SUB-MAIN BOARD SUB-MAIN BOARD SUB-MAIN BOARD SUB-MAIN BOARD SUB-MAIN BOARD SUB-MAIN BOARD

SPARES
DISTRIBUTION BOARD LIGHTING KIOSK WATER TREATMENT SEWAGE TREATMENT PASSENGER (CSLP) (SMB-G) (SMB-1) (SMB-2) (SMB-3) (SMB-4)
(GATE HOUSE) PLANT PLANT LIFT No.1 FIRE PUMPS WATER PUMPS DIESEL PUMPS STABILIZER IS
(LK) GROUND FLOOR FIRST FLOOR SECOND FLOOR (THIRD FLOOR) (FOURTH FLOOR)
(63A) (63A) (63A) (63A) (32A) (32A) (63A)
3-C 10mm2 PVC/SWA/PVC CABLE
4-C 10mm2 PVC/SWA/PVC CABLE
4-C 16mm2 PVC/SWA/PVC CABLE
4-C 35mm2 PVC/SWA/PVC CABLE
32A SPN 32A TPN 63A TPN 63A TPN 63A TPN 63A TPN 125A TPN 125A TPN 125A TPN 125A TPN 125A TPN 63A TPN 32A TPN 32A TPN 32A TPN 32A TPN 63A TPN 125A TPN 125A TPN
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB 63A TPN
MCCB MCCB MCCB MCCB MCCB
MCCB
1 2 3 4 5 6 7 8 9 10 11 12 13 14 16 17 18 19
N
E
A
S 0-800A
15
A 800A RATED BUSBARS.
ESP 415 SURGE
ARRESTOR. 800A
TPN Q1
ACB
I
E
I>
I>>
LV
FF
800/5A
V 0-600V
S
V
MAIN LV PANEL
LOAD SUMMARY
LOAD[A].
SWITCHGEAR
MAIN LV PANEL 'MLVP'
R. Y. B.
FROM COS-2
GATE HOUSE - 10.0 -
LIGHTING KIOSK 7.0 7.0 7.0
WATER TREATMENT PLANT 18.0 18.0 18.0
SEWAGE TREATMENT PLANT 19.5 19.5 19.5
PASSENGER LIFT N0.1 17.5 17.5 17.5
CSLP 18.9 18.9 21.7
SMB-G 107.5 83.8 82.3
SMB-1 76.2 77.3 71.4
SMB-2 113.6 132.5 119.8
SMB-3 137.1 133.8 157.0
design
SMB-4 141.6 115.5 113.6
FIRE PUMPIS 16.8 16.8 16.8 consultants
WATER PUMPIS 12.6 12.6 12.6
DIESEL PUMPIS 11.2 11.2 11.2
STABILIZER IS 21.6 21.6 21.6
TOTAL CONNECTED LOAD[A]. 719.1 696.0 690.0
MAX. DEMAND[A].@(0.60) 431.5 417.6 414.0
PEAK DEMAND LOAD [kVA]. 298.6