My Preparation Topics

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 10

SAP PP Certification Exam

mySAP Certification - Criteria


SAP PP Certification – Sharing My Exam Experience
SAP PP Certification Sample Questions and Answers
SAP PP Self Test Certification Questions

Questions on Production Planning 

What is SAP Production Planning


Overall Goal of Production Planning
SAP PP Questions and Answers
Sample Questions on SAP PP
SAP PP Test Questions (MCQ)
Steps of a Typical Production Process
SAP Production Execution Process
Production Resources Tools Self Review Questions and Answers
Randomly Pick Multiple Choice Questions and Answers #1
Randomly Pick Multiple Choice Questions and Answers #2

Interview Preparation

Interview Questions and Anwsers on SAP PP


SAP PP Interview Questions

Transaction Codes in SAP PP

Transaction Code To View All SAP Tables


Commonly Used Tcodes in PP Module Part 1
Commonly Used Tcodes in PP Module Part 2
Commonly Used Tcodes in PP Module Part 3
SAP ECM Transaction Codes
Tcodes of Common SAP PP Process
SAP PP Customizing Transaction Codes
OPJS - Defining Reduction Strategy

PP Tables

SAP Production Planning Table


SAP PP Master Data Tables
Table of the Order Production Operation
Cost Analysis Table In Production Order
MRP Area Forecast Table
MRP

MRP Report 16.01.2022


The Concept Of MRP In ERP
Why used Planning tools like APO or I2?
Difference between MRP vs MPS
Factory Calendar 16.01.2022
GR processing time in PP and MM
Calculation to determine the delivery date and release date
Purchasing processing Time - OPPQ
Define Safety Stock Availability
Defining MRP Groups
Questions on MRP Group and MRP Controller
Daily Task Of MRP Planner Using MD06
Explain MRP profile, MRP group, MRP controller, MRP type
How to Take The MRP Run for Individual MRP Controller
Individual Collective Requirement Indicator
The Common Planning Strategy used
Why Planning file entry still Exists
Planning File Entry Not Created
Total Planning ? Netch, Netpl, Neupl
How The MRP Planning File Works
Processing Keys In TC MD02
Planning Strategy Selection
MRP Monthly lot size
Reservation Not Created During MRP Run
How to Configure Range Of Coverage Profile
Lose of link between sales order and production order
Batch Characteristics while Running MRP
What is Firming Type in the MRP Types
How MRP Type In MM MRP View 1 Works
MRP Types Procedure Description
Functions of Production Version
Steps To Do Repetative Manufacturing
What The Use of Reorder Planning
What Is Planned and Unplanned Consumption
Planning separately via Storage Loc or Vendor MRP Area
MRP Area Customizing and Mass Updating
What is MRP Area And How Is It defined
MD04 - Inconsistencies after PGI - SDRQCR21
MD04 MD05 MD06 MD07 Differences
What Is Safety Stock In MRP ERP
Explain Rounding Profile In MRP
Difference Between MTO and MTS
Checking Groups and Checking Rules
MRP Not Creating Purchase Requisition
How And When To Use MDAB Transaction
Step by Step Process Of MRP Flow
Usage Probability For MRP Run
MRP To Generate PR Once In No Of days
Planned Order Split For Material During MRP RUN
Splitting Of The Forecast Requirements
Pre Requisites Before Running MRP
Creating Planning Scenario MS31
MRP And SOP Definition And Flow
Take Planning Run with MS01
MRP Setting For ERSA Material Type
Production Planning Material Requirement Planning
Fixed Vendor Not defaulted in Purchase Requisition Generated from MRP
Number Range 01 for Object MDTB Nearly Exhausted

Scheduling

Rescheduling date not take in account the GR Process Time


Schedule Margin Key in Production Scheduling
Work Scheduling View in Material Master
Scheduling Background Jobs for MRP
What is Finite and Infinite Scheduling
What Is Mean By Schedule Lines
Difference Between Basic and Lead Time Scheduling
What Is Work Scheduling
What Is The Rescheduling Horizon
Scheduling For Planned Order

Production Order

What Is Production Order


Production Setup Time
Material Stock in Production Order
Automatic Conversion to Production Orders
Regarding Production Order Confirmation
Add An Entry Field In CO11N
What is Backflushing
How Costing takes place in Production Orders
SAP flow for REWORK activity
Rework Thru Trigger Point
Serial Number For Component
Serial Number Concept And Scenario In PP
Procedure For Printing The Production Order
Issue and Receipt Storage Location in Production
Process Order (COR1) Batch Management
No GR and GI Posting After TECO
Change Not Allowed When Order Status TECO
Production Order Inspection Lot
Yield Of Operation for Next Operation
Production Order External Operation Processing
Account Assignment Of Production Order
MFBF REM Back Flushing

