02-1 Tecnical Spec

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 22

Ventilation and Air-Treatment Systems for Ships

TECHNICAL SPECIFICATION

Ventilation and Air-Condition System

Shipyard: Yard type:


BÅTSERVICE MANDAL AS 55 m Multi-purpose oil recovery
Yard no: Order no: File name: Quotation no: Orig. date: Sign:
80 - Rev-05 Sk09.021 26.02.2009 BAK
Sales Manager: Project Manager:
Aage Nygaard Øyvind Steinnes
Revisions: Rev. date: Sign:
0 PRELIMINARY ISSUE 26.02.2009 BAK
1 ADJUSTMENTS AFTER MAIL 03.03.2009 BAK

2 Changed cooling machinery 06.03.2009 BAK


3 Various changes 12.03.2009 BAK
4 Changed machinery room 31.03.2009 BAK
5 Changes after meeting in Mandal. 07.09.2009 BAK
6 E-1 changed, voltage on S-40/41 changed, el data included 14.10.2009 ØS
7 Voltage changed on S-44/45, Starters added, E-21 changed 06.11.2009 ØS
8
9
10

Number of pages: 21
INDEX

BASIC OF CALCULATION ..................................................................................................................................... 3 


571 VENTILATION PLANT ACCOMMODATION .............................................................................................. 4 
AC-1, AIR TREATMENT UNIT ACCOMMODATION AND WHEELHOUSE ............................................... 4 
CONTROL SYSTEM .......................................................................................................................................... 4 
CP-1, CONTROL PANELFOR HVAC IN ACCOMODATION ......................................................................... 5 
CABIN UNITS..................................................................................................................................................... 5 
SPIRO DUCTS, DAMPERS, SOUND TRAPS, GRILLES, EXHAUST VALVE ............................................... 5 
E-1A, EXHAUST FAN SANITARY SPACES, MAIN DECK ............................................................................ 6 
E-1B, EXHAUST FAN SANITARY SPACES, FORECASTLE DECK ............................................................. 6 
E-2, EXHAUST FAN HOSPITAL ....................................................................................................................... 6 
E-3, EXHAUST FAN DRY PROVISION............................................................................................................ 7 
E-4, EXHAUST FAN LINEN / LAUNDRY ........................................................................................................ 7 
E-5, EXHAUST FAN SHOWERS ....................................................................................................................... 7 
C-1, COOLING MACHINERY ........................................................................................................................... 8 
C-2, COOLING MACHINERY WHEELHOUSE ............................................................................................... 9 
572 VENTILATION IN GALLEY .......................................................................................................................... 10 
S-20, SUPPLY FAN GALLEY .......................................................................................................................... 10 
E-21, EXHAUST FAN GALLEY ...................................................................................................................... 10 
C-3 PROVISION PLANT .................................................................................................................................. 11 
573 VENTILATION IN CONTROL ROOMS ...................................................................................................... 12 
E-32, EXHAUST FAN PAINT STORE MAIN DECK ...................................................................................... 12 
E-33, EXHAUST FAN MOORING EQUIPMENT MAIN DECK .................................................................... 12 
E-35, EXHAUST FAN SOLID GARBAGE ROOM MAIN DECK................................................................... 13 
S-36, SUPPLY FAN LABORATORY MAIN DECK ........................................................................................ 13 
C-4, COOLING MACHINERY LABORATORY MAIN DECK ...................................................................... 13 
S-37, SUPPLY FAN BOATSMAN STORE ...................................................................................................... 14 
S-38, SUPPLY FAN EMERGENCY GENERATOR ROOM ............................................................................ 14 
574 VENTILATION IN ENGINE ROOM ETC. ................................................................................................... 15 
S-40&S-41, SUPPLY FAN ENGINE ROOM .................................................................................................... 15 
DAMPERS FOR SUPPLY FANS ENGINE ROOM ......................................................................................... 15 
C-5, COOLING MACHINERY ENGINE CONTROL ROOM ......................................................................... 16 
S-44, SUPPLY FAN THRUSTER COMPARTMENT /CARGO HOLD........................................................... 17 
S-45, SUPPLY FAN BOW THRUSTER ROOM............................................................................................... 17 
ADDITIONAL DELIVERIES ................................................................................................................................. 17 
CP-2 PUMP STARTERS FOR SEA WATER PUMPS FOR AC-PLANT......................................................... 17 
CP-3 CP-2 PUMP STARTERS FOR SEA WATER PUMPS FOR PROV.PLANT ........................................... 17 
VENTILATION GRILLES AND LOUVERS ........................................................................................................ 18 
GENERAL INFORMATION ............................................................................................................................ 19 
THE FOLLOWING ARE INCLUDED IN OUR DELIVERY ........................................................................... 19 
THE FOLLOWING ARE NOT INCLUDED IN OUR DELIVERY .................................................................. 21 
GUARANTEE: .................................................................................................................................................. 22 

