Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

PROJECT

NORTH

TRUE NORTH

STAMP
A B C D E F A B C D E F
ISSUES:
NO. DATE DESCRIPTION
A 2020-04-23 ISSUED AS 100% SD
B 2020-06-16 50% DD PROGRESS
21'-10" 30'-6" 21'-4" 29'-11" 19'-11" 21'-10" 30'-6" 21'-4" 29'-11" 19'-11" SET

1 WALL 1
S5.01 ELEVATION S5.01

L05SC13

"

"

"

"

"

"

"

"
48

48

48

48

48

48

48

48
WALL

x
"

"

"

"

"

"

"

"
ELEVATION

16

16

16

16

16

16

16

16
1 2
1 2
S5.01 S5.01

L05SC28
14" 14"
28'-6"

28'-6"
L05SC27
10" SLAB
14"

(6) 10" SLAB


14"

"

"
72

72
x

x
"

"
"

"
72

72
29

29
"

"
72

72
x

x
"

"
42

42
"

"
16

16
x

x
"

"
x

x
16

16
"

"
L05SC07

30

30
L05SC09
2 2

L05SC36
L05SC35
7.4 kps/ft

L05SC29
UP UP

8" CMU 8" CMU


INFILL WALL INFILL WALL

THESE DRAWINGS ARE NOT TO BE USED FOR


TENDER, CONTRACT, OR CONSTRUCTION
25'-6"

25'-6"
"

"
48

48
x

x
"

"
14

14
(2)

2020-06-17 12:04:09 PM
PROGRESS
L05SC30 L05SC48

L05SC11 12.15
(3)
8" CMU 8" CMU

L05SC14
INFILL WALL INFILL WALL
3 3
kips/ft

24"

24"
L05SC38
"
48

"
22"

22"
48
x

x
"
24

"
24
L05SC02 12
L05SC01 DN.
8" CMU
INFILL WALL DN.
8" CMU
INFILL WALL

L05SC15 24"

UP
(1) 9.7
24"

UP kips/ft
28'-0"

28'-0"
L05SC32

"

"
UPSTAND

UPSTAND
48

48
12" x 36"

12" x 36"
kip/ft

x
14" 14"

"

"
14

14
L05SC03
HSS
6x4x.375
L05SC04 ALL HEADER BEAMS TO BE 30" DP. HSS
6x4x.375
ALL HEADER BEAMS TO BE 30" DP.
L05SC33

INCLUDING SLAB DEPTH ON ALL INCLUDING SLAB DEPTH ON ALL


14" 14"
LEVELS LEVELS

19.3
24"

24"
"

"
L05SC37
56

56
L05SC19
20"

20"
8" CMU 8" CMU

x
VARIES

VARIES
INFILL WALL INFILL WALL

"

"
24

24
STEP

STEP
4 4
24"
24"
kips/ 24"
24"

ft (5)

"

"
"

"
48

48
30

30
x

x
x

x
"

"
"

"
14

14
24

24
L05SC20
L05SC31

RAMP DN. TO LEVEL 4

RAMP DN. TO LEVEL 4


28'-0"

28'-0"
L05SC17 L05SC05
"

"
30

30
24" 24"

L05SC06

30925-01
Date APRIL 10TH, 2020

JD
ML
24" 24"
x

x
8" CMU 8" CMU
"

"
L05SC39
24

24
INFILL WALL INFILL WALL
26"

26"
L05SC12
L05SC08

L05SC10
L05SC41
L05SC44

5 5

Project Number
L05SC42

Checked By
24"

24"
8" CMU

L05SC40 8" CMU

Drawn By
INFILL WALL INFILL WALL
"

"
48

48
L05SC34
x

x
10" SLAB 10" SLAB
"

"
14

14
L05SC45

L05SC21
14"

(7) 7.4 (4) 12.15 14"

(8)
25'-6"

25'-6"
8" CMU 8" CMU
INFILL WALL INFILL WALL

kips/ft
kips/f

1233 South Grand


4"

4"

4"

4"

4"

4"
11

11

11

11

11

11
L05SC26 t
"x

"x

"x

"x

"x

"x
7.4
16

16

16

16

16

16
6 6
L05SC23
DN.

