Professional Documents
Culture Documents
Gate Module: Process ID Process Name Sub-Process Sub-Process ID Number Key Consideration ID
Gate Module: Process ID Process Name Sub-Process Sub-Process ID Number Key Consideration ID
1.1.2
1.1 Report Vehicle
1.1.3
1.2.1
1.2.2
1.2.3
1.2 Quality Check in
1.2.4
1.3.1
1.3.2
1 Gate Entry Process 1.3 Weighment 1.3.3
1.3.4
1.3.5
1.4.1
1.4.2
1.4.3
1.4.4
1.4 Quality Check Out 1.4.5
1.4.6
Subs. Process
Key Consideration ID
1.2.4.2
Tare weighment
Loading Started
Multiple Weighment(if needed) 1.3.3.1
Gross Weight(Final weighment)
Loading End
Post Load Quality Check
Approved
Serial No. allocated
Waybill Generated
Waybill Approved and Signed 1.4.5.1
Rejected 1.4.6.1
1.4.6.2
1.4.6.3
TM
Scenario Based
Transloading with new vehicle and follow the process from 1.1.1 TM
Sub- Key
Process ID Process Name Process ID Sub-Process Considera
Number tion ID
1.1.1
1.1.2
1.1 Report Vehicle
1.1.3
1.2.1
1.2.2
1.2 Quality Check in 1.2.3
1.4.1
1.4.2
1.4 Quality Check Out
Note:- If the same vehicle will be used for next loading then it has to follow the outb
GATE MODULE
Subs.
Key Consideration Process ID
Gross Weighment
Unloading Started
Unloading End
Tare weighment
Gate Out
ed for next loading then it has to follow the outboud delivery procedures from the starting.
Integrated
Susequent Process Module
EWM
EWM
EWM
EWM
EWM
Gate Out Pass generated. EWM
Proceed for Gate out.