Client: Project: Yard no: Ref: Date:


BÅTSERVICE MANDAL OIL RECOVERY VESSEL 80 Sk09.021 07.09.2009
Aeron AS * Strandgaten 22 * N-4400 Flekkefjord * Norway * Phone: +47 38 32 78 00 * Fax: +47 38 32 78 01 Page 2
BASIC OF CALCULATION

The Plant is dimensioned on the basis of the data from the Technical specification and GA 1963-00-11 G

AIR CHANGES

We have calculated with following minimum air changes:

Area Central unit Supply fans Exhaust fans

Dry Prov. 300m3


Wheelhouse 25 - -
Cabins 10-22 - -
Sanitary Spaces - - 10-15
Mess-/Dayroom 11-17,5 - -
Galley - 30 40
Galley 500m3
Hospital 12 - 14
Laundry 12 - 16

*Air changes based on heat loss calculation

Conditions Outside Inside

Winter +10 °C – 55%RH + 20 °C


Summer + 45 °C - 55% RH + 23 °C – 50% RH

The system is designed for 65 % return air and 35 % fresh air.

Heating medium Electrical heating


Cooling medium R404A
Sea water + 36 °C

El. power supply 1 x 230


3 x 230
3 x 400
3 x 690

Class DNV, +1A1, SF, OIL REC.

Flag IRAN

Operation Aera -

Client: Project: Yard no: Ref: Date:


BÅTSERVICE MANDAL OIL RECOVERY VESSEL 80 Sk09.021 07.09.2009
Aeron AS * Strandgaten 22 * N-4400 Flekkefjord * Norway * Phone: +47 38 32 78 00 * Fax: +47 38 32 78 01 Page 3
571 VENTILATION PLANT ACCOMMODATION

AC-1, AIR TREATMENT UNIT ACCOMMODATION AND WHEELHOUSE

Air treatment unit. Single duct system for air distribution.

The unit consists of:


1 Mixing section with damper for fresh and return air with connections for spiro ducts
1 Filter section with filter
1 Heating section with Electricity
Capacity: 17kW
1 Cooling section
Capacity: 105 kW
1 Fan section with centrifugal fan and 1-speed fan motor
1 Distribution section with connections for spiro ducts
1 Skid

Unit data:
Air flow 7.730 m3/h
External pressure 1800 Pa.
Voltage 3 x 400 V 50 Hz
El data 11 kW 22 amp

AC-1 is designed for 65 % return air

CONTROL SYSTEM
1 Frequency converter
1 Pressure transmitter
1 Step controller
1 Temperature sensor and regulator
1 Thermometer

Client: Project: Yard no: Ref: Date:


BÅTSERVICE MANDAL OIL RECOVERY VESSEL 80 Sk09.021 07.09.2009
Aeron AS * Strandgaten 22 * N-4400 Flekkefjord * Norway * Phone: +47 38 32 78 00 * Fax: +47 38 32 78 01 Page 4
CP-1, CONTROL PANELFOR HVAC IN ACCOMODATION

1 Control panel with direct start for fan with overload relay, but without main fuses.
Including, pilot voltage, transformers, switches, signal lamps pilot fuses and supply
air temp. regulator.

Starter for: AC-1, E-1A, E-1B, E-2, E-3, E-4,E-5, S-20, E-21

Remote panel: S-20, E-21

CABIN UNITS

ACU1-30/50C
Single pipe cabin units for mounting above ceiling panel with individual control of air flow.
Square perforated diffuser with regulation knob outside for individual regulation of air flow.

SPIRO DUCTS, DAMPERS, SOUND TRAPS, GRILLES, EXHAUST VALVE

Necessary amount of pre-insulated and un-insulated spiro-ducts, fittings and flexible hoses.
Necessary amount of regulation dampers
Necessary amount of sound traps
Necessary amount of grilles for over-pressure and return air
Necessary amount of exhaust valves
Necessary amount of dampers for hospital

Client: Project: Yard no: Ref: Date:


BÅTSERVICE MANDAL OIL RECOVERY VESSEL 80 Sk09.021 07.09.2009
Aeron AS * Strandgaten 22 * N-4400 Flekkefjord * Norway * Phone: +47 38 32 78 00 * Fax: +47 38 32 78 01 Page 5
E-1A, EXHAUST FAN SANITARY SPACES, MAIN DECK