Standard PP Reports

Checking Costs and Revenues from the Sales Order


List of Confirmation on a Particular Work Center
Collective Report For Production Variance
Explain Reporting Point Backflush

Customized PP ABAP Reports

Exact data from the MRP Table


Production Order Quantity Change Daily Checklist
Compare Prod. Confirm against Planned by Work Centre
Customized Work Center List
Reference Books for SAP PP
Production Planning with SAP S/4 HANA

SAP APO Production Planning

...more SAP PP Books

SAP PP eBook
A Step by Step Guide to the SAP PP Shop Floor Control Configurations

Free PP eBook Download 

Flow of Production Planning


Mass Change of Production Times
PDF: SAP Integration Model: MM PP SD FI
PDF: PP QM Flow in SAP
PDF: PP SD MM QM Tcode Flow

PP Frequently Asked Question

PP Year End To Do List


Production Planning and Control FAQ
List of PP Transport Request and their IMG Path
The Overall Flow For SAP PP
Production Planning Process Industries Flow
Planning / Production Alternate Plant
How To Do Master Record Mass Maintenance
Manufacturing Environment Relevant Questions and Answers
SAP PP Master Data Questions And Answers
Material Planning SAP Questions and Answers

BOM

What Is BOM
How to link BOM component to storage location
When is a Material BOM Not Exploded
Simple BOM / Group BOM
Explode BOM
Where used list for BOM
Controlling data for your Bill of Materials
Allocating BOM to Other Plant 
Mass Change Bill of Materials
Multi-level configuration with variants
Explain What Is Material Variants
What exactly is a Phantom item or Assembly means
Attachment Of Drawings in BOMs
Steps To Create Material BOM
How To Do Process Scrap Recycling
Fixed Waste For Finished Goods
CS03 To Display Alternative BOM
Types of BOM
Differences Between Sales BOM and Production BOM
Explain Detached Order Assembly
Bill Of Materials Self-Review Multiple Choice Questions Answers #1
Bill Of Materials Self-Review Multiple Choice Questions Answers #2
Select Alternative BOM in Sales order

Goods Movement

Define the default components reservation movement type


Goods Receipt (101) for Process Order
Goods receipt and goods issue through a PI sheet
Transactional Flow Of PP-PI
Steps for Subcontracting
Two Types of Subcontracting Relevant for PP
Stock in Transit - liquidation or remove stk which in transit
Restricting GR Unless Production Order Confirmed
Goods Receipt of a Production Order
Functionality Usage And Limitations Of COGI

Message / System Status

Changing warning msgs to error msg n vice-versa


Production Control System Messages
Production Order System Status
Explain System and User Status In Production Order

Discrete Manufacturing

What is Discrete Manufacturing, REM, Demand Mgt


Discrete Manufacturing - The Made To Order Cycle
Discrete Manufacturing - The Made To Stock Cycle
Discrete Manufacturing - The Step By Step Tcodes
Split The Order Qty In Discrete Manufacturing

Repetitive Manufacturing

What Is Repetitive Manufacturing

Capacity Planning
Capacity Leveling Profile Setup
Rough Cut Capacity Load In Standard SOP
Operation Dispatching and Deallocation

Work Center

Guide To Mass Replace Work Center


Set Parameter and Work Center Formula
Delete Or Archive Work Centers
Work Center Relevant Questions and Answers
Work Center Basic Data View And Formula
Cost Center and Activity Type in SAP PP

Planned Order

How to “permanently” delete new planned orders?


Assign Multiple Planned Order to a Purchase Requistion
Planned Order Conversion to Process Orders
Planned Order To Production Order Conversion
Planning Table Data MF50
MF50 Capacity Leveling With Production Order
Define Scheduling Parameters for Planned Orders

Engineering Change Management

A basic Engineering Change Management Setup

Routing

Split In Routing / Diff Between Alternative And Parallel Seq


What and How To Create Routing
Display of all Routings for All Materials at a Time
Forward and Backward Scheduling In Routing
Routing Self Evaluation Questions and Answers

Authorization

Authorization Object For BOM

Archiving

How To Delete Old Production Orders


Unable To Delete Production Order
BOM Archiving Object CS_BOM In CS28
PP Archiving Object Self-Evaluation Questions Answers
AS-IT TO-BE

Routing AS-IT and TO-BE


Production Planning Demand Management AS-IS TO-BE
04.01.2022
05.01.2022
06.01.2022
06.01.2022
06.01.2022
06.01.2022
08.01.2022
08.01.2022
08.01.2022
unable to understand
09.01.2022
09.01.2022
09.01.2022
09.01.2022 arung@indusnovateur.com
09.01.2022

09.01.2022
09.01.2022
09.01.2022

You might also like