Plan of Wastewater Treatment Facility
Plan of Wastewater Treatment Facility
Plan of Wastewater Treatment Facility
4.4
0.3 0.1
SANITARY TEE AS BAFFLE SAME
SIZE AS BUILDING SEWER PIPE FREEBOARD FREEBOARD FREEBOARD
1
1700
WASTEWATER
FROM OTHER
UNITS,IF THERE
IS ANY
SCUM STORAGE ZONE
2 200MM THICK CHB WALL WITH 10MM
1.35
LAV
WC Ø HORIZONTAL REINFORCEMENT SEDIMENTATION ZONE
CO SPACED EVERY 3 BLOCKS AND 10MM
1.0
FD Ø VERTICAL BARS SPACED AT 600MM SLUDGE DIGESTION ZONE
3300
100MM Ø
SP U/G SK
150MM THICK RC BOTTOM SLAB
WITH 12MM MESH REINFORCEMENT DIGESTED SLUDGE STORAGE ZONE
3 SPACED AT 125MM O.C. B.W.
0.15
DENTAL
3300
4
3600
UP
5
100MM Ø
SP U/G
3500
1.0
1.4
MANHOLE MANHOLE MANHOLE
(MIN) (MIN) (MIN)
SEPTIC
TANK
AS
6 CONTAINMENT
FACILITY
3000
1 A
7 2
17 B 3 SEPTIC TANK DETAILS
0 0 00 SE2 SCALE NTS
25
3 33
00
00 C
40 0
00
4 13
1 WASTEWATER LINE LAYOUT 00
33
F WA
TH UNROMSTE
SE2 SCALE 1:100 MTS ER IT O WA
E S, TH TE
IS I ER R 00 D
ANF 40
5 36 Y
00 E
00
25
6 35
0 1
SP00M
0
UP U/ M Ø LA
G V
7 30 CLDENT FD WC
00 IN AL SK CO
IC
S
C T EP
FAONTAASANKTIC
CI IN 1
LI ME
TY NT SP00M
U/M Ø
G
ISOMETRIC
2 WASTEWATER LINE LAYOUT
SCALE 1:100 MTS
SE2