1 Duct fan type K 315 L


1 1-speed el motor, direct drive

Fan data:
Air flow 745 m3/h
Pressure 450 Pa.
Voltage 1 x 230 V 50 Hz
El data 0,4 kW 1,77 amp

E-1B, EXHAUST FAN SANITARY SPACES, FORECASTLE DECK

1 Duct fan type K 160 XL


1 1-speed el motor, direct drive

Fan data:
Air flow 225 m3/h
Pressure 431 Pa.
Voltage 1 x 230 V 50 Hz
El data 0,153 kW 0,67 amp

E-2, EXHAUST FAN HOSPITAL

1 Duct fan type K 200 L


1 1-speed el motor, direct drive

Fan data:
Air flow 315 m3/h
Pressure 220 Pa.
Voltage 1 x 230 V 50 Hz
El data 0,234 kW 1,01 amp

Client: Project: Yard no: Ref: Date:


BÅTSERVICE MANDAL OIL RECOVERY VESSEL 80 Sk09.021 07.09.2009
Aeron AS * Strandgaten 22 * N-4400 Flekkefjord * Norway * Phone: +47 38 32 78 00 * Fax: +47 38 32 78 01 Page 6
E-3, EXHAUST FAN DRY PROVISION

1 Duct fan type K 160 XL


1 1-speed el motor, direct drive

Fan data:
Air flow 130 m3/h
Pressure 150 Pa.
Voltage 1 x 230 V 50 Hz
El data 0,153 kW 0,67 amp

E-4, EXHAUST FAN LINEN / LAUNDRY

1 Duct fan type K 200 L


1 1-speed el motor, direct drive

Fan data:
Air flow 305 m3/h
Pressure 220 Pa.
Voltage 1 x 230 V 50 Hz
El data 0,234 kW 1,01 amp

E-5, EXHAUST FAN SHOWERS

1 Duct fan type K 160 XL


1 1-speed el motor, direct drive

Fan data:
Air flow 220 m3/h
Pressure 430 Pa.
Voltage 1 x 230 V 50 Hz
El data 0,153 kW 0,67 amp

Client: Project: Yard no: Ref: Date:


BÅTSERVICE MANDAL OIL RECOVERY VESSEL 80 Sk09.021 07.09.2009
Aeron AS * Strandgaten 22 * N-4400 Flekkefjord * Norway * Phone: +47 38 32 78 00 * Fax: +47 38 32 78 01 Page 7
C-1, COOLING MACHINERY

2x105kW El data 47 kW 80 Amp

Evapor./ Motor
Cooling capacity kW condensing Refrigerant Compressors Bitzer 400V / 3~ / 50 Hz
temp. °C 80A 47 kW

105 kW * +5 / 48 R 404
6G-40.2Y
(+7,5 / +55 °C)
COP =2,76 6G-40.2Y
capacity regulat ... steps 0-33-66-
100% * Suction gas superheat 10K Liquid subcooling 1K
1 compressor is stand-by
m
basic equipment m
Semi hermetic 1 suction 54 and 1 discharge 35 mm shut-off valves,
Reciprocating crankcase heating, electronic control unit SE-B2, enclosure class IP 66
compressor discharge gas temperature control, oil service valve, oil pressure mon. DeltaP,
Bitzer 2x capacity regulators
Controls 3x HP, 2x LP press stats, pressure gauges, transmitters
Frame Steel screw or welded with powder epoxy coating, lifting arrangement
1/2 circle include :
Discharge line Oil separator, check valve, Shell - tube cond., double relief valve 35
common parts :
Liquid line liquid receiver 175L, level control ESA, double relief valve
filter dehydrator with replaceable core, sight glass, ball valve 28
Suction line filter , ball valve, ins. Armaflex 9 mm 54
Switchboard -
Compressor motor starter, circuit breakers, pump-down operation, for
control
running and stand-by unit, PLC with touch-screen display,
Note :
Documentation - PID diagram, dimensional drawing, electric diagram, manual
cooling unit dimensions approx. :
LxW xH Length x Width x Height 1,6 x 1,2 x 1,8 m
MAX
Weight 1450 kg

Client: Project: Yard no: Ref: Date:


BÅTSERVICE MANDAL OIL RECOVERY VESSEL 80 Sk09.021 07.09.2009
Aeron AS * Strandgaten 22 * N-4400 Flekkefjord * Norway * Phone: +47 38 32 78 00 * Fax: +47 38 32 78 01 Page 8
C-2, COOLING MACHINERY WHEELHOUSE

