item UNIT QTY. Rate Amount
No. in Rs. in Rs.
12 Wet Mix Macadam (Providing, laying, Cum. 3929 1434.00 56,34,186.00
spreading and compacting graded stone
aggregate to wet mix macadam specification
including premixing the Material with water
at OMC in mechanical mix plant carriage of
mixed Material by tipper to site, laying in
uniform layers with paver in sub- base / base
course on well prepared surface and
compacting with vibratory roller to achieve
the desired density as per clause 406. of
MORTH Specification
13 Water Bound Macadam (Providing, laying,
spreading and compacting stone aggregates
of specific sizes to water bound macadam
specification including spreading in uniform
thickness, hand packing, rolling with
vibratory roller 8-10 tonnes in stages to
proper grade and camber, applying and
brooming requisite type of
screening/binding Materials to fill up the
interstices of coarse aggregate, watering and
compacting to the required density as per
clause-404 of MORTH Specification.)

a) Grading- II ( 63 to 45 mm size aggregate)


i) Using Screening Crushable type such as Cum 525.00 1449.00 7,60,725.00
Moorum or Gravel
b) Grading- III ( 53 to 22.4 mm size aggregate)
i) Using Screening Crushable type such as Cum 511.00 1476.00 7,54,236.00
Moorum or Gravel
14 Prime coat (Providing and applying primer
coat with oil based bitumen emulsion (SS-1,
grade confirming to IS:8887) on prepared
surface of granular Base including clearing of
road surface and spraying primer using
mechanical means as per clause 502 of
MORTH Specification

14.1 on WBM/WMM surface @0.85 Kg/Sqm. Sqm 17837 64.00 11,41,568.00


15 Tack coat Providing and applying tack coat
with bitumen emulsion (RS-1, grade
confirming to IS:8887) using emulsion
pressure distributor on the prepared
bituminous/granular surface cleaned with
mechanical broom and as per clause 503 as
per MORTH Specification

30 | P a g e
Signature of the tenderer
under the seal of the firm
SL. Description of Item UNIT QTY. Rate Amount
No. in Rs. in Rs.
15.1 Granular surfaces treated with primes @ Sqm 17837 17.00 3,03,229.00
0.30 kg /Sqm
16 Dense Bituminous Macadam (Providing and
laying dense bituminous macadam with
minimum 40-60 TPH capacity HMP using
crushed aggregates of specified grading,
premixed with bituminous binder @ 4.0 to
4.5% by weight of total mix of mix and filler,
transporting the hot mix to work site, laying
with a hydrostatic paver finisher to the
required grade, level and alignment,
required thickness, rolling with smooth
wheeled, vibratory and tandem rollers to
achieve the desired compaction as per
MORTH specification clause No.505
complete in all respects as per MORTH
Specification)
16.1 for Grading-I (37.5 mm nominal size, Cum 1050 7269.00 76,32,450.00
bitumen content 4.0%)
17 Bituminous Concrete (Providing and laying
bituminous concrete with minimum 40-60
TPH capacity hot mix plant using crushed
aggregates of specified grading, premixed
with bituminous binder @ 5.0 to 6.0% by
weight of total mix of mix and filler,
transporting the hot mix to work site, laying
with a hydrostatic paver finisher to the
required grade, level and alignment, and
required thickness, rolling with smooth
wheeled, vibratory and tandem rollers to
achieve the desired compaction as per
MORTH specification clause No. 507 as per
MORTH Specification complete in all
respects)
17.1 for Grading I (19 mm nominal size) with Cum 419 9282.00 38,89,158.00
bitumen 5.5 %
18 Mastic Asphalt (Providing and laying 25mm Sqm 6077 511.00 31,05,347.00
thick mastic asphalt wearing course with
paving grade bitumen meeting the
requirements given in table 500-39 prepared
by using mastic cooker and laid to required
level and slope after cleaning the surface,
including providing antiskid surface with
fine-grained hard stone chipping of 13.2 mm
nominal size pre- coated with bitumen at the
rate of 0.005cum per 10 Sqm and at an