DN.
UP

UP
kips/f
21'-0"

21'-0"
L05SC43

14"

L05SC24 14"
32

32
13'-0"

13'-0"
"

"
12" 12"
x

x
t
88

88
12" 12"
"

"
4 4

7
S5.01

L05SC25 7
S5.01
12"

12"
L05SC22
WALL
ELEVATION

SLAB NOTES:
3 1. 3
SEE PLAN FOR SLAB THICKNESS WALL
S5.01 S5.01 ELEVATION
CLEAR COVER TO REINFORCING:
1” CLEAR COVER TOP – TO UPPER MOST TOP REINF.
1” CLEAR COVER BOTTOM – TO LOWERMOST BOTTOM REINF.

ADDRESS, AVE, SUITE


ALL INTERIOR SPANS TO BE CONSIDERED "RESTRAINED" ALL END SPANS
PERPENDICULAR TO BASEMENT WALLS TO BE CONSIDERED
"UNRESTRAINED" (INCREASE BOTTOM COVER TO 1 1/4").

CITY, STATE, ZIP


PROJECT NAME
LEVEL 5 PLAN - REINFORCING LEVEL 5 2. DROP BARS FOR CHAIRING PURPOSES ARE TO BE CONSIDERED
ACCESSORIES SUPPLIED BY THE CONTRACTOR. REFER TO BAR PLACING
ORDER FOR FURTHER REQUIREMENTS.

3. PROVIDE TEMPERATURE REBAR EACH DIRECTION BOTTOM MINIMUM IN ALL


SLABS UNLESS NOTED OTHERWISE ON PLAN OR IN DETAILS. REFER TO
REINFORCING STEEL SECTION OF THE GENERAL NOTES. PROVIDE
STAGGERED SPLICES AS REQUIRED.

4. PROVIDE CAMBER TO SLABS AS SHOWN ON PLAN AND AS NOTED IN THE

THE LIMITED PURPOSE OF EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MVE + PARTNERS, INC. AND IS FURNISHED IN CONFIDENCE FOR
CONCRETE SLAB SECTION OF THE GENERAL NOTES.

OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF
5. ALL SLABS TO BE MONITORED DURING CONSTRUCTION FOR FLATNESS AND

LEVEL 05 PLAN - CONCRETE OUTLINE


LEVELNESS AS NOTE IN THE SLAB SURVEY CONTROL SECTION OF THE
GENERAL NOTES. SUBMIT SURVEY DATA TO BMZ STRUCTURAL ENGINEERS
FOR REVIEW.

6. ALL MAT REINFORCING INDICATED ON PLANS ARE TOP REINF. REFER TO


DETAIL 11/S1.04 FOR FURTHER DETAILS.

LEVEL 05 PLAN - REINFORCING


7. FOR STUDRAIL REINFORCING REFER TO STUD RAIL SCHEDULE ON PLAN.

8. CONFIRM ALL SLAB ELEVATIONS, STEPS, SLOPES, AND OPENINGS WITH


ARCHITECTURAL DRAWINGS.

9. FOR BUILTUP STRUCTURES SHOWN ON PLAN REFER TO DETAILS 2/S1.06


& 3/S1.06

10. FOR ALL DRAINAGE AND WATER PROOFING REQUIREMENTS REFER TO THE
ARCHITECT.

MVE + PARTNERS, INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018.


11. SEE ARCHITECTURAL DRAWINGS FOR SIZE AND LOCATION OF ALL
ARCHITECTURAL CURBS, UPSTANDS AND ARCHITECTURAL FEATURES.

12. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATION OF MASONRY

1/8" = 1'-0"
WALLS. ALL MASONRY WALLS TO BE 8” MINIMUM THICKNESS. REFER TO
CONCRETE MASONRY BLOCK GENERAL NOTES FOR REINFORCING. REFER
TO DETAIL 8/S1.06 FOR FURTHER REQUIREMENTS.