2 Air cooled split system cooling machinery, type Daikin.


In door unit(evaporator) type Daikin FHQ100B for roof.
Outdoor unit (compressor) type Daikin RZQ100C

Technical data:
Cooling capacity 10 kW
Heating capacity 11 kW
Power supply 3 x 400 V 50 Hz
El data 10,3 kW 14,9 amp
Cooling medium R-410A

Client: Project: Yard no: Ref: Date:


BÅTSERVICE MANDAL OIL RECOVERY VESSEL 80 Sk09.021 07.09.2009
Aeron AS * Strandgaten 22 * N-4400 Flekkefjord * Norway * Phone: +47 38 32 78 00 * Fax: +47 38 32 78 01 Page 9
572 VENTILATION IN GALLEY

S-20, SUPPLY FAN GALLEY

1 Duct fan type KT 50-30-4


1 1-speed el motor, direct drive
1 Frequency converter

Fan data:
Air flow 895 m3/h
Pressure 200 Pa.
Voltage 3 x 230 V 50 Hz
El data 0,783 kW 2,41 amp

1 Fire damper
5 Spot coolers in roof

Stand still heating to be programmed

E-21, EXHAUST FAN GALLEY

1 Centrifugal fan SKV 250


1-speed el motor, direct drive

Fan data:
Air flow 1.465 m3/h
Pressure 350 Pa.
Voltage 3 x 230 V 50 Hz
El data 1,3 kW 4,4 amp

1 Counter flange
1 Damper LSS 250(manual)
1 Frequency converter
1 Galley Hood
1 Grease filter type AO-2 50/50

Stand still heating to be programmed

Client: Project: Yard no: Ref: Date:


BÅTSERVICE MANDAL OIL RECOVERY VESSEL 80 Sk09.021 07.09.2009
Aeron AS * Strandgaten 22 * N-4400 Flekkefjord * Norway * Phone: +47 38 32 78 00 * Fax: +47 38 32 78 01 Page 10
C-3 PROVISION PLANT
CUBW-M,L - 2JC-07.2Y, 4CC-6.2Y El data 13 kW 22 amp

To / Tc Motor
Cooling capacity kW Refrigerant Compressors Bitzer
[ °C ]
400V / 3~ /50 Hz
3,1 kW * -5 / 41 R 404 2JC-07.2Y
COP =2,53
capacity regulat ... steps 0- 100% * Suction gas superheat 10K Liquid subcooling 2K

To / Tc Motor
Freezing capacity kW Refrigerant Compressors Bitzer
[ °C ]
400V / 3~ / 50 Hz
5,35 kW * -32 / 41 R 404 4CC-6.2Y
COP =1,22
capacity regulat ... steps 0- 100% * Suction gas superheat 15K Liquid subcooling 2K
cooling circle :
m
basic equipment m
Semi hermetic c. 1 suction 16 mm and 1 discharge 12 mm shut-off valves,
reciprocating crankcase heating, electronic control unit SE-B1 enclosure class IP 65
Controls HP/LP pressostat, HP/LP pressure gauges,
Discharge line oil separator, check valve, Shell - tube cond. K203HB 4pass, relief valve 12
water valve WVFX 10
Liquid line filtr dehydrator , sightglass, ball valve 10
Suction line filter , ball valve, ins. Armaflex 9 mm 16
freezing circle :
m
basic equipment m
Semi hermetic c. 1 suction 28 mm and 1 discharge 22 mm shut-off valves, additional fan
reciprocating crankcase heating, electronic control unit SE-B1 enclosure class IP 65
Controls HP/LP pressostat, HP/LP pressure gauges,
Discharge line oil separator, check valve, Shell - tube cond. K373HB 4pass, relief valve 16
water valve WVFX 15
Liquid line filtr dehydrator , sightglass, ball valve 12
Suction line filter , liquid separator, ball valve, ins. Armaflex 19 mm 28
common parts :
Frame Steel screw with powder epoxid coating, lifting arrangement
Switchboard Compressor motor starters, circuit breakers,

LxW xH Length x Width x Height 1,2 x 0,8 x 1,8 m


Weight 480 kg

Client: Project: Yard no: Ref: Date:


BÅTSERVICE MANDAL OIL RECOVERY VESSEL 80 Sk09.021 07.09.2009
Aeron AS * Strandgaten 22 * N-4400 Flekkefjord * Norway * Phone: +47 38 32 78 00 * Fax: +47 38 32 78 01 Page 11
573 VENTILATION IN CONTROL ROOMS