31 | P a g e
Signature of the tenderer
under the seal of the firm
SL. Description of Item UNIT QTY. Rate Amount
No. in Rs. in Rs.
approximate spacing of 10 cm center to
center in both directions, pressed into
surface when the temperature of surfaces
not less than 1000C, protruding 1 mm to 4
mm over mastic surface, all complete as per
clause-516 as per MORTH Specification.)
19 Open-Graded Premix Surfacing (Providing,
laying and rolling of open - graded premix
surfacing of 20 mm thickness composed of
13.2 mm to 5.6 mm aggregates either using
bitumen to required line, grade and level to
serve as wearing course on a previously
prepared base, including mixing in a suitable
plant, laying and rolling with a smooth
wheeled roller 8-10 tonne capacity, finished
to required level and grades as per clause
510 of MORTH Specification)
a) Mechanical method using Bitumen and Sqm 5108 122.00 6,23,176.00
minimum 40-60 TPH capacity hot mix plant.
With mechanical paver finisher.
20 Seal Coat (Providing and laying seal coat for
sealing the voids in a bituminous surface laid
to the specified levels, grade and cross fall
including rolling and finishing using Type A
and B seal coats as per clause 511 of MORTH
Specification)

a) Type-„A‟ (Providing and laying liquid seal Sqm 5108 62.00 3,16,696.00
coat comprising of an application of a layer
of binder followed by a cover of stone chips
of 6.7mm size)

21 Retro- reflectrorized Traffic signs (Providing


and fixing of retroreflectrorized cautionary,
mandatory and informatory sign as per
IRC:67-2012 made of Micro prismatic grade
type reflective sheeting vide clause 801.3,
fixed over aluminum sheeting, 1.5 mm thick
supported on a mild steel frame of size 40 x
40 x 5 mm and mild steel angle iron post 75
mm x75 mm x 6mm firmly fixed to the
ground by means of properly designed
foundation with M15 grade cement concrete
45 cm x 45cm x 60cm, 60 cm below ground
level as per approved drawing)

32 | P a g e
Signature of the tenderer
under the seal of the firm
SL. Description of Item UNIT QTY. Rate Amount
No. in Rs. in Rs.
(a) 90 cm equilateral triangle Each 6 5170.00 31,020.00
(b) 60 cm circle Each 2 4460.00 8,920.00
(c) 80 cm x 60 cm rectangular Each 2 6533.00 13,066.00
22 Painting Lines, Dashes, Arrows etc on Roads
in Two Coats on New Work (Painting lines,
dashes, arrows etc on roads in two coats on
new work with ready mixed road marking
paint conforming to IS:164 on bituminous
surface, including cleaning the surface of all
dirt, dust and other foreign matter,
demarcation at site and traffic control )
22.1 Over 10 cm in width Sqm 22 92.00 2,024.00
22.2 Up to 10 cm in width Sqm 11 82.00 902.00
REINFORCED EARTH RETAINING WALL
23 Construction of Reinforced Earth Structure
(RES) complete as per approved drawings
and Technical specifications clause 3100 as
per MORTH Specification.

23.1 (a) Providing and erecting precast concrete Sqm 9083 1283.61 116,59,030.00
facia panels of 0.18m thickness of M35 grade
concrete complete as per MORTH technical
specification 3100 or as directed by the
Engineer-in-charge including all fasteners
required for connecting reinforcing
elements.