13. CONFIRM ALL MECHANICAL AND ELECTRICAL OPENINGS AND SLEEVES WITH
CONSULTANTS DRAWINGS. CONFIRM ALL OPENINGS AND ELEMENTS NOT
SHOWN ON THE STRUCTURAL DRAWINGS WITH BMZ STRUCTURAL
ENGINEERS PRIOR TO CONSTRUCTION.

14. REFER TO MECHANICAL DRAWINGS FOR LOCATIONS OF IN-SLAB DUCTS.


REFER TO DETAIL 5/S1.04 FOR CLEARANCE REQUIREMENTS TO DUCTS AND
EXTRA REINFORCING REQUIRED AT IN-SLAB DUCTS.

SHEET TITLE
15. FOR SHEARWALL REINFORCING DETAILS AND ELEVATIONS SEE DRAWING
SERIES S3.00 UNLESS NOTED OTHERWISE ON PLAN.
CONCRETE COLUMN REFERENCE NOTE:

Scale

06/16/2020 - 50% DD PROGRESS SET


16. FOR COLUMN REINFORCING AND DETAILS SEE DRAWING SERIES S4.00
1. COLUMN WITH SYMBOL 50 DENOTES TOWER UNLESS NOTED OTHERWISE ON PLAN.
CONCRETE COLUMN. TYPE VARIES 17. FOR BASEMENT WALL ELEVATIONS AND OTHER WALLS SEE DRAWING SHEET NUMBER
INSIDE CIRCLE SERIES S5.00 UNLESS NOTED OTHERWISE ON PLAN.
2. SEE DRAWINGS S4.01, S4.02 AND S4.03 FOR ALL THE
TOWER CONCRETE COLUMNS, U.N.O. 18. PROVIDE SHORING AND RESHORING PROCEDURES TO ENSURE
CONSTRUCTION LOADS DO NOT EXCEED THE SPECIFIED DESIGN LIVE LOAD.
S2.07.1
REFER TO THE FORMWORK AND RESHORING SECTION OF THE GENERAL
NOTES FOR FURTHER REQUIREMENTS.

19. MINIMUM UNOBSTRUCTED HEADROOM CLEARANCE OF 7’-0” IS REQUIRED IN PROJECT NUMBER


ALL FLOOR AREAS ACCESSIBLE TO VEHICLE TRAFFIC (8’-2” WHEN ACCESS
FOR DISABLED IS REQUIRED). CLEARANCE IS TO BE PROVIDED ABOVE THE
30925-01
FINISHED FLOOR TO ANY STRUCTURAL ELEMENTS, CEILINGS, PIPES, OR
SIMILAR OBSTRUCTIONS. REFER TO THE ARCHITECT AND OTHER
CONSULTANTS DRAWINGS FOR COMPONENTS NOT PART OF THE BASE
BUILDING STRUCTURE.

20. REFER TO GENERAL NOTES FOR FURTHER REQUIREMENTS.

21. THE TWO-WAY FLAT SLAB SHOWN ON THIS PLAN IS CONSIDERED PART OF
THE PRIMARY STRUCTURAL FRAME AND HAS BEEN REINFORCED FOR 3hr BRYSON MARKULIN ZICKMANTEL
FIRE RESISTANCE RATING IN ACCORDANCE WITH CBC 2016 CHAPTER 721. STRUCTURAL ENGINEERS

22. FOR EMBED PLATES, SEE DET. 5 / S1.11 #501 - 510 BURRARD STREET, VANCOUVER, B.C. V6C 3A8
(604) 685-9533 WWW.BMZSE.COM CONTACT@BMZSE.COM

23. FOR SLAB BAND REINF. SCHEDULE INCLUDING STIRRUPS, SEE DET. 7 / S1.11

You might also like