E-32, EXHAUST FAN PAINT STORE MAIN DECK

1 Duct fan type EX 140-4C


1 1-speed EX el motor, direct drive
1 Starter(MPS)

Fan data:
Air flow 300 m3/h
Pressure 150 Pa.
Voltage 1 x 230 V 50 Hz
El data 0,17 kW 0,71 amp

E-33, EXHAUST FAN MOORING EQUIPMENT MAIN DECK

1 Duct fan type K 200 L


1 1-speed el motor, direct drive
1 Starter(MPS)

Fan data:
Air flow 500 m3/h
Pressure 300 Pa.
Voltage 1 x 230 V 50 Hz
El data 0,234 kW 1,01 amp

Client: Project: Yard no: Ref: Date:


BÅTSERVICE MANDAL OIL RECOVERY VESSEL 80 Sk09.021 07.09.2009
Aeron AS * Strandgaten 22 * N-4400 Flekkefjord * Norway * Phone: +47 38 32 78 00 * Fax: +47 38 32 78 01 Page 12
E-35, EXHAUST FAN SOLID GARBAGE ROOM MAIN DECK

1 Duct fan type EX 140-4C


1 1-speed EX el motor, direct drive
1 Starter(MPS)

Fan data:
Air flow 200 m3/h
Pressure 130 Pa.
Voltage 1 x 230 V 50 Hz
El data 0,17 kW 0,71 amp

S-36, SUPPLY FAN LABORATORY MAIN DECK

1 Duct fan type K 200 L


1 1-speed el motor, direct drive
1 Starter(MPS)

Fan data:
Air flow 400 m3/h
Pressure 280 Pa.
Voltage 1 x 230 V 50 Hz
El data 0,234 kW 1,01 amp

C-4, COOLING MACHINERY LABORATORY MAIN DECK

1 Self Contained Unit type AERON SCUE-10

The unit is complete with compressor, condenser, evaporator and fan built together
in a casing. All electrical wiring and refrigerant piping made.

Unit data:
Make Aeron
Type SCUE-10 – For duct mounting
Type of refrigerant R-404A
Cooling capacity about 10,5 kW
Compressor motor power input 4 kW/7 Amp
Condenser entering water temp. 32 °C – Sea water
Condenser water 4,10 m3/h
Pressure drop 0,13 bar
Air amount 1.680 m3/h
Pressure 400 Pa
Voltage 3 x 400 V - 50 Hz
Plenum chamber No

Necessary amounts of inlet and outlet air vents are included.


The unit to run on 100 % re-circulation.
Temperature sensors for temperature control is fitted in the return air intake.

Client: Project: Yard no: Ref: Date:


BÅTSERVICE MANDAL OIL RECOVERY VESSEL 80 Sk09.021 07.09.2009
Aeron AS * Strandgaten 22 * N-4400 Flekkefjord * Norway * Phone: +47 38 32 78 00 * Fax: +47 38 32 78 01 Page 13
S-37, SUPPLY FAN BOATSMAN STORE

1 Duct fan type EX 140-4C


1 1-speed EX el motor, direct drive
1 Starter(MPS)

Fan data:
Air flow 200 m3/h
Pressure 130 Pa.
Voltage 1 x 230 V 50 Hz
El data 0,17 kW 0,71 amp

S-38, SUPPLY FAN EMERGENCY GENERATOR ROOM

1 Duct fan type K 200 L


1 1-speed el motor, direct drive
1 Starter(MPS)

Fan data:
Air flow 500 m3/h
Pressure 280 Pa.
Voltage 1 x 230 V 50 Hz
El data 0,234 kW 1,01 amp

Client: Project: Yard no: Ref: Date:


BÅTSERVICE MANDAL OIL RECOVERY VESSEL 80 Sk09.021 07.09.2009
Aeron AS * Strandgaten 22 * N-4400 Flekkefjord * Norway * Phone: +47 38 32 78 00 * Fax: +47 38 32 78 01 Page 14
574 VENTILATION IN ENGINE ROOM ETC.

S-40&S-41, SUPPLY FAN ENGINE ROOM

2 Axial fan type MPV 800 A1K


2 1-speed el motor, direct drive 1700 r.p.m
The fans to be reversible
2 Counter flange
2 Frequency converter
2 Sound trap L=1200
1 Remote panel for Engine room

Fan data:
Air flow 30.000 m3/h
Pressure 500 Pa.
Voltage 3 x 400V 60 Hz
El-data 8,6 kW 17,3 amp

DAMPERS FOR SUPPLY FANS ENGINE ROOM

2 Closing dampers type SS-Vent Ø-800.


Motor controlled.