23.2 (b) Providing and placing With reinforcing Sqm 48616 217.08 105,53,561.00
elements of synthetic geogrids of grade as
per design in accordance with clause 3100 as
per MORTH specification with min grade
shall be type -3 as per IRC 102: 2014.
NOTE FOR RE WALL:
The Design and approval from
RITES/Railways/Concerned Road Authorities
is scope of Contractor for RE Wall
construction.
24 Providing and laying of Back fill material Cum. 629 905.00 5,69,245.00
consisting of granular materials of GW, GP,
SW groups as per IS 1498-1970 in required
profile behind boulder filling of abutments,
wing walls / return walls etc above bed level
with all labour and material complete job as
per drawing and technical specification of
RDSO Guidelines.

33 | P a g e
Signature of the tenderer
under the seal of the firm
SL. Description of Item UNIT QTY. Rate Amount
No. in Rs. in Rs.
25 Earth fill with sleeted granular material in Cum 20372 905.00 184,36,660.00
layers in approaches of ROB over Geo
synthetic Grid mesh which is to be retained
by wall including, grading and compaction
complete (Earth will be predominantly
coarse grained soil with angle of friction not
less than 30 degree and only 10 % of
particles of soil are allowed to pass through
75 micron sieve) as per drawing and and
MORTH Technical specifications clause
3100/ or as directed by the Engineer-in-
charge.
26 construction of Sub surface drain 200m dia Per 1621 738.00 11,96,298.00
using geotextiles treated with carbon black Metre
with physical properties as given in clause
702.2.3 formed in to a stable network and
planar geocomposite structure, joints
wrapped with geotextile to prevent ingress
of soil etc as per IRC SP 102-2014 and
MORTH Technical specifications clause 3100
or as directed by the Engineer-in-charge.
27 Providing and laying of Filter media with Cum. 5299 1926.00 102,05,874.00
granular materials/stone crushed aggregates
satisfying the requirements laid down in
clause 2504.2.2. of MORT&H specifications
to a thickness of not less than 600 mm with
smaller size towards the soil and bigger size
towards the wall and provided over the
entire surface behind abutment, wing wall
and return wall to the full height compacted
to a firm condition complete as per drawing
and technical specifications 710.1.4 of I.R.C.
78 and 2200 as per MORTH Specification.
Total of section-II of Sch-B= 931,44,301.00
Section-III (Bridge Work)
28 Earthwork in excavation for foundations and
floors of the bridges, Abutment, pier, RCC
box, retaining walls, drop wall, drain etc.
including setting out, dressing of sides,
ramming of bottom, getting out the
excavated material, back filling in layers with
approved material and consolidation of the
layers by ramming and watering etc.
including all lift, disposal of surplus soil upto

34 | P a g e
Signature of the tenderer
under the seal of the firm
SL. Description of Item UNIT QTY. Rate Amount
No. in Rs. in Rs.
a lead of 50m, all types of shoring and
strutting with all labour and material
complete as per drawing and technical
specification as directed by Engineer in
charge
28.1 All conditions & all types of soil except rock Cum. 1471 301.40 4,43,359.00

28.2 All conditions & all types of Soft Rock not Cum. 385 428.60 1,65,011.00
requiring blasting

NOTE FOR EARTHWORK IN EXCAVATION:


I. Payment shall be made only for the
quantity of earthwork to be excavated
so as to cover the length, breadth and
depth of the foundation (as per
approved drawings below ground level)
II. Payment will be made @75% of the
quantity of work done after excavation
and balance 25% after backfilling
/removing the excess earth work as per
the direction of Engineer-in Charge.
III. In case the ground is undulated, it will
be the first dressed and no extra
payment will be made on this account
IV. The quantity of earthwork shall be
calculated on the basis of specified
dimension of the finished foundation
and no allowance shall be made for
side slopes etc. The contractor shall
however provide adequate slopes,
Shoring, Shuttering to ensure safety
against slope failure
29 Leading of cut spoil/excavated earth to
approach bank or at indicated places beyond
free lead of 50 m with all lifts as directed by
Engineer-in-Charge
29.1 Lead beyond 50m upto 1 km Cum. 368 99.44 36,594.00

