Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 2

M.B.

DECO KAIZEN FORMAT


Please Spefify (Mark Tick) S.NO. UNIT DEPTT DATE

Planned Kaizen Unplanned Kaizen


1. KAIZEN THEME :
Kaizen Category (Mark Tick)
S Q P C D M
NAME/DESIGNATION SIGN. NAME/DESIGNATION SIGN.
SUGGESTED BY
APPROVED BY - Sr QUALITY EXECUTIVE
IMPLEMENTED BY
2. BEFORE KAIZEN (PROBLEM) PLEASE GIVE BRIEF DESCRIPTION 3. PROPOSED COUNTER MEASURE
WHAT IS THE IDEA / PROBLEM ? WHERE FOUND ? WHAT IS THE COUNTERMEASURE ? WHERE TO IMPLEMENT?

WHEN FOUND ? WHEN TO IMPLEMENT?

4. PHOTOGRAPH (BEFORE KAIZEN) 5. PHOTOGRAPH (AFTER KAIZEN)

6. AFTER KAIZEN (HOW IMPLEMENTED) PLEASE GIVE BRIEF DESCRIPTION TANGIBLE BENEFITS INTANGIBLE BENEFITS
WHERE IMPLEMENTED ?

WHEN IMPLEMENTED ?

7. KAIZEN EVALUATION HORIZONTAL DEPLOYMENT


Type Points Obtained AREA RESP. TGT DATE COMP. DATE

Idea / Problem Identified


Counter Measure also given
Implementation Results

Prepared By : Approved By :

Kaizen Points
Type Good Very Good Super
Idea / Problem Identified 1 2 3
Counter Measure also given 1 2 3
Implementation Results 1 2 3
M.B. DECO KAIZEN FORMAT
Please Spefify (Mark Tick) S.NO. UNIT DEPTT DATE

Planned Kaizen Unplanned Kaizen


TO INCREASES THE PCB CARD RELIABLE WORK THROUGH AVOIDING WIRES
1. KAIZEN THEME : DISPERSSION Kaizen Category (Mark Tick) 3 118 ASSY 15.12.21

S Q P C D M
NAME/DESIGNATION SIGN. NAME/DESIGNATION SIGN.
SUGGESTED BY Dinesh Balyan
APPROVED BY - Sr QUALITY EXECUTIVE
IMPLEMENTED BY Dinesh Balyan
2. BEFORE KAIZEN (PROBLEM) PLEASE GIVE BRIEF DESCRIPTION 3. PROPOSED COUNTER MEASURE
WHAT IS THE IDEA / PROBLEM ? WHERE FOUND ? WHAT IS THE COUNTERMEASURE ? WHERE TO IMPLEMENT?

PRODUCT'S PCB CARD PCB CARD OF PRODUCT


Additional sleeve has implemented on collated wires to sustain of all wires in unique
PCB Wire have found stucked at the time of assy WHEN FOUND ? WHEN TO IMPLEMENT?
rigidity
10.12.21 15.12.21

4. PHOTOGRAPH (BEFORE KAIZEN) 5. PHOTOGRAPH (AFTER KAIZEN)

6. AFTER KAIZEN (HOW IMPLEMENTED) PLEASE GIVE BRIEF DESCRIPTION TANGIBLE BENEFITS INTANGIBLE BENEFITS
WHERE IMPLEMENTED ?

PRODUCT( WIRING)
1. COPQ IS DECREASES
1. INSULATED SLEVE HAS BEEN COVERED ON COLLATED WIRE GRID OF PCB CARD 1. EMPLOYEES ENCAURAGING
2. PRODUCTIVITY INCREASES WHEN IMPLEMENTED ?

15.12.21

7. KAIZEN EVALUATION HORIZONTAL DEPLOYMENT


Type Points Obtained AREA RESP. TGT DATE COMP. DATE

Idea / Problem Identified


Counter Measure also given
Implementation Results

Prepared By : Approved By :

Kaizen Points
Type Good Very Good Super
Idea / Problem Identified 1 2 3
Counter Measure also given 1 2 3
Implementation Results 1 2 3

You might also like