Instructions: Enter the Risk ID (column A), Risk Description (column B), Status (column C), Probability (column D), Impact (colu
(column H), Response Plan (column I), and Impact (in dollars)(column J). The Contingency Probability (column K) and Total (co
Risk Identification
Risk ID Risk Description (identify event and impact) Status
1.1 late supply of cotton open
Risk Analysis
Probability Impact Ease of Detection RPN
3 - may or may not occur 3 - may or may not be significant 3 - may or may not detect 27
3 - may or may not occur 3 - may or may not be significant 3 - may or may not detect 27
Explore Yes, they will changed on daily bases for better results
25% $ -
50% $ -
50% $ -
50% $ -
50% $ -
50% $ -
25% $ -
100% $ -
50% $ -
100% $ -
75% $ -
Document Version # Approval Date Modified By
Section, Page(s)and Text Revised
PROB IMPACT
1 - won’t happen 1 0% 1 - no impact 1
2 - not likely 2 25% 2 - not significant 2
3 - may or may not occur 3 50% 3 - may or may not be significant 3
4 - likely 4 75% 4 - significant 4
5 - definite 5 100% 5 - severe 5
NOTE: These lists populate dropdowns on the Risk Register tab. Only edit the items in these lists if you want to edit the dro
need to modify formulas on the Risk Register tab if you make edits to the dropdown choices. The sheets are protected to p
of formulas, but there is no password. Unprotect the sheet if you need to edit it.
EASE STRATEGY
1 - definite detection 1 Avoid
2 - easy 2 Mitigate
3 - may or may not detect 3 Transfer
4 - not easy 4 Accept
5 - impossible to detect 5 Enhance