29.2 Lead beyond 1Km upto 2 km Cum. 368 113.29 41,691.00

30 Providing and laying in position machine


mixed, machine vibrated and machine
batched Design Mix Cement Concrete M-
20grade (cast in-situ) for Apron, Drop Wall,
Wearing Course and couping etc using
20mm graded crushed stone aggregate with

35 | P a g e
Signature of the tenderer
under the seal of the firm
SL. Description of Item UNIT QTY. Rate Amount
No. in Rs. in Rs.
screening and cleaning of aggregate and
coarse sand of approved quality. The rate
includes cost of design of concrete mix,
cement, sand, aggregates, admixture,
providing of thermocoal at expansion joint,
labour, tools & plant, manufacturing of
concrete by batching plant, Placement of
concrete using concrete pump,
compaction, curing of concrete up to
specified period in all respect including
royalty of aggregates, all lead, lift, crossing
road / track etc and finishing complete as per
drawings and technical specifications as
directed by Engineer in charge. The
contractor has to construct the approach road
to site at his own cost, if required. No extra
payment will be made for this. Shuttering &
centering shall be paid separately.
30.1 All works upto avg ground level Cum 269 6220.00 16,73,180.00
30.2 All works above avg. ground level Cum 346 6938.00 24,00,548.00
31 Centering and shuttering including strutting,
propping etc. and removal of form work for
CC/RCC raft foundation, Apron, Abutment,
pier, wing walls, return walls, drop wall, toe
wall, drain, road etc, Approach slab at
formation level, Dirt wall/ ballast wall at
formation level. In Bottom/top slab, side
walls, toe wall, parapet and haunches filling
head walls or any other component including
all complete
31.1 Foundations, footings, bases for columns of Sqm 1246 196.45 2,44,777.00
pier, abutment, return wall, toe wall , RE wall
footing etc)
31.2 Retaining walls, return walls, RCC Box walls Sqm 3922 360.80 14,15,058.00
(any thickness) including attached pilasters,
buttresses, plinth and string courses fillets,
kerbs and steps etc above footing.
31.3 Columns, piers, abutments, pillars, posts and Sqm 9634 453.35 43,67.574.00
struts above footing
31.4 Suspended floors, roofs, landings, balconies Sqm 14 493.55 6,910.00
and access platform.
31.5 Walls (any thickness) including attached Sqm 157 360.80 56,646.00
pilasters, buttresses, plinth and string courses
etc
31.6 Lintels, beams, plinth beams, girders, Sqm 539 423.65 2,28,347.00
bressumers and cantilevers. For construction
of composite girders etc & as instructed by

36 | P a g e
Signature of the tenderer
under the seal of the firm
SL. Description of Item UNIT QTY. Rate Amount
No. in Rs. in Rs.
Engineer-in-Charge. The rate includes to
provide the suitable shuttering as per the
specifications of RDSO Drg/ Bridge Code.
32 Providing and laying in position machine
mixed, machine vibrated and machine
batched Design Mix Cement Concrete M-35
grade (cast in-situ RCC/CC) for bridge
construction of Apron, RCC box, return wall,
abutment, pier etc. using 20mm graded
crushed stone aggregate with screening and
cleaning of aggregate and coarse sand of
approved quality The rate includes cost of
design of concrete mix, cement, sand,
aggregates, admixture, providing of
thermocoal at expansion joint, labour, tools
& plant, manufacturing of concrete by
batching plant, Placement of concrete
using concrete pump, compaction,
curing of concrete up to specified period
in all respect including all lead, lift, crossing
road / track etc and finishing complete as
per drawings and technical specifications as
directed by Engineer in charge. The
contractor has to construct the approach
road to site at his own cost, if required. No
extra payment will be made for this. Cost of
steel reinforcement, shuttering & centering
shall be paid separately.
32.1 All works upto avg ground level Cum. 250 6449.00 16,12,250.00
32.2 All works above avg ground level Cum. 2312 7168.00 165,72,416.00
33 RCC M-40 design mix with contractor's well Cum. 1051 7244.00 76,13,444.00
graded machine crushed aggregate of size
20mm and below, sand of approved quality
with contractor's staging, form work
complete in deck slab, cross girder, end
girder, diaphragm, bed block, pier cap,
abutment cap, dirt wall, padestral, and at
any other places as directed by engineer-in-
charge etc. of RCC girder as per approved
drawings, the rate includes all labour and
material with all lift, lead, royalty, taxes etc.
complete as required. The contractor has to
arrange water with any lead at their own
cost. The payment for reinforcement steel
will be made separately under relevant
items of the tender schedule.