1 x 230v supply for the motor controlled dampers

Client: Project: Yard no: Ref: Date:


BÅTSERVICE MANDAL OIL RECOVERY VESSEL 80 Sk09.021 07.09.2009
Aeron AS * Strandgaten 22 * N-4400 Flekkefjord * Norway * Phone: +47 38 32 78 00 * Fax: +47 38 32 78 01 Page 15
C-5, COOLING MACHINERY ENGINE CONTROL ROOM

1 Self Contained Unit type AERON SCUE-10

The unit is complete with compressor, condenser, evaporator and fan built together
in a casing. All electrical wiring and refrigerant piping made.

Unit data:
Make Aeron
Type SCUE-10 – For duct mounting
Type of refrigerant R-404A
Cooling capacity about 10,5 kW
Compressor motor power input 4 kW/7 Amp
Condenser entering water temp. 32 °C – Sea water
Condenser water 4,10 m3/h
Pressure drop 0,13 bar
Air amount 1.680 m3/h
Pressure 400 Pa
Voltage 3 x 400 V - 50 Hz
Plenum chamber No

Necessary amounts of inlet and outlet air vents are included.

The unit to run on 100 % re-circulation.

Temperature sensors for temperature control is fitted in the return air intake.

Client: Project: Yard no: Ref: Date:


BÅTSERVICE MANDAL OIL RECOVERY VESSEL 80 Sk09.021 07.09.2009
Aeron AS * Strandgaten 22 * N-4400 Flekkefjord * Norway * Phone: +47 38 32 78 00 * Fax: +47 38 32 78 01 Page 16
S-44, SUPPLY FAN THRUSTER COMPARTMENT /CARGO HOLD

1 Axial fan type MPV 355 A1K


1 1-speed el motor, direct drive
1 Counter flange
1 Protection grid
1 Starter(Frequency Converter with temperature transmitter on the side)

Fan data:
Air flow 3.500 m3/h
Pressure 500 Pa
Voltage 3 x 230 V 50 Hz
El-data 1,4 kW 5,7amp

S-45, SUPPLY FAN BOW THRUSTER ROOM

1 Axial fan type MPV 355 A1K


1 1-speed el motor, direct drive
1 Counter flange
1 Protection grid
1 Starter(Frequency Converter with temperature transmitter on the side)

Fan data:
Air flow 3.500 m3/h
Pressure 500 Pa
Voltage 3 x 230 V 50 Hz
El-data 1,4 kW 5,7amp

Additional deliveries

CP-2 PUMP STARTERS FOR SEA WATER PUMPS FOR AC-PLANT

Pump Starter for sea water pumps(normal and standby) for AC-plant
Frequency converters with front panel for start/stop + manual override
Temp transmitter(loose delivery) 1 pcs for mounting on condenser outlet

CP-3 CP-2 PUMP STARTERS FOR SEA WATER PUMPS FOR PROV.PLANT
Pump Starter for sea water pumps(normal and standby) for provision plant
Frequency converters with front panel for start/stop + manual override
Temp transmitter(loose delivery) 1 pcs for mounting on condenser outlet

Client: Project: Yard no: Ref: Date:


BÅTSERVICE MANDAL OIL RECOVERY VESSEL 80 Sk09.021 07.09.2009
Aeron AS * Strandgaten 22 * N-4400 Flekkefjord * Norway * Phone: +47 38 32 78 00 * Fax: +47 38 32 78 01 Page 17
VENTILATION GRILLES AND LOUVERS
Sys. Pos. System Qt Type Dimension Cut-Out H. side Remarks
no: no: (W x H) (W x H)
S-40 Supply Engine Room PS 1 DRS-F 1380 x 1380 1400x 1400 - Mist elem.
Nat. Exhaust Engine Room 1 SS-Vent-FS 750 x 780 800 x 800 - Grille