37 | P a g e
Signature of the tenderer
under the seal of the firm
SL. Description of Item UNIT QTY. Rate Amount
No. in Rs. in Rs.
34 Supplying and Laying steel reinforcement MT 331 68100.00 225,41,100.00
Thermo Mechanically Treated- TMT 500/550
in RCC works and surface reinforcement
of CC works including straightening,
cutting, bending, hooking, placing in
position and binding with contractor's
binding wire of requisite gauge all
complete as per approved drawing &
specifications. The rate include cost of all
tools and plants, testing etc. All
reinforcement steel shall be TMT 500/550
grade procured from primary producers
SAIL, TISCO & RINL.

35 Providing and laying in position machine


mixed, machine vibrated and machine
batched Design Mix Cement Concrete M-25
grade (cast in-situ RCC/CC) for road, Drain
etc. using 20mm graded crushed stone
aggregate with screening and cleaning of
aggregate and coarse sand of approved
quality The rate includes cost of design of
concrete mix, cement, sand, aggregates,
admixture, providing of thermocoal at
expansion joint, labour, tools & plant,
manufacturing of concrete by batching
plant, Placement of concrete using
concrete pump, compaction, curing of
concrete up to specified period in all respect
including all lead, lift, crossing road / track
etc and finishing complete as per drawings
and technical specifications as directed by
Engineer in charge. The contractor has to
Construct the approach road to site at his
own cost, if required. No extra payment will
be made for this. Cost of steel
reinforcement, shuttering & centering shall
be paid separately.
35.1 All works above avg ground level Cum. 23 7014.55 1,61,335.00
36 Supplying and providing Boulder Backing Cum 80 504.15 40,332.00
behind wing wall, return wall, retaining wall
with hand packed boulders & cobbles with
smaller size boulders toward the back
including. The rate shall include cost of all
materials, leads & lifts, taxes, royalty,
transportation ascent & descent labour,
tools & plants & other incidental charges
as complete work in all respect. 600 mm
38 | P a g e
Signature of the tenderer
under the seal of the firm
SL. Description of Item UNIT QTY. Rate Amount
No. in Rs. in Rs.
thick behind the walls with boulders size
200mm to 250mm dia approx.
37 Providing weep holes in Brick masonry/ Plain/ Per 1019 321.00 3,27,099.00
Reinforced concrete abutment, wing Metre
wall/return wall with 100 mm dia. AC pipe,
extending through the full width of the
structure with slope of 1 V: 20 H towards
drawing face. Complete as per drawing and
Technical specifications section 2706 and 2200
of MORTH Specification
38 Providing and fixing in position strip seal type Per 28 11124.00 3,11,472.00
expansion joint with a total allowable Metre
movement of 80mm complete as per MORTH
drawing and specification as per clause 2607
to 2610 of MORTH specification of road and
bridges work including acceptance testing as
specified with manufacturer's
recommendations. Entire installation is to be
carried out strictly in presence of
manufacturer’s representative only. The seal
of expansion joint shall be such that so as not
to permit any dust collection at all times.
39 Supplying, laying, jointing, fitting and fixing in Each 98 2007.00 1,96,686.00
position of drainage spout with CI grating of
250 mm x 250 mm size connected with 150
mm dia G.I. pipe as directed by engineer-in-
charge including all lead and lift etc. the rate
includes supply of G.I. pipe, cutting, threading,
fitting, fixing the pipe securing it in slab and
parapet wall.
40 Providing and applying two coats of coal tar or Sqm 208 192.80 40,102.00
bitumen confirming to IS 3117 - 1965 on the
top and sides of RCC box/slabs/footings etc.
@ 1.70 Kgs / Sqm after cleaning the surface
with all labour and materials complete job as
directed by the Engineer
41 Supplying of all types of structural steel
conforming to Fe 410 B of IS:2062, fabrication,
assembling, erection / slewing / end launching
of steel girders (Not requiring traffic block)
upto 45.7 M span on sub-structure incl.
provision of trolley refuges, if reqd. complete
as per approved drawing incl. one coat of Zinc
chrome primer to 1S-104 & one coat of Zinc
Chrome Red Oxide to IS 2074 and painting as
per IRS-B-1 on all members, (Detailed
fabrication and erection drawings & launching