Nat Exhaust Engine Room 1 SS-Vent-FS 750 x 780 800x800 Grille


AC-1 Supply AC Unit 1 DRSL-F 600 x 500 600 x 500 Top Mist el. w/ hatch
Nat. Exhaust Cargo/thrusters 1 SRL-F 400 x 400 400x400 Top Grille w/ hatch
S-44 Supply Cargo/thruster 1 DRSL-F 400 x 600 400x600 Top Mist el. w/ hatch
Nat. Exhaust Emergency Gen 1 SS-Vent FS 780 x 780 800x800 Nat. Grille
S-20 Supply Galley 1 Swan neck Yard Supp.
S-46 Supply bow thruster 1 Swan neck Yard Supp.
Nat Exhaust bow thruster 1 Swan neck Yard Supp.
E-47 Exhaust workshop TD 1 Swan neck Yard Supp.
Nat. Supply workshop TD 1 Swan neck Yard Supp.
E-48 Exhaust store TD 1 Swan neck Yard Supp.
Nat Supply store TD 1 Swan neck Yard Supp.
E-49 Exhaust paint store 1 Swan neck Yard Supp.
Nat. Supply paint store 1 Swan neck Yard Supp.
S-50 Supply mooring eq. MD 1 Swan neck Yard Supp.
Nat. Exhaust mooring eq MD 1 Swan neck Yard Supp.
S-51 Supply CO2/store MD 1 Swan neck Yard Supp.
Nat. Exhaust CO2/store MD 1 Swan neck Yard Supp.
E-52 Exhaust solid garbage 1 Swan neck Yard Supp.
Nat. Supply solid garbage 1 Swan neck Yard Supp.
S-53 Supply laboratory 1 Swan neck Yard Supp.
Nat. Exhaust laboratory 1 Swan neck Yard Supp.
E-54 Exhaust boatsman store 1 Swan neck Yard Supp.
Nat. Supply boatsman store 1 Swan neck Yard Supp.

Client: Project: Yard no: Ref: Date:


BÅTSERVICE MANDAL OIL RECOVERY VESSEL 80 Sk09.021 07.09.2009
Aeron AS * Strandgaten 22 * N-4400 Flekkefjord * Norway * Phone: +47 38 32 78 00 * Fax: +47 38 32 78 01 Page 18
GENERAL INFORMATION

THE FOLLOWING ARE INCLUDED IN OUR DELIVERY

1 5 SETS PAPER AND 2 CD OF INSTALLATION AND ENGINEERING MANUAL


CONTAINING:
General information.
Complete technical specification
Measuring drawings of all components
Engineering of heating and air-conditioning inside accommodation
Engineering of air amount in each room inside accommodation
Data sheets for evaporator and heating battery
Principal drawings with dimensions for all ventilation in accommodation
Up to 1 revisions of drawings is included. Additional revisions according to separate prices
Electric data for all equipment «Technical data»
Cable and survey diagram for Control systems
Current circuit diagrams for control panels
Technical data sheets for electric components
Piping diagram for refrigerating machinery
All text to be in English language
Necessary approval drawings for ventilation and air-conditioning in accommodation including
refrigerating machinery

2 RESPONSIBILITY
AERON to be responsible for ventilation and air-condition inside accommodation
The drawings and scope of supply to be in accordance with the technical specification, the
classification society rules, and the national rules etc.
AERON is not responsible for design and calculating of air amount etc. outside accommodation, but
deliver fans according to technical specification.

3 5 SETS PAPER AND 2 CD OF OPERATING AND MAINTENANCE INSTRUCTION BOOKS


FOR THE VENTILATION AND AIR-CONDITION SYSTEMS - CONTAINING:
The same as for Engineering Manual, but with «as built» drawings as far as practicable.
Description of the plant
Measuring reports from start up and trial run for all fans we deliver.
Measuring report from start up and trial run with register of air-mass in every room inside the
accommodation.
Maintenance and Operating instructions for AERON-air-handling units
Maintenance and Operating instructions for auxiliary components
Maintenance and operating instructions for fans
Recommended list of spare parts
Type Test certificate for all electric motors

Client: Project: Yard no: Ref: Date:


BÅTSERVICE MANDAL OIL RECOVERY VESSEL 80 Sk09.021 07.09.2009
Aeron AS * Strandgaten 22 * N-4400 Flekkefjord * Norway * Phone: +47 38 32 78 00 * Fax: +47 38 32 78 01 Page 19
4 4 SETS PAPER AND ONE CD OF OPERATING AND MAINTENANCE
INSTRUCTION BOOKS FOR REFRIGERATING MACHINERY - CONTAINING:
Description of the plant
Operating instructions of refrigerating machinery, compressors etc.
Technical specification of refrigerating machinery
Operating instruction of compressors
Operating instructions for auxiliary components
Maintenance and Description of condensers
Measuring drawings, current circuit diagrams and piping diagrams of refrigerating machinery
Start up / instruction manual
General seeking for defects
Supplementary information

5 START UP AND TRIAL RUN


A Pre-start up procedure to be sent to yard describes what have to be finished before we come. A Start
up procedure to be sent to yard describing what we shall do at the yard.