39 | P a g e
Signature of the tenderer
under the seal of the firm
SL. Description of Item UNIT QTY. Rate Amount
No. in Rs. in Rs.
methodology will be prepared and got
approved by the contractor from RITES/,
Railway,/Respective authorities as
applicable). Rate include fabrication of all
the types of battens, bracings, ties,
stiffeners, packing, diaphragms, shop rivets
/ welding, T&F bolts, drifts, shop welds,
templates, jigs, fixtures, back up supports,
accessories, transporting various
components from fabrication shop. to site,
including loading, unloading, lift and taxes
complete. assembly of girders' on-
drifts/bolts, field riveting/welding,
assembling of temporary support for side
slewing, raising of girders to the bed block
level, providing sliding arrangements and
slewing the girder in position, lowering of
girder on bearings and bed plates. Grouting
holes in the bed block for fixing of HD
bolts/anchor pins of bed plates, all
temporary arrangements. The bearing sets
to - be provided with the girders will be paid
separately as per relevant item separately.
Payment Schedule
(i) Material at site – 40%
(ii) Fabrication at site – 15%
(iii) Erection/Launching – 20%
(iv) Completion incl. painting & finishing –
25%
41.1 steel girders (For Composite Construction- MT 222.72 146314.00 325,87,054.00
ROB)
NOTE FOR GIRDER FOR ITEM 41
I. All welds are to be made by approved
welder using approved welding
procedure.
II. The rates are deemed to include cost
of rivets, drifts, bolts and nuts,
riveting/welding etc.
III. Any temporary arrangement
strengthening of member (s) if
required in connection with launching
of girders shall be at contractor's cost
including restoring it back as per
original standard drawing.

40 | P a g e
Signature of the tenderer
under the seal of the firm
SL. Description of Item UNIT QTY. Rate Amount
No. in Rs. in Rs.
IV. On completion of work the contractor
shall clear all temporary staging and
other arrangements and obstruction
and restore it to its original position.
V. Contractor has to ensure proper
camber as per drawing irrespective of
Launching scheme.
VI. The rates are deemed to include all
labour, tools, plants, equipment,
machinery, cranes etc. all leads, lifts,,
fuel, electric charges etc., complete
for all material unless specified
otherwise.
VII. All but welds are to be examined
radio graphically. All other welds may
be examined by radiographic or any
other nondestructive methods which
are equally effective. All the welds
shall also be examined by liquid
penetrant flaw detection method or
by magnetic particle flaw detection
method as per IS- 3658 and 3703.
VIII. Detailed launching scheme along with
design of formwork should be
prepared by the contractor and shall
be got approved from RITES & Railway
& concerned authorities at his own
cost and nothing extra shall be paid
on this account.
IX. All Layers of painting should be
separately got approved by contractor
from engineer-in-charge or his
authorised representative.
X. Fabrication shall be done with RDSO
approved agency.
XI. Structural steel shall be procured
from SAIL/TISCO/IISCO/RINL/
JINDAL/ESSAR/ISPAT Industries
Ltd/LLOYED steel only
XII. Fabricated Girders shall be got
inspected by Contractor from
RDSO/RITES. Inspection charges shall
be borne by Contractor. All welds are
to be made by approved welder using
approved welding procedure.