1 person for start up and trial run of ventilation and air-conditioning systems. Based on one trip with
necessary assistance for up to 4 working days with up to10 hours day time work each day

1 PERSON FOLLOWING THE INNSTALLATION FOR 4 DAYS

1 person for start up and trial run of refrigerating machinery. Based on one trip with necessary
assistance for up to 3 working days with up to10 hours day time work each day

Waiting time caused by the yard will be charged.

THE FOLLOWING REPORTS WILL BE DELIVERED:


Measuring of air-amount in all rooms in accommodation
Measuring of air-amount of all fans outside accommodation
Measuring of ampere of all electric motors
All equipment to be checked.

Refrigerating machinery to be started up, checked and handed over.


Pre-commissioning and commissioning report to be delivered.

Client: Project: Yard no: Ref: Date:


BÅTSERVICE MANDAL OIL RECOVERY VESSEL 80 Sk09.021 07.09.2009
Aeron AS * Strandgaten 22 * N-4400 Flekkefjord * Norway * Phone: +47 38 32 78 00 * Fax: +47 38 32 78 01 Page 20
THE FOLLOWING ARE NOT INCLUDED IN OUR DELIVERY

1 Installation.
2 All grills in doors.
3 Delivery and mounting of piping and closing valves which is not specified.
4 Natural ventilations
5 Foundations with necessary irons, bolts etc
6 Insulation work.
7 Painting of any parts for the plant after dispatch
8 Drilling and cutting through bulkheads and decks.
9 All kind of shipwork, like welding etc.
10 Bringing onboard of materials or transportation at the yard.
11 All kinds of square formed ducts.
12 All kind of spiro pipes etc outside accommodation
13 Delivery of electric cables
14 Automatic water valves for refrigerant machinery
15 Water pumps
16 Refrigerant leakage detection and alarm system
17 Drainage from evaporators
18 Fasteners for pipelines (refrigerant system)
19 Vibration dampers and flexible hoses except where it is described
20 Pressure air, nitrogen, Water, light, electric power, etc. which is necessary during adjusting and delivery.
21 Any classification costs for the installation onboard ship
22 Unloading and transportation of the goods at the shipyard
23 Screws, tools etc. necessary for installation of the plant
24 Any item not specially mentioned in this technical specification

Client: Project: Yard no: Ref: Date:


BÅTSERVICE MANDAL OIL RECOVERY VESSEL 80 Sk09.021 07.09.2009
Aeron AS * Strandgaten 22 * N-4400 Flekkefjord * Norway * Phone: +47 38 32 78 00 * Fax: +47 38 32 78 01 Page 21
GUARANTEE:

1. Aeron AS will only accept guarantee claims on complete installations when the
installation has been commissioned and certified by Aeron AS or by others with
Aeron AS’s written approval.

2. Aeron AS undertakes to correct all defects on components which are due to faulty
design, faulty manufacture or faulty materials, when following conditions are met or
taken into account.

3. Aeron AS covers defects only which occur within 12 months from the day of ship delivery, or in any
event, a maximum of 24 months from the date of delivery of plant
at yard.

4. Repair or replacement of parts shall never extend the contractual guarantee of the
whole plant or goods supplied.

5. All claims under guarantee must be ordered in writing to the yard / main contractor.
Any defect parts replaced to be placed at Aeron AS’s disposal.
Unless otherwise agreed the transport of new and defect parts is for customer's account.

6. If special trained engineers are required, Aeron AS will provide service engineers to carry out guarantee
work.
Travelling, lodging and expenses for customer's account.

7. Aeron AS is never responsible for loss of refrigerant, oil or other fluids, in


connection with any guarantee claim.

8. Aeron AS’s responsibility covers defects only which appear when the plant is operating under conditions
and for purposes agreed in the contract.
The responsibility shall not cover defects due to faulty operation or maintenance or incorrect installation,
or alterations made without the written consent of Aeron AS or normal wear.

9. When the risk for the contract goods has passed to the purchaser, Aeron AS is no
longer liable for any defects other than what is covered under the guarantee
obligations of Aeron AS as here stated.

10. Aeron AS shall not be responsible for damage to property which occurs when the
plant is in the possession of the purchaser, nor shall Aeron AS be responsible for
damage to products manufactured by the purchaser or to other products of which the
purchaser’s product form a part.

11. Aeron AS shall never be responsible to any loss the defects may cause, such as loss of production, loss
of profit or any other direct or indirect losses.

Client: Project: Yard no: Ref: Date:


BÅTSERVICE MANDAL OIL RECOVERY VESSEL 80 Sk09.021 07.09.2009
Aeron AS * Strandgaten 22 * N-4400 Flekkefjord * Norway * Phone: +47 38 32 78 00 * Fax: +47 38 32 78 01 Page 22

You might also like