42 Supplying, fitting and fixing in position true


to line and level POT-PTFE bearing consisting
41 | P a g e
Signature of the tenderer
under the seal of the firm
SL. Description of Item UNIT QTY. Rate Amount
No. in Rs. in Rs.
of a metal piston supported by a disc or un
reinforced elastomer confined within a
metal cylinder, sealing rings, dust seals, PTFE
surface sliding against stainless steel mating
surface, complete assembly to be of cast
steel / fabricated structural steel, metal and
elastomer elements complete as per IS 2062,
IS:1030, AISI:304, AISI:316, IS:6911, BS:3784,
IS:3400, IS:226, BS-5400, Bridge code and as
per drawing and approved Technical
Specifications. The design of the bearings
shall be submitted by the
manufacturers/contractor and got approved
from Railway before fixing. Test report of the
bearings should be got approved before the
materials are lifted from the manufacturer
premises. Payment is based on 250 MT
capacity of Bearing (Concrete face should be
abraded by chipping in grinding and properly
cleaned before laying epoxy mortar).
POT-PTFE Bearings Nos 10 1,37,310.00 13,73,100.00
43 Load testing of one or more spans of bridge
as selected by the Engineer as per approved
load test procedure following relevant
IS/IRC/Railway codes with contractor’s
labour, deflection measuring instruments,
loading materials, recoding and analyzing
the load testing results including all lead &
lift, etc. complete as required. The rates are
all inclusive and will be paid after load test is
finished and girder is cleared of the
kentledges /loading material etc. The load
shall be 1.25 times the stipulated design load
Based on Design load & not span
43.1 For Span design load upto 100 MT Each 1 83471.91 83,472.00
44 Providing and fixing 150mm dia PVC pipes Per 139 189.10 26,285.00
for draining storm water to drain with all Metre
bends, clamps complete as per drawings and
MORTH technical specifications clause 2700
or as directed by the Engineer-in-charge.
45 Providing and fixing 65mm dia GI pipes Per 1660 600.00 9,96,000.00
passed through a plate over a crash barrier Metre
as per drawing including welding, painting
with two or three coats of aluminium paint
with aluminium primer all complete
according to the MORTH Technical
42 | P a g e
Signature of the tenderer
under the seal of the firm
SL. Description of Item UNIT QTY. Rate Amount
No. in Rs. in Rs.
Specifications clause 2703 including cost of
material complete as per approved drawing.
45 Painting of Bridge number and span Each 2 201.00 402.00
arrangement as per MORTH Technical
Specifications clause 800.
47 Providing and laying Non Pressure NP-4 class
(Heavy duty) R.C.C. pipes collars/spigot
jointed with stiff mixture of cement mortar
in the proportion of 1:2 (1 cement : 2 fine
sand) including testing of joints etc.
complete where necessary. The rates
includes labour, supplying from the
manufacturers at site and concrete/mortar
mixing for collar joint etc complete as per
direction of Engineer-In-Charge.
a) 450 mm dia RCC pipes Meter 594.00 2195.75 13,04,276.00
48 Any other items which are not covered will 25,00,000.00
be operated as per DSR-2014/SOR for Bridge
Works/SOR for Road Works, C.G, P.W.D.
w.e.f. 01-01-2015,
Total Cost is Rs.25,00,000/-
Total of Section-III of Sch-B 9,93,66,520.00
Total of Schedule-B= 21,33,78,068.00
Total of Schedule (A+B) 92,35,35,177.00

43 | P a g e
Signature of the tenderer
under the seal of the firm